Pegasus Building/Castle Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Oct 2015
- Last 24 months
- 0 permits filed
137 permits since 2000: 129 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 137.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2015 | Completed final sign-off Jul 2017 | 4376 24th St | sequencing plan for foundation installation along west property line, related to bpa#201301168071 s1.Details
sequencing plan for foundation installation along west property line, related to bpa#201301168071 s1. | $1,000 |
| Apr 16, 2015 | Completed final sign-off May 2017 | 295 Sanchez St | revision to app#201304053901: enclose extg lightwell at 1st and 2nd floor at north p.l., add new elevator. replace extg brick veneer with stucco at ground floor, remove extg stair to roof at 4th floor, new interior stair between 1st and 2nd floor.Details
revision to app#201304053901: enclose extg lightwell at 1st and 2nd floor at north p.l., add new elevator. replace extg brick veneer with stucco at ground floor, remove extg stair to roof at 4th floor, new interior stair between 1st and 2nd floor. | $20,000 |
| Nov 24, 2014 | Completed final sign-off Sep 2015 | 1725 Wawona St | kitchen and bathroom remodelling at the first story: replacing tile, sink and toilet. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodelling shall comply with cec 150.0(k)3 and 150.0(k)5.Details
kitchen and bathroom remodelling at the first story: replacing tile, sink and toilet. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodelling shall comply with cec 150.0(k)3 and 150.0(k)5. | $25,000 |
| Oct 9, 2014 | Completed final sign-off May 2017 | 295 Sanchez St | foundatin repair detail changed and add new slab, revision to approved permit 201304053901.Details
foundatin repair detail changed and add new slab, revision to approved permit 201304053901. | |
| May 30, 2014 | Completed final sign-off Nov 2014 | 130 Lenox Wy | new bathroom at 2nd floor. new window (2nd floor) not facing street.Details
new bathroom at 2nd floor. new window (2nd floor) not facing street. | $12,000 |
| May 15, 2014 | Completed final sign-off Aug 2014 | 52 Sotelo Av | restore stucco to 3-sides of bldg. replace windows on 3-sides of bldg with aluminium wood clad windows.to comply with violation #201473375. revision to app#201403049825.Details
restore stucco to 3-sides of bldg. replace windows on 3-sides of bldg with aluminium wood clad windows.to comply with violation #201473375. revision to app#201403049825. | $30,000 |
| Apr 24, 2014 | Completed final sign-off Jun 2014 | 684 30th Av | replace stucco in kind @ front of buildingDetails
replace stucco in kind @ front of building | $6,000 |
| Mar 4, 2014 | Completed final sign-off Aug 2014 | 52 Sotelo Av | removal and replacement of stucco @ rear wall approx 40 linear ft. x 10 ft high @ 1st floor. dry rot repair as reqd.Details
removal and replacement of stucco @ rear wall approx 40 linear ft. x 10 ft high @ 1st floor. dry rot repair as reqd. | $6,000 |
| Sep 27, 2013 | Completed final sign-off Oct 2013 | 16 California St | revise pa# 201306068852 to clarify counter with no seating.Details
revise pa# 201306068852 to clarify counter with no seating. | |
| Sep 17, 2013 | Completed final sign-off Jun 2014 | 2735 Folsom St | foundation replacement, interior remodel @ 1st story and associated structural work, remodel kitchen & bathrooms, add bath.Details
foundation replacement, interior remodel @ 1st story and associated structural work, remodel kitchen & bathrooms, add bath. | $150,000 |
| Jul 11, 2013 | Completed final sign-off Oct 2013 | 701 Geary St | comply with nov #20130831 - tenant improvement: barrier removal at front door, (n) storefront @ geary street & leavenworthDetails
comply with nov #20130831 - tenant improvement: barrier removal at front door, (n) storefront @ geary street & leavenworth | $20,000 |
