Joseph J Fitzsimons
- Listed as
- engineer
- On San Francisco permits
- May 2021 to Oct 2026
18 permits since 2000 (engineer on 18 permits): 12 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 2543 Noriega St | att is proposing to modify its existing wireless facility at the above address. the proposed modifications consist of ; reinforce 7 existing antenna mounts, remove and replace 3 pipe mounts & baseplates, 3 rrus, 3 air antennas, remove 1 pwer plant,replace 20 batteries, 1 batter rack, 1 dcpp rackDetails
att is proposing to modify its existing wireless facility at the above address. the proposed modifications consist of ; reinforce 7 existing antenna mounts, remove and replace 3 pipe mounts & baseplates, 3 rrus, 3 air antennas, remove 1 pwer plant,replace 20 batteries, 1 batter rack, 1 dcpp rack | $45,980 | |
| May 7, 2026 | Completed final sign-off Sep 2026 | 5 The Embarcadero | Metropolitan Electrical Construction | modification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage.Details
modification of an existing wireless at&t facility consisting:remove and replace(3) antennas w/ mast pipes for new antennas; rf eme safety signage. | $46,722 |
| Apr 9, 2026 | In progress filed Apr 2026, not yet issued | 755 Stanyan St | at&t modification of an (e) wireless facility consisting of: r/r 3 antennas; 12 converters and 1 rectifier & 1 netsure 512 retrofit kit in (e) dc power plantDetails
at&t modification of an (e) wireless facility consisting of: r/r 3 antennas; 12 converters and 1 rectifier & 1 netsure 512 retrofit kit in (e) dc power plant | $46,000 | |
| Jan 29, 2026 | In progress issued Sep 2026 | 4610 Mission St | Diablo Telecom & Construction Inc | at&t modification of (e) wireless facility consisting of: r/r (3) antennas w/(3) (n) mounting pipes; install 1 (n) netsure 7100 upgrade kit in (e) dcpp rack and (9) (n) vertiv converter - in (e) dcpp rack; install rf safety signage; stripping and barricades per eme rf reportDetails
at&t modification of (e) wireless facility consisting of: r/r (3) antennas w/(3) (n) mounting pipes; install 1 (n) netsure 7100 upgrade kit in (e) dcpp rack and (9) (n) vertiv converter - in (e) dcpp rack; install rf safety signage; stripping and barricades per eme rf report | $68,520 |
| Jan 29, 2026 | In progress filed Jan 2026, not yet issued | 2 New Montgomery St | at&t modification of an (e) wireless facility consisting of: remove (4) rru's & power trunks: install 1 (2) air anteannas, 2 rrus & power trunks & pipes: install 1 rectifier expansion shelf; (1) -48v rectifier; 6 power exten converter; (1) g4 bbu; install rf safety signs. stripping & barricades perDetails
at&t modification of an (e) wireless facility consisting of: remove (4) rru's & power trunks: install 1 (2) air anteannas, 2 rrus & power trunks & pipes: install 1 rectifier expansion shelf; (1) -48v rectifier; 6 power exten converter; (1) g4 bbu; install rf safety signs. stripping & barricades per | $81,500 | |
| Feb 22, 2023 | Completed final sign-off Dec 2023 | 251 Barneveld Av | Electric Tech Construction Inc | revision to pa #202009043530, remove 3 existing radomes, replace 3 new radomes w/guywires added to n&e, r/r 6 anenans & relocate 3 e antenas, install 3 new rru's, 1 new 6648 bbu in e cabinet, 1 new rectifier in e dcpp,4 n 160ah lead acid batteries in e battery cab in outdoor equip. area.Details
revision to pa #202009043530, remove 3 existing radomes, replace 3 new radomes w/guywires added to n&e, r/r 6 anenans & relocate 3 e antenas, install 3 new rru's, 1 new 6648 bbu in e cabinet, 1 new rectifier in e dcpp,4 n 160ah lead acid batteries in e battery cab in outdoor equip. area. | $55,000 |
