Fred Pollack
- Listed as
- architect, designer, engineer
- Firm
- Van Meter Williams Pollack
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Apr 2025
25 permits since 2000 (architect on 23 permits, engineer on 2 permits, designer on 1 permit): 15 completed, 2 in progress, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2025 | Completed final sign-off Aug 2025 | 11 Innes Ct | Specialized Graphics Inc | install building name sign "dorris m vicent apartment" on plaster wall, non -illunimated & non structuralDetails
install building name sign "dorris m vicent apartment" on plaster wall, non -illunimated & non structural | $2,000 |
| Apr 30, 2025 | Completed final sign-off Aug 2025 | 11 Innes Ct | Specialized Graphics Inc | install building number "275" on concrete planter, non -illunimated & non structuralDetails
install building number "275" on concrete planter, non -illunimated & non structural | $2,000 |
| Feb 14, 2025 | In progress filed Feb 2025, not yet issued | 11 Innes Ct | Nibbi Bros Assoc Inc. | final stormwater control plan for dbi plumbing division. renew of the new catch basin located at the parking garage driveway into new building along kennedy drive. see sheet note 122 on c-5.1 ref pa 2021-0426-9364Details
final stormwater control plan for dbi plumbing division. renew of the new catch basin located at the parking garage driveway into new building along kennedy drive. see sheet note 122 on c-5.1 ref pa 2021-0426-9364 | $40,000 |
| Jan 4, 2024 | In progress issued May 2024 | 11 Innes Ct | Nibbi Bros Assoc Inc. | revision to pa # 202104269364 s2 & s3 to revise rooms 114 & 116 rating to match adjoining garage area rating of s-2 for removal of fsd at mech ducts; revise elevator penthouse to add ul listed rate access hatch for smoke detector.Details
revision to pa # 202104269364 s2 & s3 to revise rooms 114 & 116 rating to match adjoining garage area rating of s-2 for removal of fsd at mech ducts; revise elevator penthouse to add ul listed rate access hatch for smoke detector. | |
| Aug 10, 2022 | Never finaled filed Aug 2022, never issued | 1001 Franklin St | Cahill Contractors Llc. | priority processing - to construct a 7-story, 94 dwelling units, type 3a over 1a, senior affordable housing. residential building.Details
priority processing - to construct a 7-story, 94 dwelling units, type 3a over 1a, senior affordable housing. residential building. | $42,365,000 |
| Apr 26, 2021 | Completed final sign-off Nov 2025 | 11 Innes Ct | Nibbi Bros Assoc Inc. | 100% affordable housing. erect a 5 stories, 73 dwelling unit with residential and offices type 1 building with no basement.Details
100% affordable housing. erect a 5 stories, 73 dwelling unit with residential and offices type 1 building with no basement. | $28,704,000 |
| Jun 5, 2018 | Completed final sign-off Jul 2018 | 2175 Market St | Adam Lewis Construction Company | replace 3 bays of retail storefront to restore original conditionDetails
replace 3 bays of retail storefront to restore original condition | $15,000 |
| Jul 26, 2017 | Completed final sign-off Oct 2019 | 1101 Connecticut St | Cahill Const Service Inc | revision to 201603172392-s3, update addendum schedule, update delete deferred submitals, merge lots 001a & 007 into new lot 076.Details
revision to 201603172392-s3, update addendum schedule, update delete deferred submitals, merge lots 001a & 007 into new lot 076. | |
| Dec 23, 2016 | Expired or cancelled withdrawn Jun 2017 | 55 Laguna St | James E Roberts-Obayashi Corporation | add a security gate at hermann st, former entry to the bldg. the stair & door on hermann is not a required exit for the building. reference 201604255585,regarding stair & door on hermann st., (ref.201306270646)Details
add a security gate at hermann st, former entry to the bldg. the stair & door on hermann is not a required exit for the building. reference 201604255585,regarding stair & door on hermann st., (ref.201306270646) | $15,000 |
| Jul 14, 2016 | Completed final sign-off Jun 2017 | 55 Laguna St | James E Roberts-Obayashi Corporation | revision to pa #201306070646, #201512215607 & 201604255585 - revise exterior stair from wood to concrete. build exterior concrete retaining wall at north side.Details
revision to pa #201306070646, #201512215607 & 201604255585 - revise exterior stair from wood to concrete. build exterior concrete retaining wall at north side. | $80,000 |
| May 6, 2016 | Expired or cancelled expired Jun 2017 | 55 Laguna St | James E Roberts-Obayashi Corporation | revise rating of door 200c from 45 min to not rated per exceptions in exterior exit stair codes. this work is related to ref pa's 2013 0607 0646 & 2015 1221 5607Details
revise rating of door 200c from 45 min to not rated per exceptions in exterior exit stair codes. this work is related to ref pa's 2013 0607 0646 & 2015 1221 5607 | |
| Mar 17, 2016 | Completed final sign-off Oct 2019 | 1101 Connecticut St | Cahill Const Service Inc, Value Fire Protection Inc, Fire Detection Unlimited, Errc Systems Inc (Former Dishnet Direct) | erect 5 story, 1 basement, 72 units, 100% affordable housing, located on two lots, 001a & 007.Details
erect 5 story, 1 basement, 72 units, 100% affordable housing, located on two lots, 001a & 007. | $21,800,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 6 Moffitt St | Andrew Chekene Enterprises/ Dba Ac Enter | repair in kind of dryrot or deteriorated deck, bridge, roof overhang or balcony framing of elements fro compliance with sec.604 of the s.f. housing code.Details
