Jefferson Chen
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Enertia Designs
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Dec 2025
68 permits since 2000 (engineer on 59 permits, architect on 8 permits, authorized agent-others on 1 permit): 43 completed, 8 in progress, 8 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2025 | In progress issued Dec 2025 | 20 Medau Pl | Anco Construction Company | revision 202406275426 1st fl e bath to be relocated. e door at hallway removed, remove wall at kitchen/dining rm. 2nd fl: door to be removed at hallway and kitchen. dryrot replacement.Details
revision 202406275426 1st fl e bath to be relocated. e door at hallway removed, remove wall at kitchen/dining rm. 2nd fl: door to be removed at hallway and kitchen. dryrot replacement. | $5,000 |
| Aug 4, 2025 | In progress issued Aug 2025 | 847 Haight St | Amador General Construction Inc | revision to pa# 202504043766, foundation from (e) brick to new concrete.Details
revision to pa# 202504043766, foundation from (e) brick to new concrete. | $30,000 |
| Oct 31, 2024 | Completed final sign-off Apr 2026 | 1827 33rd Av | Bc United Construction Inc | renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to groundDetails
renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to ground | $730,000 |
| Aug 12, 2024 | Expired or cancelled cancelled Aug 2024 | 1350 44th Av | Sigma Construction Company | adu construction in the 1st story level garage of a 2 story single family house consisting off 2 bedrooms and 1 bath.Details
adu construction in the 1st story level garage of a 2 story single family house consisting off 2 bedrooms and 1 bath. | $80,000 |
| Jun 27, 2024 | In progress issued Apr 2025 | 40 Encanto Av | D3 Construction | new roof deck, 920 sf addition of new wetbar, new spa, new stair and guardrail interior to roof deckDetails
new roof deck, 920 sf addition of new wetbar, new spa, new stair and guardrail interior to roof deck | $13,750 |
| Jun 21, 2024 | In progress issued Jul 2024 | 47 Worth St | San Francisco Developers | ground floor remodeling: to add 2 bedrooms, 2 baths and laundry room; no work on main floor; ref pa# 202403046978Details
ground floor remodeling: to add 2 bedrooms, 2 baths and laundry room; no work on main floor; ref pa# 202403046978 | $100,000 |
| May 30, 2024 | Completed final sign-off Sep 2024 | 1350 Hayes St | expand existing rear deck and ndew stair to rear yardDetails
expand existing rear deck and ndew stair to rear yard | $41,000 | |
| Jan 17, 2024 | Completed final sign-off Mar 2026 | 3941 23rd St | D3 Construction, J W Structures | remodel e residence. relocate e bath at 2nd fl,remodel kitchen. gr fl conversion of non habitable space to add 2 bedrooms and bath. convert gfl window to door retain (e) adj. window.Details
remodel e residence. relocate e bath at 2nd fl,remodel kitchen. gr fl conversion of non habitable space to add 2 bedrooms and bath. convert gfl window to door retain (e) adj. window. | $100,000 |
| Nov 3, 2023 | In progress issued Nov 2023 | 30 Encanto Av | D3 Construction | permeation grouting at property line to a depth of 6 ft for foundation work at 40 encanto ave.Details
permeation grouting at property line to a depth of 6 ft for foundation work at 40 encanto ave. | $12,000 |
| Jan 24, 2023 | Completed final sign-off Oct 2025 | 2821 Franklin St | Vega Construction Company | revision to bpa#201909303123. add a/c condensor roof, change facade windows, front gate/door in-kind, revise kitchen/bathroom layouts, add wet bar, change rear yard facing door & add concrete slabDetails
revision to bpa#201909303123. add a/c condensor roof, change facade windows, front gate/door in-kind, revise kitchen/bathroom layouts, add wet bar, change rear yard facing door & add concrete slab | $32,000 |
| Jul 7, 2022 | Completed final sign-off Dec 2022 | 429 Burnett Av | M & L Construction | new (replaced) 42" code compliant guardrail new stair from deck to garden below (6'-1") no structural work requested vif less than 50 percent dryrot replacement (some deck boards)Details
new (replaced) 42" code compliant guardrail new stair from deck to garden below (6'-1") no structural work requested vif less than 50 percent dryrot replacement (some deck boards) | $20,000 |
