James Dixon
- Listed as
- architect, authorized agent-others
- Firm
- James Dixon, Architect
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Aug 2025
21 permits since 2000 (architect on 20 permits, authorized agent-others on 2 permits): 15 completed, 4 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2025 | In progress filed Aug 2025, not yet issued | 1032 Broadway | Art Of Construction Inc | garage door replacement at an existing detached garage; remove (e) full lwidth garage door, replace it with (n) narrower garage door of same appearance; add 1 swinging door for egress & package delivery; add secure package drop box; all call box with camera; add exterior lighting fixture. does notDetails
garage door replacement at an existing detached garage; remove (e) full lwidth garage door, replace it with (n) narrower garage door of same appearance; add 1 swinging door for egress & package delivery; add secure package drop box; all call box with camera; add exterior lighting fixture. does not | $10,000 |
| Jan 13, 2025 | Completed final sign-off Dec 2025 | 1529 Beach St | Art Of Construction Inc | replacing existing windows and doors in kind, no change to opening, no change in location. kitchen and bath renovation. 5 windows face the street,setback all. others facing side yard or rear yard.Details
replacing existing windows and doors in kind, no change to opening, no change in location. kitchen and bath renovation. 5 windows face the street,setback all. others facing side yard or rear yard. | $150,000 |
| Feb 7, 2024 | Completed final sign-off Aug 2025 | 1032 Broadway | West Coast Architectural Millwork, Broad Oaks Construction Inc | replace exterior doors in-kind to watch existing. 8 doors. proposed project consists of the replacement of non-historic, multilite wood doors with new multilite wood doors matching the material, configuration and operation of the (e) doors in the (e) openings at 5 locations at the south and west eleDetails
replace exterior doors in-kind to watch existing. 8 doors. proposed project consists of the replacement of non-historic, multilite wood doors with new multilite wood doors matching the material, configuration and operation of the (e) doors in the (e) openings at 5 locations at the south and west ele | $35,000 |
| Jun 9, 2023 | In progress issued Mar 2026 | 50 Beaumont Av | De Well Construction Inc | rear cottage: demolish a type-b 1 story utility cottage.Details
rear cottage: demolish a type-b 1 story utility cottage. | $10,000 |
| Jun 9, 2023 | In progress issued Mar 2026 | 50 Beaumont Av | De Well Construction Inc | front: demolish of a single family type-b, 1 story, residential dwelling.Details
front: demolish of a single family type-b, 1 story, residential dwelling. | $20,000 |
| Jun 9, 2023 | In progress issued Mar 2026 | 50 Beaumont Av | De Well Construction Inc | new construction of a 4-story, type-b, 2-family residential building.Details
new construction of a 4-story, type-b, 2-family residential building. | $2,500,000 |
| Nov 28, 2022 | Completed final sign-off Aug 2023 | 806 32nd Av | Broad Oaks Construction Inc | convert 330 sq ft of e unconditioned storage space into habitable space on gr fl garage level of e 1926 3 story dwelling. work includes a sleeping/living area, a wet bar, and bath. no change to footprint or openings. no work visible from street.Details
convert 330 sq ft of e unconditioned storage space into habitable space on gr fl garage level of e 1926 3 story dwelling. work includes a sleeping/living area, a wet bar, and bath. no change to footprint or openings. no work visible from street. | $200,000 |
| Nov 22, 2022 | Completed final sign-off Jul 2024 | 1960 Broadway | Valhalla Construction | #5: interior remodel of a 12 story residential condominium 1925 bldg. relocation of some interior non structural walls, updating finishes and fixtures in kitchen and bathrooms. no changes to bldg structural elements, no changes to windows, no relocation of plmg lines involving the bldgs sub floorDetails
#5: interior remodel of a 12 story residential condominium 1925 bldg. relocation of some interior non structural walls, updating finishes and fixtures in kitchen and bathrooms. no changes to bldg structural elements, no changes to windows, no relocation of plmg lines involving the bldgs sub floor | $600,000 |
| Oct 7, 2019 | Never finaled issued Sep 2021, no final | 1290 Stanyan St | D E F Co | excavate & add 2 basements below (e)2-story sfd. excavate for new driveway & garage. new foundation & new structural strengthening. facade alteration, new windows at new areas visible from public way to match historical window profiles, ogee lugs, wood windows.Details
excavate & add 2 basements below (e)2-story sfd. excavate for new driveway & garage. new foundation & new structural strengthening. facade alteration, new windows at new areas visible from public way to match historical window profiles, ogee lugs, wood windows. | $300,000 |
| Mar 28, 2018 | Completed final sign-off Mar 2018 | 3140 25th St | to pay penalty fees (2x$5,000) on nov 201797872, fees were not paid on pa#201711022947 as required by 2016 sfbcDetails
