Manuel Tsihlas
- Listed as
- architect, engineer
- Firm
- Mst Architects
- Based in
- Sacramento
- On San Francisco permits
- Aug 2010 to Jan 2020
25 permits since 2000 (architect on 24 permits, engineer on 1 permit): 12 completed, 3 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2020 | Expired or cancelled cancelled Mar 2022 | 576 Sacramento St | C I K Power Distributors, Llc | existing verizon wireless cell site modification. install new 5 g antennas to be wrapped i rf transparent film. install new basebord in equip rm maher not reqDetails
existing verizon wireless cell site modification. install new 5 g antennas to be wrapped i rf transparent film. install new basebord in equip rm maher not req | $30,000 |
| Jan 31, 2020 | Completed final sign-off Mar 2022 | 1900 Bryant St | Apex Site Solutions Inc | verizon wirelelss cell site modification , remove and replace 9 antennas, relocate all sector c antennas, rrh units, surge protectors to new screen wall. remove 3 e 44h units and install 3 new rrh units 9 antennasDetails
verizon wirelelss cell site modification , remove and replace 9 antennas, relocate all sector c antennas, rrh units, surge protectors to new screen wall. remove 3 e 44h units and install 3 new rrh units 9 antennas | $60,000 |
| Mar 28, 2019 | Completed final sign-off Dec 2020 | 450 Harrison St | Electric Tech Construction Inc | removal and replacement of antennas. removal and replacement of remote radio units. installation of new baseband and removal of (e) diplexers @ equip.Details
removal and replacement of antennas. removal and replacement of remote radio units. installation of new baseband and removal of (e) diplexers @ equip. | $25,000 |
| Mar 19, 2019 | Completed final sign-off Apr 2019 | 30 Rickard St | Shah & Associates Inc Dba P D C Corporat | revised permit drawings to remove requirement for special inspection for permit #201804045477. change from concrete towood floor w/lag bolts.Details
revised permit drawings to remove requirement for special inspection for permit #201804045477. change from concrete towood floor w/lag bolts. | |
| Aug 28, 2018 | Expired or cancelled cancelled Mar 2022 | 2288 Broadway | Quality Telecom Consultants | verizon wireless - relocation of 1 antenna and removal and replacement of 3 antennas; removal and replacement of 6 remote radio units. remove 3 existing diplexersDetails
verizon wireless - relocation of 1 antenna and removal and replacement of 3 antennas; removal and replacement of 6 remote radio units. remove 3 existing diplexers | $15,000 |
| Feb 23, 2018 | Expired or cancelled withdrawn Mar 2022 | 245 South Van Ness Av | verizon - relocate 4 (e) panel antennas within a new antenna shelter. install 4 rrus, 6 diplexings. install 3 rrus in shelter. maher naDetails
verizon - relocate 4 (e) panel antennas within a new antenna shelter. install 4 rrus, 6 diplexings. install 3 rrus in shelter. maher na | $12,000 | |
| Sep 26, 2017 | Completed final sign-off Jan 2019 | 1300 26th Av | Unlimited Communications | verizon wireless - install 2 new antenna stand offs; remote radio units (9) and 6 diplexers. remove and replace 3 remote radio units with 3 replacment remove radio units and remove and replace 1 cabinet with 1 new cabinetDetails
verizon wireless - install 2 new antenna stand offs; remote radio units (9) and 6 diplexers. remove and replace 3 remote radio units with 3 replacment remove radio units and remove and replace 1 cabinet with 1 new cabinet | $15,000 |
| Jun 16, 2017 | Completed final sign-off Mar 2021 | 2149 Chestnut St | new stealthed verizon cellular site on rooftop, mounted antennas & equipment cabinet on metal platform, standby natural gas generator. 12 antennas being installed. stealth wall top @ 54.5' above grade. ** maher: n/a **Details
new stealthed verizon cellular site on rooftop, mounted antennas & equipment cabinet on metal platform, standby natural gas generator. 12 antennas being installed. stealth wall top @ 54.5' above grade. ** maher: n/a ** | $100,000 | |
| Jun 23, 2016 | Expired or cancelled withdrawn May 2018 | 245 South Van Ness Av | verizon: revision to 201505216898, adjust antenna centerline, no change to scope of work; maher n/aDetails
