Gisela Schmoll
- Listed as
- architect, authorized agent-others
- Firm
- Gisela Schmoll Architect Pc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Aug 2026
75 permits since 2000 (architect on 72 permits, authorized agent-others on 5 permits): 44 completed, 8 in progress, 8 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 1480 Willard St | C H Burnham Inc | remodel 1/f plan. in-fill addition at balcony. rebuild stairs to the 2/f to bring them into code compliance. add new bath & bar. new rear windows.Details
remodel 1/f plan. in-fill addition at balcony. rebuild stairs to the 2/f to bring them into code compliance. add new bath & bar. new rear windows. | $150,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 1480 Willard St | C H Burnham Inc | remodel basement in single family home. add new bath & sauna. new glass doors & window.Details
remodel basement in single family home. add new bath & sauna. new glass doors & window. | $150,000 |
| Oct 22, 2025 | In progress issued Feb 2026 | 3226 18th St | Cronin Construction & Development Inc. | new adu under state adu programme. convert existing 1/f storage space into a 1-bedroom adu. new stairs from sidewalk to new unit. new utility room. no work on upper two floors.Details
new adu under state adu programme. convert existing 1/f storage space into a 1-bedroom adu. new stairs from sidewalk to new unit. new utility room. no work on upper two floors. | $68,000 |
| Sep 23, 2025 | In progress issued Sep 2025 | 70 Saint Marys Av | Mcmahon Construction | revision to pa # 2024-0829-9696. change window material vinyl. replace rear foundation at existing house. remove redundant foundation at passageway.Details
revision to pa # 2024-0829-9696. change window material vinyl. replace rear foundation at existing house. remove redundant foundation at passageway. | $10,000 |
| Sep 19, 2025 | Completed final sign-off Apr 2026 | 3378 22nd St | revision to permit 202505065873. replacement in kind of rear stairs and landing.Details
revision to permit 202505065873. replacement in kind of rear stairs and landing. | $10,000 | |
| Jul 17, 2025 | In progress issued Jul 2025 | 1883 Funston Av | Mission Home Remodeling Inc | revision to permit #202101132622 and 202404301099. demo bath 2 and convert to storage. new location for bath 2. shift rear windows for bath 2. relocate trap door to first floor.Details
revision to permit #202101132622 and 202404301099. demo bath 2 and convert to storage. new location for bath 2. shift rear windows for bath 2. relocate trap door to first floor. | |
| Jun 30, 2025 | Completed final sign-off Jun 2026 | 738 Hayes St | O'shea Co. Home Grown Construction | remodel primary bathroom & bedroom, new skylight at bath at 3rd/f. new skylight at kitchen, new on-demand hot water heater for primary bath. no work at 1st/f. no change to exterior elevationsDetails
remodel primary bathroom & bedroom, new skylight at bath at 3rd/f. new skylight at kitchen, new on-demand hot water heater for primary bath. no work at 1st/f. no change to exterior elevations | $60,000 |
| Mar 26, 2025 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | revision to pa# 202412056258 and 202502210850: replace (e) furnace and replace ducts at 1/f. new ducted heat pump at second and third floors. additional pad footings in crawl space.Details
revision to pa# 202412056258 and 202502210850: replace (e) furnace and replace ducts at 1/f. new ducted heat pump at second and third floors. additional pad footings in crawl space. | $15,000 |
| Mar 6, 2025 | Completed final sign-off Feb 2026 | 428 27th St | Mission Home Remodeling Inc | revision to permit 202409130753 (ref 201909060896). change bath main unit on first floor to a powder room. enlarge bath for the legalized unit.Details
revision to permit 202409130753 (ref 201909060896). change bath main unit on first floor to a powder room. enlarge bath for the legalized unit. | |
| Feb 21, 2025 | Expired or cancelled expired Mar 2026 | 4250 23rd St | Perez Construction Llc. | revision to pa#202412056258. replace existing windows with new in-kind. remodel kitchen. new wall at stair. enlarge bedroom 5Details
revision to pa#202412056258. replace existing windows with new in-kind. remodel kitchen. new wall at stair. enlarge bedroom 5 | $30,000 |
