Permit GraphShortlistSan Francisco building permits since 2000

Jay Sherlock

License
C33354
Look the license up with the state
Listed as
architect, authorized agent-others, designer, engineer
Firm
Studio J. Architecture
Based in
San Anselmo
On San Francisco permits
Oct 2004 to Jun 2026

75 permits since 2000 (architect on 72 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 51 completed, 4 in progress, 8 never finaled, 12 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 5, 2026In progress
issued Jun 2026
500 De Haro StBlair Burke General Contractors Increvision to pa#202601304970, thicken and raise stem on concrete assembly, see 2/s1 & 3/s3 for more information
Details
Permit
202606052639
Status
issued
Filed
Jun 5, 2026
Permit issued
Jun 9, 2026
Declared cost
$16,000
Address
500 De Haro St

revision to pa#202601304970, thicken and raise stem on concrete assembly, see 2/s1 & 3/s3 for more information

Open the permit page

$16,000
Jan 30, 2026In progress
issued Mar 2026
500 De Haro StBlair Burke General Contractors Increplace (e) north entry wall/fence and gate; provide (n) court yard garden podium & wall
Details
Permit
202601304970
Status
issued
Filed
Jan 30, 2026
Permit issued
Mar 17, 2026
Declared cost
$309,000
Address
500 De Haro St

replace (e) north entry wall/fence and gate; provide (n) court yard garden podium & wall

Open the permit page

$309,000
Dec 23, 2025In progress
issued Dec 2025
519 Clipper Stwiden existing ingrade concrete stairs. remove strap on wall (no longer 2 parts) revision to pa #201902153129 (s1)
Details
Permit
202512232490
Status
issued
Filed
Dec 23, 2025
Permit issued
Dec 26, 2025
Address
519 Clipper St

widen existing ingrade concrete stairs. remove strap on wall (no longer 2 parts) revision to pa #201902153129 (s1)

Open the permit page

Nov 21, 2024Completed
final sign-off Jul 2025
331 Gates Strelocate/reconfigure (e) kitchen and bathroon at 2/f. replace/reconfigure rear shed roof to create conforming door height condition.
Details
Permit
202411215481
Status
complete
Filed
Nov 21, 2024
Permit issued
Dec 17, 2024
Final sign-off
Jul 25, 2025
Declared cost
$90,000
Address
331 Gates St

relocate/reconfigure (e) kitchen and bathroon at 2/f. replace/reconfigure rear shed roof to create conforming door height condition.

Open the permit page

$90,000
Nov 21, 2024Completed
final sign-off Jul 2025
745 Brazil Avnew applicance, fixture, counter top and kitchen cabinets, in kitchen - all plumbing and gas to remain in the same locations. all work at upper floor only (kitchen and bathroom remodel, replaced in kind. new,fixtures and cabinets in bathroom, replace tub, wainscolting tile. full tile walls shower,
Details
Permit
202411215507
Status
complete
Filed
Nov 21, 2024
Permit issued
Nov 22, 2024
Final sign-off
Jul 11, 2025
Declared cost
$40,000
Address
745 Brazil Av

new applicance, fixture, counter top and kitchen cabinets, in kitchen - all plumbing and gas to remain in the same locations. all work at upper floor only (kitchen and bathroom remodel, replaced in kind. new,fixtures and cabinets in bathroom, replace tub, wainscolting tile. full tile walls shower,

Open the permit page

$40,000
Sep 20, 2024Completed
final sign-off Jan 2026
2120 Jefferson StNancy Built Llcenclose (e) covered porch at rear yard.provide (n) laundry/mud room.relocate (e) g/f bathroom w/ shower.add kitchen counter/cabinets & bar sink.new hvac & w/h.relocate (e) elec pnl.relocate (e) r-yard gate.reconfigure (e) 2 car garage.replace (e) garage doors & windows.
Details
Permit
202409040006
Status
complete
Filed
Sep 20, 2024
Permit issued
Jan 14, 2025
Final sign-off
Jan 20, 2026
Declared cost
$40,000
Address
2120 Jefferson St

enclose (e) covered porch at rear yard.provide (n) laundry/mud room.relocate (e) g/f bathroom w/ shower.add kitchen counter/cabinets & bar sink.new hvac & w/h.relocate (e) elec pnl.relocate (e) r-yard gate.reconfigure (e) 2 car garage.replace (e) garage doors & windows.

Open the permit page

$40,000
Aug 5, 2024Completed
final sign-off Oct 2024
151 Warriors WyPacific Wide Builders Inc.revision to pa 202311281506 changes include revise interior ceiling height; remove exterior canopy for exterior elevations; change manager desk and pass through window layout; update finishes. no changes to water fixtures
Details
Permit
202408057952
Status
complete
Filed
Aug 5, 2024
Permit issued
Sep 27, 2024
Final sign-off
Oct 30, 2024
Address
151 Warriors Wy

revision to pa 202311281506 changes include revise interior ceiling height; remove exterior canopy for exterior elevations; change manager desk and pass through window layout; update finishes. no changes to water fixtures

Open the permit page

Apr 30, 2024Completed
final sign-off Jul 2025
538 22nd Avadministrative updates to pa# 2022-0506-3720. we identified oversights on the front elevation, 3rd story sq ft and 3rd floor deck
Details
Permit
202404301033
Status
complete
Filed
Apr 30, 2024
Permit issued
May 16, 2024
Final sign-off
Jul 7, 2025
Address
538 22nd Av

administrative updates to pa# 2022-0506-3720. we identified oversights on the front elevation, 3rd story sq ft and 3rd floor deck

