72 permits since 2000: 49 completed, 1 in progress, 14 never finaled, 8 expired or cancelled.
Of the 14 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2025 | Completed final sign-off Mar 2026 | 2900 Franklin St | revision to 202309287641, 172 sq ft in garage for equipment cabinetsDetails
revision to 202309287641, 172 sq ft in garage for equipment cabinets | |
| Sep 28, 2023 | In progress issued Aug 2024 | 2900 Franklin St | 112 sqft equipment lease area & 3 (10'x10') antenna lease area. equipment inside (e) garage room at 1st fl, gps antenna, telco box & intersect cabinet w/ wattnote on exterior wall. 12 antennas inside faux frp vents, 3 air, 3 4449 rrus, 2 8863 rrus, 3' h-frames, 5 raycaps 6627, 3 hybrid cables,Details
112 sqft equipment lease area & 3 (10'x10') antenna lease area. equipment inside (e) garage room at 1st fl, gps antenna, telco box & intersect cabinet w/ wattnote on exterior wall. 12 antennas inside faux frp vents, 3 air, 3 4449 rrus, 2 8863 rrus, 3' h-frames, 5 raycaps 6627, 3 hybrid cables, | $120,000 |
| Jun 9, 2023 | Completed final sign-off Aug 2025 | 400 Hyde St | (n) verizon wireless antennas unmanned telecommuncation facility consist of: 8 (n) verizon wireless antennas inside 30" frp vents 12 (n) radio units 8 (n) surge suprerssor 4 @ equpment & 4 @ antennas. (n) veirzon wireless 392 sq ft equpment lease area located on roof. 4 (n) antenna lease areas locatDetails
(n) verizon wireless antennas unmanned telecommuncation facility consist of: 8 (n) verizon wireless antennas inside 30" frp vents 12 (n) radio units 8 (n) surge suprerssor 4 @ equpment & 4 @ antennas. (n) veirzon wireless 392 sq ft equpment lease area located on roof. 4 (n) antenna lease areas locat | $150,000 |
| Dec 2, 2022 | Completed final sign-off Jul 2025 | 99 Grove St | verizon install (8) (n) antennas (24) rru units, (12) diplexes (4) surge suppressions. (2) gps antennas, and other supporting equipment. verizon to establish an internal equipment area of 243 sf.Details
verizon install (8) (n) antennas (24) rru units, (12) diplexes (4) surge suppressions. (2) gps antennas, and other supporting equipment. verizon to establish an internal equipment area of 243 sf. | $150,000 |
| Nov 8, 2022 | Completed final sign-off Jan 2024 | 318 Main St | installation of nw site bld unmanned telecommunications facility consisting of the installation of 3 panel antennas at sector c; removal of 2 types of rru's and installation of other rru's. installation of frp screen box & related equipment. removal of extg cabinet on rooftop. installation of dcppDetails
installation of nw site bld unmanned telecommunications facility consisting of the installation of 3 panel antennas at sector c; removal of 2 types of rru's and installation of other rru's. installation of frp screen box & related equipment. removal of extg cabinet on rooftop. installation of dcpp | $215,000 |
| Oct 26, 2022 | Completed final sign-off May 2023 | 1800 Sutter St | t-mobile. revision to bpa#202106051570. install (3) new antenna on lower stairwell rooftop & screen, remove facade mounted antenna & screening from original scope of work.Details
t-mobile. revision to bpa#202106051570. install (3) new antenna on lower stairwell rooftop & screen, remove facade mounted antenna & screening from original scope of work. | |
| Jul 1, 2022 | Never finaled issued Aug 2022, no final | 1528 Pine St | at&t installation of temp facility consisting of: install 32'4" temp monopole w/6 panel antennas, 12 rrus on rooftop; temp equip. shetler on roof top containing 3 rrus, 2 surge suppresors, 1 dcpp rack w/3 strings 190ah batteries, 8 rectifiers, 2 racks w/(2) 5216bbu & 2 xmu bbu; 1 new ac power panel;Details
at&t installation of temp facility consisting of: install 32'4" temp monopole w/6 panel antennas, 12 rrus on rooftop; temp equip. shetler on roof top containing 3 rrus, 2 surge suppresors, 1 dcpp rack w/3 strings 190ah batteries, 8 rectifiers, 2 racks w/(2) 5216bbu & 2 xmu bbu; 1 new ac power panel; | $85,000 |
| May 10, 2022 | Completed final sign-off Feb 2024 | 1072 Market St | at&t: relocate sectors a+c. replace 1 antenna + add 1 new to all sectors with infant frp vents. remove 6 rru's + install 3 new rrus. remove 2 rbs cabinets. install 1 vertivxte dual stack battery cab with 4 new 190ah batteries. swap 12 "e" 155ah batteries with 12 new 190ah. 4 new rectifiers.one 6630.Details