| Jun 20, 2013 | Completed final sign-off Jun 2014 | 2731 Folsom St | exploratory demo, remove sheetrock for new insulation & electrical & living areas. replace with new sheetrock & paint at all 3 unitsDetails
exploratory demo, remove sheetrock for new insulation & electrical & living areas. replace with new sheetrock & paint at all 3 units | $15,000 |
| Jun 18, 2013 | Completed final sign-off Oct 2013 | 701 Geary St | reconstruction of interior stair. accessibility upgrades at e restrooms, provide 2-hour fire rating at interior ceiling. partial comply with nov 201308031.Details
reconstruction of interior stair. accessibility upgrades at e restrooms, provide 2-hour fire rating at interior ceiling. partial comply with nov 201308031. | $20,000 |
| Jun 6, 2013 | Completed final sign-off Oct 2013 | 16 California St | revise pa #2013.03.22.2783 - to eliminate proposed mezzanine level.Details
revise pa #2013.03.22.2783 - to eliminate proposed mezzanine level. | |
| Apr 18, 2013 | Completed final sign-off Oct 2013 | 701 Geary St | soft demo of interior ceiling, exploratory 200 sq.ft. of 1000 sq.ft. to be demo'dDetails
soft demo of interior ceiling, exploratory 200 sq.ft. of 1000 sq.ft. to be demo'd | $800 |
| Mar 29, 2013 | Completed final sign-off Jul 2013 | 350 Claremont Bl | kitchen remodel, new bath and laundry at 3rd floor, repair dryrot at rear wall.Details
kitchen remodel, new bath and laundry at 3rd floor, repair dryrot at rear wall. | $20,000 |
| Mar 27, 2013 | Completed final sign-off May 2013 | 218 Wawona St | kitchen remodel in kindDetails
kitchen remodel in kind | $9,000 |
| Mar 22, 2013 | Completed final sign-off Oct 2013 | 16 California St | tenant improvement for cafe - bar the 1st floor tenant space. new accessible restroom, new mezzanine, new counters, new lighting, new storefront.Details
tenant improvement for cafe - bar the 1st floor tenant space. new accessible restroom, new mezzanine, new counters, new lighting, new storefront. | $141,000 |
| Mar 4, 2013 | Completed final sign-off Jul 2013 | 392 Eureka St | revise bpa# 201208036468, 2nd floor framing to show splice at joists and drag detail 10/s2.2. revise pa# 201208318726, s2.0 - 2nd floor framing plan. revisions are cloudedDetails
revise bpa# 201208036468, 2nd floor framing to show splice at joists and drag detail 10/s2.2. revise pa# 201208318726, s2.0 - 2nd floor framing plan. revisions are clouded | |
| Jan 24, 2013 | Completed final sign-off May 2013 | 2731 Folsom St | nov correction pa in-kind egress stair replacement w/ minor modifications for code compliance. front & rear stair. nov correction items #'s 201175573, 201176254. 201271741. 200922446, 200448382 & 20126580.Details
nov correction pa in-kind egress stair replacement w/ minor modifications for code compliance. front & rear stair. nov correction items #'s 201175573, 201176254. 201271741. 200922446, 200448382 & 20126580. | $15,000 |
| Jan 24, 2013 | Expired or cancelled cancelled Jan 2026 | 46 West Portal Av | dry rot repair front and move windowDetails
dry rot repair front and move window | $1,700 |
| Dec 3, 2012 | Completed final sign-off Jul 2013 | 392 Eureka St | remodel facade-replace (e) windows at 2nd story & create bay windows at 3rd story. revision to permit application #201208318726 & #201208036468.Details
remodel facade-replace (e) windows at 2nd story & create bay windows at 3rd story. revision to permit application #201208318726 & #201208036468. | $20,000 |
| Oct 25, 2012 | Completed final sign-off Dec 2012 | 2261 Fulton St | repair rear stairs in kind, less than 50% replacement due to dry rot. deck boards at stairs landing to be replaced railing to be replaced as requiredDetails
repair rear stairs in kind, less than 50% replacement due to dry rot. deck boards at stairs landing to be replaced railing to be replaced as required | $4,000 |
| Oct 10, 2012 | Completed final sign-off Mar 2013 | 639 Oak St | replace 6 rear windows in kind @ 2nd floor, , replace 6 rear windows in kind @ 3d floorDetails
