Wei's Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to May 2025
- Last 24 months
- 1 permit filed
42 permits since 2000: 41 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2025 | Completed final sign-off Jun 2025 | 56 Winfield St | repair damaged siding like for like on left side of building approx 400 sq ft.Details
repair damaged siding like for like on left side of building approx 400 sq ft. | $900 |
| Jul 24, 2024 | Completed final sign-off Oct 2024 | 2266 35th Av | 1/f: replace federal pacific main panel & install new ceiling mounted furnace & tankless water heater in garage. 2/f: replace all windows & skylights, convert a 4-fixture bath into a 3-fixture bath & powder room and remodel kitchen. no structural alteration under this permit.Details
1/f: replace federal pacific main panel & install new ceiling mounted furnace & tankless water heater in garage. 2/f: replace all windows & skylights, convert a 4-fixture bath into a 3-fixture bath & powder room and remodel kitchen. no structural alteration under this permit. | $70,000 |
| Sep 22, 2022 | Completed final sign-off Dec 2022 | 1177 California St | remodeling one bathroom. non structural.Details
remodeling one bathroom. non structural. | $5,000 |
| Jun 21, 2022 | Completed final sign-off Aug 2022 | 3026 Octavia St | remodel bathroom in the hallwayDetails
remodel bathroom in the hallway | $10,000 |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 1987 California St | unit #102: bathroom remodel - replace toilet, bathtub, and vanity. retile bathroom & walls . replace fixtures.Details
unit #102: bathroom remodel - replace toilet, bathtub, and vanity. retile bathroom & walls . replace fixtures. | $15,000 |
| Dec 24, 2021 | Completed final sign-off Mar 2022 | 2386 15th St | to comply with violation 202183972. convert legal half bath on ground floor to full bath.Details
to comply with violation 202183972. convert legal half bath on ground floor to full bath. | $5,200 |
| Jan 13, 2021 | Completed final sign-off Apr 2021 | 23 Skyview Wy | revision to pa #202001212411 - to revise structural foundation planDetails
revision to pa #202001212411 - to revise structural foundation plan | $12,000 |
| Aug 6, 2020 | Completed final sign-off Jan 2021 | 56 Winfield St | replace (e) garage door header.Details
replace (e) garage door header. | $1,500 |
| Jun 22, 2020 | Completed final sign-off Jul 2020 | 286 Noe St | replace (4) wood windows in front of building on 2nd floor. (5-light double-casement to left, 3-light casement, fixed picture, 3-light casement at bay) replace (11) vinyl window on back of house on 2nd floor.Details
replace (4) wood windows in front of building on 2nd floor. (5-light double-casement to left, 3-light casement, fixed picture, 3-light casement at bay) replace (11) vinyl window on back of house on 2nd floor. | $8,000 |
| May 30, 2020 | Completed final sign-off Jun 2022 | 686 Colby St | new adu per ordinance 95-17. to comply with nov 2019-05-947.Details
new adu per ordinance 95-17. to comply with nov 2019-05-947. | $25,000 |
| Jan 21, 2020 | Completed final sign-off Apr 2021 | 23 Skyview Wy | new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd flDetails
new rooms and baths on gr fl. new interior stairs, infill over rear overhand at rear, rear deck at grade, open kitchen wall 2nd fl | $93,500 |
| Dec 23, 2019 | Completed final sign-off Sep 2020 | 1495 39th Av | interior remodel to develop unconditioned square footage on 1st level adding 1 bedroom, 1 bath, living space and office. remodel of (e) interior stair connecting levels and bathroom on 2nd level. replace (e) windows.Details
interior remodel to develop unconditioned square footage on 1st level adding 1 bedroom, 1 bath, living space and office. remodel of (e) interior stair connecting levels and bathroom on 2nd level. replace (e) windows. | $250,000 |
| Apr 30, 2019 | Completed final sign-off Nov 2019 | 1446 Moraga St | remodel of kitchen (wall removed & open kitchen); addition of bathroom (lower level) & add mudroom. renovate existing bathrooms. update windowsDetails