| Feb 13, 2025 | In progress issued Oct 2025 | 7 07th Av | Assembly Builders Inc. | lower garage floor. new retaining walls sistered to existing walls. widen garage door. adjust driveway scope. no work at upper levels.Details
lower garage floor. new retaining walls sistered to existing walls. widen garage door. adjust driveway scope. no work at upper levels. | $100,000 |
| Jan 28, 2025 | Expired or cancelled withdrawn Jan 2025 | 428 27th St | Mission Home Remodeling Inc | revision to 201909060896 and 202409130753. update sprinkler requirements per cbc 903.3.1.3 nfpa 13d sprinkler systemsDetails
revision to 201909060896 and 202409130753. update sprinkler requirements per cbc 903.3.1.3 nfpa 13d sprinkler systems | |
| Dec 5, 2024 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | attic build out. new connecting stair to habitavke attic floor. new 8'x8' dormer. new skylights. two new windows, replace 3 (e) windows. remodel two bathroom laundry room and closets.Details
attic build out. new connecting stair to habitavke attic floor. new 8'x8' dormer. new skylights. two new windows, replace 3 (e) windows. remodel two bathroom laundry room and closets. | $100,000 |
| Nov 27, 2024 | Completed final sign-off Apr 2026 | 917 Alvarado St | S & K Construction | convert existing attic into primary suite. new connecting stair. three new dormers less than 8'x8' size. replace 2nd flr vinyl windows.Details
convert existing attic into primary suite. new connecting stair. three new dormers less than 8'x8' size. replace 2nd flr vinyl windows. | $150,000 |
| Nov 20, 2024 | Completed final sign-off Mar 2026 | 4250 23rd St | Perez Construction Llc. | voluntary foundation strenthening consisting of the replacement of weathered unreinforced brick foundations with conventionally reinforced concrete spread footings along the perimeter of the house. this is a revision to pa#: 202407196880Details
voluntary foundation strenthening consisting of the replacement of weathered unreinforced brick foundations with conventionally reinforced concrete spread footings along the perimeter of the house. this is a revision to pa#: 202407196880 | $20,000 |
| Sep 25, 2024 | In progress issued Jun 2025 | 70 St Marys Av | Mcmahon Construction | ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units.Details
ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units. | $250,000 |
| Sep 13, 2024 | Expired or cancelled expired Feb 2026 | 428 27th St | Mission Home Remodeling Inc | revision to pa # 201909060896: mirror kitchen & stair location. remove breezeway. shift rear windows and glass doors.Details
revision to pa # 201909060896: mirror kitchen & stair location. remove breezeway. shift rear windows and glass doors. | $5,000 |
| Aug 23, 2024 | Expired or cancelled expired Dec 2025 | 39 Atalaya Tr | C H Burnham Inc | rev 202405021269- lower florr in garage work room and adjacent hall to match (n) laundry and bath 3Details
rev 202405021269- lower florr in garage work room and adjacent hall to match (n) laundry and bath 3 | $5,000 |
| Jul 19, 2024 | Expired or cancelled expired Mar 2026 | 4250 23rd St | Perez Construction Llc. | remove walls at living room to open the space. relocated the powder room. shift wall at bedroom 5 and remodel bathroom 4. new foundation at north wall. no change to elevations view from streetDetails
remove walls at living room to open the space. relocated the powder room. shift wall at bedroom 5 and remodel bathroom 4. new foundation at north wall. no change to elevations view from street | $50,000 |
| May 10, 2024 | In progress issued Oct 2024 | 1883 Funston Av | Mission Home Remodeling Inc | alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard.Details
alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard. | $100,000 |
| May 2, 2024 | Completed final sign-off Dec 2025 | 39 Atalaya Tr | C H Burnham Inc | remodel kitchen, pantry and powder at 2nd floor. convert a portion of ground floor unconditional space into conditioned area with new bath, laundry room & connecting stair. remodel 3rd floor baths. new windows at sides and rear. no change to front elevation.Details
remodel kitchen, pantry and powder at 2nd floor. convert a portion of ground floor unconditional space into conditioned area with new bath, laundry room & connecting stair. remodel 3rd floor baths. new windows at sides and rear. no change to front elevation. | $200,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2025 | 323 25th Av | Mission Home Remodeling Inc | kitchen and bath remodel at 3/f. new exterior stair in light well. new wood deck at grade in rear yard, less than 36" above grade. new glass doors to rear yard at 2/f. replace existing windows at 3/f.Details
