Kevin H Moon Dba Crescent Builders
- Based in
- San Rafael
- On San Francisco permits
- Jun 2004 to Apr 2014
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2014 | Completed final sign-off Aug 2014 | 51 Clipper St | unit a ground fl(only) lower kitchen remodel; lower bath remodel; (n) powder room; and voluntary seismic upgrade; replace rear window with 2 new rear windows.Details
unit a ground fl(only) lower kitchen remodel; lower bath remodel; (n) powder room; and voluntary seismic upgrade; replace rear window with 2 new rear windows. | $85,000 |
| Oct 17, 2013 | Completed final sign-off Apr 2014 | 380 10th St | bathroom remodel: demo all finishes & fixtures, change single vanity to double, new shower pan, new toilet, new cabinets, new tile, new lighting fixtures, new door, paint. all fixtures & shower to remain in (e) locations. remove privacy partitions, non-load bearing.Details
bathroom remodel: demo all finishes & fixtures, change single vanity to double, new shower pan, new toilet, new cabinets, new tile, new lighting fixtures, new door, paint. all fixtures & shower to remain in (e) locations. remove privacy partitions, non-load bearing. | $22,000 |
| Jun 13, 2012 | Completed final sign-off Nov 2012 | 2198 Fell St | removal of kitchen partition wall. electrical work including new outlets and switches.Details
removal of kitchen partition wall. electrical work including new outlets and switches. | $10,000 |
| Feb 22, 2012 | Completed final sign-off Jun 2012 | 451 Kansas St | unit # 290: retile two (2) bathrooms, remove bathtub and convert to shower pan in one (1) bathroom. replace mixer valves in both bathrooms. paint add 2 can lights. lighting to comply with cec 150(k)Details
unit # 290: retile two (2) bathrooms, remove bathtub and convert to shower pan in one (1) bathroom. replace mixer valves in both bathrooms. paint add 2 can lights. lighting to comply with cec 150(k) | $15,000 |
| Jun 2, 2011 | Completed final sign-off Oct 2011 | 30 Wayne Pl | repl kitchen & bath cabinets & counters, install new electrical outlets & fixtures, install new shower in bathrm (replaces tub), install new appliances, bath & kitchen fixtures, install new heat/exhaust fan in bathrmDetails
repl kitchen & bath cabinets & counters, install new electrical outlets & fixtures, install new shower in bathrm (replaces tub), install new appliances, bath & kitchen fixtures, install new heat/exhaust fan in bathrm | $25,000 |
| Jun 3, 2009 | Completed final sign-off Mar 2010 | 1044 Sanchez St | laundry room remodel (use existing/same location dryer & exhaust); remove existing cabinetry, trim & sheet rock (r-13 insulation) move existing outlets and switches; plumbing and electrical permit under separate permit; aka: 1042-1046 sanchez stDetails
laundry room remodel (use existing/same location dryer & exhaust); remove existing cabinetry, trim & sheet rock (r-13 insulation) move existing outlets and switches; plumbing and electrical permit under separate permit; aka: 1042-1046 sanchez st | $4,500 |
| Jan 2, 2008 | Completed final sign-off Feb 2008 | 1487 Greenwich St | work @ unit# 42 only. convert hall closet to laundry room. new electrical circuit. dedicated. new hot-cold supplies. new drain / vent. provide min 100 sq. in. make up air opening.Details
work @ unit# 42 only. convert hall closet to laundry room. new electrical circuit. dedicated. new hot-cold supplies. new drain / vent. provide min 100 sq. in. make up air opening. | $15,000 |
| Jan 2, 2008 | Completed final sign-off Nov 2008 | 1487 Greenwich St | work @ unit# 32 only. convert hall closet to laundry closet. remodel 2 bathrooms. provide fluorescent light or occupancy sensor. replace 2 windows, not visable from street. new fixtures & tile. provide 1 hour rated shaft endosure for dry vent.Details
work @ unit# 32 only. convert hall closet to laundry closet. remodel 2 bathrooms. provide fluorescent light or occupancy sensor. replace 2 windows, not visable from street. new fixtures & tile. provide 1 hour rated shaft endosure for dry vent. | $86,000 |
| Aug 10, 2007 | Completed final sign-off Sep 2007 | 1487 Greenwich St | install washer/dryer unit into (e) closet. plumb supplies, waste, vent & electricalDetails
install washer/dryer unit into (e) closet. plumb supplies, waste, vent & electrical | $4,500 |
| Jul 5, 2007 | Completed final sign-off Feb 2008 | 1487 Greenwich St | 2 bath remodels - new fixtues & tile, no structural changes, addition of washer/drter unit inot existing closet no windows or doors on this project,.Details
2 bath remodels - new fixtues & tile, no structural changes, addition of washer/drter unit inot existing closet no windows or doors on this project,. | $22,000 |
| Jun 30, 2004 | Completed final sign-off Aug 2004 | 168 Jersey St | repair sheetrock,replace tub,wc & vanity sink,electrical upgrades,tile & paint.no structural workDetails
repair sheetrock,replace tub,wc & vanity sink,electrical upgrades,tile & paint.no structural work | $7,500 |