verizon: revision to 201505216898, adjust antenna centerline, no change to scope of work; maher n/a | $10,000 | |
| Jul 23, 2015 | Expired or cancelled withdrawn Oct 2015 | 222 Front St | verizon wireless remove & replace 4 antennas w/4 replacement antennas. installation of 2 new remode radio units. removal & replacement of 2 remode radio units w/2 replacement remode radio units. intallation of 2 diplexers. remove 2 diplexer & replace w/2 new tma's. ** maher: n/a **Details
verizon wireless remove & replace 4 antennas w/4 replacement antennas. installation of 2 new remode radio units. removal & replacement of 2 remode radio units w/2 replacement remode radio units. intallation of 2 diplexers. remove 2 diplexer & replace w/2 new tma's. ** maher: n/a ** | $10,000 | |
| Jun 18, 2015 | Completed final sign-off May 2016 | 1500 Market St | Unlimited Communications | remove & replace (4) existing verizon wireless panel antennas with 4 new antennas. install: 2 pipe mounts, 1 surge protecter, 4 remote radio units, 2 diplexes. n/a for maher.Details
remove & replace (4) existing verizon wireless panel antennas with 4 new antennas. install: 2 pipe mounts, 1 surge protecter, 4 remote radio units, 2 diplexes. n/a for maher. | $10,000 |
| Jun 18, 2015 | Expired or cancelled cancelled Feb 2024 | 1900 Bryant St | remove and replace (11) existing antenas with (11 replacement antennas. install: 9 pipe mounth, 9a2 back packs, reroute 2 cables, install diplexers. n/a for maher.Details
remove and replace (11) existing antenas with (11 replacement antennas. install: 9 pipe mounth, 9a2 back packs, reroute 2 cables, install diplexers. n/a for maher. | $10,000 | |
| Jun 18, 2015 | Never finaled issued Oct 2015, no final | 576 Sacramento St | Quality Telecom Consultants | modify existing verizon wireless wts facility. install three (3) remote radio unit in equipment room at basement. n/a for maher.Details
modify existing verizon wireless wts facility. install three (3) remote radio unit in equipment room at basement. n/a for maher. | $5,000 |
| Jun 18, 2015 | Expired or cancelled withdrawn Mar 2022 | 845 Jackson St | remove & replace (4) existing verizon wireless antennas with 4 new antennas. install: 3 new antennas 4 surge protecter, 9 rrh unit remote, 2 diplexes, relocate sector a antennas. n/a for maher.Details
remove & replace (4) existing verizon wireless antennas with 4 new antennas. install: 3 new antennas 4 surge protecter, 9 rrh unit remote, 2 diplexes, relocate sector a antennas. n/a for maher. | $10,000 | |
| May 21, 2015 | Expired or cancelled cancelled May 2018 | 245 South Van Ness Av | Jfc Construction Inc. | on roof: install (6) a2 backpacks on (e) rrh units on (n) pipe mounts. add camouflage and new exclusion area striping. ** maher: compliance with ordinance no# 155-13 not required **Details
on roof: install (6) a2 backpacks on (e) rrh units on (n) pipe mounts. add camouflage and new exclusion area striping. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| Jul 23, 2014 | Completed final sign-off Jan 2015 | 655 Beach St | Quality Telecom Consultants | install: two remote radio units. two diplexers, one surge protecter and barricade at sectore b antennas. maher-compliance with ordinance no. 155-13 not required.Details
install: two remote radio units. two diplexers, one surge protecter and barricade at sectore b antennas. maher-compliance with ordinance no. 155-13 not required. | $10,000 |
| Apr 11, 2014 | Expired or cancelled cancelled Nov 2014 | 655 Beach St | install 2 new remote radio units, 2 diplexers & 1 surge protector, paint new yellow striping area on (e) rooftop. install new rf warning signs @ roof access doorway. install new emergency shotdown procedure sign @ equipment area. verizon wireless. *compliance with ordinance no# 155-13 not required*Details
install 2 new remote radio units, 2 diplexers & 1 surge protector, paint new yellow striping area on (e) rooftop. install new rf warning signs @ roof access doorway. install new emergency shotdown procedure sign @ equipment area. verizon wireless. *compliance with ordinance no# 155-13 not required* | $10,000 | |
