Radiant Construction Company
- Based in
- Oakland
- On San Francisco permits
- Apr 2002 to Sep 2026
- Last 24 months
- 10 permits filed
82 permits since 2000: 68 completed, 4 in progress, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 1983 15th Av | remodel 3/f bathroom. all work in-kind. amend to 202609118025 2nd bathroom on floor. no wall stud demolition or construction.Details
remodel 3/f bathroom. all work in-kind. amend to 202609118025 2nd bathroom on floor. no wall stud demolition or construction. | $17,500 |
| May 4, 2026 | In progress issued Jun 2026 | 1983 15th Av | interior kitchen (2/f) and bathroom (3/f) remodel of (e) single family residential. no exterior changes. no change to existing square footage.Details
interior kitchen (2/f) and bathroom (3/f) remodel of (e) single family residential. no exterior changes. no change to existing square footage. | $15,000 |
| Feb 13, 2026 | In progress issued Mar 2026 | 505 Gennessee St | ground fl: relocate washer. dryer and laundry sink from rear to new location at the front of the garage. infill ground fl lightwell and construct new bathroom.Details
ground fl: relocate washer. dryer and laundry sink from rear to new location at the front of the garage. infill ground fl lightwell and construct new bathroom. | $24,000 |
| Oct 31, 2025 | In progress issued Oct 2025 | 742 33rd Av | remodel kitchen and 1/2 bathroom on the 2/f, replce window in the kitchen, not street visible.Details
remodel kitchen and 1/2 bathroom on the 2/f, replce window in the kitchen, not street visible. | $25,000 |
| Jun 12, 2025 | Completed final sign-off Feb 2026 | 5125 Anza St | violation for 201879892; 1) demolish basement bathroom and kitchen. 2) legalize existing non-load bearing partitions. 3) legalize lights and outlets.Details
violation for 201879892; 1) demolish basement bathroom and kitchen. 2) legalize existing non-load bearing partitions. 3) legalize lights and outlets. | $8,500 |
| May 19, 2025 | Completed final sign-off May 2026 | 642 Washington St | rev to pa# 2025-0103-7686: omit architectural key notes used in previous approved permit update rcp and lighting schedule upadate supply and exhaust fan schedule update electrical plans add gas shut off valve and cd to sink tail pieceDetails
rev to pa# 2025-0103-7686: omit architectural key notes used in previous approved permit update rcp and lighting schedule upadate supply and exhaust fan schedule update electrical plans add gas shut off valve and cd to sink tail piece | |
| May 16, 2025 | Completed final sign-off May 2026 | 642 Washington St | revision to pa #202302061437 remove floor opening btwn 1st & 2nd fl. remove non structural wood columns at basement. remove 1 skylight & infill opening. amend fire rated walls at restrooms. minor changes of interior non partition per field adjustment from approved plansDetails
revision to pa #202302061437 remove floor opening btwn 1st & 2nd fl. remove non structural wood columns at basement. remove 1 skylight & infill opening. amend fire rated walls at restrooms. minor changes of interior non partition per field adjustment from approved plans | |
| Jan 3, 2025 | Completed final sign-off May 2026 | 642 Washington St | tenant improvement and change of use permit: change of use from (e) vacant space former garment shop (f-1) to new office (b) and mechanical/electrical/plumbing improvement throughout.Details
tenant improvement and change of use permit: change of use from (e) vacant space former garment shop (f-1) to new office (b) and mechanical/electrical/plumbing improvement throughout. | $80,000 |
| Dec 11, 2024 | Completed final sign-off Apr 2025 | 539 Nevada St | kitchen remodel in-kind w/ new appliances & plumbing fixtures.Details
kitchen remodel in-kind w/ new appliances & plumbing fixtures. | $8,000 |
| Dec 3, 2024 | Completed final sign-off Apr 2025 | 539 Nevada St | like to like bathroom remodel w/ new plumbing fixtures. update electrical wiring & main electrical panel from 100amp to 200 amp.Details
like to like bathroom remodel w/ new plumbing fixtures. update electrical wiring & main electrical panel from 100amp to 200 amp. | $8,000 |