kitchen and bath remodel at 3/f. new exterior stair in light well. new wood deck at grade in rear yard, less than 36" above grade. new glass doors to rear yard at 2/f. replace existing windows at 3/f. | $100,000 |
| Oct 27, 2022 | Never finaled issued Sep 2023, no final | 223 Anderson St | vertical addition to add new suite with bedroom,bath & closet.new connecting stair,new windows @ rear,new window @(e) front facade.resurface (e)entry stair & replace guardrails.remove (e)bath @ existing primary suite & convert into family room.Details
vertical addition to add new suite with bedroom,bath & closet.new connecting stair,new windows @ rear,new window @(e) front facade.resurface (e)entry stair & replace guardrails.remove (e)bath @ existing primary suite & convert into family room. | $200,000 | |
| Feb 23, 2021 | Completed final sign-off Apr 2025 | 262 20th Av | Mission Home Remodeling Inc | horizontal addition to the rear to create (n) family room, expand kitchen/dining room & additional bedroom. (n) deck over 1st fl addition w/ (n) stair to rear yard. widen garage door. replace front windows w/ (n) clad wood windows to match.Details
horizontal addition to the rear to create (n) family room, expand kitchen/dining room & additional bedroom. (n) deck over 1st fl addition w/ (n) stair to rear yard. widen garage door. replace front windows w/ (n) clad wood windows to match. | $200,000 |
| Jan 28, 2021 | Completed final sign-off May 2023 | 369 Missouri St | C H Burnham Inc | create new master suite by raising roof and adding a vertical addition at the rear. new connecting stair from second floor to third floor. new skylight over stair.Details
create new master suite by raising roof and adding a vertical addition at the rear. new connecting stair from second floor to third floor. new skylight over stair. | $200,000 |
| Jan 13, 2021 | Never finaled issued May 2022, no final | 1883 Funston Av | new in-fill addition under the cantilevered 1st floor. extend living / dining room out 4' to the rear. remodel kitchen & family room. add bath in basement. new connecting stair to lower basement & access to new rear yard deck. new windows @ rear. no change to front facade.Details
new in-fill addition under the cantilevered 1st floor. extend living / dining room out 4' to the rear. remodel kitchen & family room. add bath in basement. new connecting stair to lower basement & access to new rear yard deck. new windows @ rear. no change to front facade. | $150,000 | |
| Sep 2, 2020 | Completed final sign-off Aug 2021 | 78 Carmel St | Lindquist Custom Construction Inc | revision to 201906072894 add 2nd terrace,shift e stair to align with new terrace. reduce wood deck sizeDetails
revision to 201906072894 add 2nd terrace,shift e stair to align with new terrace. reduce wood deck size | $1,000 |
| Dec 17, 2019 | Expired or cancelled cancelled Jan 2026 | 178 Douglass St | horizontal & vertical addition. addition at rear of house to add family room, 2 bedrooms/baths and master suite. new interior stair connecting all floors.Details
horizontal & vertical addition. addition at rear of house to add family room, 2 bedrooms/baths and master suite. new interior stair connecting all floors. | $250,000 | |
| Oct 18, 2019 | Completed final sign-off Apr 2020 | 428 27th St | L A S Twins Construction Inc | rev to pa# 201908290209; replace (e) brick steps with cast stone, replace (e) newel posts with cast stome, posts raise (e) guardrail at front steps to 36" hight, reface (e) brick wall with cast stoneDetails
rev to pa# 201908290209; replace (e) brick steps with cast stone, replace (e) newel posts with cast stome, posts raise (e) guardrail at front steps to 36" hight, reface (e) brick wall with cast stone | $1,000 |
| Sep 6, 2019 | Expired or cancelled expired Feb 2026 | 428 27th St | Cronin Construction & Development Inc. | legalize unauthorized dwelling unit. new bedroom & breezeway access to rear yard @ 1st floor. remodel upper levels. rebuild (e) deck. raise roof @ rear for new master suite.Details
legalize unauthorized dwelling unit. new bedroom & breezeway access to rear yard @ 1st floor. remodel upper levels. rebuild (e) deck. raise roof @ rear for new master suite. | $250,000 |
