Adam Lewis Construction Company
- Based in
- Livermore
- On San Francisco permits
- Sep 2013 to Feb 2026
- Last 24 months
- 8 permits filed
49 permits since 2000: 37 completed, 6 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Apr 2026 | 2343 Fillmore St | revison to pa #202510288279. revision at restroom for site conditions that revealed a sump pump that needs to remain with access. documentation of existing transformer and panel to remain as shown.Details
revison to pa #202510288279. revision at restroom for site conditions that revealed a sump pump that needs to remain with access. documentation of existing transformer and panel to remain as shown. | |
| Jan 29, 2026 | In progress issued Apr 2026 | 3838 California St | suite #505: interior t.i. to convert an existing office to an exam room & convert a protion of an existing open office area to a storage room.mechanical, electrical & fire related shall be design build under seperate permit. no exterior work.Details
suite #505: interior t.i. to convert an existing office to an exam room & convert a protion of an existing open office area to a storage room.mechanical, electrical & fire related shall be design build under seperate permit. no exterior work. | $25,000 |
| Oct 28, 2025 | In progress issued Jan 2026 | 2343 Fillmore St | interior only tenant improvement of existing hospital, including new non-load bearing partitions, mep, finishes, and equipment.Details
interior only tenant improvement of existing hospital, including new non-load bearing partitions, mep, finishes, and equipment. | $300,000 |
| Sep 29, 2025 | Completed final sign-off Apr 2026 | 3490 California St | unit 203; interior t.i. to add an admin office within (e) reception and enlarage the (e) large consult, break room and storage rooms. mechanical, electrical and fire related shall be design-build under separte permit. no exterior work.Details
unit 203; interior t.i. to add an admin office within (e) reception and enlarage the (e) large consult, break room and storage rooms. mechanical, electrical and fire related shall be design-build under separte permit. no exterior work. | $54,000 |
| Sep 8, 2025 | In progress issued Oct 2025 | 2175 Market St | g/f t.i. to enlarge the e) consult & x-ray rooms. mep & fire related shall be design-build under separate permit. no exterior workDetails
g/f t.i. to enlarge the e) consult & x-ray rooms. mep & fire related shall be design-build under separate permit. no exterior work | $28,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 1280 10th Av | to obtain final inspection for work approved under pa # 201406178584. all work is completeDetails
to obtain final inspection for work approved under pa # 201406178584. all work is complete | |
| Jun 6, 2025 | In progress issued Jun 2025 | 1280 10th Av | interior tenant improvement to add a new consultant room, new cabinets, and new baby changing station. mechanical and electrical shall be deferred. no exterior work.Details
interior tenant improvement to add a new consultant room, new cabinets, and new baby changing station. mechanical and electrical shall be deferred. no exterior work. | $16,756 |
| Oct 29, 2024 | Completed final sign-off Feb 2025 | 98 Gough St | g/f -to comply with nov 202307976, remove unpermitted handrails and install (n) handrails at (e) step (n) walk off mat at (e) step. raise (e) partial height wall at receptrion install (n) flooring. install ada signs at restroomsDetails
g/f -to comply with nov 202307976, remove unpermitted handrails and install (n) handrails at (e) step (n) walk off mat at (e) step. raise (e) partial height wall at receptrion install (n) flooring. install ada signs at restrooms | $3,750 |
| Sep 20, 2024 | Completed final sign-off Feb 2026 | 3820 24th St | 1275 sf basement tenant improvements expansion of existing 2576 sf ground flr veterinary clinic.completed veterinary clinc will be total of 3851sf (ref 2023-007870cua). ti work includes new partitions, new mech, elect, and plumb. new accessible restroom, new finishes, and new hvac eqip locaetd in(e)Details
1275 sf basement tenant improvements expansion of existing 2576 sf ground flr veterinary clinic.completed veterinary clinc will be total of 3851sf (ref 2023-007870cua). ti work includes new partitions, new mech, elect, and plumb. new accessible restroom, new finishes, and new hvac eqip locaetd in(e) | $400,000 |