repair in kind of dryrot or deteriorated deck, bridge, roof overhang or balcony framing of elements fro compliance with sec.604 of the s.f. housing code. | $75,000 |
| Dec 30, 2013 | Completed final sign-off Jan 2015 | 317 Arbor St | Andrew Chekene Enterprises/ Dba Ac Enter | repair in kind of dryrot of deteriorated decks and bridges. roof overhand on balcony framing of rail elements for compliance with sec 605 of the housing codeDetails
repair in kind of dryrot of deteriorated decks and bridges. roof overhand on balcony framing of rail elements for compliance with sec 605 of the housing code | $40,000 |
| Dec 26, 2013 | Completed final sign-off Nov 2014 | 57 Addison St | Andrew Chekene Enterprises/ Dba Ac Enter | repair in kind of dryrot or deteriorated deck, bridge, roof overhang or balcony framing of elements for compliance with sec. 604 of the s.f. housing code.Details
repair in kind of dryrot or deteriorated deck, bridge, roof overhang or balcony framing of elements for compliance with sec. 604 of the s.f. housing code. | $48,000 |
| Dec 26, 2013 | Completed final sign-off Nov 2014 | 121 Addison St | Andrew Chekene Enterprises/ Dba Ac Enter | repair in kind dry rotted or deteriorated decks, bridge, roof overhang or balcony framing of elements for compliance with sec. 604 of the s.f. housing code.Details
repair in kind dry rotted or deteriorated decks, bridge, roof overhang or balcony framing of elements for compliance with sec. 604 of the s.f. housing code. | $55,000 |
| Dec 2, 2013 | Completed final sign-off Nov 2014 | 41 Addison St | Andrew Chekene Enterprises/ Dba Ac Enter | repair in kind of dryrot or deteriorated deck, bridge, roof overhang or balcony framing of rail elements for compliance with sec. 604 of the san francisco housing code.Details
repair in kind of dryrot or deteriorated deck, bridge, roof overhang or balcony framing of rail elements for compliance with sec. 604 of the san francisco housing code. | $48,000 |
| Aug 6, 2013 | Completed final sign-off Jan 2014 | 55 Laguna St | Build Group Inc. | demo - salvaging of particular historically contributing building elements. demo of administration wing structure.Details
demo - salvaging of particular historically contributing building elements. demo of administration wing structure. | $12,000 |
| Jun 27, 2013 | Completed final sign-off Jun 2017 | 55 Laguna St | James E Roberts-Obayashi Corporation, Pac Integrations Inc | change of occupancy and change of use of an existing historic building from a school into affordable senior housing.the grd fl incl retail space and t.i. space for a non-profit organization. the bldg is landmark #256, work was approved on 5/16/12.Details
change of occupancy and change of use of an existing historic building from a school into affordable senior housing.the grd fl incl retail space and t.i. space for a non-profit organization. the bldg is landmark #256, work was approved on 5/16/12. | $15,000,000 |
| Apr 16, 2013 | Expired or cancelled withdrawn Jul 2013 | 55 Laguna St | demolish 1 story office building.Details
demolish 1 story office building. | $8,000 | |
| Jul 20, 2012 | Completed final sign-off Jan 2015 | 2175 Market St | James E Roberts-Obayashi Corporation | erect 6 stories , 88 dwelling unit.type 5 over 1Details
erect 6 stories , 88 dwelling unit.type 5 over 1 | $12,500,000 |
| Apr 26, 2012 | Never finaled issued May 2012, no final | 211 Moreland St | Andrew Chekene Enterprises/ Dba Ac Enter | replacement in -kind of dry rot or deteriorated deck, bridge, roof overhang, or balcony framing of rail elelments in response to sfdbi issued citationsDetails
replacement in -kind of dry rot or deteriorated deck, bridge, roof overhang, or balcony framing of rail elelments in response to sfdbi issued citations | $21,000 |
| Apr 26, 2012 | Never finaled issued May 2012, no final | 116 Moreland St | Andrew Chekene Enterprises/ Dba Ac Enter | to comply complaint#201041339 dated 6/9/10. replacement in -kind of dry rot or deteriorated deck, bridge, roof overhang, or balcony framing of rail elelments in response to sfdbi issued citationsDetails
to comply complaint#201041339 dated 6/9/10. replacement in -kind of dry rot or deteriorated deck, bridge, roof overhang, or balcony framing of rail elelments in response to sfdbi issued citations | $32,000 |
| Apr 26, 2012 | Expired or cancelled expired Feb 2014 | 36 Addison St | Andrew Chekene Enterprises/ Dba Ac Enter | to comply nov#200926829. replacement in -kind of dry rot or deteriorated deck, bridge, roof overhang, or balcony framing of rail elelments in response to sfdbi issued citationsDetails
to comply nov#200926829. replacement in -kind of dry rot or deteriorated deck, bridge, roof overhang, or balcony framing of rail elelments in response to sfdbi issued citations | $58,000 |
| Nov 10, 2005 | Never finaled issued Feb 2006, no final | 360 Valencia St | Nibbi Brothers Construction | rev.to day care center, primarily plumbing. note: this is a revision to addendum 3 for site appl#200312081855 & should be routed to john chenDetails
rev.to day care center, primarily plumbing. note: this is a revision to addendum 3 for site appl#200312081855 & should be routed to john chen |