| Jul 6, 2022 | Completed final sign-off Jun 2023 | 64 06th Av | Caruso Construction Inc. | renovate kitchen , 2 bathrooms and mudroom. partial infill of lightwell, convert bedroom to wetbar, recofigure walls. paint exterior 4 interior.Details
renovate kitchen , 2 bathrooms and mudroom. partial infill of lightwell, convert bedroom to wetbar, recofigure walls. paint exterior 4 interior. | $125,000 |
| Apr 14, 2022 | Completed final sign-off May 2023 | 1034 Chestnut St | Beyond Construction Builders | rev to pa202203150028: basement floor: (e) wall between between master suite and bathroom to be relocated, bathroom remodel. 1/f: (e) bathroom window to be infilled (in lightwell).Details
rev to pa202203150028: basement floor: (e) wall between between master suite and bathroom to be relocated, bathroom remodel. 1/f: (e) bathroom window to be infilled (in lightwell). | $4,000 |
| Mar 8, 2022 | In progress issued May 2026 | 845 Vermont St | Pristine Builders Group | horizontal addition over 3 levels including basement,first floor. replace rear stair with new fire escape.remodel rear facade,rear yard,interior remodel.Details
horizontal addition over 3 levels including basement,first floor. replace rear stair with new fire escape.remodel rear facade,rear yard,interior remodel. | $165,000 |
| Feb 24, 2022 | Never finaled filed Feb 2022, never issued | 433 Lombard St | rear bldg - interior renovation. upgrades to exterior fenestration & exterior facade materials. waterproofing @ basement. (n) roof @ sun room. replace exterior roof deck w/ noncombustible membrane. replace/repair roofing. (e) (3) floors + basement. no increase in interior sq.ft.Details
rear bldg - interior renovation. upgrades to exterior fenestration & exterior facade materials. waterproofing @ basement. (n) roof @ sun room. replace exterior roof deck w/ noncombustible membrane. replace/repair roofing. (e) (3) floors + basement. no increase in interior sq.ft. | $250,000 | |
| Feb 2, 2022 | Expired or cancelled cancelled Jan 2026 | 51 San Andreas Wy | Caruso Construction Inc. | rev to an approved set of drawings permust appt 202107124204 footing repair (structural)Details
rev to an approved set of drawings permust appt 202107124204 footing repair (structural) | |
| Jan 6, 2022 | Completed final sign-off Sep 2026 | 12 Medau Pl | Anco Construction Company | unit 12: dry rot replacement at office room only. revision to approved permit application number 201912189854.Details
unit 12: dry rot replacement at office room only. revision to approved permit application number 201912189854. | |
| Jan 6, 2022 | Completed final sign-off Sep 2026 | 16 Medau Pl | Anco Construction Company | unit 16: dry rot replacement at bathroom only. revision to approved permit application number 202003116785.Details
unit 16: dry rot replacement at bathroom only. revision to approved permit application number 202003116785. | |
| Dec 2, 2021 | In progress issued Jul 2026 | 1327 48th Av | Metzler Brothers General Contractors Inc | rear side horizontal residence addition on 1st floor. add roof deck to addition. add staircase from backyard to new roof deck. converting part of storage to access corridor to new bedroom. relocation washer and dryer. add new retractable canopy on top of new roof deck. changing existing kitchen winDetails
rear side horizontal residence addition on 1st floor. add roof deck to addition. add staircase from backyard to new roof deck. converting part of storage to access corridor to new bedroom. relocation washer and dryer. add new retractable canopy on top of new roof deck. changing existing kitchen win | $70,000 |
| Sep 14, 2021 | Never finaled issued Sep 2021, no final | 565 Rockdale Dr | existing wallas between kitchen and dining room to be removed. new skylight at kitchen.Details
existing wallas between kitchen and dining room to be removed. new skylight at kitchen. | $10,000 | |
| Mar 3, 2021 | Completed final sign-off Jun 2023 | 8325 Geary Bl | D3 Construction | interior remodel: (e) garage project includes new foundation rear of bldg, new laundry, 2 new bedrooms and bathrooms, new family room. 2/f work includes new master suite and remodel bedroom, new stair included in scope. no change to (e) bldg height or (e) bldg envelope.Details
