Lev Weisbach
- Listed as
- architect, authorized agent-others
- Firm
- Weisbach Architecture
- Based in
- Sf
- On San Francisco permits
- Aug 2003 to Sep 2026
52 permits since 2000 (architect on 50 permits, authorized agent-others on 2 permits): 37 completed, 6 in progress, 6 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1060 Illinois St | ti. improvement of 2 new plumbing fixtures: installatin of 1 handwashing sink and 1 three compartment sink in (e) bar counter.Details
ti. improvement of 2 new plumbing fixtures: installatin of 1 handwashing sink and 1 three compartment sink in (e) bar counter. | $40,500 | |
| Sep 22, 2026 | In progress issued Sep 2026 | 2427 03rd St | Dajani Construction | ti improvements, interior renovation with ada all gender restrooms, new stairs to 2nd floor space, new finishes to prepare space for future restaurant tenant.Details
ti improvements, interior renovation with ada all gender restrooms, new stairs to 2nd floor space, new finishes to prepare space for future restaurant tenant. | $25,000 |
| Sep 15, 2026 | In progress issued Sep 2026 | 360 Pine St | Ken O'sullivan Construction And Renovati | install phone booth on 7th floor.Details
install phone booth on 7th floor. | $2,500 |
| Sep 8, 2026 | In progress issued Sep 2026 | 640 Davis St | Kaludia Builders | unit#: 21; remodel bathroom to replace bathtub w/shower.Details
unit#: 21; remodel bathroom to replace bathtub w/shower. | $65,000 |
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 3200 California St | Gci, Inc | revision to approved permit#202510167532: update occ load calculations.Details
revision to approved permit#202510167532: update occ load calculations. | |
| May 26, 2026 | Completed final sign-off Jun 2026 | 360 Pine St | Ken O'sullivan Construction And Renovati | legalizing phone booth pods on floors 2,5 and 6 due to nov from sffd high rise inspectionDetails
legalizing phone booth pods on floors 2,5 and 6 due to nov from sffd high rise inspection | $2,500 |
| Oct 16, 2025 | In progress issued Nov 2025 | 3200 California St | Gci, Inc | replace (e) retractable seating (409 seats) with new retractable seating (407) seats by same company. new maximum occload of theater only - 423 persons.Details
replace (e) retractable seating (409 seats) with new retractable seating (407) seats by same company. new maximum occload of theater only - 423 persons. | $600,000 |
| Sep 18, 2025 | Completed final sign-off May 2026 | 3200 California St | Gci, Inc | replace (e) carpet in theater, 1st & 2nd levels. theater work- add acoustic wood wall panels & fabric system. replace surround sound system with new system.Details
replace (e) carpet in theater, 1st & 2nd levels. theater work- add acoustic wood wall panels & fabric system. replace surround sound system with new system. | $600,000 |
| Jun 28, 2024 | Completed final sign-off Sep 2024 | 3200 California St | Cahill Contractors Llc. | remodel of existing women's steam room. scope includes replacingg the current fixed seating layout and the replacement of the existing ceramic tile, including providing ada access as required for steam rooms.Details
remodel of existing women's steam room. scope includes replacingg the current fixed seating layout and the replacement of the existing ceramic tile, including providing ada access as required for steam rooms. | $110,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 325 Arguello Bl | addition of accessible ramp to comply with accessible entry problem abe 202207052332Details
addition of accessible ramp to comply with accessible entry problem abe 202207052332 | $10,000 | |
| Jul 26, 2022 | Never finaled filed Jul 2022, never issued | 4007 25th St | extend rear of house 3';1st fl - add (n) family room with bath & laundry @ rear of garage; add a (n) exit passage way & stair from the right of way to the rear yard to provide ladder access & emergency exiting to comply w/eg-02; 2nd fl - add powder room, renovate kitchen, and add new stair from kitcDetails
extend rear of house 3';1st fl - add (n) family room with bath & laundry @ rear of garage; add a (n) exit passage way & stair from the right of way to the rear yard to provide ladder access & emergency exiting to comply w/eg-02; 2nd fl - add powder room, renovate kitchen, and add new stair from kitc | $400,000 | |