| Jan 31, 2023 | Completed final sign-off Feb 2025 | 140 02nd St | Electric Tech Construction Inc | at&t mobility installation of new unmanned telecommunications facility on rooftop. sffd operational permit for batteries on a separate permit.Details
at&t mobility installation of new unmanned telecommunications facility on rooftop. sffd operational permit for batteries on a separate permit. | $195,000 |
| Jan 26, 2023 | Expired or cancelled withdrawn May 2025 | 260 Golden Gate Av | at&t modifications of an unmanned telecom facility consisting of remove (4) panel antennas; install (3) new antennas; (3) new rru's; rru mounting; new rf safety signs, barricades + stripping on rooftop. (1) new rectifier in (e) dcpp; (1) new dc 12-rm + (1) new 6673 bbu in (e) racks.Details
at&t modifications of an unmanned telecom facility consisting of remove (4) panel antennas; install (3) new antennas; (3) new rru's; rru mounting; new rf safety signs, barricades + stripping on rooftop. (1) new rectifier in (e) dcpp; (1) new dc 12-rm + (1) new 6673 bbu in (e) racks. | $55,000 | |
| Nov 8, 2022 | Completed final sign-off Jan 2024 | 318 Main St | Jfc Construction Inc. | installation of nw site bld unmanned telecommunications facility consisting of the installation of 3 panel antennas at sector c; removal of 2 types of rru's and installation of other rru's. installation of frp screen box & related equipment. removal of extg cabinet on rooftop. installation of dcppDetails
installation of nw site bld unmanned telecommunications facility consisting of the installation of 3 panel antennas at sector c; removal of 2 types of rru's and installation of other rru's. installation of frp screen box & related equipment. removal of extg cabinet on rooftop. installation of dcpp | $215,000 |
| Aug 9, 2022 | Completed final sign-off Jun 2023 | 1135 Evans Av | Ravig Inc Dba Salient Global Technologi | section 6409 modification to e verizon site. remove 6 antennas, remove 2 rrus-12 radios, remove preplace 2 raycaps and 2 hybrid cables. install 6 new antennas and 2 rru 8843 radios . remove 8 coax cablesDetails
section 6409 modification to e verizon site. remove 6 antennas, remove 2 rrus-12 radios, remove preplace 2 raycaps and 2 hybrid cables. install 6 new antennas and 2 rru 8843 radios . remove 8 coax cables | $23,460 |
| Jul 1, 2022 | Never finaled issued Aug 2022, no final | 1528 Pine St | Jfc Construction Inc. | at&t installation of temp facility consisting of: install 32'4" temp monopole w/6 panel antennas, 12 rrus on rooftop; temp equip. shetler on roof top containing 3 rrus, 2 surge suppresors, 1 dcpp rack w/3 strings 190ah batteries, 8 rectifiers, 2 racks w/(2) 5216bbu & 2 xmu bbu; 1 new ac power panel;Details
at&t installation of temp facility consisting of: install 32'4" temp monopole w/6 panel antennas, 12 rrus on rooftop; temp equip. shetler on roof top containing 3 rrus, 2 surge suppresors, 1 dcpp rack w/3 strings 190ah batteries, 8 rectifiers, 2 racks w/(2) 5216bbu & 2 xmu bbu; 1 new ac power panel; | $85,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2023 | 2601 Mission St | Metropolitan Electrical Construction | at&t modification: roof - remove + replace 9 antennas, 9 rru's, 9 cable shrouds. add 3 new rru's, 6 dc9 boxes, 6 #6 awg dc power trunks. remove 6 dc6 boxes. install 4 rectifiers in (e) dcpp, 1 dc power dist panel in (e) rack. 1 dc12-rm and 1 6648 baseband unit in (e) racks.Details
