Permit GraphShortlistSan Francisco building permits since 2000

Johnathan Toman

License
M33853
Look the license up with the state
Listed as
engineer
Firm
Emerald City Engineers, Inc.
Based in
Mountlake Terrace
On San Francisco permits
Feb 2016 to Mar 2025

9 permits since 2000 (engineer on 9 permits): 7 completed, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 10, 2025Completed
final sign-off Apr 2026
3900 03rd StSingular Buildersrenov. of shared bathrooms @ lvls 2&3. convert (e) g.f. retail space to support services for (p) boarding rms abv. legalize 1 sleeping room (307) for a total of 20 sleeping rms. energy upgrades incl: (n) lighting and mechanical units. replce all int. flooring, cabinets,plumbing fixtures and finishes
Details
Permit
202412035993
Status
complete
Filed
Mar 10, 2025
Permit issued
Jul 1, 2025
Final sign-off
Apr 1, 2026
Declared cost
$1,365,000
Address
3900 03rd St

renov. of shared bathrooms @ lvls 2&3. convert (e) g.f. retail space to support services for (p) boarding rms abv. legalize 1 sleeping room (307) for a total of 20 sleeping rms. energy upgrades incl: (n) lighting and mechanical units. replce all int. flooring, cabinets,plumbing fixtures and finishes

Open the permit page

$1,365,000
Dec 9, 2019Completed
final sign-off Mar 2025
1360 43rd AvCahill Contractors Llc.priority project, mayor ed 13-01. to erect a type 3a over type 1a, 5-story, 100% afforable educator building w/ 135 residential units.
Details
Permit
201912099009
Status
complete
Filed
Dec 9, 2019
Permit issued
Jan 11, 2021
Final sign-off
Mar 5, 2025
Declared cost
$40,000,000
Address
1360 43rd Av

priority project, mayor ed 13-01. to erect a type 3a over type 1a, 5-story, 100% afforable educator building w/ 135 residential units.

Open the permit page

$40,000,000
Jun 24, 2019Completed
final sign-off Dec 2021
1532 Harrison StCannon Constructors North Increvision to s3(stromwater) for pa 2016-07-25-3262s. adjust the sewer piping to meet all the inverts at the street. maher exempted-approval from dph attached.
Details
Permit
201906244253
Status
complete
Filed
Jun 24, 2019
Permit issued
Jul 15, 2019
Final sign-off
Dec 13, 2021
Declared cost
$18,500
Address
1532 Harrison St

revision to s3(stromwater) for pa 2016-07-25-3262s. adjust the sewer piping to meet all the inverts at the street. maher exempted-approval from dph attached.

Open the permit page

$18,500
Mar 20, 2019Completed
final sign-off Apr 2021
333 12th StGranite Excavation & Demolition Increvision to pa# 2017/05/02/5458-s2 (arch / mech); ef-11 discharge has been rerouted to the exterior. the fsd is no longer required. heat calculations provided on sheet m2.01; fire pump wiring method will follow bulletin 4.22. ** maher: n/a **
Details
Permit
201903205770
Status
complete
Filed
Mar 20, 2019
Permit issued
Jun 14, 2019
Final sign-off
Apr 7, 2021
Address
333 12th St

revision to pa# 2017/05/02/5458-s2 (arch / mech); ef-11 discharge has been rerouted to the exterior. the fsd is no longer required. heat calculations provided on sheet m2.01; fire pump wiring method will follow bulletin 4.22. ** maher: n/a **

Open the permit page

Apr 23, 2018Expired or cancelled
cancelled Oct 2022
1174 Folsom Stpuc stormwater management permit, requires dbi plumbing inspection
Details
Permit
201804237132
Status
cancelled
Filed
Apr 23, 2018
Address
1174 Folsom St

puc stormwater management permit, requires dbi plumbing inspection

Open the permit page

Oct 24, 2017Completed
final sign-off Dec 2020
2000 Bryant StBuild Group Inc.design of a storm water management plan. ** maher: n/a **
Details
Permit
201710242138
Status
complete
Filed
Oct 24, 2017
Permit issued
Nov 27, 2017
Final sign-off
Dec 4, 2020
Declared cost
$500,000
Address
2000 Bryant St

design of a storm water management plan. ** maher: n/a **

Open the permit page

$500,000
Jul 20, 2017Completed
final sign-off Jun 2018
388 Fulton Strevision to pa#201608185378, 201704043120, 201704144019, revision of mep permit to alter makeup air routing & water heater venting
Details
Permit
201707202529
Status
complete
Filed
Jul 20, 2017
Permit issued
Jul 20, 2017
Final sign-off
Jun 12, 2018
Address
388 Fulton St

revision to pa#201608185378, 201704043120, 201704144019, revision of mep permit to alter makeup air routing & water heater venting

Open the permit page

Mar 23, 2016Never finaled
issued Mar 2016, no final
350 08th StJames E Roberts-Obayashi Corporationrevision to arch/mep s2 addensum required for sprinkler s3 addendum. mech calcs added for fire pump room, elec wiring done per sf requirements to be watertight. n/a for maher.
Details
Permit
201603232899
Status
issued
Filed
Mar 23, 2016
Permit issued
Mar 30, 2016
Address
350 08th St

revision to arch/mep s2 addensum required for sprinkler s3 addendum. mech calcs added for fire pump room, elec wiring done per sf requirements to be watertight. n/a for maher.

Open the permit page

Feb 17, 2016Completed
final sign-off Oct 2019
210 Taylor StCahill Contractors Llc., Cahill Contractors Incerect 9 story, type 1, zero basement, 113 dwelling unit and retail building.
Details
Permit
201602179822
Status
complete
Filed
Feb 17, 2016
Permit issued
Feb 7, 2017
Final sign-off
Oct 31, 2019
Declared cost
$40,000,000
Address
210 Taylor St

erect 9 story, type 1, zero basement, 113 dwelling unit and retail building.

Open the permit page

$40,000,000