Gregory Miller
- Listed as
- authorized agent-others, engineer
- Firm
- Gregory Miller Structural Eng.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Jun 2025
27 permits since 2000 (engineer on 26 permits, authorized agent-others on 1 permit): 17 completed, 2 in progress, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2025 | Completed final sign-off Jun 2026 | 351 Friedell St | Solarix Systems | changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from inverter to pv ac disonnect. no change to pv system size kw-dcDetails
changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from inverter to pv ac disonnect. no change to pv system size kw-dc | |
| Jun 11, 2025 | Completed final sign-off Jun 2026 | 151 Friedell St | Solarix Systems | changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from inverter to pv ac disonnect. no change to pv system size kw-dcDetails
changes to approved addenda 201910083919 - 11 s2 solar changes consisted of using 5 pv panel out of 96 of a different model/mfg, using a different pv inverter, upsizing wire and fuse size from inverter to pv ac disonnect. no change to pv system size kw-dc | |
| Nov 21, 2024 | In progress issued Jan 2025 | 1515 South Van Ness Av | Guzman Construction Group Inc. | ed 13-01. priority prj - alter site to pa# 202306059259 s: construction type changed to 1-b from 1-a. early childhood education center occupancy type changed to 1-4 from e.revision from issued site permit present on g001,g400,g401,a300 & a302. all other sheets are indentical to approved site permit.Details
ed 13-01. priority prj - alter site to pa# 202306059259 s: construction type changed to 1-b from 1-a. early childhood education center occupancy type changed to 1-4 from e.revision from issued site permit present on g001,g400,g401,a300 & a302. all other sheets are indentical to approved site permit. | $60,708,870 |
| Jun 5, 2023 | In progress issued Jun 2024 | 1515 South Van Ness Av | Guzman Construction Group Inc., Guzman-Marinship Joint Venture | mohcd. 100% affordable project ed 13-01. to erect 9 stories, no basement, type i-a, 168 units residential apartments with mixed use building. (r-2,e)Details
mohcd. 100% affordable project ed 13-01. to erect 9 stories, no basement, type i-a, 168 units residential apartments with mixed use building. (r-2,e) | $59,568,292 |
| May 5, 2022 | Never finaled issued Jun 2023, no final | 2550 Irving St | Eco Fire Sprinklers Inc, Guzman Construction Group Inc., Crime Watch Security Sys Llc, J O'driscoll Electrical Inc | to erect 7-story, type i-b, 90 dwelling units bldg with zero basements. to include residential support service office, property management office, bike parking, serice space, & residential parking with puzzle lift and pit stacker system. (100% affordable housing) mayor dir 13-01.Details
to erect 7-story, type i-b, 90 dwelling units bldg with zero basements. to include residential support service office, property management office, bike parking, serice space, & residential parking with puzzle lift and pit stacker system. (100% affordable housing) mayor dir 13-01. | $50,000,000 |
| Sep 13, 2021 | Completed final sign-off Apr 2022 | 237 Mullen Av | new interior stairs, new exterior walls under existing bldg. new foundation work, new plumbing (no new plumbing fixtures) and electrical work. to correct complaints 202179334, nov 202050731, 202172519, 202179331Details
new interior stairs, new exterior walls under existing bldg. new foundation work, new plumbing (no new plumbing fixtures) and electrical work. to correct complaints 202179334, nov 202050731, 202172519, 202179331 | $15,000 | |
| Apr 7, 2021 | Completed final sign-off Jun 2022 | 143 Gladeview Wy | J Chavez Construction Services Corp | add new exterior second floor deck to rear of house. to access deck, replace existing dining room windows with new window / sliding glass door package. add new electrical outlet at deck.Details
add new exterior second floor deck to rear of house. to access deck, replace existing dining room windows with new window / sliding glass door package. add new electrical outlet at deck. | $20,000 |
| Mar 18, 2021 | Completed final sign-off Jun 2022 | 1957 11th Av | Traditional Trades | add roof deck. re-roof. add spiral stairs from (e) deck to roof.Details
add roof deck. re-roof. add spiral stairs from (e) deck to roof. | $20,000 |
| Feb 8, 2021 | Never finaled issued Jul 2021, no final | 1782 10th Av | James W Josephs Co | replace existing failed concrete block landscaping retaining walls with poured in place cast concrete retaining walls. replace exisitng concrete patio slab w/ a reinforced concrete slab.Details
replace existing failed concrete block landscaping retaining walls with poured in place cast concrete retaining walls. replace exisitng concrete patio slab w/ a reinforced concrete slab. | $85,000 |
| Feb 7, 2020 | Never finaled issued Oct 2020, no final | 1950 Mission St | Solarix Systems | installation of a solar hot water heating system.Details
installation of a solar hot water heating system. | $220,000 |
| Jan 16, 2019 | Completed final sign-off Jun 2020 | 1150 03rd St | Solarix Systems | install a solar hot water heating system. roof mounted collectors and a ground located horizontal storage tanksDetails
install a solar hot water heating system. roof mounted collectors and a ground located horizontal storage tanks | $200,000 |
| Sep 10, 2018 | Expired or cancelled withdrawn Sep 2018 | 2800 Arelious Walker Dr | Solarix Systems | installation of a solar hot water heating system. ground mounted storage tank and roof-mounted collector maher naDetails