to pay penalty fees (2x$5,000) on nov 201797872, fees were not paid on pa#201711022947 as required by 2016 sfbc | ||
| Jan 12, 2018 | Never finaled issued Jan 2018, no final | 3140 25th St | Level 8 Construction Inc | soft demo phase only, no removal of structural members. remove brick chimney, remove rat slab at 1st flr & excavate 18" at rat slab (39 cy) (e) foundation to remain. remove wood trellis (wall mounted) at front walls. remove some interior finishes. remove kitchen cabinets & appliancesDetails
soft demo phase only, no removal of structural members. remove brick chimney, remove rat slab at 1st flr & excavate 18" at rat slab (39 cy) (e) foundation to remain. remove wood trellis (wall mounted) at front walls. remove some interior finishes. remove kitchen cabinets & appliances | $3,000 |
| May 18, 2017 | Completed final sign-off Aug 2017 | 1543 Dolores St | Level 8 Construction Inc | relocate laundry room, replace one exterior door at rear of home and one window at rear of house. repair minor dry rot surrounding window. no structural work.Details
relocate laundry room, replace one exterior door at rear of home and one window at rear of house. repair minor dry rot surrounding window. no structural work. | $3,500 |
| Apr 27, 2017 | Completed final sign-off Sep 2018 | 422 Jersey St | Green City Construction Inc | replace front windows with wood transome & casement windows (7), addendum to (e) permit 201702099102Details
replace front windows with wood transome & casement windows (7), addendum to (e) permit 201702099102 | $4,000 |
| Feb 9, 2017 | Completed final sign-off Sep 2018 | 422 Jersey St | Green City Construction Inc | revision to 201612144924 general interio alterations to change home from (e) condition of 3 bedrooms, 2 baths to proposed condition of 4 bedrooms, 3 bathDetails
revision to 201612144924 general interio alterations to change home from (e) condition of 3 bedrooms, 2 baths to proposed condition of 4 bedrooms, 3 bath | $160,000 |
| Apr 22, 2015 | Completed final sign-off Sep 2016 | 76 06th Av | Narrowback Construction Co. | revision to pa # 2015 0323 1562; new concrete slab at garage, foundation improvements, new opening at 2nd flr wall. maher - not req'dDetails
revision to pa # 2015 0323 1562; new concrete slab at garage, foundation improvements, new opening at 2nd flr wall. maher - not req'd | $80,000 |
| Mar 23, 2015 | Completed final sign-off Sep 2016 | 76 06th Av | Narrowback Construction Co. | 1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rmDetails
1st flr: add new interior stair from (garage lvl)to 2nd flr,excavate for 7'-6"head ht at new heated spaces at 1st flr;2nd flr:remodel kitchen,replace 2 broken brick fireplaces w/decorative gas appliance,infill 2 windows @(e)lightwell.3rd flr: add new egress window,remodel bath 2 and 3 to laundry rm | $150,000 |
| Nov 17, 2014 | Completed final sign-off Sep 2016 | 76 06th Av | Narrowback Construction Co. | remove three (3) brick chimneys & fireplaces. n/a ordinance #155-13. infill void.Details
remove three (3) brick chimneys & fireplaces. n/a ordinance #155-13. infill void. | $2,000 |
| Jan 11, 2012 | Completed final sign-off May 2012 | 121 Chicago Wy | Jeffrey R Rexford | remove dry rotted deck and stair, replace with new deck and stair. remove concrete walkway, remove grass, provide new drought tolerant native california landscaping. all work is in rear yard,does not encroch into rear yard setbackDetails
remove dry rotted deck and stair, replace with new deck and stair. remove concrete walkway, remove grass, provide new drought tolerant native california landscaping. all work is in rear yard,does not encroch into rear yard setback | $50,000 |
| Jun 18, 2009 | Completed final sign-off Oct 2009 | 222 Moultrie St | relocate living room to create master bedroom and bath on 2nd fl. new operable skylight, replace wall furnace with new gas furnace. furnace and duct work design build. replace 1 alum window with wood at front.Details
relocate living room to create master bedroom and bath on 2nd fl. new operable skylight, replace wall furnace with new gas furnace. furnace and duct work design build. replace 1 alum window with wood at front. | $20,000 | |
| Feb 2, 2009 | Completed final sign-off Jan 2010 | 717 De Haro St | Narrowback Construction Co. | interior remodel (no change or any work to exterior) to the (e) top floor residence. renovate (e) master bedroom & (e) master bath, convert one (e) bedroom into new master dressing room. renovate (e) study/bedroom. renovate (e) entry hall. install 3 new beams due to the removal of walls.Details
interior remodel (no change or any work to exterior) to the (e) top floor residence. renovate (e) master bedroom & (e) master bath, convert one (e) bedroom into new master dressing room. renovate (e) study/bedroom. renovate (e) entry hall. install 3 new beams due to the removal of walls. | $60,000 |
| Sep 13, 2005 | Completed final sign-off Dec 2006 | 650 02nd St | bathroom remodel: new shower to replace (e) tub, new lavatory & new lavatory counter, new tile @Details
bathroom remodel: new shower to replace (e) tub, new lavatory & new lavatory counter, new tile @ | $50,000 |