Nelson Jameson Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Mar 2010 to Sep 2026
- Last 24 months
- 5 permits filed
59 permits since 2000: 45 completed, 3 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 634 12th Av | kitchen, remove (e) and replace w/ (n) in same location new cabinets, new plumbing, new light fixtures. primary bathroom, remove all (e) and replace (n) relocation of plumbing. guest bathroom remove (e) and replace w/ (n).Details
kitchen, remove (e) and replace w/ (n) in same location new cabinets, new plumbing, new light fixtures. primary bathroom, remove all (e) and replace (n) relocation of plumbing. guest bathroom remove (e) and replace w/ (n). | $32,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 3401 Mission St | build ramp, demolish 1 bathroom, 1 kitchen and a couple of walls.Details
build ramp, demolish 1 bathroom, 1 kitchen and a couple of walls. | $107,240 |
| Feb 13, 2026 | Completed final sign-off Aug 2026 | 1200 04th St | g/f -new partitions for lobby area and dog daycare space. new hvac distribution in lobby, daycare and hall. new plumbing fixtures for dog bathing area, break room and dog daycare room. new sink and cabinetry throughout. update finishes throughout. relocated light fixture.Details
g/f -new partitions for lobby area and dog daycare space. new hvac distribution in lobby, daycare and hall. new plumbing fixtures for dog bathing area, break room and dog daycare room. new sink and cabinetry throughout. update finishes throughout. relocated light fixture. | $300,000 |
| Aug 11, 2025 | Completed final sign-off Sep 2025 | 1048 Oak St | to comply with violation 202539586 - item 2-3 to include replace less than 50% of deck (rear deck) and replace (e) window in kind facing street. vinyl windows u= 0.3.Details
to comply with violation 202539586 - item 2-3 to include replace less than 50% of deck (rear deck) and replace (e) window in kind facing street. vinyl windows u= 0.3. | $5,000 |
| Jul 28, 2025 | In progress issued Mar 2026 | 311 Vienna St | state adu program- convert garage space into adu.Details
state adu program- convert garage space into adu. | $100,000 |
| Oct 16, 2023 | Completed final sign-off Aug 2024 | 933 Treat Av | revision to permit 202304135668; new scope is add non-structural positions; add mop room w/sink; enlarge (e) floor opening upgrade heating sytem. replace windoows in-kind. replace partial concrete slab to provide accessible accessDetails
revision to permit 202304135668; new scope is add non-structural positions; add mop room w/sink; enlarge (e) floor opening upgrade heating sytem. replace windoows in-kind. replace partial concrete slab to provide accessible access | $60,000 |
| Oct 16, 2023 | Completed final sign-off Aug 2024 | 931 Treat Av | revision to permit 202304135665; new scope is drawing clarify that new exit passageway and (n) entry hall are not required to be accessible since accessible entry is provided at 933 treat ave; upgrade heating sytem. replace windoows in-kind.Details
revision to permit 202304135665; new scope is drawing clarify that new exit passageway and (n) entry hall are not required to be accessible since accessible entry is provided at 933 treat ave; upgrade heating sytem. replace windoows in-kind. | $15,000 |
| Apr 13, 2023 | Completed final sign-off Aug 2024 | 933 Treat Av | demo interior non structural partitions. remodel two (e) restrooms, add two new restrooms, remodel (e) kitchenette/breakroom, create interior entry hall.Details
demo interior non structural partitions. remodel two (e) restrooms, add two new restrooms, remodel (e) kitchenette/breakroom, create interior entry hall. | $120,000 |
| Apr 13, 2023 | Completed final sign-off Aug 2024 | 931 Treat Av | demo interior non structural partitoins. create new exit passageway and entry hall.Details
demo interior non structural partitoins. create new exit passageway and entry hall. | $22,000 |
| Feb 21, 2023 | Completed final sign-off May 2023 | 1660 Haight St | rev to bpa# 202209212879, accessible modifications for compliance w/seismic retrofit, replace knob handles lever hardware @ (3) doors, replace toilet cistern w/new cistern having flush handle os rightDetails
rev to bpa# 202209212879, accessible modifications for compliance w/seismic retrofit, replace knob handles lever hardware @ (3) doors, replace toilet cistern w/new cistern having flush handle os right | $1,645 |