replace 6 rear windows in kind @ 2nd floor, , replace 6 rear windows in kind @ 3d floor | $6,000 |
| Sep 27, 2012 | Completed final sign-off Mar 2015 | 60 27th Av | comply with complaint #201259101-interior remodel-2 new windows at kitchen, 4 new windows at master bedroom. 1 new window at master bathroom. new playroom, laundry room, closet & storage at basement levelDetails
comply with complaint #201259101-interior remodel-2 new windows at kitchen, 4 new windows at master bedroom. 1 new window at master bathroom. new playroom, laundry room, closet & storage at basement level | $120,000 |
| Sep 14, 2012 | Completed final sign-off Dec 2012 | 3725 Ortega St | remodel kitchen in kindDetails
remodel kitchen in kind | $10,000 |
| Sep 11, 2012 | Completed final sign-off Apr 2013 | 60 27th Av | demo e roof for construction of new dormer, new rail at attic dormer. structural upgrade at living rm opening and new momemt frame at rear under master bedDetails
demo e roof for construction of new dormer, new rail at attic dormer. structural upgrade at living rm opening and new momemt frame at rear under master bed | $30,000 |
| Sep 5, 2012 | Completed final sign-off Mar 2013 | 641 Oak St | kitchen remodel in-kind. dry rot repair @ lightwell area.Details
kitchen remodel in-kind. dry rot repair @ lightwell area. | $15,000 |
| Aug 31, 2012 | Completed final sign-off Jul 2013 | 394 Eureka St | interior remodel of 394 eureka: upper level dwelling unit. add spiral stair to roof. new roof deck. fire sprinkler system under separate permit.Details
interior remodel of 394 eureka: upper level dwelling unit. add spiral stair to roof. new roof deck. fire sprinkler system under separate permit. | $70,000 |
| Aug 3, 2012 | Completed final sign-off Jul 2013 | 392 Eureka St | interior remodel of 392 eureka, lower level dwelling unit. add space at 1st story behind garage, connect with interior stair. infill stair , (n) patio at unit 394. fire sprinkler under seperate permit.Details
interior remodel of 392 eureka, lower level dwelling unit. add space at 1st story behind garage, connect with interior stair. infill stair , (n) patio at unit 394. fire sprinkler under seperate permit. | $95,000 |
| Jul 23, 2012 | Completed final sign-off Aug 2012 | 2631 16th Av | bathroom remodel in kind (fixtures, lighting, tiles, sinks, vanity & shower/tub,Details
bathroom remodel in kind (fixtures, lighting, tiles, sinks, vanity & shower/tub, | $9,037 |
| Jul 16, 2012 | Completed final sign-off Aug 2012 | 300 Moultrie St | kitchen remodel in kind. lighting to comply with title 24Details
kitchen remodel in kind. lighting to comply with title 24 | $9,000 |
| Jun 27, 2012 | Completed final sign-off Jul 2012 | 3912 Folsom St | repair/replace rear deck in kind less than 50%.Details
repair/replace rear deck in kind less than 50%. | $5,000 |
| Jun 20, 2012 | Completed final sign-off Mar 2015 | 60 27th Av | remodel 3-bathrooms, half bath & kitchen in-kind.Details
remodel 3-bathrooms, half bath & kitchen in-kind. | $40,000 |
| Apr 12, 2012 | Completed final sign-off Jun 2012 | 530 Alvarado St | remodel of existing 1st floor, add new bedroom, bath, den within existing building envelopeDetails
remodel of existing 1st floor, add new bedroom, bath, den within existing building envelope | $40,000 |
| Mar 29, 2012 | Expired or cancelled withdrawn Aug 2012 | 3912 Folsom St | rebuilt (e) rear yard deck w/ new stair locationDetails
rebuilt (e) rear yard deck w/ new stair location | $12,000 |
| Mar 27, 2012 | Completed final sign-off Sep 2012 | 654 Elizabeth St | install 4 skylights at roof, remodel (e) kitchen, install new stairs from 1st to 2nd floor. convert 1st floor storage area to family roomDetails
install 4 skylights at roof, remodel (e) kitchen, install new stairs from 1st to 2nd floor. convert 1st floor storage area to family room | $35,000 |