| Jan 18, 2024 | Expired or cancelled cancelled Jun 2024 | 1 Lombard St | the scope of work includes (n) floor finishes, light fixtures, ceiling finishes, 3 (n) all gender restrooms. tenant improvement at level 1 only. area of work to be sectioned off. all exits to remain accessible. no exterior work. no changes to building structure.Details
the scope of work includes (n) floor finishes, light fixtures, ceiling finishes, 3 (n) all gender restrooms. tenant improvement at level 1 only. area of work to be sectioned off. all exits to remain accessible. no exterior work. no changes to building structure. | $250,000 |
| Oct 17, 2023 | Expired or cancelled cancelled Jun 2025 | 1 Lombard St | interior of demo project includes removal of selected rooms; interior non-load bearing partitions, ceiling, finishes, interior doors; removal of select existing hvac equipment and ductowrk, electrical wiring, light fixtures, switches, outlets and conduit as required. removal of previously addedDetails
interior of demo project includes removal of selected rooms; interior non-load bearing partitions, ceiling, finishes, interior doors; removal of select existing hvac equipment and ductowrk, electrical wiring, light fixtures, switches, outlets and conduit as required. removal of previously added | $15,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 2355 Market St | revision to permit 2022-1028-5383 discovery of shear walls leads to layout changes. revised meps to align with new architectural floor plan. no new sfDetails
revision to permit 2022-1028-5383 discovery of shear walls leads to layout changes. revised meps to align with new architectural floor plan. no new sf | |
| Dec 7, 2022 | Completed final sign-off Aug 2023 | 2355 Market St | interior finishes removel. demo partition walls, acoustic ceiling, restrooms, fixtures for future tenant per ab-017.Details
interior finishes removel. demo partition walls, acoustic ceiling, restrooms, fixtures for future tenant per ab-017. | $25,000 |
| Oct 28, 2022 | Completed final sign-off Nov 2023 | 2355 Market St | ti improvement of an (e) commercial space consisting of new non-structural partitions, ceilings, casework, finishes, and mep fire sprinklers under sep permit no changes to building height or ~kf21&@003k%ea079c ~kf21&printDetails
ti improvement of an (e) commercial space consisting of new non-structural partitions, ceilings, casework, finishes, and mep fire sprinklers under sep permit no changes to building height or ~kf21&@003k%ea079c ~kf21&print | $1,472,000 |
| Nov 16, 2021 | Completed final sign-off Mar 2023 | 531 Commercial St | 1st/f: replace (e) exterior door w/ new in-kind storefront w/ low energy door operator & new auto door operator. 3rd/f: upgrade (e) baths to ada compliance. modify (e) kitchenette & private office, provide workstations. 4th/f: modify (e) private office and (e) conference rmDetails
1st/f: replace (e) exterior door w/ new in-kind storefront w/ low energy door operator & new auto door operator. 3rd/f: upgrade (e) baths to ada compliance. modify (e) kitchenette & private office, provide workstations. 4th/f: modify (e) private office and (e) conference rm | $140,000 |
| Feb 9, 2021 | Completed final sign-off Jun 2021 | 2 West Portal Av | revision to pa# 202005117379. tenant improvement on gronud floor of existing building. new non-structural partitions, ceilings, case work. finishes. enclose raised portion of mezz. enclosed portion (334sf) shall not be used for any purpose.Details
revision to pa# 202005117379. tenant improvement on gronud floor of existing building. new non-structural partitions, ceilings, case work. finishes. enclose raised portion of mezz. enclosed portion (334sf) shall not be used for any purpose. | |
| Jun 24, 2020 | Completed final sign-off Sep 2023 | 75 Industrial St | new structural insulated panel walls and ceilings. ref app#201712217098Details
new structural insulated panel walls and ceilings. ref app#201712217098 | $20,000 |
| May 11, 2020 | Completed final sign-off Jun 2021 | 2 West Portal Av | t.i. on ground floor of extg bldg consisting of new non-structural partitions, ceiling, casework, finishes, mechanical, electrical, and plmg work. signage under separate permit. fire alarm modifications under seperate permit.Details