remodel of kitchen (wall removed & open kitchen); addition of bathroom (lower level) & add mudroom. renovate existing bathrooms. update windows | $150,000 |
| Apr 5, 2019 | Completed final sign-off Jun 2019 | 1215 Bay St | replace windows, 42 windows facing to street w/ wood clad, rear/side 43 windows not visible from street.Details
replace windows, 42 windows facing to street w/ wood clad, rear/side 43 windows not visible from street. | $12,000 |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 838 Anza St | remodel bathroom in unit 103 .Details
remodel bathroom in unit 103 . | $10,000 |
| Mar 22, 2018 | Never finaled issued Mar 2018, no final | 467 Gold Mine Dr | to obtain final inspection for work approved under pa #201609309300Details
to obtain final inspection for work approved under pa #201609309300 | |
| Jan 3, 2018 | Completed final sign-off Mar 2018 | 467 Gold Mine Dr | remodel bathroom on 3rd floorDetails
remodel bathroom on 3rd floor | $6,000 |
| Jul 12, 2017 | Completed final sign-off Jul 2018 | 1991 California St | #111 & #112- interior remodel living space includes bedrooms, bathrooms, kitchens, living & dining rooms. add new laundry area in 2 units. n/a maherDetails
#111 & #112- interior remodel living space includes bedrooms, bathrooms, kitchens, living & dining rooms. add new laundry area in 2 units. n/a maher | $20,000 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 138 Clearfield Dr | kitchen and bath remodel. add new gas fireplace. remove non bearing wall, replace kitchen cabinets, new island and flooring. master bath remodel, common bath remodel, replace existing rear windows on upper floor. whole house electrical upgrade.Details
kitchen and bath remodel. add new gas fireplace. remove non bearing wall, replace kitchen cabinets, new island and flooring. master bath remodel, common bath remodel, replace existing rear windows on upper floor. whole house electrical upgrade. | $35,000 |
| Feb 22, 2017 | Completed final sign-off Apr 2017 | 1991 California St | reinforce structural beams of apartment buildings at basement. n/a for maherDetails
reinforce structural beams of apartment buildings at basement. n/a for maher | $20,000 |
| Sep 1, 2016 | Completed final sign-off Nov 2016 | 474 Princeton St | add a play room family room, an office and a full bath on 1st floor.Details
add a play room family room, an office and a full bath on 1st floor. | $50,000 |
| Aug 2, 2016 | Completed final sign-off Nov 2016 | 2659 Leavenworth St | replace four front wood clad windows in kindDetails
replace four front wood clad windows in kind | $1,200 |
| Dec 2, 2015 | Completed final sign-off Jan 2016 | 1243 16th Av | remodel kitchen on 2nd fl.Details
remodel kitchen on 2nd fl. | $9,000 |
| Jan 14, 2015 | Completed final sign-off Dec 2015 | 26 Maddux Av | remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room.Details
remodel upstairs kitchen & bathroom. add closet to upstairs bedroom, add balcony, widen stairs to round floor, interior remodel to ground level to 2 bedrooms, bathroom & living room. | $100,000 |
| Jun 9, 2014 | Completed final sign-off Jul 2014 | 86 Florentine Av | minor repair at front stair.Details
minor repair at front stair. | $500 |
| May 15, 2014 | Completed final sign-off Oct 2014 | 155 Hancock St | unit #5:kitchen remodel with new counter top and cabinets.Details
unit #5:kitchen remodel with new counter top and cabinets. | $8,000 |
| Mar 24, 2014 | Completed final sign-off May 2014 | 155 Hancock St | retile bathroom at unit 5.Details
retile bathroom at unit 5. | $2,500 |
| Jul 30, 2013 | Completed final sign-off Oct 2013 | 2386 15th St | repair front stopway. replace front door.Details
repair front stopway. replace front door. | $2,500 |
| Mar 8, 2013 | Completed final sign-off Apr 2013 | 608 Missouri St | convert powder room to full bath on 2nd fl. relocate laundry room.Details
convert powder room to full bath on 2nd fl. relocate laundry room. | $20,000 |
