Geoffrey Clifford
- Listed as
- architect, engineer
- Firm
- Bca Structural Engineer
- Based in
- San Carlos
- On San Francisco permits
- Dec 2006 to Nov 2020
20 permits since 2000 (engineer on 19 permits, architect on 1 permit): 18 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2020 | Completed final sign-off Dec 2021 | 4207 26th St | H & Bo Construction Inc. | convert part of garage into master suite & 2 bathrooms. add new laundry room. remove bearing & non-bearing walls at upper level. add (e) lightwell to living space. remodel kitchen. provide new stairs between levels. new roof trusses at area of remodel. add 7 new skylights.Details
convert part of garage into master suite & 2 bathrooms. add new laundry room. remove bearing & non-bearing walls at upper level. add (e) lightwell to living space. remodel kitchen. provide new stairs between levels. new roof trusses at area of remodel. add 7 new skylights. | $150,433 |
| Feb 24, 2020 | Completed final sign-off Apr 2022 | 1783 08th Av | R & D Construction Co Inc | structural rev to pa201901281407.Details
structural rev to pa201901281407. | |
| Oct 3, 2019 | Completed final sign-off Oct 2021 | 80 Thor Av | Kohlmyer | revision to previously approved pa# 201704254820-s2, revised escape ladder.Details
revision to previously approved pa# 201704254820-s2, revised escape ladder. | |
| Oct 17, 2017 | Completed final sign-off Feb 2021 | 142 Eastwood Dr | F C O General Construction | revision to pa#201612165143, add second bathroom in basement, new rear window at bath, convert storage to media room. all work at basement.Details
revision to pa#201612165143, add second bathroom in basement, new rear window at bath, convert storage to media room. all work at basement. | $130,000 |
| Sep 6, 2017 | Completed final sign-off Feb 2019 | 2961 Sacramento St | S F Garage Company Inc. | excavate 46.66 cubic yards fo basement vrawl space to allow for new garage. tie new portion of basement into existing basement. provide ramp (driveway) from sidewalk to new garage. provide new handrail @ exisitng entry steps.Details
excavate 46.66 cubic yards fo basement vrawl space to allow for new garage. tie new portion of basement into existing basement. provide ramp (driveway) from sidewalk to new garage. provide new handrail @ exisitng entry steps. | $80,000 |
| May 21, 2015 | Completed final sign-off Dec 2016 | 150 Arbor St | Golden West Construction, Moroso Construction Inc | detached backyard staircase from lower to upper backyard. landings at stair midpoint and top.Details
detached backyard staircase from lower to upper backyard. landings at stair midpoint and top. | $35,000 |
| Aug 22, 2014 | Completed final sign-off Apr 2017 | 23 Peralta Av | E. Grelli Construction, R & D Construction Co Inc | construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath.Details
construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath. | $350,000 |
| Apr 15, 2014 | Completed final sign-off Oct 2015 | 142 Bonview St | R & D Construction Co Inc | interior remodel of 2025 sq ft house, no new usable floor area. total 3 bedrooms & 2 -1/2 baths. repair (e) deck less than 50%. installation of structural elements in anticupation of a future vertical addition which is not part of this permit.Details
interior remodel of 2025 sq ft house, no new usable floor area. total 3 bedrooms & 2 -1/2 baths. repair (e) deck less than 50%. installation of structural elements in anticupation of a future vertical addition which is not part of this permit. | $100,000 |
| Jan 29, 2014 | Expired or cancelled expired Apr 2018 | 3124 Baker St | Forood Design & Construction Inc | interior remodel - window replacement, upgrade electrical & plumbing.Details
interior remodel - window replacement, upgrade electrical & plumbing. | $250,000 |
| Dec 19, 2013 | Completed final sign-off Apr 2015 | 120 Quintara St | Big Boys Construction Inc., Burradell Construction Inc---See Notes | proposed bedroom & exercise room & new staircase @ lower level. structural reinforcement. typical removal of (e) concrete slab & laundry room.Details
proposed bedroom & exercise room & new staircase @ lower level. structural reinforcement. typical removal of (e) concrete slab & laundry room. | $93,600 |
| Oct 5, 2012 | Completed final sign-off Apr 2013 | 148 Bonview St | Outdoor Environments | revision to permit #201205241183: changing hieght of landscape retaining wall @ rear.Details
revision to permit #201205241183: changing hieght of landscape retaining wall @ rear. | $2,000 |
| Feb 29, 2012 | Completed final sign-off Jun 2012 | 2550 Filbert St | Bjlgc Inc | widen garage door from 10 to 13'-9"(33% of lot width)Details
widen garage door from 10 to 13'-9"(33% of lot width) | $20,000 |
| Feb 22, 2012 | Completed final sign-off Dec 2013 | 868 Head St | 279 sqft. single level addition to (e) main level of residence. remodel (e) kitchen. add new master bedroom & master bath & sun room. relocate (e) bathroom. add new skylight in (e) kitchen.Details
279 sqft. single level addition to (e) main level of residence. remodel (e) kitchen. add new master bedroom & master bath & sun room. relocate (e) bathroom. add new skylight in (e) kitchen. | $100,000 | |
| Feb 7, 2012 | Completed final sign-off May 2012 | 1118 Prague St | revision to pa #201112190931. dryrot repair of front stairs. remove and replace in kindDetails
revision to pa #201112190931. dryrot repair of front stairs. remove and replace in kind | $5,000 | |
| Oct 27, 2011 | Completed final sign-off Nov 2012 | 2236 15th Av | Fernandez Designs & Builders Inc | revision to 201107220817: field change: add a floor beam to replace girder and change of new slab connection to existing foundation.Details
revision to 201107220817: field change: add a floor beam to replace girder and change of new slab connection to existing foundation. | |
| Nov 8, 2010 | Completed final sign-off Oct 2011 | 331 Dorantes Av | Pegasus Building/Castle Construction | add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom.Details
add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom. | $50,000 |
| Sep 23, 2010 | Completed final sign-off Feb 2011 | 1015 Florida St | Western Exterminator Company | removal of concrete steps at front, install new framing and new steps, and porchDetails
removal of concrete steps at front, install new framing and new steps, and porch | $10,900 |
| Feb 2, 2010 | Completed final sign-off Mar 2011 | 285 Nevada St | C W Wright Construction Co Inc | revision to previously issed permit 200804048895 & 1202774 to replace raised floor @ ground level w/ concrete slab on grade.Details
revision to previously issed permit 200804048895 & 1202774 to replace raised floor @ ground level w/ concrete slab on grade. | |
| Nov 2, 2007 | Expired or cancelled expired Jun 2010 | 2335 Francisco St | interior remodel 2 kitchens 5 bathrooms, replace 15 windows, convert first floor room to a media roomDetails
interior remodel 2 kitchens 5 bathrooms, replace 15 windows, convert first floor room to a media room | $200,000 | |
| Dec 28, 2006 | Completed final sign-off Dec 2010 | 894 Folsom St | new commerical space on ground level. new 2nd floor residential unit and garage. new roof structure and interiors.new driveway/curbcut/building frontage.Details
new commerical space on ground level. new 2nd floor residential unit and garage. new roof structure and interiors.new driveway/curbcut/building frontage. | $500,000 |