| Aug 2, 2019 | Completed final sign-off Jan 2024 | 3795 Market St | F C O General Construction | revision to pa 2018-0905-9138 replace existing vinyl or aluminum windows at upper unit kitchen and master bath with clad wood windows. replace (e) aluminum with aluminum wood clad casementDetails
revision to pa 2018-0905-9138 replace existing vinyl or aluminum windows at upper unit kitchen and master bath with clad wood windows. replace (e) aluminum with aluminum wood clad casement | $2,000 |
| Jul 30, 2019 | Completed final sign-off Feb 2020 | 1475 15th Av | Kasas Builders Inc | add additional unconditioned bathroomon g/f. new garage door, new type x gypsum board at g/f walls and ceiling.Details
add additional unconditioned bathroomon g/f. new garage door, new type x gypsum board at g/f walls and ceiling. | $65,000 |
| Jun 7, 2019 | Completed final sign-off Aug 2021 | 78 Carmel St | Lindquist Custom Construction Inc | legalize non-conforming deck. replace wood guardrails & deck surface with structural glass. landscape work @ rear yard patio.Details
legalize non-conforming deck. replace wood guardrails & deck surface with structural glass. landscape work @ rear yard patio. | $30,000 |
| Apr 25, 2019 | Expired or cancelled expired Oct 2023 | 707 Rockdale Dr | Grant Ian Hetherington | revision to pa 2016-1007-9839 and 2018-0802-6245 increase depth of juliet balconies at 3rd fl to 24 inches. revise header at bifold doorDetails
revision to pa 2016-1007-9839 and 2018-0802-6245 increase depth of juliet balconies at 3rd fl to 24 inches. revise header at bifold door | $500 |
| Apr 9, 2019 | Completed final sign-off Jan 2024 | 3795 Market St | F C O General Construction | revision to permit #201809059138. remodel of lower unit kitchen and bath. new rear door and window.Details
revision to permit #201809059138. remodel of lower unit kitchen and bath. new rear door and window. | $20,000 |
| Jan 30, 2019 | Completed final sign-off May 2021 | 445 Anderson St | Cronin Construction & Development Inc. | rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck.Details
rev to pa#201712217083; change powder room at basement to full bath, add dormer, repair exteior stair and deck. | $5,000 |
| Dec 28, 2018 | Expired or cancelled expired Sep 2024 | 51 Pixley St | horizontal in-fill addition @ 3rd fl rear. new roof deck. penthouse addition for roof deck access. interior remodel new rear windows. no change to front facade.Details
horizontal in-fill addition @ 3rd fl rear. new roof deck. penthouse addition for roof deck access. interior remodel new rear windows. no change to front facade. | $250,000 | |
| Aug 2, 2018 | Expired or cancelled expired Oct 2023 | 707 Rockdale Dr | Grant Ian Hetherington | revision to app#201610079839 to address nov#201863791 "e" permeter walls to be demolishid and rebuilt in same location. adjust some deminsions due to final elevation size based on manufactured.Details
revision to app#201610079839 to address nov#201863791 "e" permeter walls to be demolishid and rebuilt in same location. adjust some deminsions due to final elevation size based on manufactured. | |
| Jul 3, 2018 | Completed final sign-off Feb 2021 | 142 Eastwood Dr | F C O General Construction | revision to app#201612155143 widen side porch of kitchen. move gas meter. replace topping at front porch.Details
revision to app#201612155143 widen side porch of kitchen. move gas meter. replace topping at front porch. | $2,000 |
| Dec 21, 2017 | Completed final sign-off Jun 2021 | 445 Anderson St | Cronin Construction & Development Inc. | remodel of single family home. excavate down to add additional habitable space. replace existing windows and exterior rear stairs, new roof deck. no change to building footprint, no change to front facade other window replacement.Details
remodel of single family home. excavate down to add additional habitable space. replace existing windows and exterior rear stairs, new roof deck. no change to building footprint, no change to front facade other window replacement. | $300,000 |
| Oct 17, 2017 | Completed final sign-off Feb 2021 | 142 Eastwood Dr | F C O General Construction | revision to pa#201612165143, add second bathroom in basement, new rear window at bath, convert storage to media room. all work at basement.Details