| May 11, 2022 | Completed final sign-off Feb 2023 | 30 Temescal Tr | Jdesignbuild | addition of family room to lower level behind at back of garage. addition of doors to (e) rear wall/replacement of furnance.Details
addition of family room to lower level behind at back of garage. addition of doors to (e) rear wall/replacement of furnance. | $140,000 |
| Mar 22, 2021 | Completed final sign-off Mar 2022 | 3200 California St | Cahill Contractors Llc. | remove existing aquatics center humidifier and associated ductwork and piping, lighting over pool, and plenum wall.Details
remove existing aquatics center humidifier and associated ductwork and piping, lighting over pool, and plenum wall. | $10,000 |
| Mar 5, 2021 | Completed final sign-off Jun 2024 | 401 Mason St | Richlen Construction | nightclub was forced to close due to sanitary sewer leak from tenant above. removed all of the interiror fiinshes and furningings, including bar and kitchen equipment, gyp board from walls and ceilings, flooring, lighting and ductwork, upgrades to the bathroom, stairs, elevator, andDetails
nightclub was forced to close due to sanitary sewer leak from tenant above. removed all of the interiror fiinshes and furningings, including bar and kitchen equipment, gyp board from walls and ceilings, flooring, lighting and ductwork, upgrades to the bathroom, stairs, elevator, and | $200,000 |
| Feb 8, 2021 | Completed final sign-off Jun 2022 | 3200 California St | Cahill Contractors Llc. | upgrade hvac system that serves the aquatic center. replace (e) air handler unit, add (n) condenser, (n) exhaust shaft, (n) ductwork, replace lighting over the pools. include plumbing, electrical, mechanical, structural & architectural in scope.Details
upgrade hvac system that serves the aquatic center. replace (e) air handler unit, add (n) condenser, (n) exhaust shaft, (n) ductwork, replace lighting over the pools. include plumbing, electrical, mechanical, structural & architectural in scope. | $500,000 |
| Jan 27, 2021 | Completed final sign-off Jul 2021 | 3200 California St | Cahill Contractors Llc. | renovation of existing shower and toilet rooms, replace tile, shower partitions, new vanities, mirrors, convert lighting to led. no added wattage, redistribute exhast.Details
renovation of existing shower and toilet rooms, replace tile, shower partitions, new vanities, mirrors, convert lighting to led. no added wattage, redistribute exhast. | $250,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 3236 24th St | installation of cyclone fenceDetails
installation of cyclone fence | $2,500 | |
| Feb 19, 2019 | Completed final sign-off Jul 2019 | 2791 Greenwich St | renovation of unit #1 bathroom. kitchen and bathroom. split 1 bedroom into 2 no exterior work to be carried outDetails
renovation of unit #1 bathroom. kitchen and bathroom. split 1 bedroom into 2 no exterior work to be carried out | $70,000 | |
| Aug 9, 2018 | Never finaled issued Aug 2018, no final | 2791 Greenwich St | L H Construction | revision to 201804186728 replace rear stairDetails
revision to 201804186728 replace rear stair | $15,000 |
| Aug 21, 2017 | Completed final sign-off May 2018 | 4545 18th St | lower unit (1st floor) - work to include renovation kitchen & bath, replace (e) window with a door, minimal exterior structural work. add one bedroom and bath. soft story work on first floor.Details
lower unit (1st floor) - work to include renovation kitchen & bath, replace (e) window with a door, minimal exterior structural work. add one bedroom and bath. soft story work on first floor. | $149,951 | |
| Aug 15, 2017 | Expired or cancelled cancelled Jun 2026 | 3230 24th St | to erect 5 stories, no basement, type va over type ia, 17 units residential over commercial building.(r-2,m,b) lot #011a & 015Details
to erect 5 stories, no basement, type va over type ia, 17 units residential over commercial building.(r-2,m,b) lot #011a & 015 | $3,000,000 | |