Open the permit page

Nov 28, 2023Completed
final sign-off Oct 2024
151 Warriors WyPacific Wide Builders Inc.suite 105-106: first time t.i. of existing commercial retail/food shell. install new kitchen & food service equipment, appliances, and other needed elements. new flooring, lighting, elegant finishes. life safety under separate permit
Details
Permit
202311281506
Status
complete
Filed
Nov 28, 2023
Permit issued
May 28, 2024
Final sign-off
Oct 30, 2024
Declared cost
$2,250,000
Address
151 Warriors Wy

suite 105-106: first time t.i. of existing commercial retail/food shell. install new kitchen & food service equipment, appliances, and other needed elements. new flooring, lighting, elegant finishes. life safety under separate permit

Open the permit page

$2,250,000
Feb 16, 2023Completed
final sign-off Oct 2023
519 Clipper Strevision to pa# 202203220521, new sump pump in maintenance hallway, remove linear drains from scope. sump pump to drain to city sewer.
Details
Permit
202302162150
Status
complete
Filed
Feb 16, 2023
Permit issued
Feb 23, 2023
Final sign-off
Oct 19, 2023
Address
519 Clipper St

revision to pa# 202203220521, new sump pump in maintenance hallway, remove linear drains from scope. sump pump to drain to city sewer.

Open the permit page

Dec 21, 2022Completed
final sign-off Jan 2024
80 Linda StConnemara Fine Trim Inc Dba Highland Buireplace extg dining room window with folding door and glass guardrail. remove partition wall adjacent to fridge. add and provide pantry cab. replace extg primary deck gaurdrail with new glass guardrail. add decorative trellis sunshading.
Details
Permit
202212218863
Status
complete
Filed
Dec 21, 2022
Permit issued
Jun 13, 2023
Final sign-off
Jan 19, 2024
Declared cost
$26,500
Address
80 Linda St

replace extg dining room window with folding door and glass guardrail. remove partition wall adjacent to fridge. add and provide pantry cab. replace extg primary deck gaurdrail with new glass guardrail. add decorative trellis sunshading.

Open the permit page

$26,500
Sep 30, 2022Completed
final sign-off Apr 2023
1481 38th AvFootfour Buildersrevision to bpa#202206166525, reduction of scope no new stairs to garage, keep (e) stairs to garage & add fire rated door @ top of stairs to main habitable floor, remove wall @ end of kitchen island, provide new beam above
Details
Permit
202209303542
Status
complete
Filed
Sep 30, 2022
Permit issued
Oct 3, 2022
Final sign-off
Apr 10, 2023
Address
1481 38th Av

revision to bpa#202206166525, reduction of scope no new stairs to garage, keep (e) stairs to garage & add fire rated door @ top of stairs to main habitable floor, remove wall @ end of kitchen island, provide new beam above

Open the permit page

Sep 29, 2022Completed
final sign-off Apr 2024
519 Clipper Strevise pa#202203220521 to include the construction of new concrete steps tot extg patio.
Details
Permit
202209293461
Status
complete
Filed
Sep 29, 2022
Permit issued
Oct 4, 2022
Final sign-off
Apr 17, 2024
Declared cost
$10,000
Address
519 Clipper St

revise pa#202203220521 to include the construction of new concrete steps tot extg patio.

Open the permit page

$10,000
Jun 16, 2022Completed
final sign-off Apr 2023
1481 38th AvFootfour Buildersprovide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler.
Details
Permit
202206166525
Status
complete
Filed
Jun 16, 2022
Permit issued
Jul 14, 2022
Final sign-off
Apr 10, 2023
Declared cost
$289,000
Address
1481 38th Av

provide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler.

Open the permit page

$289,000
May 6, 2022Completed
final sign-off Aug 2025
538 22nd Av(n) window, (n) addition at 1st fl, (n) laundry, (n) kitchen, remodel (e) bathroom, 3rd fl rear & vertical adition, (n) roof deck, (n) siding.
Details
Permit
202205063720
Status
complete
Filed
May 6, 2022
Permit issued
Dec 6, 2023
Final sign-off
Aug 21, 2025
Declared cost
$415,000
Address
538 22nd Av

(n) window, (n) addition at 1st fl, (n) laundry, (n) kitchen, remodel (e) bathroom, 3rd fl rear & vertical adition, (n) roof deck, (n) siding.

Open the permit page

$415,000
Mar 22, 2022Completed
final sign-off Oct 2023
519 Clipper Stlower (e) floor in maintenance pass through
Details
Permit
202203220521
Status
complete
Filed
Mar 22, 2022
Permit issued
Apr 26, 2022
Final sign-off
Oct 19, 2023
Declared cost
$16,000
Address
519 Clipper St

lower (e) floor in maintenance pass through

Open the permit page

$16,000
Jun 14, 2021Expired or cancelled
cancelled Nov 2024
97 Saturn StNorth South Construction Incnew foundation; create (n) habitable space @ lower level crawl space; new stairs to connect 1st floor with lower level; remodel kitchen, 3 new bedrooms, 2 new bathrooms, 1 laundry room
Details
Permit
202106142323
Status
cancelled
Filed
Jun 14, 2021
Declared cost
$175,000
Address
97 Saturn St

new foundation; create (n) habitable space @ lower level crawl space; new stairs to connect 1st floor with lower level; remodel kitchen, 3 new bedrooms, 2 new bathrooms, 1 laundry room

Open the permit page

$175,000
Mar 24, 2021Expired or cancelled
withdrawn Feb 2022
4732 17th Strenovate (e) unit w/ 2 bedrooms, 1 bath and kitchen. renovate egress hall for (e) unit. renovate (e) primary unit w/ new stairs to garage level, new laundry, new closet, water heater and trash area. 2nd fl remodel kitchen, bathrooms, fireplace and master bed and bath.
Details
Permit
202103247248
Status
withdrawn
Filed
Mar 24, 2021
Declared cost
$210,000
Address
4732 17th St

renovate (e) unit w/ 2 bedrooms, 1 bath and kitchen. renovate egress hall for (e) unit. renovate (e) primary unit w/ new stairs to garage level, new laundry, new closet, water heater and trash area. 2nd fl remodel kitchen, bathrooms, fireplace and master bed and bath.