at&t: relocate sectors a+c. replace 1 antenna + add 1 new to all sectors with infant frp vents. remove 6 rru's + install 3 new rrus. remove 2 rbs cabinets. install 1 vertivxte dual stack battery cab with 4 new 190ah batteries. swap 12 "e" 155ah batteries with 12 new 190ah. 4 new rectifiers.one 6630. | $75,000 |
| Mar 16, 2022 | Completed final sign-off Feb 2024 | 3830 California St | at&t: submitting eligible facilities request under 6409 as a collocation & installation of (n) transmission equipment, new site build, unmanned telecom faciiility consisting of 4 sectors, 16 panels, 24 rrus. 4 dc-9 surge suppressors, 1 gps antenna & related equipment.Details
at&t: submitting eligible facilities request under 6409 as a collocation & installation of (n) transmission equipment, new site build, unmanned telecom faciiility consisting of 4 sectors, 16 panels, 24 rrus. 4 dc-9 surge suppressors, 1 gps antenna & related equipment. | $215,000 |
| Oct 25, 2021 | Completed final sign-off Apr 2026 | 2 Geneva Av | installation of new site build under 6409, telecommunication facility consisting of 1 at&t frp screen box on rooftop, 9 at&t panel antenas: 20 at&t remote radio units; 5 dc-9 surge suppresers, 1 gps atnenna; cable tray from equipment area to antannas.Details
installation of new site build under 6409, telecommunication facility consisting of 1 at&t frp screen box on rooftop, 9 at&t panel antenas: 20 at&t remote radio units; 5 dc-9 surge suppresers, 1 gps atnenna; cable tray from equipment area to antannas. | $215,000 |
| Sep 27, 2021 | Completed final sign-off May 2022 | 251 Barneveld Av | reissue expitred bp# 201512074294- all work is completed.Details
reissue expitred bp# 201512074294- all work is completed. | $150,000 |
| Jun 3, 2021 | Never finaled issued Jan 2022, no final | 1800 Sutter St | proposed mod to e wts to include releocate 1 e antenna and mount, add 2 new frp screenwalls to face of e penthouses, installing 6 new antennas, relocate 3 e ant part behind frp, add 3 new radios, 3 n 6x12 hcs, 2 n cabinets, repaint facade at antennnaDetails
proposed mod to e wts to include releocate 1 e antenna and mount, add 2 new frp screenwalls to face of e penthouses, installing 6 new antennas, relocate 3 e ant part behind frp, add 3 new radios, 3 n 6x12 hcs, 2 n cabinets, repaint facade at antennna | $25,000 |
| Feb 28, 2020 | Completed final sign-off May 2022 | 2 Geneva Av | recommencement and completion of work appoved pa#201809069313Details
recommencement and completion of work appoved pa#201809069313 | |
| Sep 6, 2018 | Expired or cancelled expired May 2022 | 2 Geneva Av | a proposed t-mobile unmanned telecom facility consists of: installing (6) new antennas, (2) new cabinet equipment, (3) new rrus and (2) new frp screens.Details
a proposed t-mobile unmanned telecom facility consists of: installing (6) new antennas, (2) new cabinet equipment, (3) new rrus and (2) new frp screens. | $100,000 |
| Jul 3, 2018 | Never finaled issued Sep 2018, no final | 20 Heron St | ste3755 in (e): installation of (2) 4" conduits appx(205lf),4 pull cans,(8) 4" cores,(1)1.25" innerduct 25lf,(2)1.5"unistruct hangers,(1) 3/4"muletape in all new & (e) conduits/innerduct.no modification to any equipment (antennas, radios, batteries, etc) that would affect the rf status of the site.Details
ste3755 in (e): installation of (2) 4" conduits appx(205lf),4 pull cans,(8) 4" cores,(1)1.25" innerduct 25lf,(2)1.5"unistruct hangers,(1) 3/4"muletape in all new & (e) conduits/innerduct.no modification to any equipment (antennas, radios, batteries, etc) that would affect the rf status of the site. | $20,000 |
| May 11, 2016 | Completed final sign-off Aug 2019 | 1 South Van Ness Av | verizon wireless telecommunications facility with 15 panel antennas behind an frp screen and related radio equipment on rooftop; maher n/aDetails
verizon wireless telecommunications facility with 15 panel antennas behind an frp screen and related radio equipment on rooftop; maher n/a | $425,000 |
