Ravig Inc Dba Salient Global Technologi
- Based in
- Pittsburg
- On San Francisco permits
- May 2021 to Oct 2024
- Last 24 months
- 1 permit filed
18 permits since 2000: 14 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2024 | Completed final sign-off Apr 2025 | 766 Vallejo St | removal of 9 antennas,9 antenna mounts,6 diplexers, 8 1 5/8" & 7/8" coax cables, 1 rbs 6201 lte cabinet and associated radios at ment, 3 rrus-12 units @ equipment,6 triplexers @ equipment,& all cdma related equipment & cables.installation of 3(n)frp screens @ antennasDetails
removal of 9 antennas,9 antenna mounts,6 diplexers, 8 1 5/8" & 7/8" coax cables, 1 rbs 6201 lte cabinet and associated radios at ment, 3 rrus-12 units @ equipment,6 triplexers @ equipment,& all cdma related equipment & cables.installation of 3(n)frp screens @ antennas | $100,000 |
| Nov 18, 2022 | Completed final sign-off Dec 2023 | 2 Henry Adams St | remove an dreplace 2 raycap 3315 surge surpressors wi 3 racapsurge supr. replace rack mounted 22 60 surge sup w 3 rack mntd.2 hybrid cables w 3 12x24 hybrid cables.replace surge surge mounts w 2 new mnts. 3 antennas, cbrs 4408 b48 radio units @ antennas,4 4449 units @antenntasDetails
remove an dreplace 2 raycap 3315 surge surpressors wi 3 racapsurge supr. replace rack mounted 22 60 surge sup w 3 rack mntd.2 hybrid cables w 3 12x24 hybrid cables.replace surge surge mounts w 2 new mnts. 3 antennas, cbrs 4408 b48 radio units @ antennas,4 4449 units @antenntas | $40,000 |
| Aug 9, 2022 | Completed final sign-off Jun 2023 | 1135 Evans Av | section 6409 modification to e verizon site. remove 6 antennas, remove 2 rrus-12 radios, remove preplace 2 raycaps and 2 hybrid cables. install 6 new antennas and 2 rru 8843 radios . remove 8 coax cablesDetails
section 6409 modification to e verizon site. remove 6 antennas, remove 2 rrus-12 radios, remove preplace 2 raycaps and 2 hybrid cables. install 6 new antennas and 2 rru 8843 radios . remove 8 coax cables | $23,460 |
| Aug 2, 2022 | Completed final sign-off Apr 2025 | 1900 Bryant St | mod to (e) verizon wirless site: remove 6 (e) antennas and install new. r/r 3 b2 units with 3 radio 8843 units.install 3 new radio 8863 units.install 3 (n) 4408 radio units.r/r 5 raycep3315 surge supressors with 5 new raycap6627. r/r 2 (e) 6x12 hybrid cables with (n) 12x24 hybrid cables.Details
mod to (e) verizon wirless site: remove 6 (e) antennas and install new. r/r 3 b2 units with 3 radio 8843 units.install 3 new radio 8863 units.install 3 (n) 4408 radio units.r/r 5 raycep3315 surge supressors with 5 new raycap6627. r/r 2 (e) 6x12 hybrid cables with (n) 12x24 hybrid cables. | $40,000 |
| Jun 21, 2022 | Never finaled issued Dec 2022, no final | 425 California St | verizon: remove & replace 8 (e) antennas with 8 (n) antennas. remove & replace 4 (e) raycap 3315 surge suppressors with 4 (n) raycap. remove & replace 4 (e) 260 surge suppressors with 4 (n) raycap surge suppressors at equipment. remove & replace 4 (e) 6x12 hybrid cable.Details
verizon: remove & replace 8 (e) antennas with 8 (n) antennas. remove & replace 4 (e) raycap 3315 surge suppressors with 4 (n) raycap. remove & replace 4 (e) 260 surge suppressors with 4 (n) raycap surge suppressors at equipment. remove & replace 4 (e) 6x12 hybrid cable. | $40,000 |