Open the permit page

$210,000
Dec 1, 2020Completed
final sign-off Mar 2022
2425 Francisco Stref pa# 202008061206, 201612013903, 201907297219-s1 revise heating system. new heating and cooling system. 1 - new fau (lower & mid fl) 2 - new heat pump systerm (3rd fl only)
Details
Permit
202012019922
Status
complete
Filed
Dec 1, 2020
Permit issued
Jan 15, 2021
Final sign-off
Mar 14, 2022
Declared cost
$8,000
Address
2425 Francisco St

ref pa# 202008061206, 201612013903, 201907297219-s1 revise heating system. new heating and cooling system. 1 - new fau (lower & mid fl) 2 - new heat pump systerm (3rd fl only)

Open the permit page

$8,000
Oct 5, 2020Expired or cancelled
cancelled Jan 2025
1548 Leavenworth Staddition to expand (e) 4th fl to facade & rear allowable setback. (n) roof deck/guardrail & stair/elevator penthouse. connect (e) ground fl office/bath to 2nd fl unit. fill in partial north wall light well. reconfigure building & private entry doors & stairs. remodel both units.
Details
Permit
202010055942
Status
cancelled
Filed
Oct 5, 2020
Declared cost
$700,000
Address
1548 Leavenworth St

addition to expand (e) 4th fl to facade & rear allowable setback. (n) roof deck/guardrail & stair/elevator penthouse. connect (e) ground fl office/bath to 2nd fl unit. fill in partial north wall light well. reconfigure building & private entry doors & stairs. remodel both units.

Open the permit page

$700,000
Oct 4, 2020Expired or cancelled
withdrawn Mar 2021
4732 17th Stadd adu unit (per ordinance 162-17) on 1/f behind garage.
Details
Permit
202010045868
Status
withdrawn
Filed
Oct 4, 2020
Declared cost
$250,000
Address
4732 17th St

add adu unit (per ordinance 162-17) on 1/f behind garage.

Open the permit page

$250,000
Sep 10, 2020Expired or cancelled
withdrawn Mar 2021
4732 17th Stadd 3rd story setback from facade. add adu unit (sep permit). reconfgure (e) 1st & 2nd units for new finishes, kitchen, baths & laundry. new windows, new doors, new exterior siding. new deck/stair & balcony at rear.
Details
Permit
202009103891
Status
withdrawn
Filed
Sep 10, 2020
Declared cost
$735,000
Address
4732 17th St

add 3rd story setback from facade. add adu unit (sep permit). reconfgure (e) 1st & 2nd units for new finishes, kitchen, baths & laundry. new windows, new doors, new exterior siding. new deck/stair & balcony at rear.

Open the permit page

$735,000
Aug 6, 2020Completed
final sign-off Mar 2022
2425 Francisco Ststructural revisions to grade beam, coundation work & structural work. architectural interior walls shifted & toilet room location change on 3rd fl; add laundry closet to 3rd floor. revision to pa 2019-0729-7219 & 2016-1201-3903
Details
Permit
202008061206
Status
complete
Filed
Aug 6, 2020
Permit issued
Oct 16, 2020
Final sign-off
Mar 14, 2022
Address
2425 Francisco St

structural revisions to grade beam, coundation work & structural work. architectural interior walls shifted & toilet room location change on 3rd fl; add laundry closet to 3rd floor. revision to pa 2019-0729-7219 & 2016-1201-3903

Open the permit page

Jul 22, 2020Completed
final sign-off Aug 2021
2425 Francisco Stproposed lean concrete for stabilization of 2429 francisco st existing foundation per notice of violation 202028732 and 2020028751
Details
Permit
202007220692
Status
complete
Filed
Jul 22, 2020
Permit issued
Oct 16, 2020
Final sign-off
Aug 12, 2021
Declared cost
$1,000
Address
2425 Francisco St

proposed lean concrete for stabilization of 2429 francisco st existing foundation per notice of violation 202028732 and 2020028751

Open the permit page

$1,000
Jul 29, 2019Completed
final sign-off Apr 2022
2425 Francisco Staltered site permit to 201612013903 -reduce whole original scope to:- add full bath, office & relocate laundry room & sink, relocate garage wall @ (e) 1/f. remodel kitche, relocate toilet @ 2/f. add bathroom, remodel bath , add closet & skylight @ 3/f. replace windows & repair (e)siding as reqd
Details
Permit
201907297219
Status
complete
Filed
Jul 29, 2019
Permit issued
Oct 21, 2019
Final sign-off
Apr 21, 2022
Address
2425 Francisco St

altered site permit to 201612013903 -reduce whole original scope to:- add full bath, office & relocate laundry room & sink, relocate garage wall @ (e) 1/f. remodel kitche, relocate toilet @ 2/f. add bathroom, remodel bath , add closet & skylight @ 3/f. replace windows & repair (e)siding as reqd

Open the permit page

May 3, 2019Completed
final sign-off Jul 2025
10 Curtis StHungto Co Incorporation, Wilkinson Design & Construction, Inc.horizontal addition. create habitable space below (e) kitchen & office. excavate lower level. new laundry room. new yoga room, new spa, new wine room, new dumbwaster. remodel (e) kitchen & bath. new driveway, driveway entrance, curb & rear deck.
Details
Permit
201905039676
Status
complete
Filed
May 3, 2019
Permit issued
Dec 7, 2020
Final sign-off
Jul 31, 2025
Declared cost
$500,000
Address
10 Curtis St

horizontal addition. create habitable space below (e) kitchen & office. excavate lower level. new laundry room. new yoga room, new spa, new wine room, new dumbwaster. remodel (e) kitchen & bath. new driveway, driveway entrance, curb & rear deck.