| Mar 15, 2012 | Completed final sign-off Aug 2012 | 36 Alma St | changes to upper unit of 2 unit bldg. new master bath & closet @ (e) room. renovate and revisions to existing split bath. new opening between dining & living room. relocate washer/dryer to (e) laundry. no change to area of unit. no habitable space at garage level. new skylight @ new maser bath.Details
changes to upper unit of 2 unit bldg. new master bath & closet @ (e) room. renovate and revisions to existing split bath. new opening between dining & living room. relocate washer/dryer to (e) laundry. no change to area of unit. no habitable space at garage level. new skylight @ new maser bath. | $53,000 |
| Mar 13, 2012 | Completed final sign-off Jul 2012 | 3912 Folsom St | 1st fl remodel existing kitchen and change existing powder room/laundry room into new powder room/nook area. infill 2 existing rear window, 1 new window, enlarged door to rear deck. no work on deck.Details
1st fl remodel existing kitchen and change existing powder room/laundry room into new powder room/nook area. infill 2 existing rear window, 1 new window, enlarged door to rear deck. no work on deck. | $55,000 |
| Jan 24, 2012 | Completed final sign-off Mar 2012 | 1435 05th Av | selective demo & remodel of portions of (e) upper level 3rd floor including installation of 1 new bathroom, relocation of 1 bathroom & replacement of 1 (e) window at rear. voluntary structural upgrades at rear of buildingDetails
selective demo & remodel of portions of (e) upper level 3rd floor including installation of 1 new bathroom, relocation of 1 bathroom & replacement of 1 (e) window at rear. voluntary structural upgrades at rear of building | $28,500 |
| Jan 17, 2012 | Completed final sign-off May 2012 | 91 Gates St | new steel spiral stairs at rear for access rear yard from main floor levelDetails
new steel spiral stairs at rear for access rear yard from main floor level | $3,500 |
| Jan 9, 2012 | Completed final sign-off Mar 2012 | 212 Connecticut St | work in unit 214 connecticut st. only: in the lower flat only, replacement in kind with new range, refrigerator, sink, faucet, cabinets, countertop, and flooring. no change to wall openings (doors and windows) lighting to comply with cec 150(k)Details
work in unit 214 connecticut st. only: in the lower flat only, replacement in kind with new range, refrigerator, sink, faucet, cabinets, countertop, and flooring. no change to wall openings (doors and windows) lighting to comply with cec 150(k) | $12,000 |
| Dec 28, 2011 | Completed final sign-off Sep 2012 | 654 Elizabeth St | remodel existing third floor, remove and relocate existing bathroom, add new bathroom, add laundry closet, reconfigure bedroom closets.Details
remodel existing third floor, remove and relocate existing bathroom, add new bathroom, add laundry closet, reconfigure bedroom closets. | $35,000 |
| Dec 14, 2011 | Completed final sign-off Feb 2012 | 1537 Pacific Av | 1 kitchen remodel in kind top floor unit lighting to comply with cec 150 cDetails
1 kitchen remodel in kind top floor unit lighting to comply with cec 150 c | $9,200 |
| Nov 30, 2011 | Completed final sign-off Sep 2012 | 654 Elizabeth St | foundation replacement, structural strengthening with new steel frames and plywood walls. not to current codeDetails
foundation replacement, structural strengthening with new steel frames and plywood walls. not to current code | $100,000 |
| Nov 15, 2011 | Completed final sign-off Dec 2011 | 156 Grattan St | replace exterior shingles in kind, match material, match pattern in kindDetails
replace exterior shingles in kind, match material, match pattern in kind | $5,000 |
| Sep 13, 2011 | Completed final sign-off Sep 2011 | 827 Castro St | unit #829-revision to pa# 2011-0224-0891-add new powder room at 2nd floor, minor modifications at configuration of bathroom at 2nd floorDetails
