Vega Construction Company
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2019 to Jun 2026
- Last 24 months
- 5 permits filed
31 permits since 2000: 22 completed, 3 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2026 | Completed final sign-off Jun 2026 | 171 Beaver St | to obtain final inspection for work approved under pa#: 202305026894. all work is complete.Details
to obtain final inspection for work approved under pa#: 202305026894. all work is complete. | |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 2295 Vallejo St | bathroom remodel: install new shower pan in the exising shower. install new shower valve and new wall tile and tile floor. no structural work.Details
bathroom remodel: install new shower pan in the exising shower. install new shower valve and new wall tile and tile floor. no structural work. | $25,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 2821 Franklin St | revision to 201909303123 glass guard 2nd fl rear balcony frameless glass.Details
revision to 201909303123 glass guard 2nd fl rear balcony frameless glass. | $11,000 |
| Dec 3, 2024 | In progress issued Dec 2024 | 286 28th Av | interior remodel on 1st and 2nd floorrs- replace bath tub and install (n) electrical and plumbing fixtures. renovate wall at kitchen area. remove and replace ceiling exhaust fans.Details
interior remodel on 1st and 2nd floorrs- replace bath tub and install (n) electrical and plumbing fixtures. renovate wall at kitchen area. remove and replace ceiling exhaust fans. | $68,000 |
| Dec 2, 2024 | Completed final sign-off May 2025 | 267 Mallorca Wy | interior remodeling on 2nd floor only. remodel (e) bath in same location add 2nd bath to master bedroom. remove 1/2 bathroom and change to laundry room and remodel kitchen. to open kitchen on 2nd floor in same location.Details
interior remodeling on 2nd floor only. remodel (e) bath in same location add 2nd bath to master bedroom. remove 1/2 bathroom and change to laundry room and remodel kitchen. to open kitchen on 2nd floor in same location. | $45,000 |
| Oct 3, 2024 | Completed final sign-off Oct 2025 | 317 Cortland Av | rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel.Details
rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel. | |
| Aug 26, 2024 | Completed final sign-off Jul 2025 | 286 28th Av | all work is in-kind: no moving walls. no layout changes. kitchen remodel, bathroom remodel, laundry closet remodel. electrical install new subpanel, new outlets, switches and new recessedDetails
all work is in-kind: no moving walls. no layout changes. kitchen remodel, bathroom remodel, laundry closet remodel. electrical install new subpanel, new outlets, switches and new recessed | $210,000 |
| Mar 11, 2024 | In progress issued Mar 2024 | 56 Lower Tr | revision to 202402075445. repair dry rot at framing member at rear wall. replace door headers and wall plates and framing the new studsDetails
revision to 202402075445. repair dry rot at framing member at rear wall. replace door headers and wall plates and framing the new studs | $11,000 |
| Feb 7, 2024 | In progress issued Feb 2024 | 56 Lower Tr | back of the house not street facing. replacing 7 exterior doors and 1 window and repar 250 sq ft of damage exterior siding and replacing 3 pcs of 2x 4 x 10 studs in kind. same size and same location.Details
back of the house not street facing. replacing 7 exterior doors and 1 window and repar 250 sq ft of damage exterior siding and replacing 3 pcs of 2x 4 x 10 studs in kind. same size and same location. | $31,000 |
| Dec 5, 2023 | Completed final sign-off Jan 2025 | 777 Noe St | master bathroom remodel first fl, 8x7. no walls removedDetails
master bathroom remodel first fl, 8x7. no walls removed | $32,000 |
| Jul 12, 2023 | Never finaled issued Jul 2023, no final | 777 Noe St | guest bathroom remodel on first floor, 8'x7' size. no alteration of wall.Details
guest bathroom remodel on first floor, 8'x7' size. no alteration of wall. | $26,000 |
| Jun 9, 2023 | Completed final sign-off Jun 2023 | 993 Cayuga Av | to comply with 202295303#9- installation of the exhaust for dryer machine in laundry room.Details
to comply with 202295303#9- installation of the exhaust for dryer machine in laundry room. | $600 |
| May 2, 2023 | Expired or cancelled expired Jun 2026 | 171 Beaver St | bathroom remodeling new tile new shower valveDetails
bathroom remodeling new tile new shower valve | $21,000 |
| Feb 21, 2023 | Completed final sign-off Oct 2023 | 171 Beaver St | 3rd floor non-structural remodel to existing primary bathroom. scope of work to include: new partitions, ceiling/lighting, plumbing, electrical and finishes.Details
3rd floor non-structural remodel to existing primary bathroom. scope of work to include: new partitions, ceiling/lighting, plumbing, electrical and finishes. | $51,875 |
| Jan 24, 2023 | Completed final sign-off Oct 2025 | 2821 Franklin St | revision to bpa#201909303123. add a/c condensor roof, change facade windows, front gate/door in-kind, revise kitchen/bathroom layouts, add wet bar, change rear yard facing door & add concrete slabDetails
revision to bpa#201909303123. add a/c condensor roof, change facade windows, front gate/door in-kind, revise kitchen/bathroom layouts, add wet bar, change rear yard facing door & add concrete slab | $32,000 |
| Jan 10, 2023 | Completed final sign-off Sep 2024 | 346 Liberty St | remodel 1 bathroom. remodel kitchen. install 10 new recessed can lights.Details
