Jesus Francisco Sierra
- Listed as
- engineer
- Firm
- Sierra Engineering Group
- Based in
- Fremont
- On San Francisco permits
- Nov 2004 to Aug 2026
27 permits since 2000 (engineer on 27 permits): 16 completed, 3 in progress, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 5241 Geary Bl | barrier removal, remove column, alter entry alcove slope, install batter power activator. install steel channel.Details
barrier removal, remove column, alter entry alcove slope, install batter power activator. install steel channel. | $18,000 | |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 350 Kansas St | revision to pa# 202512161930: modification of new elec. room, show room kitchen, and (n) ada shower.Details
revision to pa# 202512161930: modification of new elec. room, show room kitchen, and (n) ada shower. | ||
| Jan 9, 2026 | In progress issued Jun 2026 | 350 Kansas St | Leonard Schendel Const.Co | change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile showroom as one building. scope of work includes demolition of existing kitchens, restrooms, per plans. new tile display area raised partial floor...Details
change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile showroom as one building. scope of work includes demolition of existing kitchens, restrooms, per plans. new tile display area raised partial floor... | $1,500,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 1 Warriors Wy | Skyline Construction | tenant improvements for retail space (restaurant) at suite 4Details
tenant improvements for retail space (restaurant) at suite 4 | $911,460 |
| Mar 15, 2022 | Completed final sign-off Sep 2023 | 150 07th St | Swinerton Builders | t.i. partial exterior renovation of (e) bldg @ 154 7th st for a filipino community center of 2 lvl and unoccupied basement with fire/lifesafety improvements to the current restaurant sharing the bldg a@ 150 7th st. limited demo of structural elements, exterior facade and roofingDetails
t.i. partial exterior renovation of (e) bldg @ 154 7th st for a filipino community center of 2 lvl and unoccupied basement with fire/lifesafety improvements to the current restaurant sharing the bldg a@ 150 7th st. limited demo of structural elements, exterior facade and roofing | $2,500,000 |
| Feb 8, 2022 | Completed final sign-off Jan 2023 | 3737 23rd St | Christopher Gate Construction Inc | partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting.Details
partial infill of existing lighwell. remodel of two existing apartments including selected demolition of walls, doors, kitchens & baths, plus reframing of walls and new kitchens, baths, finishes, lighting. | $160,000 |
| Jul 6, 2021 | Completed final sign-off Jan 2022 | 108 Alpine Tr | De Brus Construction Inc | revision to pa #202105079995. to continue foundation repair work to connect (e) footing at garage slab to (e) foundation.Details
revision to pa #202105079995. to continue foundation repair work to connect (e) footing at garage slab to (e) foundation. | $28,000 |
| Jun 1, 2021 | Completed final sign-off Jul 2026 | 260 Crestlake Dr | 1st floor: rebuild existing conservatory to expand kitchen. lower level: enclose space below conservatory for office. lower level: build single story addition, approx 65 sq ft, for living space, with exterior roof deck above. replace non-compliant interior spiral stair with new switch-back stair.Details
1st floor: rebuild existing conservatory to expand kitchen. lower level: enclose space below conservatory for office. lower level: build single story addition, approx 65 sq ft, for living space, with exterior roof deck above. replace non-compliant interior spiral stair with new switch-back stair. | $68,550 | |
| Mar 24, 2021 | Expired or cancelled cancelled Jan 2026 | 160 Central Av | replace (e) carport with a two car garage. create (n) deck on roof of new garage to replace (e) freestanding elevated wood deck. replace (e) exterior wood stair to 2nd fl owner's unit with (n) wood stair in same location.Details
replace (e) carport with a two car garage. create (n) deck on roof of new garage to replace (e) freestanding elevated wood deck. replace (e) exterior wood stair to 2nd fl owner's unit with (n) wood stair in same location. | $30,000 | |
| Dec 10, 2019 | Never finaled issued Aug 2022, no final | 1537 Cole St | to erect a front detached 3-story, type 5b, single family building w/ 1 basement; reference p/a 2019-1210-9141 for associated form 6 demolition permit application, dmj 05/31/2024;Details
to erect a front detached 3-story, type 5b, single family building w/ 1 basement; reference p/a 2019-1210-9141 for associated form 6 demolition permit application, dmj 05/31/2024; | $325,000 | |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 1010 16th St | Dajani Construction | built out new 823 sf commercial kitchen "whole cakes bakery" in existing retail space with (n) 126 sf mezzanine. add a type 2 hood, new plumbing, electrical and finishes as requiredDetails
built out new 823 sf commercial kitchen "whole cakes bakery" in existing retail space with (n) 126 sf mezzanine. add a type 2 hood, new plumbing, electrical and finishes as required | $90,000 |
| Jan 30, 2018 | Never finaled issued Feb 2018, no final | 342 Grant Av | revision to pa #201711274802 and pa #201801168735, to revise structural support method for new dropped ceiling. maher n/a.Details