Open the permit page

$500,000
Apr 30, 2019Never finaled
issued May 2019, no final
80 Linda StAndrew Mark Construction Increvision to pa 2016-1026-1169 (s1) raising roof deck guardrail +/- 3" above facade roof deck
Details
Permit
201904309252
Status
issued
Filed
Apr 30, 2019
Permit issued
May 8, 2019
Address
80 Linda St

revision to pa 2016-1026-1169 (s1) raising roof deck guardrail +/- 3" above facade roof deck

Open the permit page

Mar 1, 2019Never finaled
issued Mar 2019, no final
2241 Fillmore StWest Coast Commercial Interiorsproposed ti: (n) storage room, (n) fitting rooms, (n) ada fitting rooms, (n) display units, update lighting and power.
Details
Permit
201903014141
Status
issued
Filed
Mar 1, 2019
Permit issued
Mar 8, 2019
Declared cost
$30,000
Address
2241 Fillmore St

proposed ti: (n) storage room, (n) fitting rooms, (n) ada fitting rooms, (n) display units, update lighting and power.

Open the permit page

$30,000
Feb 15, 2019In progress
issued Sep 2024
519 Clipper Stto legalize rear detached, 1-story,type-vb structure w/ 1 dwelling unit per ord# 43-14. to comply w/ nov# 201728515 and 201868411.
Details
Permit
201902153129
Status
issued
Filed
Feb 15, 2019
Permit issued
Sep 19, 2024
Declared cost
$54,650
Address
519 Clipper St

to legalize rear detached, 1-story,type-vb structure w/ 1 dwelling unit per ord# 43-14. to comply w/ nov# 201728515 and 201868411.

Open the permit page

$54,650
Feb 8, 2019Expired or cancelled
cancelled Jan 2026
146 Flood Avreplace rear foundation. remove wall in garage and reinforce w/steel plate
Details
Permit
201902082513
Status
cancelled
Filed
Feb 8, 2019
Declared cost
$40,000
Address
146 Flood Av

replace rear foundation. remove wall in garage and reinforce w/steel plate

Open the permit page

$40,000
Nov 27, 2018Completed
final sign-off Jul 2022
2550 28th AvConnor Daly Corporationnew vertical addition on 3rd fl. new master bedroom, new full bath,new family room addition @ 3rd fl, new interior stairs, demo selected portion of wall between kitchen and living room @ 2nd fl. new base cabinet at 2nd fl. minor excavation, remodel at 1st fl
Details
Permit
201811276765
Status
complete
Filed
Nov 27, 2018
Permit issued
Sep 17, 2019
Final sign-off
Jul 8, 2022
Declared cost
$400,000
Address
2550 28th Av

new vertical addition on 3rd fl. new master bedroom, new full bath,new family room addition @ 3rd fl, new interior stairs, demo selected portion of wall between kitchen and living room @ 2nd fl. new base cabinet at 2nd fl. minor excavation, remodel at 1st fl

Open the permit page

$400,000
Sep 19, 2018Completed
final sign-off Oct 2019
3259 Mission Stlegalization of a dwelling unit. ord #43-14, add nfpa 13d automatic sprinkler system.
Details
Permit
201809190844
Status
complete
Filed
Sep 19, 2018
Permit issued
May 8, 2019
Final sign-off
Oct 2, 2019
Declared cost
$24,350
Address
3259 Mission St

legalization of a dwelling unit. ord #43-14, add nfpa 13d automatic sprinkler system.

Open the permit page

$24,350
Aug 10, 2018Completed
final sign-off Jun 2019
146 Flood AvWilkinson Design & Construction, Inc.1st fl. remove post in garage, 2nd fl. remodel kitchen remove interior wall, add new bathroom, add new doors, add (n) skylight
Details
Permit
201808107037
Status
complete
Filed
Aug 10, 2018
Permit issued
Oct 5, 2018
Final sign-off
Jun 26, 2019
Declared cost
$110,000
Address
146 Flood Av

1st fl. remove post in garage, 2nd fl. remodel kitchen remove interior wall, add new bathroom, add new doors, add (n) skylight

Open the permit page

$110,000
Jul 12, 2018Completed
final sign-off May 2020
120 Fernwood DrQuality Home Builders Construction Inccreate new habitable space at lower level new bedroom, new bathroom, reframe existing interior stairs. replace existing wood burning fire place with gas fire place
Details
Permit
201807124406
Status
complete
Filed
Jul 12, 2018
Permit issued
Nov 8, 2018
Final sign-off
May 5, 2020
Declared cost
$100,000
Address
120 Fernwood Dr

create new habitable space at lower level new bedroom, new bathroom, reframe existing interior stairs. replace existing wood burning fire place with gas fire place

Open the permit page

$100,000
Jun 7, 2018Expired or cancelled
withdrawn Oct 2019
353 Park Streconfigure front steps, wide garage door. remove (e) posts in garage and provide storage & utility rooms.expand lower level under kitchen & deck.provide fam room, study & bath w/ access to side yard. provide steps to rear yard. new kitchen, home office, powder room & stairs to fm room below.
Details
Permit
201806071298
Status
withdrawn
Filed
Jun 7, 2018
Declared cost
$400,000
Address
353 Park St

reconfigure front steps, wide garage door. remove (e) posts in garage and provide storage & utility rooms.expand lower level under kitchen & deck.provide fam room, study & bath w/ access to side yard. provide steps to rear yard. new kitchen, home office, powder room & stairs to fm room below.