| Jan 9, 2013 | Completed final sign-off Feb 2013 | 497 21st Av | remodel kitchen in unit 497 only.Details
remodel kitchen in unit 497 only. | $3,500 |
| Jun 15, 2012 | Completed final sign-off Aug 2012 | 478 Hazelwood Av | repair front stair & stucco.Details
repair front stair & stucco. | $5,000 |
| Jun 4, 2012 | Completed final sign-off Jun 2012 | 40 Rockwood Ct | repair stucco at right side of garage. apprx 100 sq ft area.Details
repair stucco at right side of garage. apprx 100 sq ft area. | $800 |
| Nov 1, 2010 | Completed final sign-off Dec 2010 | 130 23rd Av | to comply w/ physical inspection report #cc-5860.Details
to comply w/ physical inspection report #cc-5860. | $400 |
| Aug 3, 2010 | Completed final sign-off Aug 2010 | 130 23rd Av | #2 - remodel kitchen. no wall changes. replace cabinets, counter top, no new lighting.Details
#2 - remodel kitchen. no wall changes. replace cabinets, counter top, no new lighting. | $1,500 |
| Jul 19, 2010 | Completed final sign-off Aug 2010 | 130 23rd Av | unit #5 & 6. remodel kitchens & laundry in kind. no new lighting. no change to exhaust system.Details
unit #5 & 6. remodel kitchens & laundry in kind. no new lighting. no change to exhaust system. | $3,000 |
| May 17, 2010 | Completed final sign-off Dec 2010 | 735 Cambridge St | revision to appl. #201004140229; relocate (e) full bathroom & laundry on (e) ground flr. per plan. enlarge (e) garage depth.Details
revision to appl. #201004140229; relocate (e) full bathroom & laundry on (e) ground flr. per plan. enlarge (e) garage depth. | |
| Apr 14, 2010 | Completed final sign-off Dec 2010 | 735 Cambridge St | to add one bedroom, one play room, one full bath room, one laundry room & one storage on the existing ground floor.Details
to add one bedroom, one play room, one full bath room, one laundry room & one storage on the existing ground floor. | $38,000 |
| Sep 23, 2008 | Completed final sign-off Jul 2009 | 1458 Silver Av | attic area-new bathrm & 3 skylights. 2nd fl-relocate (e) kitchen, bathrm, convert laundry to new family rm, convert (e) dining rm to new kitchen, convert (e) family rm to new bedrm. 1st fl-remodeling new game rm, reduce size of (e) office to provide an access to street and a new rear exit stairDetails
attic area-new bathrm & 3 skylights. 2nd fl-relocate (e) kitchen, bathrm, convert laundry to new family rm, convert (e) dining rm to new kitchen, convert (e) family rm to new bedrm. 1st fl-remodeling new game rm, reduce size of (e) office to provide an access to street and a new rear exit stair | $70,000 |
| Jul 3, 2008 | Completed final sign-off Oct 2008 | 512 Burrows St | add new fire rated wall to separate ex living space from the garage. remove non-bearing walls and relocate laudry and storage area, enlarge 2 windows in the rear, construct new entrance door and relocate wh and furnanceDetails
add new fire rated wall to separate ex living space from the garage. remove non-bearing walls and relocate laudry and storage area, enlarge 2 windows in the rear, construct new entrance door and relocate wh and furnance | $10,000 |
| Aug 15, 2007 | Completed final sign-off Jan 2010 | 1630 Sloat Bl | vertical addition to single family dwelling - (n) master bedroom & two bedroom, master bath & bath.Details
vertical addition to single family dwelling - (n) master bedroom & two bedroom, master bath & bath. | $80,000 |
| Jun 25, 2007 | Completed final sign-off Jul 2007 | 264 Cambridge St | repair leaking damge left side front building. re-stucco. approx 50 sqft, all work in kind.Details
repair leaking damge left side front building. re-stucco. approx 50 sqft, all work in kind. | $600 |
| Mar 2, 2007 | Completed final sign-off Jun 2007 | 1726 Alemany Bl | 1)construct one story rear deck(9'-6" ht) on ground floor level per plan. 2) to add 2 bed room, one full bath room, one laundry room/storage on extg ground floor per planDetails
1)construct one story rear deck(9'-6" ht) on ground floor level per plan. 2) to add 2 bed room, one full bath room, one laundry room/storage on extg ground floor per plan | $26,000 |