at&t modification: roof - remove + replace 9 antennas, 9 rru's, 9 cable shrouds. add 3 new rru's, 6 dc9 boxes, 6 #6 awg dc power trunks. remove 6 dc6 boxes. install 4 rectifiers in (e) dcpp, 1 dc power dist panel in (e) rack. 1 dc12-rm and 1 6648 baseband unit in (e) racks. | $75,000 |
| May 23, 2022 | Completed final sign-off Mar 2024 | 536 Mission St | Metropolitan Electrical Construction | at&t modicficaition of an unmanned telecom facility, consisting of: remove and replace (18) antennas; remove (12) rru's install (6); install (6) dc9 box with (6) power trunks; r+r (8) antenna masts; remove (28) strings 155ah batteries + install (16) 190ah battery in new battery rack. (12) 190 ag inDetails
at&t modicficaition of an unmanned telecom facility, consisting of: remove and replace (18) antennas; remove (12) rru's install (6); install (6) dc9 box with (6) power trunks; r+r (8) antenna masts; remove (28) strings 155ah batteries + install (16) 190ah battery in new battery rack. (12) 190 ag in | $85,000 |
| May 4, 2022 | Completed final sign-off Apr 2023 | 1625 Post St | Lemcon | att modi of antennas: r/r (9)panels behind (e) 5c rooms & (6) rrus, remove (9) antennas; install (4) n recifieds in (e) dcpp cabinets, install (8) 190 alt batterry in 1 new stackable cabinet, 1 n 6648 baseband unit/max in (e) purcell cabinets 2n l 4x4x1/4 beam for new cabinet and new rf safety signDetails
att modi of antennas: r/r (9)panels behind (e) 5c rooms & (6) rrus, remove (9) antennas; install (4) n recifieds in (e) dcpp cabinets, install (8) 190 alt batterry in 1 new stackable cabinet, 1 n 6648 baseband unit/max in (e) purcell cabinets 2n l 4x4x1/4 beam for new cabinet and new rf safety sign | $45,000 |
| May 4, 2022 | Completed final sign-off Jul 2024 | 795 Folsom St | Metropolitan Electrical Construction | r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinetsDetails
r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinets | $55,000 |
| Apr 26, 2022 | Completed final sign-off Nov 2022 | 225 30th St | Metropolitan Electrical Construction | att cell site mod: r/r 9 panel antennas.remove 6 rru's and replace with 3 new rrus. install 3 new diplexers near antennas sector.r/r 20 batteirs.install new rf safety signs and striping at rooftop.Details
att cell site mod: r/r 9 panel antennas.remove 6 rru's and replace with 3 new rrus. install 3 new diplexers near antennas sector.r/r 20 batteirs.install new rf safety signs and striping at rooftop. | $45,000 |
| Apr 26, 2022 | Completed final sign-off Mar 2023 | 270 Mcallister St | Electric Tech Construction Inc | cell site mod: r/r 2 antennas from sector c.install 1 (n) antennae at sector a/b.remove 2 (e) low loss conbiners, 1 (e) duw from rack.install 1-6648 bbu,3 rectifiers, 8 batteries.replace a/c panel with new 200ac breaker.install rf saftey.Details
cell site mod: r/r 2 antennas from sector c.install 1 (n) antennae at sector a/b.remove 2 (e) low loss conbiners, 1 (e) duw from rack.install 1-6648 bbu,3 rectifiers, 8 batteries.replace a/c panel with new 200ac breaker.install rf saftey. | $45,000 |
| May 10, 2021 | Completed final sign-off Feb 2023 | 2425 17th St | Quality Telecom Consultants | revision to pa# 201806081378. structural changes revised frp screws boxes from 4 to 3 moving sector btd to same bx. structural changes revised in cals.Details
revision to pa# 201806081378. structural changes revised frp screws boxes from 4 to 3 moving sector btd to same bx. structural changes revised in cals. | $200,000 |