Kenneth Brogno
- Listed as
- architect, authorized agent-others, designer
- Firm
- D-Scheme Studio
- Based in
- San Francisco
- On San Francisco permits
- Nov 2002 to Jun 2026
32 permits since 2000 (architect on 23 permits, authorized agent-others on 8 permits, designer on 1 permit): 28 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2026 | In progress filed Jun 2026, not yet issued | 505 Gennessee St | partial new ground floor concrete foundation and slab. new framing for 2 new bedrooms and closets, new exterior sliding doors, new stairs from 2nd floor, new rear yard concrete stair and retaining walls. new electrical outlets, lighting, hvac duct extensions under separate permits.Details
partial new ground floor concrete foundation and slab. new framing for 2 new bedrooms and closets, new exterior sliding doors, new stairs from 2nd floor, new rear yard concrete stair and retaining walls. new electrical outlets, lighting, hvac duct extensions under separate permits. | $90,000 | |
| Feb 13, 2026 | In progress issued Mar 2026 | 505 Gennessee St | Radiant Construction Company | ground fl: relocate washer. dryer and laundry sink from rear to new location at the front of the garage. infill ground fl lightwell and construct new bathroom.Details
ground fl: relocate washer. dryer and laundry sink from rear to new location at the front of the garage. infill ground fl lightwell and construct new bathroom. | $24,000 |
| Mar 29, 2023 | Completed final sign-off Jun 2023 | 1 Kearny St | Centric Construction Inc | 1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of workDetails
1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of work | |
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 1 Kearny St | Centric Construction Inc | 1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit.Details
1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit. | $65,000 |
| Apr 12, 2022 | Completed final sign-off Sep 2022 | 460 Bush St | Marchetti Group | revision to pa#202201216401. change 4 of 6 dental exam rm show disabled access 36" wied side clearance at one side of exam chair per cbc 11b-804.1 exception for non-emergency settings. 1hr wall and 45min door and frame at med gas closet. sffd op permit for med gas submitted separately.Details
revision to pa#202201216401. change 4 of 6 dental exam rm show disabled access 36" wied side clearance at one side of exam chair per cbc 11b-804.1 exception for non-emergency settings. 1hr wall and 45min door and frame at med gas closet. sffd op permit for med gas submitted separately. | |
| Jun 10, 2019 | Completed final sign-off Jun 2021 | 55 Magellan Av | Abz Contruction | new roof deck above 2nd floor roof and new stair penthouse from 2nd floor living room to roof deck.Details
new roof deck above 2nd floor roof and new stair penthouse from 2nd floor living room to roof deck. | $42,060 |
| Feb 16, 2018 | Completed final sign-off Nov 2020 | 347 Lexington St | Living Structure Inc | revision to pa 201609137594. reconstruct front facade including (n)windows and entry door. interior work for (n) single entry door and additional unit entries for other units in the building. work is to rectify sf planning notice of enforcement 2017004791 enf.Details
revision to pa 201609137594. reconstruct front facade including (n)windows and entry door. interior work for (n) single entry door and additional unit entries for other units in the building. work is to rectify sf planning notice of enforcement 2017004791 enf. | $65,000 |
| Apr 14, 2017 | Completed final sign-off Apr 2018 | 45 Spear St | Marchetti Group | relocate & replace in kind of (e) storefront door and glazing along spear street at an unoccupied future tenant space, no other changes to exterior and no changes to interior. space to remain unoccupied. n/a ordinance #155-13Details
relocate & replace in kind of (e) storefront door and glazing along spear street at an unoccupied future tenant space, no other changes to exterior and no changes to interior. space to remain unoccupied. n/a ordinance #155-13 | $30,000 |
| Oct 3, 2016 | Completed final sign-off Nov 2020 | 349 Lexington St | Living Structure Inc | units 347 & 349: interior work only, remodel kitchen and bath at upper unit - 347. remodel bath at middle unit - 349. partial seismic upgradeDetails
units 347 & 349: interior work only, remodel kitchen and bath at upper unit - 347. remodel bath at middle unit - 349. partial seismic upgrade | $25,000 |
| Sep 13, 2016 | Completed final sign-off Feb 2018 | 138 Coleridge St | J A K Construction | all work is @ rear of bldg. demolish (e) rear stairs. construct (n) 2nd fl deck & spiral stairs to grade. construct (n) lower deck less than 30 inches above grade. replace (e) windows @ 2nd fl laundry rm & @ lower level on rear facade.Details