unit #829-revision to pa# 2011-0224-0891-add new powder room at 2nd floor, minor modifications at configuration of bathroom at 2nd floor | $4,000 |
| Jul 29, 2011 | Completed final sign-off Sep 2011 | 130 Lenox Wy | (1) kitchen remodel, non structural.Details
(1) kitchen remodel, non structural. | $8,500 |
| Jul 14, 2011 | Completed final sign-off Jun 2012 | 710 Victoria St | interior remodel. excavate crawl space for new basement with new 900 sf of habitable space, new guest room,bath,ent rm, new wine cellar in bsmt.convert e sunroom at 2nd fl t new mstr bath. remove e brick chimneys.new dormer window at rear,new deck/stairs at rear. replace ex shingles in kindDetails
interior remodel. excavate crawl space for new basement with new 900 sf of habitable space, new guest room,bath,ent rm, new wine cellar in bsmt.convert e sunroom at 2nd fl t new mstr bath. remove e brick chimneys.new dormer window at rear,new deck/stairs at rear. replace ex shingles in kind | $150,000 |
| Jul 6, 2011 | Completed final sign-off Aug 2011 | 2249 Clay St | create new half bath in unit 1. remodel 2 existing baths in kind. all work at 2nd flDetails
create new half bath in unit 1. remodel 2 existing baths in kind. all work at 2nd fl | $18,000 |
| Jun 22, 2011 | Completed final sign-off Mar 2012 | 710 Victoria St | soft demolition of interior. remove (e) sheetrock at interior walls. rerplace w/(n) at 2nd & 1st floor. does not exceed 2/3 substantial change.Details
soft demolition of interior. remove (e) sheetrock at interior walls. rerplace w/(n) at 2nd & 1st floor. does not exceed 2/3 substantial change. | $1,800 |
| Jun 21, 2011 | Completed final sign-off Mar 2012 | 710 Victoria St | bathroom remodel in kind. high efficacy lighting or occupancy sensor.Details
bathroom remodel in kind. high efficacy lighting or occupancy sensor. | $7,500 |
| Jun 15, 2011 | Completed final sign-off Aug 2011 | 2683 17th Av | (1) kitchen remodel in kind. lighting to comply with cec 150(k). no change to windows, walls or doors.Details
(1) kitchen remodel in kind. lighting to comply with cec 150(k). no change to windows, walls or doors. | $8,000 |
| Jun 15, 2011 | Never finaled issued Jun 2011, no final | 2249 Clay St | remodel (2) existing bathrooms in kind.Details
remodel (2) existing bathrooms in kind. | $15,000 |
| Jun 1, 2011 | Completed final sign-off Oct 2011 | 57 Capra Wy | interior kitchen remodel voluntary seismic upgrade.Details
interior kitchen remodel voluntary seismic upgrade. | $50,000 |
| May 18, 2011 | Completed final sign-off Jun 2011 | 1916 16th Av | kitchen remodel in kind.Details
kitchen remodel in kind. | $7,000 |
| May 12, 2011 | Completed final sign-off Sep 2011 | 5149 Anza St | 1)replace approx. 35 lineal ft of foundation at south and west side of bldg. 2)replace one interior spread ftg. 3) replace approx 645 sf of slab at 1st floor. 4)sister new joist at 2nd floor between gridlines 182 and a & b. 5)extend kitchen into lightwell @ 2nd floor. 6)replace extg 2nd floor closetDetails
1)replace approx. 35 lineal ft of foundation at south and west side of bldg. 2)replace one interior spread ftg. 3) replace approx 645 sf of slab at 1st floor. 4)sister new joist at 2nd floor between gridlines 182 and a & b. 5)extend kitchen into lightwell @ 2nd floor. 6)replace extg 2nd floor closet | $40,000 |
| May 11, 2011 | Completed final sign-off Jun 2011 | 1916 16th Av | remodel (e) bathroom in kind.Details
remodel (e) bathroom in kind. | $8,000 |
| May 10, 2011 | Completed final sign-off Jun 2011 | 1916 16th Av | create new half bath at 2nd floor.Details
create new half bath at 2nd floor. | $8,000 |
| May 4, 2011 | Completed final sign-off Jul 2011 | 2434 Jackson St | (1) bathroom remodel in kind. lighting to comply with cec 150(k)Details
(1) bathroom remodel in kind. lighting to comply with cec 150(k) | $7,300 |
| May 4, 2011 | Completed final sign-off Sep 2011 | 5149 Anza St | (1) bathroom remodel in kind. lighting to comply with cec 150 (k)Details