revision to pa#201612165143, add second bathroom in basement, new rear window at bath, convert storage to media room. all work at basement. | $130,000 |
| Aug 30, 2017 | Never finaled issued Oct 2017, no final | 1382 Page St | unit 3: add 3 dormers. remodel bath, new powder room. no change to front elevation or floor area. no work at 1st or 2nd flDetails
unit 3: add 3 dormers. remodel bath, new powder room. no change to front elevation or floor area. no work at 1st or 2nd fl | $70,000 | |
| Dec 16, 2016 | Completed final sign-off Feb 2021 | 142 Eastwood Dr | F C O General Construction | remodel existing kitchen, bath, laundry new interior stair to basement. new skylights. new stairs to side yard, replace existing windows at side yard. replace existing windows at sides and rear with new dual pane windows. remove existing concrete patio, replace with permeable pavers. no change toDetails
remodel existing kitchen, bath, laundry new interior stair to basement. new skylights. new stairs to side yard, replace existing windows at side yard. replace existing windows at sides and rear with new dual pane windows. remove existing concrete patio, replace with permeable pavers. no change to | $100,000 |
| Oct 13, 2016 | Completed final sign-off Oct 2017 | 370 Valdez Av | revision to app#201601116734. a bathroom(bath #3), exercise room and mud room will be added to the 1st floor. replace windows on 1st floor. remove garage door from side of house. windows will matche (e) upstairs windows, new exterior wall will match (e) wall. n/a for maherDetails
revision to app#201601116734. a bathroom(bath #3), exercise room and mud room will be added to the 1st floor. replace windows on 1st floor. remove garage door from side of house. windows will matche (e) upstairs windows, new exterior wall will match (e) wall. n/a for maher | $10,000 | |
| Oct 7, 2016 | Expired or cancelled expired Nov 2021 | 707 Rockdale Dr | Grant Ian Hetherington, Hymac Construction Inc | remodel of single family dwelling to create accessible access for paraplegic child. new ellvator, vertical addition to add bedrooms & bath. excavate at first floor to create legal habitable space. new ramp at front yard to allow 13.8cubic yard of dirt removed.Details
remodel of single family dwelling to create accessible access for paraplegic child. new ellvator, vertical addition to add bedrooms & bath. excavate at first floor to create legal habitable space. new ramp at front yard to allow 13.8cubic yard of dirt removed. | $300,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2022 | 3378 22nd St | F C O General Construction | remodel of (e) 2 floor condominium. remodel (e) ground floor to create media room, laundry, study & bath. in-fill addition under sun room for new connecting stair between ground floor & upper level. remodel of kitchen & upper level bath. expand garage for 2-car parking. no change to front facade.Details
remodel of (e) 2 floor condominium. remodel (e) ground floor to create media room, laundry, study & bath. in-fill addition under sun room for new connecting stair between ground floor & upper level. remodel of kitchen & upper level bath. expand garage for 2-car parking. no change to front facade. | $250,000 |
| Jun 28, 2016 | Never finaled issued Apr 2018, no final | 185 Elsie St | remodel of basement to include bike parking. remodel 1st fl with in-fill additions at lightwell & a horizontal addition to the rear. vertical addition to create a 2nd story master suite & roof deck. no change to front facade other than to replace materials. replace alummium windows with wood windowsDetails
remodel of basement to include bike parking. remodel 1st fl with in-fill additions at lightwell & a horizontal addition to the rear. vertical addition to create a 2nd story master suite & roof deck. no change to front facade other than to replace materials. replace alummium windows with wood windows | $350,000 | |
| Jan 11, 2016 | Completed final sign-off Oct 2017 | 370 Valdez Av | Sun Sun Construction Co | remodel of kitchen, new master bath, new stair and bath 1 remodel. seal one exterior side door. new electrical on 2nd floor. replace extg windows with in kind at front and side facades. no change to floor area , front facade or grade.Details