| Mar 30, 2017 | Completed final sign-off May 2017 | 416 12th Av | Alex R Construction | scope of work includes the removal of an extg room located in the garage in complience with n.o.v. #201763441. no exterior work. does not include the removal of an illegal unit. removal of room in garage only.Details
scope of work includes the removal of an extg room located in the garage in complience with n.o.v. #201763441. no exterior work. does not include the removal of an illegal unit. removal of room in garage only. | $5,000 |
| Jan 4, 2017 | Completed final sign-off May 2017 | 58 Harrington St | bathroom addition located on the ground floor. plan a2.00Details
bathroom addition located on the ground floor. plan a2.00 | $20,000 | |
| Dec 8, 2014 | Completed final sign-off May 2016 | 406 Connecticut St | Herling Construction | kitchen remodel, replacement of kitchen windows and doors. in-fill of existing lightwell.Details
kitchen remodel, replacement of kitchen windows and doors. in-fill of existing lightwell. | $75,000 |
| Jun 3, 2014 | Completed final sign-off Dec 2015 | 76 Laidley St | Forma Construction | revision to app#201308134144.1) replace extg doors at north roof deck and rear facade. 2)replace extg trellis at north roof deck and add trellis at south facade(upper level)Details
revision to app#201308134144.1) replace extg doors at north roof deck and rear facade. 2)replace extg trellis at north roof deck and add trellis at south facade(upper level) | $10,000 |
| Aug 13, 2013 | Completed final sign-off Dec 2015 | 76 Laidley St | Forma Construction | frong bldg - replacing of (e) entry swing door w/pivot door, replacing o (e) interior stairs at same location. remodel of (e) master suite @ 2nd floor.Details
frong bldg - replacing of (e) entry swing door w/pivot door, replacing o (e) interior stairs at same location. remodel of (e) master suite @ 2nd floor. | $100,000 |
| Aug 9, 2012 | Completed final sign-off Oct 2013 | 3200 California St | Cahill Contractors Inc | renovation of locker rooms at lower level 1 and addition of office space at ground floor.Details
renovation of locker rooms at lower level 1 and addition of office space at ground floor. | $500,000 |
| Jul 25, 2012 | Completed final sign-off Aug 2012 | 3200 California St | Flory Construction, Inc. | relocate cafe service counter and install new finishes.Details
relocate cafe service counter and install new finishes. | $120,000 |
| Aug 25, 2009 | Never finaled issued Aug 2009, no final | 230 California St | J M E Construction Services Inc | remodel to (e) storefront facade. scope of building interior tenant improvement under separate and approved permit #2009/0604/9752.Details
remodel to (e) storefront facade. scope of building interior tenant improvement under separate and approved permit #2009/0604/9752. | $6,500 |
| Nov 20, 2008 | Completed final sign-off Jan 2009 | 555 North Point St | Northern Sun Associates | interior renovation of (e) restaurant. new kitchen equipment and minor lighting upgrades. new tile floor, furnishings wainscots, new tile on kitchen, bar diewalls, new kitchen & bar counters.Details
interior renovation of (e) restaurant. new kitchen equipment and minor lighting upgrades. new tile floor, furnishings wainscots, new tile on kitchen, bar diewalls, new kitchen & bar counters. | $300,000 |
| Oct 22, 2008 | Completed final sign-off Sep 2010 | 3255 Pierce St | Pattani Construction Co Inc | residential addition to extg at second and 3rd levels including renovation of kitchen, addtion of one bathroom closets, addition of dining and living rooms. relocation/replacement of extg rear wooden stair. new roof decksDetails
residential addition to extg at second and 3rd levels including renovation of kitchen, addtion of one bathroom closets, addition of dining and living rooms. relocation/replacement of extg rear wooden stair. new roof decks | $70,000 |
| Oct 22, 2008 | Completed final sign-off Sep 2010 | 3255 Pierce St | commercial tenant addition to extg. grnd lvl. new restroom-handicap accessible. mep separate permit on commercial portion of the work only; sprinklers and occupant load calcs under separate permit, change of use b to a2 & occupant load verification under separate permitDetails