interior remodel: (e) garage project includes new foundation rear of bldg, new laundry, 2 new bedrooms and bathrooms, new family room. 2/f work includes new master suite and remodel bedroom, new stair included in scope. no change to (e) bldg height or (e) bldg envelope. | $200,000 |
| Sep 22, 2020 | Never finaled issued Nov 2021, no final | 118 Collins St | Terence Mcmahon Construction | 1 story horizontal addition @ ground floor. balcony @ 2nd floor on top of horizontal addition. pedestrian rear yard access bridge. spiral stair from balcony to roof, roof deck, new entry door / window @ front facade. excavation @ rear yard, new rear yard hardscape(concrete steps & retaining walls)Details
1 story horizontal addition @ ground floor. balcony @ 2nd floor on top of horizontal addition. pedestrian rear yard access bridge. spiral stair from balcony to roof, roof deck, new entry door / window @ front facade. excavation @ rear yard, new rear yard hardscape(concrete steps & retaining walls) | $245,000 |
| Jan 23, 2020 | Completed final sign-off Apr 2020 | 665 29th St | rev to 201910094039: to omit structural work shown for 3rd floor of previous permit.Details
rev to 201910094039: to omit structural work shown for 3rd floor of previous permit. | ||
| Dec 24, 2019 | Completed final sign-off Aug 2020 | 2734 20th St | Daniel Knight Construction | rev to pa201906254378: structural repairs & modifications of kitchen north wall.Details
rev to pa201906254378: structural repairs & modifications of kitchen north wall. | $10,000 |
| Dec 11, 2019 | Completed final sign-off Jun 2020 | 2736 20th St | Diego Brothers Inc. | rev to pa# 201911046368; footing structure repairs and shearwall, no other changes, no changes that affect dphDetails
rev to pa# 201911046368; footing structure repairs and shearwall, no other changes, no changes that affect dph | |
| Dec 10, 2019 | Completed final sign-off Jul 2020 | 2999 California St | (unit 203) remove and relocate 2 non load bearing wallsDetails
(unit 203) remove and relocate 2 non load bearing walls | $3,500 | |
| Nov 5, 2019 | In progress issued Dec 2023 | 617 Elizabeth St | Yefa Construction Inc | horizontal & vertical expansion to (e) (3) bedroom, (2.5) bath house to create total of (4) bedroom, (3.5) bath main unit including (n) rear facing decks. adu compromising of (1) bedroom & (1) bath will be created on 1st fl & facing rear yard. adu under permmit #: 202211307361.Details
horizontal & vertical expansion to (e) (3) bedroom, (2.5) bath house to create total of (4) bedroom, (3.5) bath main unit including (n) rear facing decks. adu compromising of (1) bedroom & (1) bath will be created on 1st fl & facing rear yard. adu under permmit #: 202211307361. | $245,000 |
| Oct 18, 2019 | Completed final sign-off Apr 2020 | 3468 17th St | Brighter Bay Builders Inc | kitchen remodel on 3rd floor. new bathroom on 3rd floor.Details
kitchen remodel on 3rd floor. new bathroom on 3rd floor. | $10,000 |
| Oct 15, 2019 | Completed final sign-off Jul 2020 | 244 15th Av | D3 Construction | 2/f: remodel of (e) kitchen, open non-structurual wall between (e) ktichen & (e) dining roo. new bathroom, new closet in (e) office.Details
2/f: remodel of (e) kitchen, open non-structurual wall between (e) ktichen & (e) dining roo. new bathroom, new closet in (e) office. | $45,000 |
| Sep 26, 2019 | Completed final sign-off Jul 2020 | 1737 Chestnut St | Connor Daly Corporation | revision to app#201809140244. changing shear wall to frameDetails
revision to app#201809140244. changing shear wall to frame | $10,000 |
| Sep 16, 2019 | Completed final sign-off Oct 2019 | 1861 Pine St | Mc Gowan Builders | rev to pa201506199474: to comply with nov201632291. rev to plans showing shared foundation & floor joist of 1861/1863 pine street.Details
rev to pa201506199474: to comply with nov201632291. rev to plans showing shared foundation & floor joist of 1861/1863 pine street. | |
| Aug 9, 2019 | Completed final sign-off Sep 2020 | 122 Sussex St | Pattani Construction Co Inc | to comply with complaint 201949681. new family rm & internal stair in basement w/new bedrm/bath 1st flr remodel kitchen & powder rm, convert den to bedrm & bath, 2nd flr - remodel bedrms/bath add 1 bathDetails