remodel of kitchen, new master bath, new stair and bath 1 remodel. seal one exterior side door. new electrical on 2nd floor. replace extg windows with in kind at front and side facades. no change to floor area , front facade or grade. | $80,000 |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 2621 30th Av | R M Construction | new study, bath and laundry added to unfinished ground floor. new stairs, new glass doors, and windows added to the rear of bldg at 1st floor. new rear deck. no change to front facade. no change to floor area.Details
new study, bath and laundry added to unfinished ground floor. new stairs, new glass doors, and windows added to the rear of bldg at 1st floor. new rear deck. no change to front facade. no change to floor area. | $120,000 |
| Aug 14, 2015 | Completed final sign-off Mar 2016 | 1488 14th Av | R M Construction | remodel of upper level flat in two unit bld. remodel kitchen, add new powder riim and open wall between kitchen & dining rm. new windows at kitchen and living rm. remodel (e) bath. no change to sq ft, no change to front facade. no change to lower unit.Details
remodel of upper level flat in two unit bld. remodel kitchen, add new powder riim and open wall between kitchen & dining rm. new windows at kitchen and living rm. remodel (e) bath. no change to sq ft, no change to front facade. no change to lower unit. | $112,000 |
| Mar 12, 2015 | Completed final sign-off Feb 2016 | 2105 Buchanan St | Gil Construction & Assoc Inc. | #3 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bathrooms. new master closet/study. no change to exterior facade, no structural work.Details
#3 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bathrooms. new master closet/study. no change to exterior facade, no structural work. | $90,000 |
| Mar 12, 2015 | Completed final sign-off Feb 2016 | 2105 Buchanan St | Gil Construction & Assoc Inc. | #1 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bath #1. new tile & lighitng only bath #2. no change to exterior facade, no structural work.Details
#1 - kitchen & bathrooms remodel. new cabinetry, appliances & finishes in kitchen. new tile, fixtures & cabinetry in bath #1. new tile & lighitng only bath #2. no change to exterior facade, no structural work. | $70,000 |
| Apr 28, 2014 | Completed final sign-off Feb 2015 | 877 Douglass St | Assembly Builders Inc. | kitchen remodel that involves removig two walls & adding new windows at the rear of the property. new gas fireplaces in living room & dining room. open wall between living room & bedroom. no change to front facade or overall area. no work on 1st floor or basement.Details
kitchen remodel that involves removig two walls & adding new windows at the rear of the property. new gas fireplaces in living room & dining room. open wall between living room & bedroom. no change to front facade or overall area. no work on 1st floor or basement. | $75,000 |
| Apr 9, 2014 | Expired or cancelled expired Jan 2016 | 87 Maddux Av | add a set of french doors in rear to replace (e) window, add sq.ft. to (e) deck @ door height, move deck stair, lighting, hose bibs.Details
add a set of french doors in rear to replace (e) window, add sq.ft. to (e) deck @ door height, move deck stair, lighting, hose bibs. | $15,000 | |
| Oct 17, 2013 | Completed final sign-off Dec 2013 | 684 Arkansas St | Assembly Builders Inc. | open wall between bedroom/study and living room, demolish extg closets in living room and replace with new cabinetry. new washer/dryer closet and bedroom/study closet. no change to exterior facade. no change to basement/garage or upper unit. no change to bldg area.Details
open wall between bedroom/study and living room, demolish extg closets in living room and replace with new cabinetry. new washer/dryer closet and bedroom/study closet. no change to exterior facade. no change to basement/garage or upper unit. no change to bldg area. | $26,000 |
| May 9, 2013 | Never finaled issued May 2013, no final | 893 Folsom St | Nelson Jameson Construction Inc | revision to appl #2013.04.11.4339 & 2013.04.16.4710 - renive 1-hr partition form permit drawings between office & filing area per cbc section 508.3 & table 508.4, required separation of occupancies; no separation required between office & filing area.Details
revision to appl #2013.04.11.4339 & 2013.04.16.4710 - renive 1-hr partition form permit drawings between office & filing area per cbc section 508.3 & table 508.4, required separation of occupancies; no separation required between office & filing area. | |