commercial tenant addition to extg. grnd lvl. new restroom-handicap accessible. mep separate permit on commercial portion of the work only; sprinklers and occupant load calcs under separate permit, change of use b to a2 & occupant load verification under separate permit | $90,000 | |
| Aug 29, 2008 | Completed final sign-off Oct 2008 | 1375 Sutter St | D Kelly Construction Inc. | addition of 1 new data closet room, low voltage for floors 1,2,3,4. new partitions and doors. new work includes modification of e lighting, power, data. electrical separate permit. no mechanical or plumbing work.Details
addition of 1 new data closet room, low voltage for floors 1,2,3,4. new partitions and doors. new work includes modification of e lighting, power, data. electrical separate permit. no mechanical or plumbing work. | $8,000 |
| Aug 7, 2008 | Expired or cancelled expired Sep 2010 | 3200 California St | conversion of extg. emigre office space into (2) excercise rooms and addition of new doors. patch extg finishes and flooring as req'd. no change in extg bldg. extg of fire ratings of extg partitions. no mechanical, electrical or structural changes.Details
conversion of extg. emigre office space into (2) excercise rooms and addition of new doors. patch extg finishes and flooring as req'd. no change in extg bldg. extg of fire ratings of extg partitions. no mechanical, electrical or structural changes. | $15,000 | |
| Jun 25, 2008 | Completed final sign-off Dec 2008 | 3200 California St | replace existing non rated storefront windows between restaurant and main lobby with bifolding glass doors. patch existing finishes and flooring as requiredDetails
replace existing non rated storefront windows between restaurant and main lobby with bifolding glass doors. patch existing finishes and flooring as required | $15,000 | |
| May 23, 2008 | Completed final sign-off Dec 2008 | 134 Golden Gate Av | office ti on basement floor. new open office areas in existing office in basement floor. new partitions, finishes. mec, elec. and plumbing under separate permit. modifications to power and data and lighting.(n)accessible restrooms. no struc.work.demo limited to removal of infill at(e)openingsDetails
office ti on basement floor. new open office areas in existing office in basement floor. new partitions, finishes. mec, elec. and plumbing under separate permit. modifications to power and data and lighting.(n)accessible restrooms. no struc.work.demo limited to removal of infill at(e)openings | $225,000 | |
| May 23, 2008 | Completed final sign-off Jul 2008 | 633 Folsom St | office ti on the 1st floor. new partitions, modify system furniture, addition of (n) rated door at (e) rated corridor.elec. and mech. under separate permit. modify power and data,. relocation of lighting (no title 24, no increase in fixtures). no structural work. no plumbing work.Details
office ti on the 1st floor. new partitions, modify system furniture, addition of (n) rated door at (e) rated corridor.elec. and mech. under separate permit. modify power and data,. relocation of lighting (no title 24, no increase in fixtures). no structural work. no plumbing work. | $40,000 | |
| May 23, 2008 | Completed final sign-off Jan 2009 | 1375 Sutter St | #208- ti for renovation of 2nd flr offices. demo and rebuild new partition to add exam rm and offices.ada parking stalls and path of travel upgrade.new ada restroom. modification of ex. lighting, power data, mechanical, electrical and life safety work will be under a seperate permit.Details
#208- ti for renovation of 2nd flr offices. demo and rebuild new partition to add exam rm and offices.ada parking stalls and path of travel upgrade.new ada restroom. modification of ex. lighting, power data, mechanical, electrical and life safety work will be under a seperate permit. | $115,000 | |
| Jan 31, 2008 | Completed final sign-off Apr 2008 | 55 Francisco St | 3rd floor t.i. remodel existing offices- add private toilet room and utility sinks. life safety and sprinkler work under separate permits.Details
3rd floor t.i. remodel existing offices- add private toilet room and utility sinks. life safety and sprinkler work under separate permits. | $89,000 | |