to comply with complaint 201949681. new family rm & internal stair in basement w/new bedrm/bath 1st flr remodel kitchen & powder rm, convert den to bedrm & bath, 2nd flr - remodel bedrms/bath add 1 bath | $138,000 |
| Jul 23, 2019 | Never finaled issued Oct 2019, no final | 6439 California St | remove & replace (e) wood staircase and landing with new pre-fabricated steel spiral stair and landingDetails
remove & replace (e) wood staircase and landing with new pre-fabricated steel spiral stair and landing | $20,000 | |
| Jul 3, 2019 | Completed final sign-off Jul 2023 | 120 Varennes St | Topline Builders Corp | interior remodel of 2 residential flats. exterior scope limited to replacement of (e) vinyl & aluminium windows to new wood windows. new garage door & new windows @ rear facade & infill of south light well.Details
interior remodel of 2 residential flats. exterior scope limited to replacement of (e) vinyl & aluminium windows to new wood windows. new garage door & new windows @ rear facade & infill of south light well. | $355,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 3325 Kirkham St | Aurora Builders | revisio to 201902263870, underpin e foundation for work at neighboring property at 3331 kirkhamDetails
revisio to 201902263870, underpin e foundation for work at neighboring property at 3331 kirkham | |
| Jun 25, 2019 | Completed final sign-off Aug 2020 | 3331 Kirkham St | Aurora Builders | revision to 201902263870, underpin existing foundation for foundation reinforcementDetails
revision to 201902263870, underpin existing foundation for foundation reinforcement | |
| Apr 30, 2019 | Completed final sign-off Jun 2019 | 937 Guerrero St | Sft Construction Corp | revision to pa 201710050523. foundation revision including framing and structural details.Details
revision to pa 201710050523. foundation revision including framing and structural details. | |
| Feb 26, 2019 | Completed final sign-off Nov 2019 | 41 Cuvier St | Liang General Construction Inc | interior remodel of 2 units incl new kitchens, remodel (e) baths, remove wall between living rooms & new kitchens, new elctr, mech & plumb, new windows at (e) openings. windows not visible from street. repair (e) deck & stairs in-kind total less than 50%Details
interior remodel of 2 units incl new kitchens, remodel (e) baths, remove wall between living rooms & new kitchens, new elctr, mech & plumb, new windows at (e) openings. windows not visible from street. repair (e) deck & stairs in-kind total less than 50% | $165,000 |
| Feb 25, 2019 | Completed final sign-off Dec 2019 | 4801 Geary Bl | to comply with nov #201921306. the projet proposes conversion of a mattress firm retail to a fitness gym on the ground floor retail spaces of an extg 4 story mixed use bldg in an nc-3 district. the work includes installation of fitness equipment and construction of a post to beam structure toDetails
to comply with nov #201921306. the projet proposes conversion of a mattress firm retail to a fitness gym on the ground floor retail spaces of an extg 4 story mixed use bldg in an nc-3 district. the work includes installation of fitness equipment and construction of a post to beam structure to | $5,000 | |
| Jan 17, 2019 | Completed final sign-off Nov 2019 | 760 Fell St | Sft Construction Corp | voluntary strengthening.Details
voluntary strengthening. | $10,000 |
| Nov 28, 2018 | Completed final sign-off Apr 2019 | 430 Scott St | Wickman Development And Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $73,170 |
| Sep 19, 2018 | Completed final sign-off Oct 2019 | 441 Oak St | Ewen Utting Inc. | 3rd fl new bathroom, e bearing wall at living rm to be removed, new closet at bedroom, voluntary plywood strentheningDetails
3rd fl new bathroom, e bearing wall at living rm to be removed, new closet at bedroom, voluntary plywood strenthening | $5,000 |
| Jul 19, 2018 | Completed final sign-off Aug 2022 | 725 Ofarrell St | per ordinance 162-16, (4) adu in the basement; (3) 2-bedroom units and (1) 1-bedroom unit.Details
per ordinance 162-16, (4) adu in the basement; (3) 2-bedroom units and (1) 1-bedroom unit. | $120,000 | |