(1) bathroom remodel in kind. lighting to comply with cec 150 (k) | $7,300 |
| May 4, 2011 | Completed final sign-off Jun 2011 | 528 Melrose Av | remodel bathroom same location.Details
remodel bathroom same location. | $7,300 |
| Apr 29, 2011 | Completed final sign-off Feb 2013 | 681 Duncan St | rear yard improvements-(n) retaining walls & deck & spiral stairsDetails
rear yard improvements-(n) retaining walls & deck & spiral stairs | $30,000 |
| Apr 28, 2011 | Completed final sign-off Aug 2011 | 1430 09th Av | addition of new roof dormer for storage space and creation of new attic area in existing attic. open up ceilings in existing bedroom and add (n) skylightsDetails
addition of new roof dormer for storage space and creation of new attic area in existing attic. open up ceilings in existing bedroom and add (n) skylights | $20,000 |
| Apr 27, 2011 | Completed final sign-off May 2011 | 1426 47th Av | replace 14 windows in kind, visable from street, wood clad. replace siding in kind, hardie shingle 1500 sq.ft.Details
replace 14 windows in kind, visable from street, wood clad. replace siding in kind, hardie shingle 1500 sq.ft. | $25,000 |
| Apr 13, 2011 | Completed final sign-off May 2012 | 91 Gates St | interior remodel with the addition of a bathroom at the ground floor. voluntary seismic strengthening. not to cope.Details
interior remodel with the addition of a bathroom at the ground floor. voluntary seismic strengthening. not to cope. | $30,000 |
| Apr 1, 2011 | Completed final sign-off May 2012 | 91 Gates St | remodel of (e) building & horizontal addition @ rear. 6.25' @ upper floor & 12.5' @ ground floor. refinish exterior surfaces & add 2 (n) windows @ south facing property line wall.Details
remodel of (e) building & horizontal addition @ rear. 6.25' @ upper floor & 12.5' @ ground floor. refinish exterior surfaces & add 2 (n) windows @ south facing property line wall. | $90,000 |
| Mar 18, 2011 | Completed final sign-off May 2011 | 59 Newburg St | kitchen remodel in kind.Details
kitchen remodel in kind. | $7,000 |
| Mar 14, 2011 | Completed final sign-off Jun 2011 | 207 Claremont Bl | remove & replace (e) internal stair,remodel (e) kitchen,add (n) bath @ 2nd flr. add (n) conditioned hallway in ground flr,remove brick chmney & reinstate (e) bay window, remove 1 (e) int. wall,remove 1 (e) window,remove & replace 1 ext door & 4 windows, add 2 skylightsDetails
remove & replace (e) internal stair,remodel (e) kitchen,add (n) bath @ 2nd flr. add (n) conditioned hallway in ground flr,remove brick chmney & reinstate (e) bay window, remove 1 (e) int. wall,remove 1 (e) window,remove & replace 1 ext door & 4 windows, add 2 skylights | $70,000 |
| Mar 7, 2011 | Completed final sign-off Jun 2011 | 207 Claremont Bl | repair water damage @ wall & floor @ kitchen area only. no other work.Details
repair water damage @ wall & floor @ kitchen area only. no other work. | $2,500 |
| Jan 20, 2011 | Completed final sign-off Feb 2011 | 2414 Funston Av | kitchen remodelDetails
kitchen remodel | $7,000 |
| Jan 20, 2011 | Completed final sign-off Mar 2011 | 1543 Mcallister St | kitchen remodel for unit #34 only (no window, door, ceiling or wall work on this permit.)Details
kitchen remodel for unit #34 only (no window, door, ceiling or wall work on this permit.) | $7,000 |
| Jan 19, 2011 | Completed final sign-off Jul 2011 | 2306 29th Av | bathroom remodel at 2nd floorDetails
bathroom remodel at 2nd floor | $9,000 |
| Dec 1, 2010 | Expired or cancelled withdrawn Aug 2012 | 3912 Folsom St | remodel kitchen & bathrooms: add dormer adjacent to existing dormer. add bathroom below dormer. repair dryrot @ front facade. replace windows wood @ front vinyl @ rear.Details
remodel kitchen & bathrooms: add dormer adjacent to existing dormer. add bathroom below dormer. repair dryrot @ front facade. replace windows wood @ front vinyl @ rear. | $80,000 |