| Sep 27, 2024 | Completed final sign-off Jul 2025 | 1493 Valencia St | comply w/ nov #202421323: to remove as-built non-bearing partitions, massage rooms and to provide commercial ti to (e) massage establishment. planning change of use from a "foot massage" to a "massage establishment" (defined in planning code sec 102). construct (n0 partition walls.Details
comply w/ nov #202421323: to remove as-built non-bearing partitions, massage rooms and to provide commercial ti to (e) massage establishment. planning change of use from a "foot massage" to a "massage establishment" (defined in planning code sec 102). construct (n0 partition walls. | $15,000 |
| Aug 8, 2024 | Completed final sign-off Feb 2025 | 587 41st Av | 2nd fl remodel kitchen and bath. add 1 full bathDetails
2nd fl remodel kitchen and bath. add 1 full bath | $60,000 |
| Jun 27, 2024 | Completed final sign-off Jun 2024 | 952 Clement St | to obtain a final inspection for work approved under pa# 201805310563 & 201807164619. all work is completeDetails
to obtain a final inspection for work approved under pa# 201805310563 & 201807164619. all work is complete | |
| May 14, 2024 | Completed final sign-off Jun 2024 | 952 Clement St | provide evacuaton signs for a 2 story commercial bldg with roof decks.Details
provide evacuaton signs for a 2 story commercial bldg with roof decks. | $800 |
| Mar 8, 2024 | Completed final sign-off Jul 2025 | 2504 Sacramento St | repair & install 60sf of gypsum boarding around (e) ground floor trash chute. 5/8in type-x & maintain any (e) fire rating. no structural work. no wall modfication.Details
repair & install 60sf of gypsum boarding around (e) ground floor trash chute. 5/8in type-x & maintain any (e) fire rating. no structural work. no wall modfication. | $1,000 |
| Sep 11, 2023 | Completed final sign-off Aug 2024 | 2114 43rd Av | approx ~300sf: front facade replacement. all work in-kind brick veneer for brick veneer. repair any dry rot if necessary.Details
approx ~300sf: front facade replacement. all work in-kind brick veneer for brick veneer. repair any dry rot if necessary. | $8,000 |
| Feb 6, 2023 | Completed final sign-off May 2026 | 642 Washington St | base building improvement of interior basement, grnd & 2nd. demolition of e non bearing wall(int wall) e restrooms, e stair and e mezz floor, new construction non bearing int partitions, ext modification, new accessible restrms, new stairs, (n) incline ladder. new drop down ladder at fire escape.Details
base building improvement of interior basement, grnd & 2nd. demolition of e non bearing wall(int wall) e restrooms, e stair and e mezz floor, new construction non bearing int partitions, ext modification, new accessible restrms, new stairs, (n) incline ladder. new drop down ladder at fire escape. | $653,776 |
| Sep 8, 2022 | Completed final sign-off Jun 2024 | 952 Clement St | mod: reconfigurate interior layout of activity / function rooms, offices and bathrooms. roof deck and skylitesDetails
mod: reconfigurate interior layout of activity / function rooms, offices and bathrooms. roof deck and skylites | $120,000 |
| Apr 12, 2022 | Completed final sign-off May 2023 | 391 Sutter St | 8th floor ste ti (e) occupancy to be maintained 8 story office building new non structural walls, ceilings, lighting, plumbing fixtures and new finishes. new ada single stall bath at l8.Details
8th floor ste ti (e) occupancy to be maintained 8 story office building new non structural walls, ceilings, lighting, plumbing fixtures and new finishes. new ada single stall bath at l8. | $138,600 |
| May 11, 2020 | Completed final sign-off Aug 2021 | 58 Stanford Heights Av | revision to bpa #2019-0520-1160. remodel downstairs bedroom into master suite w/ larger bathroom & walk-in closet. add bathtub, shower & steam room in downstairs bathroom. relocate water heater, furnace, washer & dryer.Details
revision to bpa #2019-0520-1160. remodel downstairs bedroom into master suite w/ larger bathroom & walk-in closet. add bathtub, shower & steam room in downstairs bathroom. relocate water heater, furnace, washer & dryer. | $8,000 |