Open the permit page

$400,000
Feb 28, 2018Expired or cancelled
cancelled Nov 2022
1598 Fulton Stnew roof deck 337 sqfft. new stairs to roof with operable sky light, new bathroom & closets at 2nd level, new bathroon & closet at 3rd level.
Details
Permit
201802282440
Status
cancelled
Filed
Feb 28, 2018
Declared cost
$170,000
Address
1598 Fulton St

new roof deck 337 sqfft. new stairs to roof with operable sky light, new bathroom & closets at 2nd level, new bathroon & closet at 3rd level.

Open the permit page

$170,000
Nov 9, 2017Expired or cancelled
expired Sep 2021
47 Newburg StDel Smith Design Buildnew vertical addition. new foundation work & structural as required. create habitable space @ 1st floor. remodel (e) bathroom & relocate kitchen to proposed 3rd level. new bathroom @ 3rd level & new interior stairs. alter entry.
Details
Permit
201711093672
Status
expired
Filed
Nov 9, 2017
Permit issued
Nov 1, 2018
Declared cost
$275,000
Address
47 Newburg St

new vertical addition. new foundation work & structural as required. create habitable space @ 1st floor. remodel (e) bathroom & relocate kitchen to proposed 3rd level. new bathroom @ 3rd level & new interior stairs. alter entry.

Open the permit page

$275,000
Sep 21, 2017Completed
final sign-off Jun 2018
584 Hayes Stinstall an illuminate double faced projecting sign.
Details
Permit
201709219193
Status
complete
Filed
Sep 21, 2017
Permit issued
Oct 19, 2017
Final sign-off
Jun 27, 2018
Declared cost
$800
Address
584 Hayes St

install an illuminate double faced projecting sign.

Open the permit page

$800
Sep 21, 2017Completed
final sign-off Jun 2018
584 Hayes Stinstall non-illuminate, non-structural door/window sign.
Details
Permit
201709219197
Status
complete
Filed
Sep 21, 2017
Permit issued
Oct 19, 2017
Final sign-off
Jun 27, 2018
Declared cost
$100
Address
584 Hayes St

install non-illuminate, non-structural door/window sign.

Open the permit page

$100
Aug 23, 2017Completed
final sign-off Mar 2019
122 Avila StSan Francisco Investment Developmentrev to pa#201610079824: relocate interor stairs, alter (e) bath to (n) powder room. remove post in garage. no exterior alterations.
Details
Permit
201708235649
Status
complete
Filed
Aug 23, 2017
Permit issued
Aug 28, 2017
Final sign-off
Mar 4, 2019
Address
122 Avila St

rev to pa#201610079824: relocate interor stairs, alter (e) bath to (n) powder room. remove post in garage. no exterior alterations.

Open the permit page

Jul 25, 2017Expired or cancelled
cancelled Jan 2026
584 Hayes StPacific General Constructionrevision to pa #201703161605 - partial height walls to be raised to 12' just shy of full height. new openings per mechanical at top of walls.
Details
Permit
201707252822
Status
cancelled
Filed
Jul 25, 2017
Declared cost
$3,000
Address
584 Hayes St

revision to pa #201703161605 - partial height walls to be raised to 12' just shy of full height. new openings per mechanical at top of walls.

Open the permit page

$3,000
Apr 5, 2017Expired or cancelled
expired May 2019
3624 Scott StG Family Incorporatedrevision to pa 201610119904 - revise roof framing per discovery during demo; maher ord 155-13 na
Details
Permit
201704053292
Status
expired
Filed
Apr 5, 2017
Permit issued
Apr 7, 2017
Declared cost
$115
Address
3624 Scott St

revision to pa 201610119904 - revise roof framing per discovery during demo; maher ord 155-13 na

Open the permit page

$115
Jan 27, 2017Never finaled
issued Apr 2017, no final
45 Parker AvCronin Construction & Development Inc.revise permit 201612024055 remove steel moment frame and replace with wood shear wall
Details
Permit
201701278093
Status
issued
Filed
Jan 27, 2017
Permit issued
Apr 27, 2017
Address
45 Parker Av

revise permit 201612024055 remove steel moment frame and replace with wood shear wall

Open the permit page

Dec 1, 2016Completed
final sign-off May 2022
1385 Greenwich StWilkinson Design & Construction, Inc.add (1) adu per ordinance #162-16
Details
Permit
201612013962
Status
complete
Filed
Dec 1, 2016
Permit issued
Apr 25, 2019
Final sign-off
May 5, 2022
Declared cost
$20,000
Address
1385 Greenwich St

add (1) adu per ordinance #162-16

Open the permit page

$20,000
Dec 1, 2016Completed
final sign-off Apr 2022
2425 Francisco StAndrew Mark Construction Inchorizontal addition on 3rd flr. add bath & relocate laundry room on 1st flr. bathroom & ktichen remodel on 2nd flr.
Details
Permit
201612013903
Status
complete
Filed
Dec 1, 2016
Permit issued
Dec 20, 2017
Final sign-off
Apr 21, 2022
Declared cost
$50,000
Address
2425 Francisco St

horizontal addition on 3rd flr. add bath & relocate laundry room on 1st flr. bathroom & ktichen remodel on 2nd flr.

Open the permit page

$50,000
Nov 22, 2016Completed
final sign-off Mar 2019
122 Avila StSan Francisco Investment Developmentrear addition, expand master bedroom on 1st fl, add (2) bedbroom on 2nd fl sprinkler 13r throughout.
Details
Permit
201611223344
Status
complete
Filed
Nov 22, 2016
Permit issued
Oct 31, 2017
Final sign-off
Mar 4, 2019
Declared cost
$50,000
Address
122 Avila St

rear addition, expand master bedroom on 1st fl, add (2) bedbroom on 2nd fl sprinkler 13r throughout.