| Nov 6, 2015 | Completed final sign-off Jun 2016 | 77 Beale St | modification to an (e) t-mobile microcell facility including: removing 1 (e) antenna, replacing/relocating 1 antenna to top of penthouse; install 1 (n) faux vent pipe to conceal antenna; install 2 (n) rrus, 2 (n) diplexers & 4 (n) 7/8" coax cables; remove all (e) coax & conduit to old antennDetails
modification to an (e) t-mobile microcell facility including: removing 1 (e) antenna, replacing/relocating 1 antenna to top of penthouse; install 1 (n) faux vent pipe to conceal antenna; install 2 (n) rrus, 2 (n) diplexers & 4 (n) 7/8" coax cables; remove all (e) coax & conduit to old antenn | $16,000 |
| Oct 30, 2015 | Completed final sign-off Feb 2016 | 1204 Mason St | modification to an extg t-mobile microcell facility including:removing and replacing extg antenna and radome with new antenna and radome. installing 6 new tmas on roof. modifying extg antenna mount to accomodate new smaller antenna.Details
modification to an extg t-mobile microcell facility including:removing and replacing extg antenna and radome with new antenna and radome. installing 6 new tmas on roof. modifying extg antenna mount to accomodate new smaller antenna. | $12,000 |
| Oct 15, 2015 | Completed final sign-off Feb 2019 | 600 California Av | verizon: installation of telecommunication facility, antenna, rrm, surge protection, gps & power and fiber connections. hanger 3Details
verizon: installation of telecommunication facility, antenna, rrm, surge protection, gps & power and fiber connections. hanger 3 | $125,000 |
| Sep 17, 2015 | Expired or cancelled cancelled Oct 2021 | 310 Arballo Dr | replace 9 antennas on extg verizon wireless facility.Details
replace 9 antennas on extg verizon wireless facility. | $20,000 |
| Sep 4, 2015 | Completed final sign-off Jun 2017 | 171 02nd St | 'verizon wireless' - wireless is proposing a roof-top build-installing 8 antennas behind/inside 2 frp screens. there will be 2 gps antennas. there will be 15 rru-12 units with 15 a2 modules. 3 antennas will also be in faux radomes.Details
'verizon wireless' - wireless is proposing a roof-top build-installing 8 antennas behind/inside 2 frp screens. there will be 2 gps antennas. there will be 15 rru-12 units with 15 a2 modules. 3 antennas will also be in faux radomes. | $205,000 |
| Jun 15, 2015 | Completed final sign-off Jan 2016 | 170 Ofarrell St | installation of new verizon wireless unmanned telecommunication facility including 9 antennas, 16 rrus, 8 ray cap surge protectors, new steel platform, 4 hybrid cables; maher n/aDetails
installation of new verizon wireless unmanned telecommunication facility including 9 antennas, 16 rrus, 8 ray cap surge protectors, new steel platform, 4 hybrid cables; maher n/a | $100,000 |
| Jun 10, 2015 | Completed final sign-off May 2016 | 101 Geary St | installation of (n) verizon wireless micro wireless telecommunications services facility consisting of: (1)(n) cabinet, (2)(n) panel antennas within frp simulated vent & (4)(n) rrus on (e) roof.Details
installation of (n) verizon wireless micro wireless telecommunications services facility consisting of: (1)(n) cabinet, (2)(n) panel antennas within frp simulated vent & (4)(n) rrus on (e) roof. | $50,000 |
| May 21, 2015 | Expired or cancelled cancelled May 2018 | 245 South Van Ness Av | on roof: install (6) a2 backpacks on (e) rrh units on (n) pipe mounts. add camouflage and new exclusion area striping. ** maher: compliance with ordinance no# 155-13 not required **Details
on roof: install (6) a2 backpacks on (e) rrh units on (n) pipe mounts. add camouflage and new exclusion area striping. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| Mar 11, 2015 | Completed final sign-off Mar 2015 | 310 Arballo Dr | as built plans: revision to indicate accurate configuration of elevator shaft wall detail. reference permit 201402219001. there is no actual work under this permit. no change in rf report.Details
as built plans: revision to indicate accurate configuration of elevator shaft wall detail. reference permit 201402219001. there is no actual work under this permit. no change in rf report. | |