all work is @ rear of bldg. demolish (e) rear stairs. construct (n) 2nd fl deck & spiral stairs to grade. construct (n) lower deck less than 30 inches above grade. replace (e) windows @ 2nd fl laundry rm & @ lower level on rear facade. | $35,000 |
| Oct 27, 2015 | Completed final sign-off Feb 2017 | 1610 Post St | medical office change to personal service for massage. no construction under this permit.Details
medical office change to personal service for massage. no construction under this permit. | ||
| Aug 20, 2014 | Completed final sign-off Dec 2015 | 1 Embarcadero Center | tenant spaces at lobby level.install glass storefront, finishes and lighting at public spaces only. structural- new window at north exterior wall. electrical: install new elect service to tenants. sprinklers and fire alarm sep. permit n/a for the maher ordinance #155-Details
tenant spaces at lobby level.install glass storefront, finishes and lighting at public spaces only. structural- new window at north exterior wall. electrical: install new elect service to tenants. sprinklers and fire alarm sep. permit n/a for the maher ordinance #155- | $702,000 | |
| Feb 5, 2014 | Completed final sign-off Feb 2017 | 1 Enterprise St | new disabled entry and ramp access to restroom at ground floor, change of use commercial to commercial/residential, new loading dock rolling door and windows along enterprise street, new guard rails at exterior stair, landings and existing roof deck. n/a for maher ordinance 155-13.Details
new disabled entry and ramp access to restroom at ground floor, change of use commercial to commercial/residential, new loading dock rolling door and windows along enterprise street, new guard rails at exterior stair, landings and existing roof deck. n/a for maher ordinance 155-13. | ||
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 2436 Judah St | Perfect Connection Inc. | change of use from commercial 2-units to medical service. install (1) one utility sink.Details
change of use from commercial 2-units to medical service. install (1) one utility sink. | $1,600 |
| Jan 10, 2012 | Completed final sign-off Dec 2012 | 1840 Clement St | Adam Knowles Construction | change of use from restaurant to stained glass workshop.ground floor tenant improvement only. new front entry storefront door, new footings, columns, beam for upper floor support. new skylights, new partitions, finishes, and skylights. new ada compliant restroom and entry.Details
change of use from restaurant to stained glass workshop.ground floor tenant improvement only. new front entry storefront door, new footings, columns, beam for upper floor support. new skylights, new partitions, finishes, and skylights. new ada compliant restroom and entry. | $25,000 |
| Dec 5, 2011 | Completed final sign-off Feb 2012 | 1840 Clement St | Adam Knowles Construction | ground floor only -demolition of interior finishes & utilities to stub-outs. new tenant improvement under separate construction permit. space remain vacant.Details
ground floor only -demolition of interior finishes & utilities to stub-outs. new tenant improvement under separate construction permit. space remain vacant. | $5,000 |
| Jan 31, 2011 | Completed final sign-off Feb 2011 | 195 05th Av | enlarge existing ground floor window along california streetDetails
enlarge existing ground floor window along california street | $400 | |
| Aug 25, 2010 | Completed final sign-off Nov 2011 | 109 06th Av | Adam Knowles Construction | revision to appl #201006013565 - changes include additoinal framing details & the addition of a new front door unit & creation of an arch in the breezeway ceiling. as-built drawings.Details
revision to appl #201006013565 - changes include additoinal framing details & the addition of a new front door unit & creation of an arch in the breezeway ceiling. as-built drawings. | $7,500 |
| Aug 2, 2010 | Completed final sign-off Nov 2010 | 1407 Bush St | change of use from reataurant to pet supply & grooming service store. interior tenant improvement work including new ada features, new equipment & wall finishes. no change to existing exterior.Details
change of use from reataurant to pet supply & grooming service store. interior tenant improvement work including new ada features, new equipment & wall finishes. no change to existing exterior. | $15,000 | |
| Jun 2, 2010 | Completed final sign-off Oct 2010 | 601 Van Ness Av | R S Mac Farlane Company Inc. | ste #2030 office interior tenant improvmeent ot renovate & combine 2 (e) suites. mechanical, electrical, plumbing and sprinkler system to be filed under separate permit.Details
ste #2030 office interior tenant improvmeent ot renovate & combine 2 (e) suites. mechanical, electrical, plumbing and sprinkler system to be filed under separate permit. | $125,000 |