t.i. on ground floor of extg bldg consisting of new non-structural partitions, ceiling, casework, finishes, mechanical, electrical, and plmg work. signage under separate permit. fire alarm modifications under seperate permit. | $950,000 |
| Feb 27, 2020 | Completed final sign-off May 2023 | 75 Industrial St | install new interior steel stairs (interior). ref bpa# 2017-1221-7098.Details
install new interior steel stairs (interior). ref bpa# 2017-1221-7098. | $5,000 |
| Dec 31, 2019 | Completed final sign-off Dec 2023 | 75 Industrial St | revision to approved pa #201805310549. revise size of (n) storage room, add (n) packaging room and revise entry to (n) toilet room. (n) level concrete slab over (e) ramp. area of work is s-2 and accessory b occupancy use.Details
revision to approved pa #201805310549. revise size of (n) storage room, add (n) packaging room and revise entry to (n) toilet room. (n) level concrete slab over (e) ramp. area of work is s-2 and accessory b occupancy use. | $40,000 |
| May 7, 2019 | Completed final sign-off Jul 2019 | 2175 Market St | revision to pa 201812269162. modified number of gallons on wh & wh type in t24, added plumb equp & fixtures, added risers. modified ground flr plumb plan to incl (n) domestic water piping, sanitary piping & vent piping to (n) sinks. added floor drains.Details
revision to pa 201812269162. modified number of gallons on wh & wh type in t24, added plumb equp & fixtures, added risers. modified ground flr plumb plan to incl (n) domestic water piping, sanitary piping & vent piping to (n) sinks. added floor drains. | $18,000 |
| Mar 26, 2019 | Completed final sign-off Sep 2019 | 2029 Market St | at (e) ground floor commercial tenant space, provide (n) power door operator to comply with accessible business entrance program (abe ordinance 51-16). project scope consists of barrier removal only.Details
at (e) ground floor commercial tenant space, provide (n) power door operator to comply with accessible business entrance program (abe ordinance 51-16). project scope consists of barrier removal only. | $2,500 |
| Dec 26, 2018 | Completed final sign-off Jul 2019 | 2175 Market St | 1/f: ti - consisting of new non structural partitions ceiling, casework, finishes, mechanican, ele and plm work. maher n/a.Details
1/f: ti - consisting of new non structural partitions ceiling, casework, finishes, mechanican, ele and plm work. maher n/a. | $365,400 |
| Oct 30, 2018 | Expired or cancelled cancelled Jun 2023 | 75 Industrial St | mechanical design for office t.i. and plant drying room. deferred submittal to approved app#201712217098Details
mechanical design for office t.i. and plant drying room. deferred submittal to approved app#201712217098 | $63,000 |
| Aug 7, 2018 | Completed final sign-off Oct 2018 | 527 Howard St | electrical only revision to approved 201709209121. add led lighting at front counter add outlets at front counter and rear counterDetails
electrical only revision to approved 201709209121. add led lighting at front counter add outlets at front counter and rear counter | $2,000 |
| Jun 5, 2018 | Completed final sign-off Jul 2018 | 2175 Market St | replace 3 bays of retail storefront to restore original conditionDetails
replace 3 bays of retail storefront to restore original condition | $15,000 |
| May 31, 2018 | Completed final sign-off Dec 2023 | 75 Industrial St | change of use of portion of (e) ground flr area from industrial agriculture to wholesale sales with accessory office space from cannabis distribution. install new partitions, new doors & new toilet room. mech/plm/ele/lighting/sprinklerslife safety under sep permit maher naDetails
change of use of portion of (e) ground flr area from industrial agriculture to wholesale sales with accessory office space from cannabis distribution. install new partitions, new doors & new toilet room. mech/plm/ele/lighting/sprinklerslife safety under sep permit maher na | $40,000 |
| Apr 2, 2018 | Completed final sign-off Jun 2018 | 555 Hayes St | interior non bearing partition opening infill at one location and door addition at one location. no exterior work. revision to pa #201710020095 & #201801098234 for disabled access entry.Details
interior non bearing partition opening infill at one location and door addition at one location. no exterior work. revision to pa #201710020095 & #201801098234 for disabled access entry. | $1,000 |