| Jul 12, 2018 | Completed final sign-off Nov 2018 | 2866 Jackson St | C H Burnham Inc | new laundry roomDetails
new laundry room | $5,000 |
| Jul 12, 2018 | Completed final sign-off Oct 2018 | 599 Belvedere St | D3 Construction | remodel (2) exist bath rms.reconfigure exist. closets to create new bedroom, replace exist double hung window w/casement to provide eero, new closet at rear bedroom, no load bearning structural changesDetails
remodel (2) exist bath rms.reconfigure exist. closets to create new bedroom, replace exist double hung window w/casement to provide eero, new closet at rear bedroom, no load bearning structural changes | $50,000 |
| Jul 5, 2018 | Never finaled issued May 2022, no final | 248 03rd Av | Jwl 888 Construction Inc, Bejarano Construction 9inc | legalize ground flr unit per ord# 43-14. excavation of the (n) ground flr unit in order to provide minimum ceilingDetails
legalize ground flr unit per ord# 43-14. excavation of the (n) ground flr unit in order to provide minimum ceiling | $65,000 |
| Jul 5, 2018 | Expired or cancelled withdrawn May 2021 | 248 03rd Av | (n) deck and spiral stairs. (n) door. legalization of 3rd unit under permit # 201807053839s.Details
(n) deck and spiral stairs. (n) door. legalization of 3rd unit under permit # 201807053839s. | $10,000 | |
| Jun 15, 2018 | Expired or cancelled suspend Aug 2025 | 1545 Clement St | Olive Construction Corp | build new rear retaining wall with max height =5'-0", and excavate to create 5'-0" sunken courtyardDetails
build new rear retaining wall with max height =5'-0", and excavate to create 5'-0" sunken courtyard | $2,000 |
| Jun 4, 2018 | Completed final sign-off Jan 2019 | 2474 Washington St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appenddix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appenddix a-4 | $92,340 | |
| Jun 4, 2018 | Completed final sign-off Mar 2019 | 1459 Jones St | Lordan Construction | revision to mandatory soft story retrofit pa 2018-0112-8499 hardy moment frame changed to custom designed special moment frame. n/a for maher.Details
revision to mandatory soft story retrofit pa 2018-0112-8499 hardy moment frame changed to custom designed special moment frame. n/a for maher. | |
| May 30, 2018 | Completed final sign-off Aug 2019 | 1118 Harrison St | Champion Construction Inc. | base building improvement of an (e) 1-story w/mezzanine bldg. scope to include removal of (e) stair, (n) stairs, (n) interior partitions for (n) office and accessible restrooms. mep & fire sprinkler permit deferred. maher naDetails
base building improvement of an (e) 1-story w/mezzanine bldg. scope to include removal of (e) stair, (n) stairs, (n) interior partitions for (n) office and accessible restrooms. mep & fire sprinkler permit deferred. maher na | $175,000 |
| May 15, 2018 | Expired or cancelled withdrawn Apr 2019 | 451 Union St | convert nonconforming use to a dwellling (studio) unit per section 182, new kitchen, new bath.Details
convert nonconforming use to a dwellling (studio) unit per section 182, new kitchen, new bath. | $25,000 | |
| May 7, 2018 | Expired or cancelled withdrawn Feb 2021 | 334 03rd Av | revison to mandatory soft story retrofit per sf ordinance permit # 2016-1110-2397 and for adu permit 2016-1110-2401Details
revison to mandatory soft story retrofit per sf ordinance permit # 2016-1110-2397 and for adu permit 2016-1110-2401 | ||
| May 3, 2018 | Never finaled issued Jan 2020, no final | 425 Peru Av | Lee And Son Construction Inc. | (n) deck at rear of bldg, 2 new sliding glass doors @ rear (not visible from street) infill (1) window (not visible from street)Details
(n) deck at rear of bldg, 2 new sliding glass doors @ rear (not visible from street) infill (1) window (not visible from street) | $10,000 |
| May 3, 2018 | Completed final sign-off Feb 2021 | 1324 Chestnut St | Red Bridge Construction Inc | construct one new dwelling unit (1 bedroom & 1 bath) at (e) storage per density of zoning. soft story work under pa# 2018-0501-7900.Details
construct one new dwelling unit (1 bedroom & 1 bath) at (e) storage per density of zoning. soft story work under pa# 2018-0501-7900. | $150,000 |