remodel 1 bathroom. remodel kitchen. install 10 new recessed can lights. | $68,000 |
| Oct 19, 2022 | Completed final sign-off Jun 2023 | 2703 Bush St | main floor - remove fire place in bedroom; convert a closet into 1/2 bathroom frame in closet and replace tile in (e) shower. installation of new shower tubDetails
main floor - remove fire place in bedroom; convert a closet into 1/2 bathroom frame in closet and replace tile in (e) shower. installation of new shower tub | $43,000 |
| Jul 12, 2022 | Completed final sign-off Mar 2023 | 149 Laidley St | repair deck at back of the house dry rot, railings, and 2 section plywood floor. replacing 2 damaged joints. less than 50% repair. water damage work at one room next to deck.Details
repair deck at back of the house dry rot, railings, and 2 section plywood floor. replacing 2 damaged joints. less than 50% repair. water damage work at one room next to deck. | $62,000 |
| May 2, 2022 | Never finaled issued May 2022, no final | 18 Grand View Tr | unit 18: kitchen remodel in kindDetails
unit 18: kitchen remodel in kind | $40,000 |
| Feb 22, 2022 | Never finaled issued Feb 2022, no final | 1 College Av | bathroom remodel. installation of new sub electrical panel. installation 26 new recessed lights. replacing galvanized pipes.Details
bathroom remodel. installation of new sub electrical panel. installation 26 new recessed lights. replacing galvanized pipes. | $65,000 |
| Jan 31, 2022 | Completed final sign-off Sep 2022 | 155 24th Av | apt 1. one kitchen remodel. new cabinets, new countertop. electrical install new outlets. plumbging install new water angles.Details
apt 1. one kitchen remodel. new cabinets, new countertop. electrical install new outlets. plumbging install new water angles. | $25,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 427 Crestmont Dr | repair front patio floor less than 30 inch above grade and replacing dry rot plywoood and install new tile. repair in kind.Details
repair front patio floor less than 30 inch above grade and replacing dry rot plywoood and install new tile. repair in kind. | $25,000 |
| Dec 15, 2021 | Completed final sign-off Nov 2023 | 757 North Point St | #6: kitchen remodel. install new electrical panel. replacing kitchen water angles. no wall layout changeDetails
#6: kitchen remodel. install new electrical panel. replacing kitchen water angles. no wall layout change | $25,000 |
| Sep 21, 2021 | Completed final sign-off Dec 2021 | 2250 Greenwich St | kitchen and bathroom remodel no walss to be removed. connected to 257 moulton stDetails
kitchen and bathroom remodel no walss to be removed. connected to 257 moulton st | $52,000 |
| Aug 16, 2021 | Completed final sign-off Dec 2021 | 1600 Larkin St | unit 103: all (n) led lights: remoedl one bathroom- replace existing fans: remodel one kitchen non structural.Details
unit 103: all (n) led lights: remoedl one bathroom- replace existing fans: remodel one kitchen non structural. | $43,000 |
| Aug 16, 2021 | Never finaled issued Aug 2021, no final | 2226 California St | unit 301: remodel 2 bathrooms:no lite changes. 1 bathroom, replacing floor tile and vanity 1 bathroom replace tub tile vanity.Details
unit 301: remodel 2 bathrooms:no lite changes. 1 bathroom, replacing floor tile and vanity 1 bathroom replace tub tile vanity. | $16,000 |
| Jul 21, 2021 | Completed final sign-off Sep 2021 | 54 Lower Tr | replacing 1 back entry door and 1 back window, in-kind. rev to pa202007160270 per bid request.eero to be maintaning. cbs 1030Details
replacing 1 back entry door and 1 back window, in-kind. rev to pa202007160270 per bid request.eero to be maintaning. cbs 1030 | $1,800 |
| Jul 21, 2021 | Never finaled issued Jul 2021, no final | 747 Santiago St | insulation & sheetrock of 2 bedrooms and living room & dining room. rev to pa202007109929 per bid request.Details
insulation & sheetrock of 2 bedrooms and living room & dining room. rev to pa202007109929 per bid request. | $12,500 |
| May 21, 2021 | Completed final sign-off Jul 2021 | 2616 25th St | unit a: to comply with nov #202177106: 1 bathroom and laundry remodel in-kind. replacing 1 bathroom window non-visible from street. repair dryrot around window only. no removing studs. all work in-kind.Details
unit a: to comply with nov #202177106: 1 bathroom and laundry remodel in-kind. replacing 1 bathroom window non-visible from street. repair dryrot around window only. no removing studs. all work in-kind. | $16,000 |
| May 7, 2021 | Completed final sign-off Oct 2021 | 374 11th St | dryrot and stucco repair approx 1000 sq ft on the back of the building wall and lower and top windows. dry rot repair.Details
dryrot and stucco repair approx 1000 sq ft on the back of the building wall and lower and top windows. dry rot repair. | $42,000 |
| Sep 30, 2019 | Completed final sign-off Oct 2025 | 2821 Franklin St | reno & alteration to (e) family home. 1st flr new conditioned space from (e) storage space, create new bedroom, full bathroom. living space 2/f - reconfigure kitchen, bedroom, bathroom spaces. new sliding doors at rear new balcony.Details
reno & alteration to (e) family home. 1st flr new conditioned space from (e) storage space, create new bedroom, full bathroom. living space 2/f - reconfigure kitchen, bedroom, bathroom spaces. new sliding doors at rear new balcony. | $160,000 |