| Mar 23, 2018 | Completed final sign-off Oct 2018 | 2175 Market St | new partitions, ramp and restrooms for interior of health services facility . no exterior workDetails
new partitions, ramp and restrooms for interior of health services facility . no exterior work | $150,000 |
| Jan 9, 2018 | Completed final sign-off Jun 2018 | 555 Hayes St | revision to app#201710020095 to complete work including new sloped entry floor finish and new power door operator per sf dbi information sheets da-04 and da-05 as a technical infeasibility with equivalent facilitation for disabled access.Details
revision to app#201710020095 to complete work including new sloped entry floor finish and new power door operator per sf dbi information sheets da-04 and da-05 as a technical infeasibility with equivalent facilitation for disabled access. | $3,000 |
| Dec 21, 2017 | Completed final sign-off Sep 2023 | 75 Industrial St | revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system.Details
revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system. | |
| Oct 11, 2017 | Completed final sign-off Oct 2018 | 527 Howard St | at (e) ground floor commercial tenant space of 4 story commercial & residential building. alter (e) mechanical system. 3 new penetrations & wall caps for mechanical systems @ (e) ground floor rear wall. ** maher: n/a **Details
at (e) ground floor commercial tenant space of 4 story commercial & residential building. alter (e) mechanical system. 3 new penetrations & wall caps for mechanical systems @ (e) ground floor rear wall. ** maher: n/a ** | $20,000 |
| Oct 2, 2017 | Completed final sign-off Jun 2018 | 555 Hayes St | ground floor retail ti, including (n) non-bearing partitions, (n) structural beams & posts. new accessible restroom, new lighting. finishes & electrical throughout. mep under separate permitDetails
ground floor retail ti, including (n) non-bearing partitions, (n) structural beams & posts. new accessible restroom, new lighting. finishes & electrical throughout. mep under separate permit | $160,000 |
| Sep 20, 2017 | Completed final sign-off Oct 2018 | 527 Howard St | interior ti of (e) mcd at ground floor in an (e) 4 story commercial building. remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millworkDetails
interior ti of (e) mcd at ground floor in an (e) 4 story commercial building. remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millwork | $214,719 |
| Sep 7, 2017 | Completed final sign-off Nov 2017 | 555 Hayes St | demo per ab-17 interior non bearing partitions, floor finishes and restroom plumbing fixtures only. no exterior work. bldg. interior to remain unoccupied until future t.i. are permitted and finalized.Details
demo per ab-17 interior non bearing partitions, floor finishes and restroom plumbing fixtures only. no exterior work. bldg. interior to remain unoccupied until future t.i. are permitted and finalized. | $5,000 |
| Apr 12, 2017 | Completed final sign-off Jun 2018 | 1823 Union St | 1st fl: new partitions, suspended ceiling, casework, finishes, restrooms, mech, plumbing, elec, lighting for tenant improvement on gr fl. per plan, no exterior workDetails
1st fl: new partitions, suspended ceiling, casework, finishes, restrooms, mech, plumbing, elec, lighting for tenant improvement on gr fl. per plan, no exterior work | $500,000 |
| Mar 28, 2017 | Completed final sign-off Jun 2018 | 1823 Union St | removing interior non-structural partitions, doors per ab-017. tenant improvement under separate permit.Details
removing interior non-structural partitions, doors per ab-017. tenant improvement under separate permit. | $18,000 |
| Dec 14, 2016 | Completed final sign-off Sep 2023 | 75 Industrial St | remove (e) interior partitions, doors, millwork, mezzanine and stair. install (n) partitions and doors for plant nursery. maher naDetails
remove (e) interior partitions, doors, millwork, mezzanine and stair. install (n) partitions and doors for plant nursery. maher na | $250,000 |
| Jul 5, 2016 | Never finaled issued Jul 2016, no final | 55 Francisco St | selective ti on 5th floor witn new non-bearing partitions & new millwork. no exterior work. maher na arch only - all else deferred submittal (mep, fire)Details
selective ti on 5th floor witn new non-bearing partitions & new millwork. no exterior work. maher na arch only - all else deferred submittal (mep, fire) | $116,400 |