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 893 Folsom St | Nelson Jameson Construction Inc | revision to existing pa# 201304114339. add leveling slab over existing sloped floor at stroage area. increase area to remain at mezz floor. minor adjustment to storage and hall width. future 1 hour barrier per table 508.2.5 sfbc 2010, under separate permitDetails
revision to existing pa# 201304114339. add leveling slab over existing sloped floor at stroage area. increase area to remain at mezz floor. minor adjustment to storage and hall width. future 1 hour barrier per table 508.2.5 sfbc 2010, under separate permit | $8,000 |
| Apr 11, 2013 | Never finaled issued Apr 2013, no final | 893 Folsom St | Nelson Jameson Construction Inc | t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior workDetails
t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior work | $65,000 |
| Dec 6, 2012 | Expired or cancelled expired Feb 2015 | 380 Capp St | Michael C Hargrove Construction | (front building) rebuild exterior rear stair. add new rear decks & new roof deck.Details
(front building) rebuild exterior rear stair. add new rear decks & new roof deck. | $8,500 |
| Apr 25, 2012 | Expired or cancelled expired Oct 2013 | 71 Granada Av | revision to pa #200905252872 s1. addendum 1 to reverse skylight roof opening to conform w/cbc 2007, section 704.11 exception 4.3Details
revision to pa #200905252872 s1. addendum 1 to reverse skylight roof opening to conform w/cbc 2007, section 704.11 exception 4.3 | $75 | |
| Apr 25, 2012 | Completed final sign-off Sep 2012 | 5650 Mission St | Romex Construction | comply w/nov# 201187406-expand (e) grocery store into adjacent retail space, cut opening in wall to adjacent space, new 1:20 ramp connecting retail spaces. remove (e) closet & toilet room. new counters, topping slab, lighting & entry door in expanded retail spaces. no work on 2nd fl level or garage.Details
comply w/nov# 201187406-expand (e) grocery store into adjacent retail space, cut opening in wall to adjacent space, new 1:20 ramp connecting retail spaces. remove (e) closet & toilet room. new counters, topping slab, lighting & entry door in expanded retail spaces. no work on 2nd fl level or garage. | $57,500 |
| Mar 6, 2012 | Completed final sign-off Dec 2012 | 382 Capp St | Michael C Hargrove Construction | remodel kitchen, utility room and bath. infill at light well for powder room. seismic upgrade at 1st floor. new closet at entry. upgrade electrical, new forced air heat. new windows.Details
remodel kitchen, utility room and bath. infill at light well for powder room. seismic upgrade at 1st floor. new closet at entry. upgrade electrical, new forced air heat. new windows. | $35,000 |
| Jun 8, 2011 | Completed final sign-off Nov 2012 | 228 San Jose Av | Serge Colombeau Const | 1st. & 2nd. floor addition for (n) internal stair & garden storage. (n) 1-hr. parapet on south side of 2nd. flr. roof. updated roof framing, blocking for future roof deck.Details
1st. & 2nd. floor addition for (n) internal stair & garden storage. (n) 1-hr. parapet on south side of 2nd. flr. roof. updated roof framing, blocking for future roof deck. | $8,000 |
| May 6, 2011 | Expired or cancelled cancelled Aug 2012 | 51 Oakwood St | replace existing dry rotted stairs and deck at rear with new stair and deck, same dimension, except code upgrade with new fire wall at rear of buildingDetails
replace existing dry rotted stairs and deck at rear with new stair and deck, same dimension, except code upgrade with new fire wall at rear of building | $3,000 | |
| Feb 11, 2011 | Completed final sign-off Jun 2011 | 230 San Jose Av | Serge Colombeau Const | remodel (e) 3rd floor one bedroom flat; remodel kitchen & bathroom, (n) heat system, (n) electrical outlets in living room & dining room. replace existing windows @ front & side on 3rd floor. in kind.Details
remodel (e) 3rd floor one bedroom flat; remodel kitchen & bathroom, (n) heat system, (n) electrical outlets in living room & dining room. replace existing windows @ front & side on 3rd floor. in kind. | $21,500 |
| Jul 16, 2010 | Completed final sign-off Nov 2011 | 4076 20th St | expand exiting basement room to match walls of exist sunroom above + small addition below existing deck, replace existing damaged exterior deck + stair.Details