| Feb 25, 2015 | Completed final sign-off Aug 2016 | 850 Stockton St | install verizon wireless micro facility on bldg rooftop: 1-18" diameter faux vent pipe to conceal 1 antenna, 4 rrus mounted to new pipe mounts, 1 new gps antenna, 1 equipment cabinet mounted in 3rd floor equipment room.Details
install verizon wireless micro facility on bldg rooftop: 1-18" diameter faux vent pipe to conceal 1 antenna, 4 rrus mounted to new pipe mounts, 1 new gps antenna, 1 equipment cabinet mounted in 3rd floor equipment room. | $50,000 |
| Feb 25, 2015 | Completed final sign-off Oct 2016 | 1801 Fulton St | install verizon wirleless micro telecom facility on bldg rooftop: 1-18" diameter faux vent pipe to conceal 1 antenna, 4 rrus mounted to new h-frame, 1 new gps antenna, 1 & 1 new charler cabinet mounted to new raised concrete slab on ground.Details
install verizon wirleless micro telecom facility on bldg rooftop: 1-18" diameter faux vent pipe to conceal 1 antenna, 4 rrus mounted to new h-frame, 1 new gps antenna, 1 & 1 new charler cabinet mounted to new raised concrete slab on ground. | $50,000 |
| Feb 25, 2015 | Completed final sign-off Jun 2016 | 799 Valencia St | install verizon wireless micro telecom facility on bldg rooftop: 1-18" diameter faux vent to conceal tri-sector antenna, 4 rrus mounted to new h-frame, 1 new gps antenna, 1 small cell equipment cabinet mounted to the ground.Details
install verizon wireless micro telecom facility on bldg rooftop: 1-18" diameter faux vent to conceal tri-sector antenna, 4 rrus mounted to new h-frame, 1 new gps antenna, 1 small cell equipment cabinet mounted to the ground. | $50,000 |
| Nov 13, 2014 | Never finaled issued Nov 2014, no final | 2601 Mission St | verizon wireless install 3 remote radio heads less than 50 lbs ea on roof. 2 raycaps less than 50 lbs each on roof and 2 raycaps on the wall in equipment room in basement. accessory equipments only, no new antennas.Details
verizon wireless install 3 remote radio heads less than 50 lbs ea on roof. 2 raycaps less than 50 lbs each on roof and 2 raycaps on the wall in equipment room in basement. accessory equipments only, no new antennas. | $7,000 |
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 222 Front St | revision to permit# 2013-0314-2206. generator installation on roof of building, change in orientation of generator on roof.Details
revision to permit# 2013-0314-2206. generator installation on roof of building, change in orientation of generator on roof. | $15,000 |
| Jun 25, 2014 | Never finaled issued Jul 2014, no final | 2601 Mission St | install a small 14.6" antenna (panel) below the (e) panel antenna on roof.(verizon antenna) from 6/28/14 to 9/08/14.Details
install a small 14.6" antenna (panel) below the (e) panel antenna on roof.(verizon antenna) from 6/28/14 to 9/08/14. | $4,000 |
| Jun 20, 2014 | Completed final sign-off Sep 2015 | 405 Valencia St | this is a temporary to install for 60 days only. 1 new verison wireless packet radio system to be installed. 1 new cat 5 cable to be installed. 1 new verizon mounting pole with pipe to pipe clamp kit to be installed. (verizon). n/a for the maher ordinance #155-13Details
this is a temporary to install for 60 days only. 1 new verison wireless packet radio system to be installed. 1 new cat 5 cable to be installed. 1 new verizon mounting pole with pipe to pipe clamp kit to be installed. (verizon). n/a for the maher ordinance #155-13 | $5,000 |
| May 8, 2014 | Never finaled issued Dec 2014, no final | 123 Townsend St | install unmanned t-mobile telecommunication facility consisting of 4 bts cabinets, stepdown transformer, bbu, pbc-02 cabinet, esc-02 utility box, 7 rru's, 4 tma's & 6 antenns enclosed within radomes.Details
install unmanned t-mobile telecommunication facility consisting of 4 bts cabinets, stepdown transformer, bbu, pbc-02 cabinet, esc-02 utility box, 7 rru's, 4 tma's & 6 antenns enclosed within radomes. | $110,000 |
| Feb 21, 2014 | Completed final sign-off Mar 2015 | 310 Arballo Dr | wireless equipment in the basement. install 9 panel antennas on the rooftop penthouse.Details
wireless equipment in the basement. install 9 panel antennas on the rooftop penthouse. | $120,000 |
