Gerard Madden
- Listed as
- engineer
- Firm
- Soha
- On San Francisco permits
- Feb 2015 to Jul 2023
5 permits since 2000 (engineer on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 17, 2023 | Completed final sign-off Feb 2024 | 1545 Green St | Patrick Coakley Construction | remove/replace 80 feet of retaining wallDetails
remove/replace 80 feet of retaining wall | $210,000 |
| Jul 17, 2023 | Completed final sign-off Feb 2024 | 1535 Green St | Patrick Coakley Construction | remove/replace retaining wallDetails
remove/replace retaining wall | $70,000 |
| May 20, 2021 | Completed final sign-off Nov 2021 | 1995 Evans Av | Clark Construction Group Ca Lp | pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details.Details
pipe and tube railings designed by sgh engineers. reference sheets from pa 2017-1221-7090-s2 for structural design criteria and sheets from pa 2017-1221-7090-s3 vol 4 for architectural location and general details. | $30,000 |
| Mar 12, 2015 | Never finaled issued Mar 2015, no final | 3700 Washington St | Cello & Maudru Construction Co Inc, Bay Area High Reach, Double O Engineering Inc | temporary building shoring & temporary soil shoring to perform work under pa#201401105995. n/a ordinance #155-13Details
temporary building shoring & temporary soil shoring to perform work under pa#201401105995. n/a ordinance #155-13 | $85,000 |
| Feb 17, 2015 | Completed final sign-off Apr 2015 | 1427 Haight St | Narrowback Construction Co. | soft story retrofit - revision to appl #2014.1107.1069: construction phase change to work presently underway on soft story reinforcement. change pilings at moment frame foundation to "micropile".Details
soft story retrofit - revision to appl #2014.1107.1069: construction phase change to work presently underway on soft story reinforcement. change pilings at moment frame foundation to "micropile". |