Open the permit page

$50,000
Nov 22, 2016Completed
final sign-off Mar 2018
506 Bella Vista WyMueller Constructionadd bedroom & bath at 1st floor, minor kitchen remodel, add 1/2 bath upstairs
Details
Permit
201611223346
Status
complete
Filed
Nov 22, 2016
Permit issued
Feb 10, 2017
Final sign-off
Mar 13, 2018
Declared cost
$30,000
Address
506 Bella Vista Wy

add bedroom & bath at 1st floor, minor kitchen remodel, add 1/2 bath upstairs

Open the permit page

$30,000
Oct 26, 2016Never finaled
issued Mar 2018, no final
80 Linda StAndrew Mark Construction Inc1st flr. relocate bathroom & laundry sink. 2nd flr-relocate kitchen,remodel (e) bathroom, demo rear addition. 3rd flr.veticle addition to include 3 bedrooms,2 full baths & rear deck <500 sq ft.
Details
Permit
201610261169
Status
issued
Filed
Oct 26, 2016
Permit issued
Mar 23, 2018
Declared cost
$50,000
Address
80 Linda St

1st flr. relocate bathroom & laundry sink. 2nd flr-relocate kitchen,remodel (e) bathroom, demo rear addition. 3rd flr.veticle addition to include 3 bedrooms,2 full baths & rear deck <500 sq ft.

Open the permit page

$50,000
Oct 11, 2016Completed
final sign-off Mar 2018
3624 Scott StG Family Incorporateddesign master bed & master bathroom on 2nd flr, design guest bathrm w/bath tub on 2nd level,open up (e)arched openings,design(n)laundry on 2nd flr,re-design kitchen; maher n/a
Details
Permit
201610119904
Status
complete
Filed
Oct 11, 2016
Permit issued
Dec 1, 2016
Final sign-off
Mar 9, 2018
Declared cost
$115,000
Address
3624 Scott St

design master bed & master bathroom on 2nd flr, design guest bathrm w/bath tub on 2nd level,open up (e)arched openings,design(n)laundry on 2nd flr,re-design kitchen; maher n/a

Open the permit page

$115,000
Oct 7, 2016Completed
final sign-off Apr 2021
122 Avila StSan Francisco Investment Developmentrelocating interior stairs, add new bathroom, remodel existing bath, remove post in garage. new skylight. sprinkler under seperate permit. ** maher: n/a **
Details
Permit
201610079824
Status
complete
Filed
Oct 7, 2016
Permit issued
Mar 2, 2017
Final sign-off
Apr 7, 2021
Declared cost
$50,000
Address
122 Avila St

relocating interior stairs, add new bathroom, remodel existing bath, remove post in garage. new skylight. sprinkler under seperate permit. ** maher: n/a **

Open the permit page

$50,000
Sep 27, 2016Completed
final sign-off Jan 2017
2001 Van Ness AvEverbuilt Construction, Inc.new entry door.
Details
Permit
201609278883
Status
complete
Filed
Sep 27, 2016
Permit issued
Oct 26, 2016
Final sign-off
Jan 9, 2017
Declared cost
$20,000
Address
2001 Van Ness Av

new entry door.

Open the permit page

$20,000
Aug 31, 2016Never finaled
issued Sep 2016, no final
45 Parker AvCronin Construction & Development Inc.revision to ref pa 201605066758; move bedroom wall to align with wall above adjust moment frame & structural details.
Details
Permit
201608316470
Status
issued
Filed
Aug 31, 2016
Permit issued
Sep 12, 2016
Address
45 Parker Av

revision to ref pa 201605066758; move bedroom wall to align with wall above adjust moment frame & structural details.

Open the permit page

Aug 3, 2016Completed
final sign-off Aug 2017
3828 19th StConnemara Fine Trim Inc Dba Highland Buiredesign heating duct work. 46 sq ft addition. relocate w/d. powder room addition
Details
Permit
201608034111
Status
complete
Filed
Aug 3, 2016
Permit issued
Jan 31, 2017
Final sign-off
Aug 21, 2017
Declared cost
$20,000
Address
3828 19th St

redesign heating duct work. 46 sq ft addition. relocate w/d. powder room addition

Open the permit page

$20,000
May 19, 2016Completed
final sign-off Dec 2016
186 Dellbrook Avnew masterbedroom with bath on 1/f, redesign entry on 1/f, remove wall between kitchen & living room on 2/f. no work visiable from street. no building expansion.
Details
Permit
201605197850
Status
complete
Filed
May 19, 2016
Permit issued
Jun 22, 2016
Final sign-off
Dec 2, 2016
Declared cost
$95,000
Address
186 Dellbrook Av

new masterbedroom with bath on 1/f, redesign entry on 1/f, remove wall between kitchen & living room on 2/f. no work visiable from street. no building expansion.

Open the permit page

$95,000
May 6, 2016Never finaled
issued Jun 2016, no final
45 Parker AvCronin Construction & Development Inc.(n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating.
Details
Permit
201605066758
Status
issued
Filed
May 6, 2016
Permit issued
Jun 2, 2016
Declared cost
$375,000
Address
45 Parker Av

(n) bathroom on 1st floor. kitchen remodel, (n) bathroom & (n) powder on 2nd floor. demo deck stairs & bathroom on 3rd floor. (n) radiant heating.

Open the permit page

$375,000
May 5, 2016Completed
final sign-off Dec 2016
65 Post StConnemara Fine Trim Inc Dba Highland Buichange of use from bank to bar. interior remodeling of (e) commercial tenant space for new bar tavern. upgrade bathrooms to (n) ada compliant bathrooms.
Details
Permit
201605056614
Status
complete
Filed
May 5, 2016
Permit issued
Aug 11, 2016
Final sign-off
Dec 13, 2016
Declared cost
$86,400
Address
65 Post St

change of use from bank to bar. interior remodeling of (e) commercial tenant space for new bar tavern. upgrade bathrooms to (n) ada compliant bathrooms.