expand exiting basement room to match walls of exist sunroom above + small addition below existing deck, replace existing damaged exterior deck + stair. | $10,000 | |
| Oct 30, 2008 | Completed final sign-off Feb 2009 | 1998 Broadway | alterations to unit 405 including new cooktop, new hood and new sink in kitchen; replace fixed glass window in dining room with 4'-0" widw sliding door.Details
alterations to unit 405 including new cooktop, new hood and new sink in kitchen; replace fixed glass window in dining room with 4'-0" widw sliding door. | $3,000 | |
| Sep 26, 2008 | Completed final sign-off Jul 2009 | 1274 08th Av | replace wood fireplace in kind in 3rd floor living room. revision to 200512190622. install per manufactores requirements.Details
replace wood fireplace in kind in 3rd floor living room. revision to 200512190622. install per manufactores requirements. | $1,000 | |
| Apr 17, 2008 | Completed final sign-off Nov 2008 | 228 San Jose Av | demo (e) kitchen appliances, bathrm fixtures, non bearing interior wall between bath & closets, kitchen cut opening in bearing wall between kitchen & hall, install new kitchen & bathrm, add bath to master bedrm, work on 2/f. install new finishes to 1/f, media room, add bath to media room.Details
demo (e) kitchen appliances, bathrm fixtures, non bearing interior wall between bath & closets, kitchen cut opening in bearing wall between kitchen & hall, install new kitchen & bathrm, add bath to master bedrm, work on 2/f. install new finishes to 1/f, media room, add bath to media room. | $45,000 | |
| Apr 11, 2008 | Completed final sign-off May 2015 | 809 Noe St | demo & rebuild (e) ext. stair & storage shed. (n) guard & handrails. (n) garbage cabinet set @ sidewalk, (n) wood retaining walls max 30" high at (e) grade in front yard. remove & replace ex main sewer line & sidewalk for sewer repair work. (n) conc. retaining wall. (n) cap on (e) conc. wall.Details
demo & rebuild (e) ext. stair & storage shed. (n) guard & handrails. (n) garbage cabinet set @ sidewalk, (n) wood retaining walls max 30" high at (e) grade in front yard. remove & replace ex main sewer line & sidewalk for sewer repair work. (n) conc. retaining wall. (n) cap on (e) conc. wall. | $15,000 | |
| Nov 7, 2007 | Completed final sign-off Jan 2009 | 267 Duncan St | Michael C Hargrove Construction | rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at gradeDetails
rear 1 story add. and roof deck and remodel existing habitable room, kitchen, new full bath, bedroom 1st flr. relocate 3 exist windows, demo rear 1 story dining room with deck and part of east facing yard walls. new rear yard deck at grade | $45,000 |
| May 30, 2007 | Completed final sign-off Jun 2008 | 300 Hazelwood Av | horizontal garage addition at 1st floor garage. convert existing storage space/garage into 2 bedrooms, laundry room and bathroom.Details
horizontal garage addition at 1st floor garage. convert existing storage space/garage into 2 bedrooms, laundry room and bathroom. | $10,000 | |
| Jan 23, 2007 | Completed final sign-off Sep 2008 | 1420 Montgomery St | C.M. Peletz Company | seismic upgrade entire building. remove and relocate partitions for future interior remodeling under seperate permit. new slab @ crawl space storage.Details
seismic upgrade entire building. remove and relocate partitions for future interior remodeling under seperate permit. new slab @ crawl space storage. | $180,000 |
| Nov 10, 2006 | Completed final sign-off Mar 2008 | 3235 Sacramento St | Spark Construction | remove load bearing walls and infill @ interior wall, temporary rear exit means of egress, paint/new drywall patch interior walls and ceiling. shift wall @ 2nd floor to align with elevator shaft in phase 3. complaint nov #200684694 bid insp, paid penalty see appl #200612220468.Details
remove load bearing walls and infill @ interior wall, temporary rear exit means of egress, paint/new drywall patch interior walls and ceiling. shift wall @ 2nd floor to align with elevator shaft in phase 3. complaint nov #200684694 bid insp, paid penalty see appl #200612220468. | $6,500 |
| Jul 7, 2004 | Completed final sign-off Jul 2007 | 1262 Plymouth Av | H M W Development Inc | 2 story +addition @ rear including master bedroom,closet & m. bath (2/f), kitchen & porch (1/f).Details
2 story +addition @ rear including master bedroom,closet & m. bath (2/f), kitchen & porch (1/f). | $130,000 |