| Feb 13, 2014 | Completed final sign-off Aug 2014 | 2601 Mission St | install new radio equipment at the old nextel site in basement, remove nextel antennas & replace with verizon antennas. add two gps antennas. swap 12 antennas.Details
install new radio equipment at the old nextel site in basement, remove nextel antennas & replace with verizon antennas. add two gps antennas. swap 12 antennas. | $80,000 |
| Jan 31, 2014 | Completed final sign-off Dec 2014 | 965 Sutter St | replace 6 panel antennas with 6 new panel antennas (metropcs/tmobile)Details
replace 6 panel antennas with 6 new panel antennas (metropcs/tmobile) | $70,000 |
| Apr 24, 2013 | Completed final sign-off May 2013 | 735 Montgomery St | revision to app#201208278289 to change electrical service from single phase to 3 phase on drawings.Details
revision to app#201208278289 to change electrical service from single phase to 3 phase on drawings. | $7,600 |
| Apr 16, 2013 | Completed final sign-off Apr 2013 | 5024 03rd St | to obtain final inspection for work approved under pa #200604179131. all work is complete.Details
to obtain final inspection for work approved under pa #200604179131. all work is complete. | |
| Mar 14, 2013 | Never finaled issued May 2014, no final | 222 Front St | install a small (21.5 gal) generator on roof for verizon wireless.Details
install a small (21.5 gal) generator on roof for verizon wireless. | $8,700 |
| Oct 23, 2012 | Completed final sign-off Sep 2013 | 1250 Columbus Av | replace 2 equipment cabinets & 3 antennas & add 3 (n) antennas at (e) t-mobile wireless site.Details
replace 2 equipment cabinets & 3 antennas & add 3 (n) antennas at (e) t-mobile wireless site. | $57,000 |
| Oct 2, 2012 | Completed final sign-off Aug 2013 | 20 Heron St | install 1 small diesel generator as backup power on roof of the building.Details
install 1 small diesel generator as backup power on roof of the building. | $9,000 |
| Aug 27, 2012 | Completed final sign-off May 2013 | 735 Montgomery St | to install a small (54 gallon tank) generator on roof to provide back-up power to a verizon cell site.Details
to install a small (54 gallon tank) generator on roof to provide back-up power to a verizon cell site. | $8,100 |
| Jun 25, 2012 | Never finaled issued Nov 2012, no final | 50 01st St | verizon proposed to add one new antenna on extg penthouse. verizon proposes to replace 2 extg antennas with new models. there will be four new equipment cabinets mounted on an extg platform. there will be six additional 7/8" coax lines installed into extg cable trays.Details
verizon proposed to add one new antenna on extg penthouse. verizon proposes to replace 2 extg antennas with new models. there will be four new equipment cabinets mounted on an extg platform. there will be six additional 7/8" coax lines installed into extg cable trays. | $18,500 |
| Apr 25, 2012 | Never finaled issued Jun 2012, no final | 185 Berry St | roof only. verizon proposed to install a 24" microwave dish on an extg penthouse wall adjacent to extg verizon panel antennas.Details
roof only. verizon proposed to install a 24" microwave dish on an extg penthouse wall adjacent to extg verizon panel antennas. | $32,000 |
| Apr 16, 2012 | Completed final sign-off Mar 2013 | 4141 Geary Bl | install wireless communications facility incl 9 new verizon wireless 4' panel antennas mounted to walls of an existing penthouse.each antenna to be covered w/ stealth screens.install outdoor equip cabinets mounted on roof.2 gps antennas mounted to roof.1 emergency power receptacle mounted at street.Details
install wireless communications facility incl 9 new verizon wireless 4' panel antennas mounted to walls of an existing penthouse.each antenna to be covered w/ stealth screens.install outdoor equip cabinets mounted on roof.2 gps antennas mounted to roof.1 emergency power receptacle mounted at street. | $180,000 |
| Oct 11, 2011 | Completed final sign-off Dec 2012 | 833 Mission St | verizon wireless proposes to add 3 new antennas in 2 locations for a total of 6 new antennas. in addition, 12 new coax cables will be added in new cable tray.Details
verizon wireless proposes to add 3 new antennas in 2 locations for a total of 6 new antennas. in addition, 12 new coax cables will be added in new cable tray. | $24,000 |