| Sep 21, 2022 | Completed final sign-off May 2023 | 1660 Haight St | strengthen bearing at wood stud wall supporting mezzanine.Details
strengthen bearing at wood stud wall supporting mezzanine. | $5,000 |
| Sep 2, 2022 | Completed final sign-off May 2023 | 1660 Haight St | abe program/ alter ramp slope. new handrails. install paver actuator per da-004. install new doors with buttom. remove tiles on ramp. abe # 202002041690.Details
abe program/ alter ramp slope. new handrails. install paver actuator per da-004. install new doors with buttom. remove tiles on ramp. abe # 202002041690. | $9,552 |
| Jul 7, 2022 | Never finaled issued Jul 2022, no final | 2150 Folsom St | renewal of pa# 2018-0928-1803: to complete work. started under pa# 201809281803.Details
renewal of pa# 2018-0928-1803: to complete work. started under pa# 201809281803. | |
| Jun 16, 2022 | Expired or cancelled expired Sep 2024 | 2170 Folsom St | recommencement and completion of work approved under permit 201809281808. renewal of permit 201809281808 to complete work.Details
recommencement and completion of work approved under permit 201809281808. renewal of permit 201809281808 to complete work. | |
| Jun 7, 2022 | Completed final sign-off Feb 2024 | 4733 Geary Bl | to comply w/abe program per ord 51-16 - restripe parking lot for accessible stall. alter entry slope add power actuator primary. comply with abe 201902115049Details
to comply w/abe program per ord 51-16 - restripe parking lot for accessible stall. alter entry slope add power actuator primary. comply with abe 201902115049 | $7,000 |
| May 13, 2022 | Completed final sign-off Aug 2022 | 4527 Mission St | change of use from an office to a vetenirary clinic. demo approx 20lf of non bearing non reted partition. enlarge (e) restroom to be accessible complaint. revise (e) elevation change on ramps to 1:20 transirion. install misc. elec.Details
change of use from an office to a vetenirary clinic. demo approx 20lf of non bearing non reted partition. enlarge (e) restroom to be accessible complaint. revise (e) elevation change on ramps to 1:20 transirion. install misc. elec. | $110,000 |
| Apr 13, 2022 | Completed final sign-off Aug 2022 | 4527 Mission St | exploratory demo. remove carpet, trash, ceiling tile. no sheetrock removal. exploratory work shall not reduce the fire resistivness or lateral resistance of building. replace any finishes removed.Details
exploratory demo. remove carpet, trash, ceiling tile. no sheetrock removal. exploratory work shall not reduce the fire resistivness or lateral resistance of building. replace any finishes removed. | $4,000 |
| Aug 27, 2021 | Completed final sign-off Feb 2022 | 1831 Divisadero St | remove existing windows in interior lightwell. replace in-kind with dual glazed ufactor .26 shgc .23 vt.57. @ residential upstairsDetails
remove existing windows in interior lightwell. replace in-kind with dual glazed ufactor .26 shgc .23 vt.57. @ residential upstairs | $3,200 |
| Jun 28, 2021 | Expired or cancelled cancelled Aug 2023 | 1839 Divisadero St | abe program per ord 51-16 for 1839 divisadero. removed raised wd floor for new ramp. install power actuator per ab.04/05.Details
abe program per ord 51-16 for 1839 divisadero. removed raised wd floor for new ramp. install power actuator per ab.04/05. | $4,000 |
| Jun 21, 2021 | Completed final sign-off Sep 2021 | 1823 Divisadero St | t.i. for converting existing yoga studio to gym with accessory juice bar. remove (e) non-structural partitions & casework.Details
t.i. for converting existing yoga studio to gym with accessory juice bar. remove (e) non-structural partitions & casework. | $90,000 |
| Jun 16, 2021 | Expired or cancelled cancelled Aug 2023 | 1837 Divisadero St | abe per ord 51-16: remove front step/replace w/ ramp & power actuator. install tile to match (e) pattern & color.Details
abe per ord 51-16: remove front step/replace w/ ramp & power actuator. install tile to match (e) pattern & color. | $6,000 |
| Feb 9, 2021 | Completed final sign-off May 2021 | 1831 Divisadero St | to comply with nov # 202050813. remove wd framing & corrugated fiberglass roof over existing light well.Details
to comply with nov # 202050813. remove wd framing & corrugated fiberglass roof over existing light well. | $2,000 |