| Apr 13, 2010 | Completed final sign-off Jan 2012 | 685 03rd St | Level 8 Construction Inc | ground level exterior storefront at (e) restaurant (spire). ti for (e) restaurant approved underpa# 2009.09.19.7097 ( to complete work for work approved under pa# 2005.06.08.4602)Details
ground level exterior storefront at (e) restaurant (spire). ti for (e) restaurant approved underpa# 2009.09.19.7097 ( to complete work for work approved under pa# 2005.06.08.4602) | $40,000 |
| Mar 26, 2010 | Completed final sign-off Dec 2010 | 373 West Portal Av | R S Mac Farlane Company Inc. | tenant improvement for (n) animal hospital. work to include (n) medical equipment, new interior walls, doors and windows, new hand sinks & new finishes on ground and mezzanine levels. change of use from merchantile to office. mep under seperate permit.Details
tenant improvement for (n) animal hospital. work to include (n) medical equipment, new interior walls, doors and windows, new hand sinks & new finishes on ground and mezzanine levels. change of use from merchantile to office. mep under seperate permit. | $120,000 |
| Mar 4, 2010 | Completed final sign-off Oct 2010 | 2015 Chestnut St | Andes General Construction | interior tenant improvement for a small egyptian specialty take out food. work to include new storefront exterior, new accessible restroom, new interior floor & wall finishes. change of use from existing retail to food sales. work on 2015 chestnut "crave city" mep on separate permit.Details
interior tenant improvement for a small egyptian specialty take out food. work to include new storefront exterior, new accessible restroom, new interior floor & wall finishes. change of use from existing retail to food sales. work on 2015 chestnut "crave city" mep on separate permit. | $60,000 |
| Feb 16, 2010 | Completed final sign-off Apr 2010 | 699 Folsom St | D N S Construction | ti for small take out food sales (what's up dog). electrical, plbg work to be submitted under separate permit.Details
ti for small take out food sales (what's up dog). electrical, plbg work to be submitted under separate permit. | $40,000 |
| Aug 17, 2009 | Completed final sign-off Sep 2009 | 1601 Howard St | R S Mac Farlane Company Inc. | erect a non-electric, single faced wall sign.Details
erect a non-electric, single faced wall sign. | $8,000 |
| Aug 7, 2009 | Expired or cancelled cancelled May 2010 | 631 Folsom St | D N S Construction | t.i. for small take out food sales. mechanical, electrical, plumbing work to be submitted under separate permit.Details
t.i. for small take out food sales. mechanical, electrical, plumbing work to be submitted under separate permit. | $40,000 |
| Dec 1, 2008 | Completed final sign-off Sep 2009 | 54 Shotwell St | revision to 200802013844: change to garage vent louvers, revise stair support wall, sink relocation, window relocation, shear wall modification, roof joist framing, steel support for bay window.Details
revision to 200802013844: change to garage vent louvers, revise stair support wall, sink relocation, window relocation, shear wall modification, roof joist framing, steel support for bay window. | ||
| Feb 1, 2008 | Completed final sign-off Sep 2009 | 54 Shotwell St | new foundation, garage in previous basement space, new garage door, entry stairs, new laundry rm, bathrm, storage rm, play rm, new interior stair, upper levele playrm, new plumbing and electrical.Details
new foundation, garage in previous basement space, new garage door, entry stairs, new laundry rm, bathrm, storage rm, play rm, new interior stair, upper levele playrm, new plumbing and electrical. | $120,000 | |
| Sep 25, 2007 | Completed final sign-off Jan 2008 | 14 Clement St | Radiant Construction Company | interior tenant improvement for proposed nail salon - change use from office. new interior partitions, new millwork, new ada compliant restroom. m/e/p under separate permit.Details
interior tenant improvement for proposed nail salon - change use from office. new interior partitions, new millwork, new ada compliant restroom. m/e/p under separate permit. | $45,000 |
| Jul 26, 2006 | Completed final sign-off Apr 2007 | 845 Market St | cti-1, beard papa's, fe 16, bart level, el, me, ls, sp.Details
cti-1, beard papa's, fe 16, bart level, el, me, ls, sp. | $70,000 | |
| Jul 26, 2006 | Completed final sign-off Feb 2007 | 845 Market St | beard papa's, fe-16, bart level, cti-2, el, me.Details
beard papa's, fe-16, bart level, cti-2, el, me. | $70,000 | |
| Nov 19, 2002 | Expired or cancelled expired Jan 2007 | 807 Wisconsin St | addition of new bathrm @2nd fl. replace (e) furnace and water heater. repalce (e) windwos & siding rDetails
addition of new bathrm @2nd fl. replace (e) furnace and water heater. repalce (e) windwos & siding r | $75,000 |