C I K Power Distributors, Llc
- Based in
- Orange
- On San Francisco permits
- May 2015 to Sep 2020
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2020 | Never finaled issued Nov 2020, no final | 1155 Harrison St | at&t modification: remove (6) (e) antennas; install (8) (n) antennas; remove (6) (e) rrus; install (12) (n) rrus; remove (3) (e) cabinets; install (3) (n) cabinets; remove (36) (e) batteries; install (12) (n) batteries.Details
at&t modification: remove (6) (e) antennas; install (8) (n) antennas; remove (6) (e) rrus; install (12) (n) rrus; remove (3) (e) cabinets; install (3) (n) cabinets; remove (36) (e) batteries; install (12) (n) batteries. | $65,000 |
| Jan 31, 2020 | Expired or cancelled cancelled Mar 2022 | 576 Sacramento St | existing verizon wireless cell site modification. install new 5 g antennas to be wrapped i rf transparent film. install new basebord in equip rm maher not reqDetails
existing verizon wireless cell site modification. install new 5 g antennas to be wrapped i rf transparent film. install new basebord in equip rm maher not req | $30,000 |
| Sep 16, 2019 | Completed final sign-off Apr 2020 | 1500 Market St | remove antennas, mounting pipes, and all ancillary equipment associated with extg wts facility.Details
remove antennas, mounting pipes, and all ancillary equipment associated with extg wts facility. | $75,000 |
| Sep 16, 2019 | Completed final sign-off Aug 2020 | 942 Market St | remove (6) antennas, replace w/6 new models. install (4) new remote radio units & (2) ovps near antennas. remove 14 runs coaxial cables; install (2) hybrid cables. add (2) ovps in equipment room & (2) baseband units.Details
remove (6) antennas, replace w/6 new models. install (4) new remote radio units & (2) ovps near antennas. remove 14 runs coaxial cables; install (2) hybrid cables. add (2) ovps in equipment room & (2) baseband units. | $110,250 |
| Dec 18, 2018 | Expired or cancelled cancelled Jun 2022 | 22 Battery St | att modification: install 3 new antennas, and other sm equip. no changes to batteriesDetails
att modification: install 3 new antennas, and other sm equip. no changes to batteries | $19,000 |
| May 16, 2018 | Completed final sign-off Dec 2019 | 650 07th St | att modification r and r 4 e antennas with 4 new antennas, install 4 n rrus, r and r antenna mount for sector b pos 2 install striping per emfDetails
att modification r and r 4 e antennas with 4 new antennas, install 4 n rrus, r and r antenna mount for sector b pos 2 install striping per emf | $33,000 |
| Mar 30, 2018 | Completed final sign-off Aug 2022 | 22 Battery St | at&t wirelessl swap 2 antennas, install 3 new rrus-4478, swap 1 rus-11 &a2 for 1 rrus - total 3. swap 1 gps antenna with lte gps. install 1 - 5216 in rack., remove 4 batteriesDetails
at&t wirelessl swap 2 antennas, install 3 new rrus-4478, swap 1 rus-11 &a2 for 1 rrus - total 3. swap 1 gps antenna with lte gps. install 1 - 5216 in rack., remove 4 batteries | $15,000 |
| Oct 4, 2017 | Completed final sign-off Oct 2021 | 2191 Market St | verizon wireless: rooftop: remove & replace (6) antennas. add (3) (n) antennas, add 20 rru's & supporting equipment on rooftop. install (n) 48 dc power plan in (e) equipment room. frp will be surrounding (n) rru's. maher n/aDetails
verizon wireless: rooftop: remove & replace (6) antennas. add (3) (n) antennas, add 20 rru's & supporting equipment on rooftop. install (n) 48 dc power plan in (e) equipment room. frp will be surrounding (n) rru's. maher n/a | $25,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2018 | 832 Folsom St | verizon wireless proposes to upgrade an (e) wts. remove(11) (e) panel antennas & install (10) (n) panel antennas; remove (4)(e)radio units & install (10) (n) rrus32 radio units; install (2)(n) diplexes @ antennas & (3)in shelter; install(3)(n) hybrid cables w/(n) surge suppression units @ each endDetails
verizon wireless proposes to upgrade an (e) wts. remove(11) (e) panel antennas & install (10) (n) panel antennas; remove (4)(e)radio units & install (10) (n) rrus32 radio units; install (2)(n) diplexes @ antennas & (3)in shelter; install(3)(n) hybrid cables w/(n) surge suppression units @ each end | $15,000 |
| May 21, 2015 | Completed final sign-off Jul 2019 | 576 Sacramento St | remove & replace (6) antennas w/ (6) (n) antennas. install (6) surge protectors. install (6) rrh units, (3) cables & (3) displexers. remove (3) rrh units. work on roof and ground floor.Details
remove & replace (6) antennas w/ (6) (n) antennas. install (6) surge protectors. install (6) rrh units, (3) cables & (3) displexers. remove (3) rrh units. work on roof and ground floor. | $10,000 |