| Mar 28, 2014 | Expired or cancelled cancelled Mar 2022 | 2 Henry Adams St | Quality Telecom Consultants | remove & replace 3(e)panel antennas w/3 new panel antenna. install 3 diplexers at equip shelter. paint new rf caution stripping on (e) rooftop & install new rf warning signs. add bracing to all new antennas.verizon wireless. maher ordinance not applicable,no disturbance of at least 50 cu yd of soil.Details
remove & replace 3(e)panel antennas w/3 new panel antenna. install 3 diplexers at equip shelter. paint new rf caution stripping on (e) rooftop & install new rf warning signs. add bracing to all new antennas.verizon wireless. maher ordinance not applicable,no disturbance of at least 50 cu yd of soil. | $10,000 |
| Oct 23, 2013 | Completed final sign-off Dec 2015 | 1900 Bryant St | Quality Telecom Consultants | remove & replace 6 panel antennas. install 12 remove radio units, 4 surge protection, remove 6 cables & replace with 4 cables, install 1 gps & replace 1 (e) lte cabinet with 1 new cabinet. verizon wirelss site.Details
remove & replace 6 panel antennas. install 12 remove radio units, 4 surge protection, remove 6 cables & replace with 4 cables, install 1 gps & replace 1 (e) lte cabinet with 1 new cabinet. verizon wirelss site. | $10,000 |
| Sep 19, 2013 | Never finaled issued Jul 2015, no final | 6221 Geary Bl | L.D. Strobel Co Ltd | remove & replace three (3) existing antenna & re-use existing six (6). installation of three (3) remote radio unit, two (2) surge protection , one (1) hybrid cable and one (1) ret cable. verizon wireless.Details
remove & replace three (3) existing antenna & re-use existing six (6). installation of three (3) remote radio unit, two (2) surge protection , one (1) hybrid cable and one (1) ret cable. verizon wireless. | $10,000 |
| Aug 13, 2013 | Completed final sign-off Apr 2014 | 45 West Portal Av | L.D. Strobel Co Ltd | remove and reaplce 3 existing panel for 3 new panel antenna. install 3 new surge protectors, 3 new rrh units and install 2 hybrid cables. verizon wirelessDetails
remove and reaplce 3 existing panel for 3 new panel antenna. install 3 new surge protectors, 3 new rrh units and install 2 hybrid cables. verizon wireless | $10,000 |
| Aug 13, 2013 | Completed final sign-off Mar 2014 | 1344 Ocean Av | L.D. Strobel Co Ltd | remove and reaplce 3 existing panel for 3 new panel antenna. install 4 new raycap surge protectors, 3 rrh units and install 1 new hybrid cables & 1 ret cable. install 3 new guardrails. verizon wireless.Details
remove and reaplce 3 existing panel for 3 new panel antenna. install 4 new raycap surge protectors, 3 rrh units and install 1 new hybrid cables & 1 ret cable. install 3 new guardrails. verizon wireless. | $10,000 |
| Aug 13, 2013 | Completed final sign-off Oct 2015 | 222 Front St | L.D. Strobel Co Ltd | remove and reaplce 2 existing verizon wireless panel antennas for 2 new panel antenna. install 2 new surge protectors, 1 new hybrid cables, 2 rrh units and 1 ret cable and remove 1 unused run of coax.Details
remove and reaplce 2 existing verizon wireless panel antennas for 2 new panel antenna. install 2 new surge protectors, 1 new hybrid cables, 2 rrh units and 1 ret cable and remove 1 unused run of coax. | $10,000 |
| Jul 21, 2011 | Completed final sign-off Jun 2014 | 222 Front St | L.D. Strobel Co Ltd | (e) verizon cell site to be upgraded with addition of (2) new antennas on new antenna mounting frames. (2) existing antennas relocated on the new mounts removal of (1) existing antenna. one additional gps antenna, one additional equipment cabinets. (no new coax).Details
(e) verizon cell site to be upgraded with addition of (2) new antennas on new antenna mounting frames. (2) existing antennas relocated on the new mounts removal of (1) existing antenna. one additional gps antenna, one additional equipment cabinets. (no new coax). | $40,000 |
| Aug 5, 2010 | Never finaled issued Mar 2012, no final | 530 Bush St | Jfc Construction Inc. | install 2 new antennas on (e) penthouse of (e) cell site. install 6 runs of coax cable. 2 pipe mounts. 1 gps antenna, replace existing indoor cabinet.Details
install 2 new antennas on (e) penthouse of (e) cell site. install 6 runs of coax cable. 2 pipe mounts. 1 gps antenna, replace existing indoor cabinet. | $10,000 |