| Nov 8, 2010 | Completed final sign-off Oct 2011 | 331 Dorantes Av | add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom.Details
add 22.5 sq. ft @ upper floor & convert 1129 sq. ft. of basement area to habitable living space. remodel kitchen, add internal stair, and add lower level bathroom. | $50,000 |
| Nov 5, 2010 | Completed final sign-off Oct 2011 | 224 Scott St | replace current wood double-hung windows in front of 2 rooms of the 3rd flr unit, with ultimate insert double hung window in wood/wood from marvin windows, total of 6 windows replace in kind (clear opening)Details
replace current wood double-hung windows in front of 2 rooms of the 3rd flr unit, with ultimate insert double hung window in wood/wood from marvin windows, total of 6 windows replace in kind (clear opening) | $7,785 |
| Oct 20, 2010 | Completed final sign-off Dec 2010 | 530 Alvarado St | install new full bath rand closet at 3rd floor onlyDetails
install new full bath rand closet at 3rd floor only | $6,000 |
| Oct 18, 2010 | Completed final sign-off Mar 2011 | 311 30th St | enlargement of existing garage to facilitate 2 cars parking. install new garage door under (e) bay windows and add new access door to garageDetails
enlargement of existing garage to facilitate 2 cars parking. install new garage door under (e) bay windows and add new access door to garage | $50,000 |
| Oct 1, 2010 | Completed final sign-off Nov 2010 | 10 Marcela Av | reroofingDetails
reroofing | $2,000 |
| Oct 1, 2010 | Completed final sign-off Nov 2010 | 757 Capp St | remodel extg bath room on 2nd floor. no structural work.Details
remodel extg bath room on 2nd floor. no structural work. | $5,000 |
| Oct 1, 2010 | Completed final sign-off Nov 2010 | 10 Marcela Av | new skylightDetails
new skylight | $1,000 |
| Aug 20, 2010 | Completed final sign-off Oct 2010 | 232 Fowler Av | bathroom remodel in kind, new lighting will comply with cec 150(k)Details
bathroom remodel in kind, new lighting will comply with cec 150(k) | $4,500 |
| Aug 20, 2010 | Completed final sign-off Dec 2010 | 206 Andover St | bathroom remodel in kind (no structural work) new lighting comply with cec 150Details
bathroom remodel in kind (no structural work) new lighting comply with cec 150 | $5,500 |
| Aug 12, 2010 | Completed final sign-off Sep 2010 | 392 Sweeny St | remodel of kitchen, move water lines & gas lines, relocate sink & stove. walls to remain, no new openings.Details
remodel of kitchen, move water lines & gas lines, relocate sink & stove. walls to remain, no new openings. | $30,000 |
| Jul 28, 2010 | Completed final sign-off Oct 2010 | 47 Costa St | bathroom remodel, new tub, toilet, vanity, tile floor, update plumbing.Details
bathroom remodel, new tub, toilet, vanity, tile floor, update plumbing. | $18,500 |
| Jul 16, 2010 | Completed final sign-off Aug 2010 | 14 Hill St | remodel bath and kitchen as is. bath: high efficacy or occupancy sensor for lighting, tile+ electrical only. kitchen: at least 50% high efficacy lighting (by wattage) no change to appliances. no change to exhaust system.Details
remodel bath and kitchen as is. bath: high efficacy or occupancy sensor for lighting, tile+ electrical only. kitchen: at least 50% high efficacy lighting (by wattage) no change to appliances. no change to exhaust system. | $6,000 |
| Jun 25, 2010 | Completed final sign-off Aug 2010 | 2634 Bush St | insulate, sheetrock, replace lighting and new garage door in the garage.Details
insulate, sheetrock, replace lighting and new garage door in the garage. | $7,000 |
| Jun 15, 2010 | Never finaled issued Jun 2010, no final | 14 Hill St | raise estimated cost by $20,000 scope of work went up per p.a.#201005213007.Details
raise estimated cost by $20,000 scope of work went up per p.a.#201005213007. | $20,000 |