| Jan 12, 2021 | Completed final sign-off Apr 2021 | 3575 Sacramento St | comply with nov 202064321 repair and replace in kind pair of door at storefront. currently accessible entry doors with complying landing and hardware. no plans per dbi/cesDetails
comply with nov 202064321 repair and replace in kind pair of door at storefront. currently accessible entry doors with complying landing and hardware. no plans per dbi/ces | $5,000 |
| Oct 13, 2020 | Completed final sign-off Dec 2020 | 360 Baltimore Wy | kitchen renovation, replace with new cabinet, new counters lighting and plumbing. renovation of 2 bathrooms, new shower,new fixtures. all exterior and interior paintingDetails
kitchen renovation, replace with new cabinet, new counters lighting and plumbing. renovation of 2 bathrooms, new shower,new fixtures. all exterior and interior painting | $20,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2023 | 15 Massasoit St | comply with nov 201907211 legalize ground floor rooms: bedroom, living room, full bath, and kitchenette.Details
comply with nov 201907211 legalize ground floor rooms: bedroom, living room, full bath, and kitchenette. | |
| Oct 7, 2019 | Completed final sign-off Jun 2021 | 101 Natoma St | 3rd floor: t.i. for consulate of estonia. new walls, doors, offices, break room, waiting area, and restrooms.Details
3rd floor: t.i. for consulate of estonia. new walls, doors, offices, break room, waiting area, and restrooms. | $200,000 |
| Jun 21, 2019 | Completed final sign-off Oct 2019 | 1564 Bush St | response to nov 201945881. replace extg restroom with accessible restroom. install breakroom, 3 consulting rooms, new storefront window at right, replace extg lighting, reconfigure hvac ducting. permitted change of use from dry cleaner to services, health.(family counseling)Details
response to nov 201945881. replace extg restroom with accessible restroom. install breakroom, 3 consulting rooms, new storefront window at right, replace extg lighting, reconfigure hvac ducting. permitted change of use from dry cleaner to services, health.(family counseling) | $106,792 |
| Sep 28, 2018 | Expired or cancelled expired Apr 2022 | 2170 Folsom St | legalize (e) light mfg. & arts use for ground fl & 2nd fl. to comply w/ planning enf 2016-0097. work to include improvement to exit/egress @ ground fl. (n) ada bathroom @ ground fl & the permitting of a pedestrian walkway bridge connecting 2150 to 2170 folsom st.Details
legalize (e) light mfg. & arts use for ground fl & 2nd fl. to comply w/ planning enf 2016-0097. work to include improvement to exit/egress @ ground fl. (n) ada bathroom @ ground fl & the permitting of a pedestrian walkway bridge connecting 2150 to 2170 folsom st. | $30,000 |
| Sep 28, 2018 | Never finaled issued Jul 2019, no final | 2150 Folsom St | legalize (e) light mfg./production @ 2nd fl. to comply w/ planning dept enf 2016-0097. work to include permittng of a pedestrian walkway bridge connecting 2150 to 2170 folsom st. legalize (e) breakroom counters built without permit.Details
legalize (e) light mfg./production @ 2nd fl. to comply w/ planning dept enf 2016-0097. work to include permittng of a pedestrian walkway bridge connecting 2150 to 2170 folsom st. legalize (e) breakroom counters built without permit. | $38,000 |
| Jun 14, 2018 | Completed final sign-off Jun 2018 | 177 Stillman St | revision to pa 2018-0529-0340 per inspector's request to change disability checklistDetails
revision to pa 2018-0529-0340 per inspector's request to change disability checklist | |
| May 29, 2018 | Completed final sign-off Jun 2018 | 177 Stillman St | barrier removal alter restroom for compliance with clear floor spaceDetails
barrier removal alter restroom for compliance with clear floor space | $8,000 |
| Jan 5, 2018 | Completed final sign-off Mar 2018 | 1900 Van Ness Av | 2/f: structural crosswalls relocation. revision to app#201711295040. n/a for maherDetails
2/f: structural crosswalls relocation. revision to app#201711295040. n/a for maher | |
| Nov 29, 2017 | Completed final sign-off Mar 2018 | 1900 Van Ness Av | 2nd flr: add 3 office and conference room, new electrical, renovate restrooms & pantry. maher naDetails
2nd flr: add 3 office and conference room, new electrical, renovate restrooms & pantry. maher na | $100,000 |
| Oct 23, 2017 | Never finaled issued Nov 2017, no final | 3463 16th St | install ventless cooking systemDetails
install ventless cooking system | $100 |