| May 1, 2018 | Expired or cancelled expired Jul 2026 | 544 Clayton St | Ewen Utting Inc. | per ord# 162-16. add two units: 2 one bedroom units each to include a kitchen & bath.Details
per ord# 162-16. add two units: 2 one bedroom units each to include a kitchen & bath. | $150,000 |
| May 1, 2018 | Completed final sign-off Mar 2021 | 1322 Chestnut St | voluntary soft story retrofit.Details
voluntary soft story retrofit. | $50,000 | |
| May 1, 2018 | Never finaled issued Apr 2019, no final | 445 Oak St | Ewen Utting Inc. | convert (e) 1st fl garage into a (n) 3 bedroom, 2 bath adu unit per ord# 162-16. remove & replace (e) fountation.Details
convert (e) 1st fl garage into a (n) 3 bedroom, 2 bath adu unit per ord# 162-16. remove & replace (e) fountation. | $100,000 |
| Apr 27, 2018 | Completed final sign-off Oct 2018 | 622 Shrader St | Sft Construction Corp | revision to pa #201802131117 & #201509247933, to mandatory soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4, (n) gradebeam.Details
revision to pa #201802131117 & #201509247933, to mandatory soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4, (n) gradebeam. | |
| Apr 27, 2018 | Completed final sign-off Jul 2020 | 2115 Hyde St | Sft Construction Corp | revision to pa #201609218391, to mandatory soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4, foundation revisions. maher naDetails
revision to pa #201609218391, to mandatory soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4, foundation revisions. maher na | |
| Apr 26, 2018 | Never finaled issued May 2018, no final | 531 Lawton St | rear deck replacement. replace (e) concrete slab. new retaining wallDetails
rear deck replacement. replace (e) concrete slab. new retaining wall | $20,000 | |
| Apr 24, 2018 | Completed final sign-off Jan 2022 | 1744 La Salle Av | Casman Construction Inc | interior remodel. relocate kitchen, bath and laundryDetails
interior remodel. relocate kitchen, bath and laundry | $25,000 |
| Apr 13, 2018 | Expired or cancelled expired Jan 2025 | 660 Naples St | Mela Construction Co | rear addition with new bedroom, bathroom, closets & hall. existing bath remodel.Details
rear addition with new bedroom, bathroom, closets & hall. existing bath remodel. | $90,000 |
| Jan 16, 2018 | Completed final sign-off Aug 2020 | 1673 08th Av | 1st flr - bathroom remodel of existing. 2nd flr - remove bearing wall btw (e) family room/dining room & kitchen, provide new beam & posts, (e) bathroom remodel. 3rd flr- master bath * bathroom remodelDetails
1st flr - bathroom remodel of existing. 2nd flr - remove bearing wall btw (e) family room/dining room & kitchen, provide new beam & posts, (e) bathroom remodel. 3rd flr- master bath * bathroom remodel | $50,000 | |
| Aug 18, 2017 | Completed final sign-off Jun 2019 | 4376 17th St | Bc United Construction Inc | comply w/ nov 201761911, clerification of scope of work. revision to 201611293702, 201608296201 expand g/f, excav rear at garage & legalize attic to bedrms & baths, new dormer, skylight,lower 3rd flr, 2nd flr balcony. repair front ext stairs. rebuilt 3rd flr.Details
comply w/ nov 201761911, clerification of scope of work. revision to 201611293702, 201608296201 expand g/f, excav rear at garage & legalize attic to bedrms & baths, new dormer, skylight,lower 3rd flr, 2nd flr balcony. repair front ext stairs. rebuilt 3rd flr. | $300,000 |
| Sep 29, 2016 | Completed final sign-off Dec 2020 | 2472 Vallejo St | horizontal addition, to legalize work done without permit at lower level for nov #201608611. add bedroom & living room.Details
horizontal addition, to legalize work done without permit at lower level for nov #201608611. add bedroom & living room. | $30,000 | |
| Dec 10, 2010 | Expired or cancelled expired Aug 2026 | 834 South Van Ness Av | replace a portion of front yard retaining wall and exterior stairDetails
replace a portion of front yard retaining wall and exterior stair | $5,500 | |
| Nov 18, 2003 | Completed final sign-off Mar 2004 | 2335 Folsom St | replace wood 2 level stairs (dry rot) w/metal 2 level stairs.required 2nd means of egress, 1 hr.wallDetails
replace wood 2 level stairs (dry rot) w/metal 2 level stairs.required 2nd means of egress, 1 hr.wall | $8,000 |