installation of a solar hot water heating system. ground mounted storage tank and roof-mounted collector maher na | $54,000 |
| Jul 13, 2018 | Completed final sign-off Nov 2019 | 912 Wisconsin St | Clonduff Construction Inc., Nicholas Burnham Construction | repair and replace portion of the existing deck in the rear yard.Details
repair and replace portion of the existing deck in the rear yard. | $6,000 |
| Dec 12, 2017 | Completed final sign-off Oct 2018 | 1036 Mission St | Solarix Systems | install a solar hot water heating system consisting of roof mounted solar collectors and a solar storage tank located in the ground floor mechanical room maher naDetails
install a solar hot water heating system consisting of roof mounted solar collectors and a solar storage tank located in the ground floor mechanical room maher na | $215,000 |
| May 1, 2017 | Completed final sign-off Feb 2018 | 628 Missouri St | O'shaughnessy Construction | revision to pa #201503050076 (renewal pa #201705015296) - relocate internal staircase.Details
revision to pa #201503050076 (renewal pa #201705015296) - relocate internal staircase. | |
| Dec 6, 2016 | Completed final sign-off Aug 2017 | 2198 Market St | Solarix Systems | intall a solar hot water heating system. system consists of roof-mounted collectors and a water storage tank. ref to permit app#2013-12-13-4180 s2Details
intall a solar hot water heating system. system consists of roof-mounted collectors and a water storage tank. ref to permit app#2013-12-13-4180 s2 | $28,000 |
| Mar 30, 2016 | Completed final sign-off Oct 2016 | 1906 Union St | Caviglia Brothers Construction | t.i. include men's & women's locker rooms with shoers & waterclosets. 2 yoga studios @ basement level. upstairs retail space & office & laundry area.Details
t.i. include men's & women's locker rooms with shoers & waterclosets. 2 yoga studios @ basement level. upstairs retail space & office & laundry area. | $250,000 |
| Jan 8, 2015 | Completed final sign-off Feb 2015 | 946 Castro St | exterior balcony facing street is being repaired. remove rot at cantelevered joists and reattach railing to structure, reducing balcony from 24" deep to 6" deep.Details
exterior balcony facing street is being repaired. remove rot at cantelevered joists and reattach railing to structure, reducing balcony from 24" deep to 6" deep. | $750 | |
| Sep 22, 2014 | Never finaled issued Sep 2014, no final | 21 Allston Wy | expand conditioned living sp @ garage (580 sf) w/in bldg footprint, new walls are non-load bearing, add bathroom & recreation room, move laundry. remodel 1st floor kitchen, replace cabinets & countertops, add sink & w.c. (1/2 bath) @ 1st floor. no structural changes.Details
expand conditioned living sp @ garage (580 sf) w/in bldg footprint, new walls are non-load bearing, add bathroom & recreation room, move laundry. remodel 1st floor kitchen, replace cabinets & countertops, add sink & w.c. (1/2 bath) @ 1st floor. no structural changes. | $60,000 | |
| Dec 16, 2013 | Completed final sign-off Sep 2014 | 428 Gold Mine Dr | add new 100 sf deck & hot tub. new sliding door to replace (e) window on east wall.Details
add new 100 sf deck & hot tub. new sliding door to replace (e) window on east wall. | $15,000 | |
| Oct 25, 2013 | Completed final sign-off Nov 2013 | 428 Waller St | revision to 201305167174, amended post to deck detail. revise details 6, 9 and 10 on sheet a6.Details
revision to 201305167174, amended post to deck detail. revise details 6, 9 and 10 on sheet a6. | ||
| Aug 15, 2012 | Completed final sign-off Nov 2013 | 426 Waller St | replace interior stairs (secondary egress) @ back of building with a (new) third story deck & spiral stairs leading to a (new) 2nd story deck and stairs.Details
replace interior stairs (secondary egress) @ back of building with a (new) third story deck & spiral stairs leading to a (new) 2nd story deck and stairs. | $50,000 | |
| Apr 22, 2011 | Completed final sign-off Dec 2011 | 247 32nd Av | remodel kitchen, master bedroom & master bathroom. remove load bearing wall at master bedroom, install engineered beam, remodel closet at master bedroom. replace window at master bathroom (in lightwell)Details
remodel kitchen, master bedroom & master bathroom. remove load bearing wall at master bedroom, install engineered beam, remodel closet at master bedroom. replace window at master bathroom (in lightwell) | $25,000 | |
| Apr 4, 2011 | Completed final sign-off May 2011 | 218 Lisbon St | Phoenix Construction | foundation footings repair. no plywood strengthening work under this permit foundation strengthening work only under this permit.Details
foundation footings repair. no plywood strengthening work under this permit foundation strengthening work only under this permit. | $20,000 |
| Sep 25, 2006 | Expired or cancelled expired Sep 2007 | 1064 Divisadero St | install new beam at head of stairway, additional work to be approved 200602225167 including adol fire block and fire stoppingDetails
install new beam at head of stairway, additional work to be approved 200602225167 including adol fire block and fire stopping | ||
| May 30, 2006 | Expired or cancelled expired Mar 2009 | 353 Church St | A M Rocca Inc. | structural upgrade of supporting beams frame wood to metal according to attached plans.Details
structural upgrade of supporting beams frame wood to metal according to attached plans. | $30,000 |
| Oct 5, 2001 | Expired or cancelled expired Apr 2002 | 4070 26th St | underpin foundationDetails
underpin foundation | $6,000 |