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 917 Bush St | 1/f: barrier removal: construction of restroom; single user, construct stair.Details
1/f: barrier removal: construction of restroom; single user, construct stair. | |
| Mar 29, 2017 | Completed final sign-off Oct 2017 | 917 Bush St | demo (e) storefront install new storefront w/compliant entry approx 23lfDetails
demo (e) storefront install new storefront w/compliant entry approx 23lf | $23,800 |
| Jan 18, 2017 | Completed final sign-off Oct 2017 | 917 Bush St | demolish remnants of laundromat per ab 017Details
demolish remnants of laundromat per ab 017 | $7,000 |
| Apr 5, 2016 | Completed final sign-off Sep 2016 | 267 08th St | revision to ref pa 2015 0911 6757: enlargement of (e) garage door along clementina st side to allow for better turn radius for entering in narrow alley. maher naDetails
revision to ref pa 2015 0911 6757: enlargement of (e) garage door along clementina st side to allow for better turn radius for entering in narrow alley. maher na | $10,000 |
| Mar 21, 2016 | Never finaled issued Apr 2016, no final | 1543 Mission St | 3/f: revised reflected ceiling plan and title 24 lighting, revision to previously approved permit 201602089043 maher not reqDetails
3/f: revised reflected ceiling plan and title 24 lighting, revision to previously approved permit 201602089043 maher not req | |
| Feb 24, 2016 | Completed final sign-off Sep 2016 | 267 08th St | revision to app#201509116757(convert occupied mezzanine level to unoccupied storage space by removing stair. n/a for maherDetails
revision to app#201509116757(convert occupied mezzanine level to unoccupied storage space by removing stair. n/a for maher | |
| Feb 19, 2016 | Completed final sign-off Jul 2016 | 560 03rd St | title 24 lighting. ref app#201511233289. n/a for maher ordinance.Details
title 24 lighting. ref app#201511233289. n/a for maher ordinance. | $12,000 |
| Feb 9, 2016 | Completed final sign-off May 2016 | 560 03rd St | beam replacement, revision to 201511233289; maher n/aDetails
beam replacement, revision to 201511233289; maher n/a | $500 |
| Feb 8, 2016 | Completed final sign-off Sep 2016 | 1543 Mission St | interior ti of (e) 3rd floor. scope of work includes (n) accessible restrooms, new partitons. mep deferred under separate permit. maher naDetails
interior ti of (e) 3rd floor. scope of work includes (n) accessible restrooms, new partitons. mep deferred under separate permit. maher na | $132,000 |
| Jan 25, 2016 | Completed final sign-off Sep 2016 | 267 08th St | revision to pa#201509116757, revise lighting. deferred lighting for ref. arch pa#201509116757. n/a ordinance #155-13Details
revision to pa#201509116757, revise lighting. deferred lighting for ref. arch pa#201509116757. n/a ordinance #155-13 | |
| Jan 21, 2016 | Completed final sign-off Sep 2016 | 267 08th St | removal of existing parking meter & existing curb to build new curb cut to access existing garage. n/a maher ordinance correct use from office (201509116757) to industrial onlyDetails
removal of existing parking meter & existing curb to build new curb cut to access existing garage. n/a maher ordinance correct use from office (201509116757) to industrial only | $5,000 |
| Dec 14, 2015 | Completed final sign-off Sep 2016 | 267 08th St | revision to 201509116757 for footing maher not reqDetails
revision to 201509116757 for footing maher not req | |
| Nov 23, 2015 | Completed final sign-off Jun 2016 | 560 03rd St | barrier removal of demo partitions & finishes, new accessible toilet rooms, new compliant millwork, new stairs & handrails, new walkway connecting two areas of 2nd floor. deferred mep. new finishesDetails
barrier removal of demo partitions & finishes, new accessible toilet rooms, new compliant millwork, new stairs & handrails, new walkway connecting two areas of 2nd floor. deferred mep. new finishes | $44,000 |
| Sep 30, 2015 | Completed final sign-off Oct 2015 | 1831 Divisadero St | replacement of defective siding on back of the property, 60'x22', 1,300 sq. ft. all work in kindDetails
replacement of defective siding on back of the property, 60'x22', 1,300 sq. ft. all work in kind | $10,000 |
| Sep 11, 2015 | Completed final sign-off Oct 2016 | 267 08th St | tenant improvement to separate e indoor garage parking with new conditioned work area, 3990, on gr fl. extension of e mezz to new work area 896 sfDetails