Open the permit page

$86,400
Jan 26, 2016Completed
final sign-off Feb 2018
925 Kirkham StM Group Constructionnew habitable space at gr level including master bedroom, bathroom, home office, family room & wet bar in same building footprint. new powder room in upper level. radiant heating upper and lower level
Details
Permit
201601267964
Status
complete
Filed
Jan 26, 2016
Permit issued
Apr 27, 2016
Final sign-off
Feb 5, 2018
Declared cost
$75,000
Address
925 Kirkham St

new habitable space at gr level including master bedroom, bathroom, home office, family room & wet bar in same building footprint. new powder room in upper level. radiant heating upper and lower level

Open the permit page

$75,000
Dec 29, 2015Completed
final sign-off Aug 2016
51 Clipper StSpryscapes Const Inc.replace (e) rear deck.
Details
Permit
201512296014
Status
complete
Filed
Dec 29, 2015
Permit issued
Jun 3, 2016
Final sign-off
Aug 23, 2016
Declared cost
$15,000
Address
51 Clipper St

replace (e) rear deck.

Open the permit page

$15,000
Aug 7, 2015Completed
final sign-off Dec 2016
1177 Guerrero StBrady Construction Inchorizontal/vertical addition. 165 sq. ft horizontal/vertical addition with a 55 sq. ft. footprint at southern side of structure. remodel upper level bathrooms and bedrooms. (n) radiant heat at upper level floor
Details
Permit
201508073641
Status
complete
Filed
Aug 7, 2015
Permit issued
Mar 11, 2016
Final sign-off
Dec 21, 2016
Declared cost
$15,000
Address
1177 Guerrero St

horizontal/vertical addition. 165 sq. ft horizontal/vertical addition with a 55 sq. ft. footprint at southern side of structure. remodel upper level bathrooms and bedrooms. (n) radiant heat at upper level floor

Open the permit page

$15,000
Jun 8, 2015Completed
final sign-off Dec 2016
1177 Guerrero StBrady Construction Increplace foundation stem wall, revision to permit application 201401136154.
Details
Permit
201506088338
Status
complete
Filed
Jun 8, 2015
Permit issued
Jun 9, 2015
Final sign-off
Dec 21, 2016
Declared cost
$50,000
Address
1177 Guerrero St

replace foundation stem wall, revision to permit application 201401136154.

Open the permit page

$50,000
Mar 26, 2015Completed
final sign-off Oct 2017
2546 28th Avrevision to appl #2014.1010.8621 - adjust placement of front dormers
Details
Permit
201503261958
Status
complete
Filed
Mar 26, 2015
Permit issued
Mar 26, 2015
Final sign-off
Oct 30, 2017
Address
2546 28th Av

revision to appl #2014.1010.8621 - adjust placement of front dormers

Open the permit page

Jan 14, 2015Completed
final sign-off Dec 2015
26 Maddux AvWei's Construction Coremodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room.
Details
Permit
201501145730
Status
complete
Filed
Jan 14, 2015
Permit issued
Feb 27, 2015
Final sign-off
Dec 9, 2015
Declared cost
$100,000
Address
26 Maddux Av

remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room.

Open the permit page

$100,000
Oct 10, 2014Completed
final sign-off Jan 2015
597 Hayes StEverbuilt Construction, Inc.t.i. build out, new fixtures, entry and door, new stock room and new changing room, new partition walls. maher n/a. ref. appl. 201406249242 and 201410108693. compliance with maher ordinance no 155-13 not required.
Details
Permit
201410108683
Status
complete
Filed
Oct 10, 2014
Permit issued
Oct 17, 2014
Final sign-off
Jan 9, 2015
Declared cost
$65,000
Address
597 Hayes St

t.i. build out, new fixtures, entry and door, new stock room and new changing room, new partition walls. maher n/a. ref. appl. 201406249242 and 201410108693. compliance with maher ordinance no 155-13 not required.

Open the permit page

$65,000
Oct 2, 2014Completed
final sign-off Oct 2015
3325 24th StGavin Painting & Cont* See 934867*replace existing window with new larger window along osage street, new window 15'x2'-6". revision to 201405075103; maher n/a
Details
Permit
201410027927
Status
complete
Filed
Oct 2, 2014
Permit issued
Jan 20, 2015
Final sign-off
Oct 16, 2015
Address
3325 24th St

replace existing window with new larger window along osage street, new window 15'x2'-6". revision to 201405075103; maher n/a

Open the permit page

Jul 30, 2014Completed
final sign-off Jun 2016
2725 Pacific AvForsythe General Contractorsaddition to extg roof deck. 2nd egress. hot tub on new deck. glass guard rail.
Details
Permit
201407302501
Status
complete
Filed
Jul 30, 2014
Permit issued
Nov 14, 2014
Final sign-off
Jun 3, 2016
Declared cost
$88,500
Address
2725 Pacific Av

addition to extg roof deck. 2nd egress. hot tub on new deck. glass guard rail.

Open the permit page

$88,500
Jul 30, 2014Never finaled
issued Aug 2015, no final
870 Innes Avchange use from warehouse to residential. create 2 residential units. create 25% open space for residential units at rear new finishes at facade. maher-compliance with ordinance no 155-13. not required.
Details
Permit
201407302502
Status
issued
Filed
Jul 30, 2014
Permit issued
Aug 27, 2015
Declared cost
$500,000
Address
870 Innes Av

change use from warehouse to residential. create 2 residential units. create 25% open space for residential units at rear new finishes at facade. maher-compliance with ordinance no 155-13. not required.