| Oct 22, 2019 | Completed final sign-off Dec 2021 | 725 Darien Wy | remodel master bathroom like to like. add new fan & vent to outside, create a double vanity from single sink vanity. new lighting led, no structural work, comply with cec 150.0 (k)5Details
remodel master bathroom like to like. add new fan & vent to outside, create a double vanity from single sink vanity. new lighting led, no structural work, comply with cec 150.0 (k)5 | $22,000 |
| Oct 4, 2019 | Completed final sign-off Aug 2020 | 3251 20th Av | interior ti for small cafe in e vacant gr fl mall. commercia ti space. work to include removal of e interior partitons and equip, new int partitions, new kitchen and related equip, new casework, finishes, lighting.Details
interior ti for small cafe in e vacant gr fl mall. commercia ti space. work to include removal of e interior partitons and equip, new int partitions, new kitchen and related equip, new casework, finishes, lighting. | $195,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 2224 Mission St | int ti for (e) restaurant on grnd flr. new accessible bar seating and accessible restroomDetails
int ti for (e) restaurant on grnd flr. new accessible bar seating and accessible restroom | $16,000 |
| Aug 13, 2019 | Completed final sign-off Feb 2021 | 106 Gaven St | revision to 201907267110, remodel kitchen and bath on 2nd fl, add 1 full bath, convert e storage at 1st fl to 2 bedrooms, 2 bath, family rmDetails
revision to 201907267110, remodel kitchen and bath on 2nd fl, add 1 full bath, convert e storage at 1st fl to 2 bedrooms, 2 bath, family rm | $90,000 |
| Apr 16, 2019 | Never finaled issued Apr 2019, no final | 1 Stanyan Bl | unit #2 - interior non structural demo of an (e) vacant grnd flr commercial tenant space. scope includes removal of (e) interior partitions, (e) mech unit to remainDetails
unit #2 - interior non structural demo of an (e) vacant grnd flr commercial tenant space. scope includes removal of (e) interior partitions, (e) mech unit to remain | $4,500 |
| Mar 28, 2019 | Completed final sign-off Feb 2020 | 1 Stanyan Bl | unit #2 inter ti for small cafe in an (e) vacant ground flr commercial tenant space. work to include new partitions, new accessible restroom, new kitchen and related equip, new casework. new finishes, and new lighting. (e) mech unit to remain, plm to design-build by cont.Details
unit #2 inter ti for small cafe in an (e) vacant ground flr commercial tenant space. work to include new partitions, new accessible restroom, new kitchen and related equip, new casework. new finishes, and new lighting. (e) mech unit to remain, plm to design-build by cont. | $180,000 |
| Dec 13, 2018 | Completed final sign-off Mar 2019 | 1889 46th Av | scope of work to including removal (e) interior wall partitions and 9e) door. add (n) one storage room at ground floor and (n) bathroom @ second floor (no horizontal/vertical extensions)Details
scope of work to including removal (e) interior wall partitions and 9e) door. add (n) one storage room at ground floor and (n) bathroom @ second floor (no horizontal/vertical extensions) | $40,000 |
| May 31, 2018 | Expired or cancelled expired Jun 2024 | 952 Clement St | change of use from (e) restaurant/office to community youth center; level the floor, raise ceiling height, roof deck.Details
change of use from (e) restaurant/office to community youth center; level the floor, raise ceiling height, roof deck. | $140,000 |
| Aug 5, 2016 | Completed final sign-off Aug 2016 | 400 Beale St | replace kitchen cabinets and floor tilesDetails
replace kitchen cabinets and floor tiles | $2,500 |
| Nov 20, 2015 | Completed final sign-off Feb 2016 | 1812 Polk St | lighting title 24 report, revision to pa# 201505085769Details
lighting title 24 report, revision to pa# 201505085769 | |
| Jul 31, 2015 | Never finaled issued Oct 2015, no final | 249 Castenada Av | remodel existing bathroom on 1st floor 1st floor per plan. repair existing rear deck per planDetails
remodel existing bathroom on 1st floor 1st floor per plan. repair existing rear deck per plan | $5,000 |