tenant improvement to separate e indoor garage parking with new conditioned work area, 3990, on gr fl. extension of e mezz to new work area 896 sf | $180,000 |
| Feb 19, 2015 | Completed final sign-off Dec 2016 | 1852 Fell St | seismic retrofit as per 2012 iebc appendix a-4 section a403.3 to comply with the soft story program.Details
seismic retrofit as per 2012 iebc appendix a-4 section a403.3 to comply with the soft story program. | $120,000 |
| Aug 13, 2014 | Completed final sign-off Oct 2014 | 69 Douglass St | kitchen remodel, new kitchen lighting, new door opening in load bearing wall, new spiral stair with oepning in floor structure to accomodate stair.Details
kitchen remodel, new kitchen lighting, new door opening in load bearing wall, new spiral stair with oepning in floor structure to accomodate stair. | $20,000 |
| May 9, 2013 | Never finaled issued May 2013, no final | 893 Folsom St | revision to appl #2013.04.11.4339 & 2013.04.16.4710 - renive 1-hr partition form permit drawings between office & filing area per cbc section 508.3 & table 508.4, required separation of occupancies; no separation required between office & filing area.Details
revision to appl #2013.04.11.4339 & 2013.04.16.4710 - renive 1-hr partition form permit drawings between office & filing area per cbc section 508.3 & table 508.4, required separation of occupancies; no separation required between office & filing area. | |
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 893 Folsom St | revision to existing pa# 201304114339. add leveling slab over existing sloped floor at stroage area. increase area to remain at mezz floor. minor adjustment to storage and hall width. future 1 hour barrier per table 508.2.5 sfbc 2010, under separate permitDetails
revision to existing pa# 201304114339. add leveling slab over existing sloped floor at stroage area. increase area to remain at mezz floor. minor adjustment to storage and hall width. future 1 hour barrier per table 508.2.5 sfbc 2010, under separate permit | $8,000 |
| Apr 11, 2013 | Never finaled issued Apr 2013, no final | 893 Folsom St | t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior workDetails
t.i-demolish part of (e) mezzanine fl, new walls at mezzanine & stairs. new handrails at stairs. repair & replace gypsum board. new finish floor at mezzanine, stairs & foyer. upgrade electrical. no exterior work | $65,000 |
| Jun 22, 2011 | Completed final sign-off Aug 2011 | 1690 Broadway | slope existing skylight for drainage, not visible from street.Details
slope existing skylight for drainage, not visible from street. | $18,000 |
| Nov 23, 2010 | Completed final sign-off Oct 2011 | 499 Castro St | converting retail to specialty food, self-service. remodel/upgrade ada bathroom, new service counter, non-bearing partition, misc electrical & plumbing.Details
converting retail to specialty food, self-service. remodel/upgrade ada bathroom, new service counter, non-bearing partition, misc electrical & plumbing. | $45,000 |
| Nov 17, 2010 | Completed final sign-off Jun 2011 | 443 Valencia St | change of use: from office to new specialty food, self service. new kitchen & new restroom.Details
change of use: from office to new specialty food, self service. new kitchen & new restroom. | $30,000 |
| Nov 3, 2010 | Completed final sign-off Feb 2011 | 667 Mission St | install service counter, outlets for equipment. approx 30 l.f. ono bearing partition tile floor. 713 s.f. washable dlt 56 l.f. soffit.change of occupancy m to a-2(152 persons)Details
install service counter, outlets for equipment. approx 30 l.f. ono bearing partition tile floor. 713 s.f. washable dlt 56 l.f. soffit.change of occupancy m to a-2(152 persons) | $30,000 |
| Mar 10, 2010 | Completed final sign-off Apr 2010 | 1960 Harrison St | t.i. to (e) book binding warehouse to split it into two uses, one part will remain as book binding, the new one will be a taekwondo gym. work to include (n) interior non struc. partitions & bathroom remodel. no changes to struc. no changes to facade except addition of 1 door req'd for exiting @rearDetails
t.i. to (e) book binding warehouse to split it into two uses, one part will remain as book binding, the new one will be a taekwondo gym. work to include (n) interior non struc. partitions & bathroom remodel. no changes to struc. no changes to facade except addition of 1 door req'd for exiting @rear | $20,000 |