| Jun 15, 2011 | Completed final sign-off Jun 2014 | 1333 Minna St | legalized mezzanne & upgrade ada w/c reduced bldg depth w/ rear yard. increased build height, a complete seismic upgrade & sprinkled throughout. a new roof with operable skylight will be installed. a new rear facade w/ openable (vertical bi-fold door) storefront facade.Details
legalized mezzanne & upgrade ada w/c reduced bldg depth w/ rear yard. increased build height, a complete seismic upgrade & sprinkled throughout. a new roof with operable skylight will be installed. a new rear facade w/ openable (vertical bi-fold door) storefront facade. | $300,000 |
| Jun 3, 2011 | Never finaled issued Aug 2012, no final | 185 Berry St | verizon proposes to relocate equipment from existing internal suite to rooftop suite. also to reroute coaxial cable. relocate 1 & add 1 gps antenna to the rooftop suite. also to install previously approved 3 antennas & 6 coax (via planning approval 2010.0039c).Details
verizon proposes to relocate equipment from existing internal suite to rooftop suite. also to reroute coaxial cable. relocate 1 & add 1 gps antenna to the rooftop suite. also to install previously approved 3 antennas & 6 coax (via planning approval 2010.0039c). | $5,000 |
| Mar 14, 2011 | Completed final sign-off Nov 2012 | 1740 Broadway | relocate a total of 3 antennas from their current location to new locations on same building.Details
relocate a total of 3 antennas from their current location to new locations on same building. | $2,900 |
| Oct 1, 2010 | Completed final sign-off Jul 2011 | 1800 Sutter St | installation of metro pcs wireless facility. 4 equipment cabinets on porposed steel platform on building roof. 3 panel antennas on (e) building. power & telco service to equipment. 1 gps antenna mounted to proposed power rack; coax runs from equipment to antennas.Details
installation of metro pcs wireless facility. 4 equipment cabinets on porposed steel platform on building roof. 3 panel antennas on (e) building. power & telco service to equipment. 1 gps antenna mounted to proposed power rack; coax runs from equipment to antennas. | $60,000 |
| Aug 5, 2010 | Never finaled issued Mar 2012, no final | 530 Bush St | install 2 new antennas on (e) penthouse of (e) cell site. install 6 runs of coax cable. 2 pipe mounts. 1 gps antenna, replace existing indoor cabinet.Details
install 2 new antennas on (e) penthouse of (e) cell site. install 6 runs of coax cable. 2 pipe mounts. 1 gps antenna, replace existing indoor cabinet. | $10,000 |
| Apr 22, 2010 | Completed final sign-off Oct 2010 | 1135 Evans Av | verizon proposes to add three (3) new antennas on the lattice towers next to their (e) antennas. add (6) runs coax approx 200'.Details
verizon proposes to add three (3) new antennas on the lattice towers next to their (e) antennas. add (6) runs coax approx 200'. | $15,000 |
| Jul 15, 2009 | Completed final sign-off Apr 2010 | 4610 Mission St | remove/replace 6-antennas total.Details
remove/replace 6-antennas total. | $2,250 |
| May 14, 2009 | Completed final sign-off Feb 2010 | 405 Valencia St | replacement of (3) existing 4' antennas with (5) new 4' antennas. swap like for like antennas.Details
replacement of (3) existing 4' antennas with (5) new 4' antennas. swap like for like antennas. | $2,500 |
| May 14, 2009 | Completed final sign-off Oct 2010 | 2288 Broadway | replacement of (6) existing 4' antennas with (6) new 4' antennas. swap like for like antennas.Details
replacement of (6) existing 4' antennas with (6) new 4' antennas. swap like for like antennas. | $2,500 |
| Feb 19, 2008 | Expired or cancelled expired Nov 2013 | 50 01st St | renew appl#200309104368 for final inspectionDetails
renew appl#200309104368 for final inspection | |
| Oct 24, 2006 | Completed final sign-off Feb 2007 | 1135 Evans Av | install total of (3) 4'6" verizon panel antennas to be mounted on (e) pg & e lattice towerDetails
install total of (3) 4'6" verizon panel antennas to be mounted on (e) pg & e lattice tower | $30,000 |
| Oct 24, 2006 | Completed final sign-off Feb 2007 | 1135 Evans Av | erect wireless communication shelter.Details
erect wireless communication shelter. | $120,000 |