| Jan 29, 2016 | Completed final sign-off Jan 2016 | 580 Valencia St | to obtain final inspection for work approved under pa 201005031576; all work is complete.Details
to obtain final inspection for work approved under pa 201005031576; all work is complete. | |
| Sep 16, 2015 | Completed final sign-off Feb 2016 | 580 Valencia St | revision to pa#201504133498, minor layout changes, add details for millwork, security grille, mechanical, electrical, plumbing included.Details
revision to pa#201504133498, minor layout changes, add details for millwork, security grille, mechanical, electrical, plumbing included. | |
| Apr 13, 2015 | Completed final sign-off Feb 2016 | 580 Valencia St | interior work: new partitions, suspended ceiling, casework, finishes, restrooms, mechanical, electrical, lighting for ground floor tenant. no exterior work. mechanical, electrical, plumbing, title 24 energy analysis under separate permits. to correct planning code violation 2015000777enfDetails
interior work: new partitions, suspended ceiling, casework, finishes, restrooms, mechanical, electrical, lighting for ground floor tenant. no exterior work. mechanical, electrical, plumbing, title 24 energy analysis under separate permits. to correct planning code violation 2015000777enf | $273,091 |
| Apr 2, 2015 | Completed final sign-off Jul 2018 | 246 Shipley St | change of use from (e) merchantile (garment factory) to office use. add 4 street trees along falmouth & 2 along shipley street. total 6 street trees. ** maher: n/a **Details
change of use from (e) merchantile (garment factory) to office use. add 4 street trees along falmouth & 2 along shipley street. total 6 street trees. ** maher: n/a ** | $20,000 |
| Jan 7, 2015 | Completed final sign-off Jul 2015 | 3490 California St | #203- 2nd floor - t.i. build new partition walls, new suspended ceiling,new casework, new finishes, new restroom, new mechanical, new plumbingm, new lightingm and electrical. no exterior.Details
#203- 2nd floor - t.i. build new partition walls, new suspended ceiling,new casework, new finishes, new restroom, new mechanical, new plumbingm, new lightingm and electrical. no exterior. | $273,091 |
| Sep 17, 2014 | Never finaled issued Sep 2014, no final | 490 Post St | remove t bar ceiling and open walls to expose existing conditions. demo per ab-17. t.i. on seperate permit to follow. n/a ordinance #155-13.Details
remove t bar ceiling and open walls to expose existing conditions. demo per ab-17. t.i. on seperate permit to follow. n/a ordinance #155-13. | $10,000 |
| Aug 21, 2014 | Completed final sign-off Jul 2015 | 246 Shipley St | shell improvement of existing 1-story building w/mezzanine. enlarge existing windows on falmouth st side & additoin of awnings. additoin of 6 new skylights. n/a maher ordinanceDetails
shell improvement of existing 1-story building w/mezzanine. enlarge existing windows on falmouth st side & additoin of awnings. additoin of 6 new skylights. n/a maher ordinance | $50,000 |
| Jun 17, 2014 | Never finaled issued Jun 2014, no final | 1280 10th Av | build new partition walls, new suspended ceiling, new casework, new finishes, and new restrooms. no exterior work: note c.u.p. approved under case #201316556 on may 8th 2014 from planning to convert grocery store to medical service use.Details
build new partition walls, new suspended ceiling, new casework, new finishes, and new restrooms. no exterior work: note c.u.p. approved under case #201316556 on may 8th 2014 from planning to convert grocery store to medical service use. | $279,000 |
| Feb 6, 2014 | Completed final sign-off Aug 2014 | 2186 Geary Bl | remove extg non-bearing partitions, cieling and interior doors. construct new office dental including partition walls, electrical, plmg, hvac, acoustic and gyp bd cieling. include 2 new accessible restrooms.Details
remove extg non-bearing partitions, cieling and interior doors. construct new office dental including partition walls, electrical, plmg, hvac, acoustic and gyp bd cieling. include 2 new accessible restrooms. | $160,000 |
| Sep 19, 2013 | Completed final sign-off Oct 2013 | 146 02nd Av | new tile floor, pedestal sink, toilet, toilet, tub, shower valve, shower pan, existing locations.Details
new tile floor, pedestal sink, toilet, toilet, tub, shower valve, shower pan, existing locations. | $12,000 |