| May 8, 2015 | Completed final sign-off Feb 2016 | 1812 Polk St | interior t.i. of approx. 3025 sq ft of ground floor tenant space for a retail store. work shall include removing interior partition and adding new partition wall. extg restroom shall be upgraded to meet the accessibility requirement. mep deffered submittal.Details
interior t.i. of approx. 3025 sq ft of ground floor tenant space for a retail store. work shall include removing interior partition and adding new partition wall. extg restroom shall be upgraded to meet the accessibility requirement. mep deffered submittal. | $36,000 |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 24 Castle St | to obtain final inspection for work approved under pa 201305015854; all work is completeDetails
to obtain final inspection for work approved under pa 201305015854; all work is complete | |
| Jan 13, 2015 | Completed final sign-off Sep 2019 | 1272 18th Av | remove interior wall at (e) sunroom area to convert the sunroom area as part of bedroom and replace/relocate water damaged windows in kind at 2/f & 3/f. repair foundation at existing rear sunroom. repair exterior stucco at rear of building; repair dry rot per plans. relocate (e) door at 1/f sunroomDetails
remove interior wall at (e) sunroom area to convert the sunroom area as part of bedroom and replace/relocate water damaged windows in kind at 2/f & 3/f. repair foundation at existing rear sunroom. repair exterior stucco at rear of building; repair dry rot per plans. relocate (e) door at 1/f sunroom | $20,000 |
| Sep 19, 2014 | Completed final sign-off Feb 2016 | 30 Aloha Av | interior renovation of 2nd floor, scope of work to include new 3/4 bath, renovation of (e) bathroom. removal of existing living room/kitchen walls, and reduction of size of (e) windows. mep. on seperate permit.Details
interior renovation of 2nd floor, scope of work to include new 3/4 bath, renovation of (e) bathroom. removal of existing living room/kitchen walls, and reduction of size of (e) windows. mep. on seperate permit. | $30,000 |
| Apr 17, 2014 | Completed final sign-off Apr 2014 | 1334 Ocean Av | remove corrugated metal roof to comply with nov #201330401. n/a for the maher ordinance #155-13Details
remove corrugated metal roof to comply with nov #201330401. n/a for the maher ordinance #155-13 | $2,000 |
| Mar 10, 2014 | Completed final sign-off Oct 2014 | 410 Brannan St | interior t.i. at ground floor for a ballet studio. scope of work to include new accessible restroom, new partitions, new finishes, and new lighting. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13Details
interior t.i. at ground floor for a ballet studio. scope of work to include new accessible restroom, new partitions, new finishes, and new lighting. n/a for the maher ordinance #155-13 and n/a for the interim controls #428-13 | $30,000 |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 1610 Post St | work in 103: replace carpet with new tiles. painting at walls and ceiling. approx. 286 sfDetails
work in 103: replace carpet with new tiles. painting at walls and ceiling. approx. 286 sf | $1,600 |
| Dec 17, 2013 | Completed final sign-off Mar 2014 | 200 Felton St | 1. remodel (3) three bathroom and kitchen. replace windows along front, side, and rear of building.Details
1. remodel (3) three bathroom and kitchen. replace windows along front, side, and rear of building. | $25,000 |
| May 7, 2013 | Completed final sign-off Oct 2013 | 1151 Sutter St | 1st time t.i. - g/f - install utility sink for medical service (foot massage). 740 sq ft.Details
1st time t.i. - g/f - install utility sink for medical service (foot massage). 740 sq ft. | $1,500 |
| May 1, 2013 | Expired or cancelled expired Apr 2015 | 24 Castle St | renovation of extg kitchen and additional bathroom at extg upper level. approx 165 sq ft.Details
renovation of extg kitchen and additional bathroom at extg upper level. approx 165 sq ft. | $25,000 |
| Feb 25, 2013 | Completed final sign-off May 2013 | 240 Bridgeview Dr | revision basement layout. revise structural detail & framing @ basement. add (n) family room @ basement. (n) laundry room @ 1st floor.Details
