Big Boys Construction Inc.
- Based in
- Livermore
- On San Francisco permits
- May 2011 to Aug 2025
- Last 24 months
- 2 permits filed
16 permits since 2000: 13 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2025 | In progress issued Sep 2025 | 19 Forest Side Av | install new ladder to attic storage and strengthen attic floor. rebuild roof with finished attic ceiling. add lighting.Details
install new ladder to attic storage and strengthen attic floor. rebuild roof with finished attic ceiling. add lighting. | $15,000 |
| Apr 28, 2025 | In progress issued May 2025 | 3020 20th Av | g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added.Details
g/f: a new bedroom and bathroom - new conditioned space taken from (e) garage. (2) new french doors at the front elevation with concrete stoops & stairs <30" above (e) grade. a remodeled kitchen and bathroom on 2nd story. new skylights, windows and french doors will be added. | $195,000 |
| May 14, 2019 | Completed final sign-off Jun 2019 | 656 Elizabeth St | at (e) rooms we are adding a 2 bathrooms (his & hers) and a closet note: all work to be interior onlyDetails
at (e) rooms we are adding a 2 bathrooms (his & hers) and a closet note: all work to be interior only | $25,000 |
| May 1, 2018 | Completed final sign-off Sep 2019 | 1612 Castro St | replace existing front stair at entryDetails
replace existing front stair at entry | $8,000 |
| May 26, 2016 | Completed final sign-off Jul 2016 | 148 Benton Av | replace the windows from left, right and back of the house, 16 windows total.Details
replace the windows from left, right and back of the house, 16 windows total. | $7,800 |
| Apr 11, 2016 | Completed final sign-off May 2016 | 1859 33rd Av | interior home improvement, 2/f- add hallway to create one bedroom, garage level- add a wall in playroom to make an office, legalize bathroom.Details
interior home improvement, 2/f- add hallway to create one bedroom, garage level- add a wall in playroom to make an office, legalize bathroom. | $8,750 |
| Apr 4, 2016 | Completed final sign-off May 2017 | 1504 Funston Av | facade renovation, new windows & new front door; new stucco cladding,and new eave overhang.rear relevation existing cladding to remain-no change. existing brick cladding at front first floor to remain.Details
facade renovation, new windows & new front door; new stucco cladding,and new eave overhang.rear relevation existing cladding to remain-no change. existing brick cladding at front first floor to remain. | $90,000 |
| Dec 4, 2014 | Completed final sign-off Jun 2015 | 861 Vermont St | upstairs bathroom remodl - replace shower, tub, floor, vanity, camode, & fan. remove & install new tile.Details
upstairs bathroom remodl - replace shower, tub, floor, vanity, camode, & fan. remove & install new tile. | $18,000 |
| Jul 11, 2014 | Never finaled issued Jul 2014, no final | 405 Beacon St | remove & replace damaged plywood on roof sheathing, approx. 120 sq.ft. with 1/2" cdx min. and to match existing thickness if more. reroofing under seperate permit.Details
remove & replace damaged plywood on roof sheathing, approx. 120 sq.ft. with 1/2" cdx min. and to match existing thickness if more. reroofing under seperate permit. | $1,250 |
| Jul 11, 2014 | Completed final sign-off Aug 2014 | 405 Beacon St | reroofingDetails
reroofing | $4,800 |
| Apr 24, 2014 | Completed final sign-off Aug 2014 | 405 Beacon St | remove existing w/h & install a new tankless w/h on a different location on the same garage room. remove existing 2/6 door & replace w/ a 2/6 fire door. 20 min w/self clausure.Details
remove existing w/h & install a new tankless w/h on a different location on the same garage room. remove existing 2/6 door & replace w/ a 2/6 fire door. 20 min w/self clausure. | $5,300 |
| Dec 19, 2013 | Completed final sign-off Apr 2015 | 120 Quintara St | proposed bedroom & exercise room & new staircase @ lower level. structural reinforcement. typical removal of (e) concrete slab & laundry room.Details
proposed bedroom & exercise room & new staircase @ lower level. structural reinforcement. typical removal of (e) concrete slab & laundry room. | $93,600 |
| Nov 12, 2013 | Completed final sign-off Jan 2014 | 390 Bella Vista Wy | no structural. remove siding and stucco on garage side. paint front of home. replace wood siding and stucco to match existing.Details
no structural. remove siding and stucco on garage side. paint front of home. replace wood siding and stucco to match existing. | $6,500 |
| May 30, 2013 | Completed final sign-off Oct 2013 | 1859 33rd Av | kitchen remodel repl of counters and counter tops, repl a window kitchen, install electrical, bathroom remodel, replacement of tile & fixture, (no structural changes) window not visible from street u factor 0.4 maxDetails
kitchen remodel repl of counters and counter tops, repl a window kitchen, install electrical, bathroom remodel, replacement of tile & fixture, (no structural changes) window not visible from street u factor 0.4 max | $24,750 |
| Jun 10, 2011 | Completed final sign-off Aug 2011 | 1859 33rd Av | remodel 1 bath - remove old and replace with new. lighting to comply with cel 150 (k), replace in kind 4 windows at rear not visible from street. max. u factor .40. no change wall & exterior door.Details
remodel 1 bath - remove old and replace with new. lighting to comply with cel 150 (k), replace in kind 4 windows at rear not visible from street. max. u factor .40. no change wall & exterior door. | $9,000 |
| May 23, 2011 | Completed final sign-off Nov 2011 | 45 Digby St | remodel of 3 existing bathrooms and existing kitchenDetails
remodel of 3 existing bathrooms and existing kitchen | $40,000 |