Open the permit page

$500,000
May 7, 2014Completed
final sign-off Oct 2015
3325 24th StGavin Painting & Cont* See 934867*remodel interior tenant space for cafe, new window on osage alley exterior wall. n/a ordinance #155-13
Details
Permit
201405075103
Status
complete
Filed
May 7, 2014
Permit issued
Sep 9, 2014
Final sign-off
Oct 16, 2015
Declared cost
$85,000
Address
3325 24th St

remodel interior tenant space for cafe, new window on osage alley exterior wall. n/a ordinance #155-13

Open the permit page

$85,000
Apr 30, 2014Completed
final sign-off Aug 2014
51 Clipper StKevin H Moon Dba Crescent Buildersunit a ground fl(only) lower kitchen remodel; lower bath remodel; (n) powder room; and voluntary seismic upgrade; replace rear window with 2 new rear windows.
Details
Permit
201404304592
Status
complete
Filed
Apr 30, 2014
Permit issued
May 13, 2014
Final sign-off
Aug 20, 2014
Declared cost
$85,000
Address
51 Clipper St

unit a ground fl(only) lower kitchen remodel; lower bath remodel; (n) powder room; and voluntary seismic upgrade; replace rear window with 2 new rear windows.

Open the permit page

$85,000
Mar 3, 2014Completed
final sign-off Jun 2014
2725 Pacific AvForsythe General Contractorsreplace back doors. replace and add lighting in back yard. add wood trim in backyard
Details
Permit
201403039666
Status
complete
Filed
Mar 3, 2014
Permit issued
Mar 4, 2014
Final sign-off
Jun 4, 2014
Declared cost
$5,000
Address
2725 Pacific Av

replace back doors. replace and add lighting in back yard. add wood trim in backyard

Open the permit page

$5,000
Dec 13, 2013Completed
final sign-off Dec 2021
43 Topaz WyTamalpais Construction Companyexterior work: (n) exterior finish "inkind", all (n) windows, (n) guardrails, (n) entry gate, re-pave driveway & walkway. interior work: remodel bathrooms, kitchen
Details
Permit
201312134126
Status
complete
Filed
Dec 13, 2013
Permit issued
Oct 29, 2014
Final sign-off
Dec 3, 2021
Declared cost
$550,000
Address
43 Topaz Wy

exterior work: (n) exterior finish "inkind", all (n) windows, (n) guardrails, (n) entry gate, re-pave driveway & walkway. interior work: remodel bathrooms, kitchen

Open the permit page

$550,000
Oct 17, 2013Completed
final sign-off Jun 2014
2725 Pacific AvForsythe General Contractorsrevision to 201303142216. revise detail 11 and 12/a6.4 wall assembly. add horizontal wood finish at 3 walls at 2nd fl at interior of cmu wall and lath with plaster at exterior cmu wall.
Details
Permit
201310179555
Status
complete
Filed
Oct 17, 2013
Permit issued
Oct 24, 2013
Final sign-off
Jun 2, 2014
Declared cost
$1,500
Address
2725 Pacific Av

revision to 201303142216. revise detail 11 and 12/a6.4 wall assembly. add horizontal wood finish at 3 walls at 2nd fl at interior of cmu wall and lath with plaster at exterior cmu wall.

Open the permit page

$1,500
Aug 26, 2013Completed
final sign-off Dec 2016
1177 Guerrero StBrady Construction Incdemo (e) shed @ rear yard & portions of perimeter fence. (n) conc. walls/fence with trellis, (n) exterior grill, (n) hot tub & (n) sink.
Details
Permit
201308265265
Status
complete
Filed
Aug 26, 2013
Permit issued
Jan 15, 2015
Final sign-off
Dec 21, 2016
Declared cost
$15,000
Address
1177 Guerrero St

demo (e) shed @ rear yard & portions of perimeter fence. (n) conc. walls/fence with trellis, (n) exterior grill, (n) hot tub & (n) sink.

Open the permit page

$15,000
Mar 14, 2013Completed
final sign-off Jun 2014
2725 Pacific AvForsythe General Contractorsrear yard only. proposed new roof deck 499 sq. ft. proposed new steel stairs from 3rd level to 3rd level roof. new exterior lighting.
Details
Permit
201303142216
Status
complete
Filed
Mar 14, 2013
Permit issued
Aug 26, 2013
Final sign-off
Jun 2, 2014
Declared cost
$100,000
Address
2725 Pacific Av

rear yard only. proposed new roof deck 499 sq. ft. proposed new steel stairs from 3rd level to 3rd level roof. new exterior lighting.

Open the permit page

$100,000
Apr 14, 2011Never finaled
issued Apr 2011, no final
443 Ellsworth Stremediate undersized central flr beam @ceiling of garage w/new w8x48 beam/hardware, below new beam/posts, remediate (e) undersized 8x8 floating footings w/new re-inforce concrete footings. no (e) hardware @ (e) perimeter walls, add new anchor bolts, hid hurricane ties & 15/32 plywd @interor of gar
Details
Permit
201104144089
Status
issued
Filed
Apr 14, 2011
Permit issued
Apr 14, 2011
Declared cost
$12,000
Address
443 Ellsworth St

remediate undersized central flr beam @ceiling of garage w/new w8x48 beam/hardware, below new beam/posts, remediate (e) undersized 8x8 floating footings w/new re-inforce concrete footings. no (e) hardware @ (e) perimeter walls, add new anchor bolts, hid hurricane ties & 15/32 plywd @interor of gar

Open the permit page

$12,000
Oct 14, 2004Expired or cancelled
expired Dec 2007
116 Hoffman AvAdobe Soil & Structuresgarage addition & exterior features. remove retaining wall @ property line @ street. excavate earth
Details
Permit
200410146806
Status
expired
Filed
Oct 14, 2004
Permit issued
Apr 4, 2005
Declared cost
$50,000
Address
116 Hoffman Av

garage addition & exterior features. remove retaining wall @ property line @ street. excavate earth

Open the permit page

$50,000