revision basement layout. revise structural detail & framing @ basement. add (n) family room @ basement. (n) laundry room @ 1st floor. | $3,000 |
| Oct 15, 2012 | Completed final sign-off May 2013 | 240 Bridgeview Dr | non-load bearing interior walls, new stair, new full bath, office (for personal use) at basement. legalize existing bedroom on ground floor.Details
non-load bearing interior walls, new stair, new full bath, office (for personal use) at basement. legalize existing bedroom on ground floor. | $11,600 |
| Jun 15, 2012 | Expired or cancelled expired Nov 2017 | 331 18th Av | extending the scope of work for 201004140293: replace rotten siding with hardiplank siding to the entire front facade. visibile from street.Details
extending the scope of work for 201004140293: replace rotten siding with hardiplank siding to the entire front facade. visibile from street. | $3,000 |
| Jun 14, 2012 | Never finaled issued Aug 2012, no final | 801 Grove St | revise permit 201204309403 to include removal of e post and strengthening of e beamDetails
revise permit 201204309403 to include removal of e post and strengthening of e beam | $4,000 |
| May 4, 2012 | Completed final sign-off Jun 2012 | 2450 San Bruno Av | change of use. convert existing retail space to foot massage establishment.Details
change of use. convert existing retail space to foot massage establishment. | $500 |
| Feb 16, 2012 | Completed final sign-off Jul 2012 | 30 29th St | convert (e) retail space to foot massage establishment.Details
convert (e) retail space to foot massage establishment. | $800 |
| Jul 15, 2011 | Completed final sign-off May 2013 | 347 Lexington St | replacement in-kind of exterior stairs & property line window. ref. permit appl.#200702204512, to comply with nov#200873293.Details
replacement in-kind of exterior stairs & property line window. ref. permit appl.#200702204512, to comply with nov#200873293. | $2,000 |
| Jul 5, 2011 | Completed final sign-off May 2012 | 2254 33rd Av | add 2 new bedrooms, 1 storage, 1 full bath, one 1/2 bath on existing gr floorDetails
add 2 new bedrooms, 1 storage, 1 full bath, one 1/2 bath on existing gr floor | $45,000 |
| May 26, 2011 | Completed final sign-off May 2013 | 349 Lexington St | reinforce framing for previously approved roof deck (ref p/a 2007-0220-4512) accommodate new hot tub/jacuzzi to be installed on separate permit.Details
reinforce framing for previously approved roof deck (ref p/a 2007-0220-4512) accommodate new hot tub/jacuzzi to be installed on separate permit. | $4,000 |
| Apr 6, 2011 | Completed final sign-off May 2012 | 347 Lexington St | install new fire sprinkler system to nfpa 13 with new 2" comb fire service at gr floor. 10 heads, 3 sprinklers in garage to protect sprinkler piping in garage.Details
install new fire sprinkler system to nfpa 13 with new 2" comb fire service at gr floor. 10 heads, 3 sprinklers in garage to protect sprinkler piping in garage. | $3,500 |
| Feb 8, 2011 | Completed final sign-off Mar 2011 | 1212 Market St | 3rd floor shower repair: replace shower wall & floor tiles, install water proof membrance, relocate control valve for accessibility upgrade.Details
3rd floor shower repair: replace shower wall & floor tiles, install water proof membrance, relocate control valve for accessibility upgrade. | $3,000 |
| Sep 9, 2010 | Completed final sign-off Dec 2010 | 1212 Market St | ti for basement office to alter exisiting fire sprinklers, add 6 heads for new dropped ceilingDetails
ti for basement office to alter exisiting fire sprinklers, add 6 heads for new dropped ceiling | $1,500 |
| Aug 26, 2010 | Completed final sign-off Dec 2010 | 1212 Market St | establish new office/meeting room in the existing basement tenant space #2Details
establish new office/meeting room in the existing basement tenant space #2 | $8,000 |
| Jul 21, 2010 | Completed final sign-off Sep 2010 | 5648 Fulton St | repl 19 alum windows with new fiberglass windows with u-factor .40 painting of front facade, windows replacement with same size and no structural changesDetails