| May 21, 2010 | Never finaled issued May 2010, no final | 14 Hill St | create new corridor. move door into bathroom and enlarge bathroom to incorporate n linen closet. new closet in bedrooms, infill e opening between room. upgrade bathroom and kitchen appliances. replace e kitchen window in kind at rearDetails
create new corridor. move door into bathroom and enlarge bathroom to incorporate n linen closet. new closet in bedrooms, infill e opening between room. upgrade bathroom and kitchen appliances. replace e kitchen window in kind at rear | $12,000 |
| May 20, 2010 | Completed final sign-off Nov 2010 | 55 Gates St | convert 130 sqft of garage space to interior conditioned for office space. add 5' dia. spiral stair from ground level to 2nd story. no change in building volume.Details
convert 130 sqft of garage space to interior conditioned for office space. add 5' dia. spiral stair from ground level to 2nd story. no change in building volume. | $8,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 4000 Kirkham St | remodel 1-kitchen and bath (work on 2nd. flr.)Details
remodel 1-kitchen and bath (work on 2nd. flr.) | $8,200 |
| Apr 22, 2010 | Completed final sign-off Aug 2010 | 4000 Kirkham St | infill e window and patch facade to match existing per planDetails
infill e window and patch facade to match existing per plan | $500 |
| Apr 15, 2010 | Completed final sign-off Apr 2010 | 14 Hill St | comply with nov# 200933782 & 200914481-replace portion of (e) front stairs in kind, less than 50%. repair/replace failing concrete slabs at front grade in front portion of property line, provide 20% landscaping at front setback per sec 132 (g)Details
comply with nov# 200933782 & 200914481-replace portion of (e) front stairs in kind, less than 50%. repair/replace failing concrete slabs at front grade in front portion of property line, provide 20% landscaping at front setback per sec 132 (g) | $3,500 |
| Apr 7, 2010 | Completed final sign-off Jun 2010 | 674 30th Av | remodel existing bath including fixture replacement and cabinets in kind on 2nd flDetails
remodel existing bath including fixture replacement and cabinets in kind on 2nd fl | $6,000 |
| Feb 10, 2010 | Completed final sign-off Feb 2010 | 1863 18th Av | reroofing reroofingDetails
reroofing reroofing | $4,000 |
| Dec 22, 2009 | Completed final sign-off Jan 2010 | 2011 Clement St | dry-rot repair approx. 20 sq.ft. @ front below bay window; addition work to 2009/1211/3088.Details
dry-rot repair approx. 20 sq.ft. @ front below bay window; addition work to 2009/1211/3088. | $2,000 |
| Dec 22, 2009 | Completed final sign-off May 2010 | 77 Central Av | infill (e) lightwell against adjacent lightwell at top floor for new bath. infill (e) vacant space @ ground level for new bedroom #4. revision to pa#2009/1117/1422.Details
infill (e) lightwell against adjacent lightwell at top floor for new bath. infill (e) vacant space @ ground level for new bedroom #4. revision to pa#2009/1117/1422. | $38,000 |
| Dec 15, 2009 | Completed final sign-off Apr 2010 | 1526 Shrader St | enlarge existing master bathroom to provide new soaking tub at 2nd floor only. no structural changes.Details
enlarge existing master bathroom to provide new soaking tub at 2nd floor only. no structural changes. | $5,000 |
| Dec 11, 2009 | Completed final sign-off Jan 2010 | 2011 Clement St | replace existing rotted & failing 8x8 post with new steel column & footing.Details
replace existing rotted & failing 8x8 post with new steel column & footing. | $3,500 |
| Nov 17, 2009 | Completed final sign-off May 2010 | 77 Central Av | remodel (e) 3 bedrooms, 2 bathrooms & kitchen. add 1 bedroom, add (n) stairs from basement to main level.remove staris @ rear of garage. (n) skylights (flat)& drawer at top level.Details
remodel (e) 3 bedrooms, 2 bathrooms & kitchen. add 1 bedroom, add (n) stairs from basement to main level.remove staris @ rear of garage. (n) skylights (flat)& drawer at top level. | $8,000 |