| May 31, 2022 | Completed final sign-off Jul 2025 | 665 Chestnut St | modification to (e) verizon site - installing 3(n)frp radomes; installing 3(n) antennas on mounts; installing 1(n) rrus-8863 unit @ antennas sector a; installing 2 (n) w12x26 beams (1) @ sector a & sector bDetails
modification to (e) verizon site - installing 3(n)frp radomes; installing 3(n) antennas on mounts; installing 1(n) rrus-8863 unit @ antennas sector a; installing 2 (n) w12x26 beams (1) @ sector a & sector b | $40,000 |
| Apr 6, 2022 | In progress issued Nov 2023 | 245 South Van Ness Av | verizon wireless: remove 3 (e) rrus. remove 3 (e) dc-3315 surge protector. install 6 (n) antennas, 3 (n) rrus, 3 (n) dc surge protectors. remove 3 (e) 6x12 hybrid cables. install 3 (n) 12x24 hybrid cables. relocate 3 (e) rrus to antennas. remove 3 (e) surge protector. install 3 (e) surge protector.Details
verizon wireless: remove 3 (e) rrus. remove 3 (e) dc-3315 surge protector. install 6 (n) antennas, 3 (n) rrus, 3 (n) dc surge protectors. remove 3 (e) 6x12 hybrid cables. install 3 (n) 12x24 hybrid cables. relocate 3 (e) rrus to antennas. remove 3 (e) surge protector. install 3 (e) surge protector. | $40,000 |
| Apr 6, 2022 | Completed final sign-off Jul 2023 | 270 Mcallister St | modif to (e) verizon wireless site; remove (1)(e) antenna, (2)(e)rrus, (1)rrus11 b13, (1) rrus12bu, (1)(e) radone; install (2) new antennas, (2) new rrus, (1) uuu9, (1)8863, (2) new diplexers, (1) new radone 8-0" x 4'-4" ocDetails
modif to (e) verizon wireless site; remove (1)(e) antenna, (2)(e)rrus, (1)rrus11 b13, (1) rrus12bu, (1)(e) radone; install (2) new antennas, (2) new rrus, (1) uuu9, (1)8863, (2) new diplexers, (1) new radone 8-0" x 4'-4" oc | $40,000 |
| Apr 6, 2022 | Completed final sign-off Jun 2023 | 50 Beale St | verizon: modification to cell site. removing and replacing 3 (e) antennas and port covers with 3 new antennas and port covers. r/r 6 (e) raycap 6627 surge suppressers.Details
verizon: modification to cell site. removing and replacing 3 (e) antennas and port covers with 3 new antennas and port covers. r/r 6 (e) raycap 6627 surge suppressers. | $40,000 |
| Mar 9, 2022 | Never finaled issued May 2022, no final | 5630 Mission St | verizon: relocate 6 & add 3 antennas. relocate 6, replace 3 & add 1 rru. relocate 1 & add 2 ovps. remove 3 diplexers. install 2 combiners. install screen wall. relocate & install mounting pipes. replace 1 & add 2 hybrid cables. install 2 oups at equip room.Details
verizon: relocate 6 & add 3 antennas. relocate 6, replace 3 & add 1 rru. relocate 1 & add 2 ovps. remove 3 diplexers. install 2 combiners. install screen wall. relocate & install mounting pipes. replace 1 & add 2 hybrid cables. install 2 oups at equip room. | $59,000 |
| Feb 28, 2022 | Completed final sign-off Apr 2024 | 1431 San Bruno Av | verizon: remove 9 antenna, add 12 antennas. remove 12 radio units, add 9 radio units. install mount modifications for antennas.Details
verizon: remove 9 antenna, add 12 antennas. remove 12 radio units, add 9 radio units. install mount modifications for antennas. | $33,500 |
| Feb 18, 2022 | Never finaled issued Apr 2023, no final | 735 Montgomery St | mod to (e) verizon wireless site: remove & replace 6 (e) antennas with 6 new antennas. install 3 (n) antennas on (n) mounts. install 3 (n) 4408 radio unit at antennas. install 3 (n) radio 044449 units at antennas.Details