repl 19 alum windows with new fiberglass windows with u-factor .40 painting of front facade, windows replacement with same size and no structural changes | $12,000 |
| Jun 16, 2010 | Completed final sign-off Sep 2010 | 35 Lobos St | kitchen remodel; (n) cabinets, countertop, flooring. ground flr. bath, (n) tiles for shower enclosure & (n) shower pan. 2nd. flr. bath-(n) floor tiles. replace 4-windows & 2-sliding doors. windows 2-@ front (aluminum) & 2-@ back with sliding doors. provide high efficacy lights or t-24 occupancyDetails
kitchen remodel; (n) cabinets, countertop, flooring. ground flr. bath, (n) tiles for shower enclosure & (n) shower pan. 2nd. flr. bath-(n) floor tiles. replace 4-windows & 2-sliding doors. windows 2-@ front (aluminum) & 2-@ back with sliding doors. provide high efficacy lights or t-24 occupancy | $16,000 |
| Nov 5, 2009 | Completed final sign-off Feb 2011 | 195 05th Av | change of use from retail to coffee. no food preparation. work includes 3 compartment sinks, hand sink, 36 " wide stainl;ess steel sink, counters, new ada restrooms, and framing. demo non-load bearing walls. mep under separate permit.Details
change of use from retail to coffee. no food preparation. work includes 3 compartment sinks, hand sink, 36 " wide stainl;ess steel sink, counters, new ada restrooms, and framing. demo non-load bearing walls. mep under separate permit. | $18,000 |
| Aug 26, 2009 | Completed final sign-off Dec 2009 | 331 18th Av | repair rear fire escape. replace (e) rotten wood platforms with metal platform and railingsDetails
repair rear fire escape. replace (e) rotten wood platforms with metal platform and railings | $5,000 |
| Aug 18, 2009 | Completed final sign-off Jan 2010 | 1542 23rd Av | new interior non-load bearing walls. new full bath room, relocate (e) washer & dryer at the ground floor / garage level. new bedroom & new storage room at all work on ground floor only.Details
new interior non-load bearing walls. new full bath room, relocate (e) washer & dryer at the ground floor / garage level. new bedroom & new storage room at all work on ground floor only. | $22,000 |
| Mar 12, 2009 | Completed final sign-off Mar 2009 | 1395 Silver Av | reroofing.Details
reroofing. | $1,500 |
| Feb 20, 2009 | Completed final sign-off Feb 2009 | 1395 Silver Av | increase construction value by 30,000. refer to app 200812228953.Details
increase construction value by 30,000. refer to app 200812228953. | $30,000 |
| Dec 22, 2008 | Completed final sign-off Jun 2009 | 1395 Silver Av | strengthening existing floor joists at 3rd fl, new bathroom at 3rd fl, new interior partition wall at 3rd fl, new skylight at new bathroomDetails
strengthening existing floor joists at 3rd fl, new bathroom at 3rd fl, new interior partition wall at 3rd fl, new skylight at new bathroom | $15,000 |
| Oct 15, 2008 | Completed final sign-off Jun 2009 | 1395 Silver Av | rework interior non-load bearing walls, new partitions, rework kitchen & bathrm, reconfigure interior stair, new flooring, new central gas furnance, new fence.Details
rework interior non-load bearing walls, new partitions, rework kitchen & bathrm, reconfigure interior stair, new flooring, new central gas furnance, new fence. | $85,000 |
| Apr 21, 2008 | Completed final sign-off Aug 2008 | 3481 18th St | in response to 3r report 3r-5084-demolish unpermitted rear deck, reconstruct (e) damaged rear shed, misc. repairs to (e) finishes per report. new acess hatch to (e) furnace, new clearance at water heater ventDetails
in response to 3r report 3r-5084-demolish unpermitted rear deck, reconstruct (e) damaged rear shed, misc. repairs to (e) finishes per report. new acess hatch to (e) furnace, new clearance at water heater vent | $15,000 |
| Mar 11, 2008 | Completed final sign-off Mar 2008 | 521 03rd Av | renew permit application 3 200609061550 and pa # 200612290723 for final inspectionDetails
renew permit application 3 200609061550 and pa # 200612290723 for final inspection | |
| Feb 15, 2008 | Completed final sign-off Oct 2008 | 1212 Market St | renewal to app #200706133835/200708099244/200708230736 for final inspectionDetails
renewal to app #200706133835/200708099244/200708230736 for final inspection | |