| Oct 26, 2007 | Completed final sign-off Dec 2008 | 134 Golden Gate Av | Behnam And Associates | modifications to (e) building to bring exiting and (e) non-compliant multi-use spaces into compliance. the conversion of "b" occupancy to "e-3" under permit appl #2006.02.08.4100 has been withdrawn. the correct occupancy clasification is "b"-office for mental health.Details
modifications to (e) building to bring exiting and (e) non-compliant multi-use spaces into compliance. the conversion of "b" occupancy to "e-3" under permit appl #2006.02.08.4100 has been withdrawn. the correct occupancy clasification is "b"-office for mental health. | $50,000 |
| Oct 22, 2007 | Completed final sign-off Jul 2008 | 3200 California St | addition of new conveniece stair from first floor down through three basements. not a required exit. re-routing ducts and utilities as required.Details
addition of new conveniece stair from first floor down through three basements. not a required exit. re-routing ducts and utilities as required. | $150,000 | |
| Dec 11, 2006 | Completed final sign-off May 2007 | 845 Market St | space #fe9-submittal of calculations for water heater and transformer suspended platforms per field inspector request. refernce pa# 200605222168 (cti-1).Details
space #fe9-submittal of calculations for water heater and transformer suspended platforms per field inspector request. refernce pa# 200605222168 (cti-1). | $100 | |
| Dec 8, 2006 | Completed final sign-off Jan 2007 | 1845 Market St | corriander thai- space fe 4-revised drawings for 200604270085 request to relfect revised location of water heater and transformer. ref 200604078499, cti-1Details
corriander thai- space fe 4-revised drawings for 200604270085 request to relfect revised location of water heater and transformer. ref 200604078499, cti-1 | $100 | |
| Jul 27, 2006 | Completed final sign-off May 2007 | 3200 California St | Lewis M Merlo Inc | installation of bollards @ building entrance, relocation of street light/conduit wire. meeting notes from 08.14.04 re:application critcria & responses found on sheet a0.01Details
installation of bollards @ building entrance, relocation of street light/conduit wire. meeting notes from 08.14.04 re:application critcria & responses found on sheet a0.01 | $75,000 |
| Jun 29, 2006 | Completed final sign-off May 2007 | 845 Market St | hana, space# fe-9. oti-2, bart level, el, me.Details
hana, space# fe-9. oti-2, bart level, el, me. | $172,520 | |
| May 30, 2006 | Completed final sign-off May 2007 | 845 Market St | cti-1, 3rd floor, space 321, el, me, ls, sp.Details
cti-1, 3rd floor, space 321, el, me, ls, sp. | $70,000 | |
| May 22, 2006 | Completed final sign-off May 2007 | 845 Market St | cti1 - basement/bart level, el, ls, spDetails
cti1 - basement/bart level, el, ls, sp | $240,560 | |
| Apr 7, 2006 | Completed final sign-off Jan 2007 | 845 Market St | cti-1, basement, el, me, ls, sp. coriander thai -bart level space #fe4.Details
cti-1, basement, el, me, ls, sp. coriander thai -bart level space #fe4. | $158,799 | |
| Aug 3, 2005 | Never finaled issued Aug 2005, no final | 45 Castro St | D Kelly Construction Inc. | rev.appl#200507197963-add bracing details,exit sign,delete light & fire notes.Details
rev.appl#200507197963-add bracing details,exit sign,delete light & fire notes. | |
| Jul 19, 2005 | Never finaled issued Jul 2005, no final | 45 Castro St | D Kelly Construction Inc. | construction of new exam room, office staff room, reception desk, replacement of casework, paint.Details
construction of new exam room, office staff room, reception desk, replacement of casework, paint. | $72,000 |
| May 23, 2005 | Completed final sign-off Jun 2006 | 3905 Sacramento St | renovation of doctors suite, combine 3 doctors suites to 1.Details
renovation of doctors suite, combine 3 doctors suites to 1. | $60,000 | |
| Aug 1, 2003 | Completed final sign-off Sep 2003 | 49 Geary St | new storage closet in existing gallery space-minor revisions to lighting- no increase in wattageDetails
new storage closet in existing gallery space-minor revisions to lighting- no increase in wattage | $6,000 |