revision to pa #201711274802 and pa #201801168735, to revise structural support method for new dropped ceiling. maher n/a. | $500 | |
| Aug 31, 2017 | Never finaled issued Jun 2023, no final | 950 Jamestown Av | to erect 3 stories, 1 basement, type v-b, single family residence.Details
to erect 3 stories, 1 basement, type v-b, single family residence. | $350,000 | |
| Aug 31, 2017 | Never finaled issued Jun 2023, no final | 938 Jamestown Av | to erect 3 stories, 1 basement, type v-b, single family residence.Details
to erect 3 stories, 1 basement, type v-b, single family residence. | $350,000 | |
| Aug 31, 2017 | Never finaled issued Jun 2023, no final | 960 Jamestown Av | to erect 3 stories, 1 basement, type v-b, single family residence.Details
to erect 3 stories, 1 basement, type v-b, single family residence. | $350,000 | |
| Aug 24, 2017 | Completed final sign-off Jan 2018 | 2245 18th St | Rozen - Const | unit #2:revision to app#2017-0712-1697. remove wall between living room and master bed room. relocate kitchen. convert exist. kitchen to officeDetails
unit #2:revision to app#2017-0712-1697. remove wall between living room and master bed room. relocate kitchen. convert exist. kitchen to office | $20,000 |
| Mar 16, 2017 | Completed final sign-off Jul 2017 | 2474 Bush St | Rosconn Construction | revision to 201501145733: soft story, remove scope of work from 2/fDetails
revision to 201501145733: soft story, remove scope of work from 2/f | |
| Nov 9, 2016 | Completed final sign-off Nov 2017 | 2 Embarcadero Center | Dome Construction Corp | space # r-2109: revision to pa#201603041173 for design updates, raise floor, add fixtures & shelving, relocate mech. items. value engineering of displays & location. n/a ordinance #155-13Details
space # r-2109: revision to pa#201603041173 for design updates, raise floor, add fixtures & shelving, relocate mech. items. value engineering of displays & location. n/a ordinance #155-13 | $145,000 |
| Sep 16, 2016 | Expired or cancelled cancelled Jul 2024 | 725 Ofarrell St | remodel (e) 1st flr to create (2) apartments. (e) 31 unit (r-2) apartment building will now be 33 unit (r-2) bldg. all (n) work will be sprinkled (fire).Details
remodel (e) 1st flr to create (2) apartments. (e) 31 unit (r-2) apartment building will now be 33 unit (r-2) bldg. all (n) work will be sprinkled (fire). | $300,000 | |
| Jun 24, 2015 | Completed final sign-off Nov 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | revision to pa#201503171114, revision to lateral system design. n/a ordinance #155-13Details
revision to pa#201503171114, revision to lateral system design. n/a ordinance #155-13 | |
| Jan 14, 2015 | Completed final sign-off Apr 2018 | 1138 Fell St | Rosconn Construction | seismic upgrade soft story, comply with sfbc 34b, other rational method.Details
seismic upgrade soft story, comply with sfbc 34b, other rational method. | $50,000 |
| Jan 14, 2015 | Completed final sign-off Jul 2017 | 2474 Bush St | seismic upgrade soft story to comply with sfbc chapter 34b using other rational design.Details
seismic upgrade soft story to comply with sfbc chapter 34b using other rational design. | $50,000 | |
| Jan 14, 2015 | Completed final sign-off Jun 2016 | 1369 Sacramento St | seismic upgrade soft story, comply with sfbc chapter 34b, other rational method.Details
seismic upgrade soft story, comply with sfbc chapter 34b, other rational method. | $80,000 | |
| Apr 10, 2014 | Completed final sign-off Jun 2014 | 2101 Jerrold Av | Cold Storage Manufacturing Inc | tenant improvement for new freezer in existing tenant space. demo existing insulated ceiling panels, light fixtures for reinstallation and evap fan coil. installation of new insul ceiling panels on existing ins wall panels. installation of new evap coil fans, and condensing unitDetails
tenant improvement for new freezer in existing tenant space. demo existing insulated ceiling panels, light fixtures for reinstallation and evap fan coil. installation of new insul ceiling panels on existing ins wall panels. installation of new evap coil fans, and condensing unit | $17,000 |
| Mar 25, 2013 | Expired or cancelled withdrawn Apr 2013 | 725 Ofarrell St | add 2 new dwelling units at 1st floor inside existing building. add stair to connect 1st & 2nd floor. add windows for light & ventilation. repair rear foundation to comply w/ complaing #200987344.Details
add 2 new dwelling units at 1st floor inside existing building. add stair to connect 1st & 2nd floor. add windows for light & ventilation. repair rear foundation to comply w/ complaing #200987344. | $250,000 | |
| Jul 27, 2012 | Completed final sign-off Oct 2013 | 63 Fernwood Dr | conversion of garage to new family room & full bathroom. rebuild stair for compliance and landscape steps at rear.Details
conversion of garage to new family room & full bathroom. rebuild stair for compliance and landscape steps at rear. | $19,000 | |
| Nov 3, 2004 | Completed final sign-off Mar 2005 | 1327 South Van Ness Av | the work consists of replacement of the rear stairs due to deterioration of (e) stairs. this is aDetails
the work consists of replacement of the rear stairs due to deterioration of (e) stairs. this is a | $32,000 |