| Sep 25, 2007 | Completed final sign-off Jan 2008 | 14 Clement St | interior tenant improvement for proposed nail salon - change use from office. new interior partitions, new millwork, new ada compliant restroom. m/e/p under separate permit.Details
interior tenant improvement for proposed nail salon - change use from office. new interior partitions, new millwork, new ada compliant restroom. m/e/p under separate permit. | $45,000 |
| Aug 31, 2007 | Completed final sign-off Oct 2007 | 1042 Lake St | bathroom remodel. replace sink, toilet, and tiles around shower and on floor. replace shower stall. plmg & elec tio be included. no exterior workDetails
bathroom remodel. replace sink, toilet, and tiles around shower and on floor. replace shower stall. plmg & elec tio be included. no exterior work | $6,800 |
| Aug 24, 2007 | Completed final sign-off Dec 2007 | 56 Crags Ct | bathroom rmodel.Details
bathroom rmodel. | $6,500 |
| Aug 24, 2007 | Completed final sign-off Oct 2007 | 1042 Lake St | remodel kitchen.Details
remodel kitchen. | $8,000 |
| Aug 13, 2007 | Completed final sign-off Jan 2008 | 75 Seward St | remodel ktichen, install new appliance,add additional sink, add additional light fixtures, all flourecent lights except (3)pendants controlled by dinner switch.Details
remodel ktichen, install new appliance,add additional sink, add additional light fixtures, all flourecent lights except (3)pendants controlled by dinner switch. | $10,000 |
| Aug 9, 2007 | Expired or cancelled cancelled Apr 2015 | 1395 Silver Av | vertical & horizontal addition of existing building at front as per plan.Details
vertical & horizontal addition of existing building at front as per plan. | $300,000 |
| Aug 9, 2007 | Completed final sign-off Sep 2008 | 1395 Silver Av | remove horizontal addition at rear yard to comply with nov #200454194 & 200233628. addition was built without permit.Details
remove horizontal addition at rear yard to comply with nov #200454194 & 200233628. addition was built without permit. | $3,000 |
| Jul 11, 2007 | Completed final sign-off Jul 2008 | 10 Abbey St | renewal expired pa #200607267732Details
renewal expired pa #200607267732 | $25,100 |
| Feb 20, 2007 | Completed final sign-off Jun 2013 | 349 Lexington St | interior renovation and roof deck and deck work.Details
interior renovation and roof deck and deck work. | $150,000 |
| Feb 5, 2007 | Completed final sign-off Jul 2008 | 75 Seward St | rework of unhabitable crawl space to become useable rooms, include a new laundry room, wine cellar, walk-in closet, jewelry closet, and a new interior staircase from garage level to entry level.Details
rework of unhabitable crawl space to become useable rooms, include a new laundry room, wine cellar, walk-in closet, jewelry closet, and a new interior staircase from garage level to entry level. | $50,000 |
| Sep 7, 2006 | Completed final sign-off Oct 2006 | 4015 24th St | replace kichn floor tile with new. install new kchn countertop. no new lightingDetails
replace kichn floor tile with new. install new kchn countertop. no new lighting | $6,000 |
| Apr 10, 2006 | Completed final sign-off Jun 2006 | 3483 18th St | (1) bathroom & kitchen, laundry room remodel . non structural.Details
(1) bathroom & kitchen, laundry room remodel . non structural. | $25,000 |
| Apr 7, 2006 | Completed final sign-off Sep 2006 | 4013 24th St | (1) bathroom and (1) kitchen remodel - non structuralDetails
(1) bathroom and (1) kitchen remodel - non structural | $20,000 |
| Sep 14, 2005 | Never finaled issued Sep 2005, no final | 1 Post St | temporary wood wall enclosure to be 8" high/revision to app #200508039374Details
temporary wood wall enclosure to be 8" high/revision to app #200508039374 | $2,500 |
| Aug 23, 2005 | Completed final sign-off Sep 2005 | 148 Dorado Tr | replace 4 exterior windows.Details
replace 4 exterior windows. | $3,000 |
| Apr 15, 2002 | Expired or cancelled expired Dec 2002 | 801 Montgomery St | demo office walls/t-bar grid and carpet on 3rd floor/remove doors to be savedDetails
demo office walls/t-bar grid and carpet on 3rd floor/remove doors to be saved | $5,000 |