| Jul 26, 2006 | Expired or cancelled expired May 2007 | 1212 Geary Bl | renew pa#200312021383 for final inspection.Details
renew pa#200312021383 for final inspection. | |
| Jul 21, 2006 | Completed final sign-off Apr 2010 | 1453 Mission St | flush mounted 3 antennas on face of building. equipment cabinets on roof ( 4 cabinets). antennas will be stealth mounted. @ batteries-mech.Details
flush mounted 3 antennas on face of building. equipment cabinets on roof ( 4 cabinets). antennas will be stealth mounted. @ batteries-mech. | $70,000 |
| Jun 21, 2006 | Completed final sign-off Jan 2007 | 1451 Church St | installation of two micro panel antnns within an frp simulated ven cylender manifoed on (e) penthouse. the assoc equip cabinets mounted on ground levelDetails
installation of two micro panel antnns within an frp simulated ven cylender manifoed on (e) penthouse. the assoc equip cabinets mounted on ground level | $55,000 |
| Jun 16, 2006 | Completed final sign-off Mar 2007 | 100 Armory Dr | install communications shelter, install panel antennas on 50' monopole. install power & telco from utility pole to communications shelter.Details
install communications shelter, install panel antennas on 50' monopole. install power & telco from utility pole to communications shelter. | $230,000 |
| May 26, 2006 | Completed final sign-off Jan 2007 | 1100 Oak St | installation of two microcell antennas with the associated equipment cabinet inside the roof penthouse. no batteries.Details
installation of two microcell antennas with the associated equipment cabinet inside the roof penthouse. no batteries. | $45,000 |
| May 4, 2006 | Completed final sign-off Jan 2007 | 3001 Mission St | installation of 2 microcell antennas with associated equipment cabinets at grade level.Details
installation of 2 microcell antennas with associated equipment cabinets at grade level. | $45,000 |
| May 1, 2006 | Completed final sign-off Feb 2007 | 1525 Ocean Av | install 2 micro cell antennas mounted to the penthouse wall of building. associated equipment cabinet mounted at roof leval.no batteries.Details
install 2 micro cell antennas mounted to the penthouse wall of building. associated equipment cabinet mounted at roof leval.no batteries. | $40,000 |
| Apr 17, 2006 | Expired or cancelled expired Mar 2008 | 5024 03rd St | install 2 antennas & 1 equipemnt cabinet for metro pcs's telecommunications network.Details
install 2 antennas & 1 equipemnt cabinet for metro pcs's telecommunications network. | $40,000 |
| Apr 12, 2006 | Never finaled issued Oct 2006, no final | 401 Valencia St | install 2 antennas and 1 equipment cabinet for the expansion of metro pcs's s.f. telecommunications net work.Details
install 2 antennas and 1 equipment cabinet for the expansion of metro pcs's s.f. telecommunications net work. | $40,000 |
| Sep 10, 2003 | Expired or cancelled expired Dec 2006 | 50 01st St | total of 12 antennas to be mounted on parapet&wall of boiler rm & elevetor penthouse.equip onrooftopDetails
total of 12 antennas to be mounted on parapet&wall of boiler rm & elevetor penthouse.equip onrooftop | $60,000 |
| Apr 10, 2002 | Completed final sign-off Jan 2003 | 251 Barneveld Av | install unmanned telecommunication facility on g/fl w/3 antennas mounted on the roofDetails
install unmanned telecommunication facility on g/fl w/3 antennas mounted on the roof | $160,000 |
| Sep 27, 2001 | Never finaled issued Nov 2001, no final | 1435 San Bruno Av | install four panel attenna on existing billboard and support equipmentDetails
install four panel attenna on existing billboard and support equipment | $45,000 |
| Mar 20, 2001 | Completed final sign-off Aug 2001 | 2001 Union St | one-stop:m.tjoe:install antennas on side of existing penthouse. radio equipment in room in basementDetails
one-stop:m.tjoe:install antennas on side of existing penthouse. radio equipment in room in basement | $65,000 |
| Dec 7, 2000 | Expired or cancelled expired Jan 2002 | 180 Geary St | bacts currently operates a cellular telephone base station at this property, ext. antennas to remainDetails
bacts currently operates a cellular telephone base station at this property, ext. antennas to remain | $30,000 |