mod to (e) verizon wireless site: remove & replace 6 (e) antennas with 6 new antennas. install 3 (n) antennas on (n) mounts. install 3 (n) 4408 radio unit at antennas. install 3 (n) radio 044449 units at antennas. | $40,000 |
| Feb 18, 2022 | Completed final sign-off Mar 2024 | 98 Battery St | verizon site modification. remove and replace 8 (e) antennas w/8 (n) antennas. remove and replace 4 (e) rrus-32 b66a units with 4 (n) radio 8443 units. remove and replace 4 (e) rrus-11 with 4 (n) radio 4449 units. see plans for further detail.Details
verizon site modification. remove and replace 8 (e) antennas w/8 (n) antennas. remove and replace 4 (e) rrus-32 b66a units with 4 (n) radio 8443 units. remove and replace 4 (e) rrus-11 with 4 (n) radio 4449 units. see plans for further detail. | $40,000 |
| Feb 14, 2022 | Completed final sign-off Mar 2024 | 171 02nd St | verizon wireless site modification removing & replacing 6(e) antennas w/6(n) antennas; retaining 2(e0 antennas; removing & replacing 2(e) 24" radomes w/2(n) radomes; removing & replacing 3(e) rrus-32 b2 units w/3(n) radio 8843 units @ antennas; installing 3(n) radio 8863 units @antennas.Details
verizon wireless site modification removing & replacing 6(e) antennas w/6(n) antennas; retaining 2(e0 antennas; removing & replacing 2(e) 24" radomes w/2(n) radomes; removing & replacing 3(e) rrus-32 b2 units w/3(n) radio 8843 units @ antennas; installing 3(n) radio 8863 units @antennas. | $40,000 |
| Feb 9, 2022 | Completed final sign-off Apr 2024 | 1344 Ocean Av | verizon wireless: replace 6 & add 3 antenna. replace 3 & add 3 rrus. replace 3 oups, add 3 antenna mounts, remove all coax runs, replace 1 & add 2 hybrid cables. at equip room, remove all rrus. replace 1 & add 2 ovps.Details
verizon wireless: replace 6 & add 3 antenna. replace 3 & add 3 rrus. replace 3 oups, add 3 antenna mounts, remove all coax runs, replace 1 & add 2 hybrid cables. at equip room, remove all rrus. replace 1 & add 2 ovps. | $70,000 |
| Dec 21, 2021 | Completed final sign-off Feb 2023 | 375 Alabama St | verizon: remove and replace 6 (e) antennas with 6 new antennas. remove and replace 3 (e) rrus-32 b2 units with 3 new radio 8843 units at antennas. install 3 new radio 8863 units at antennas.Details
verizon: remove and replace 6 (e) antennas with 6 new antennas. remove and replace 3 (e) rrus-32 b2 units with 3 new radio 8843 units at antennas. install 3 new radio 8863 units at antennas. | $40,000 |
| Dec 20, 2021 | Completed final sign-off Jun 2023 | 1111 Junipero Serra Bl | at&t:remove (3)(e)antennas, intall(6)(n) antennas,remove(6)(e) rrus;install(3)(n)rrus;remove & replace(1)(e)battery cabinet;install(8)(n)batteries;no new electrical work.Details
at&t:remove (3)(e)antennas, intall(6)(n) antennas,remove(6)(e) rrus;install(3)(n)rrus;remove & replace(1)(e)battery cabinet;install(8)(n)batteries;no new electrical work. | $52,000 |
| May 10, 2021 | Completed final sign-off May 2024 | 501 Laguna Honda Bl | this proposal involves modifying an existing verizon wireless, rooftop facility located inside a cupola on a church. the intent is to swap six existing panel antennas for six new panel antennas. remove/repl rru's, surge protector, non-rf windows, mounts.Details
this proposal involves modifying an existing verizon wireless, rooftop facility located inside a cupola on a church. the intent is to swap six existing panel antennas for six new panel antennas. remove/repl rru's, surge protector, non-rf windows, mounts. | $104,000 |