Francisco Matos
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Architects Sf
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Oct 2026
430 permits since 2000 (architect on 414 permits, authorized agent-others on 9 permits, engineer on 5 permits, designer on 4 permits, pmt consultant/expediter on 2 permits): 197 completed, 85 in progress, 59 never finaled, 89 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 430.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 646 Duncan St | interior renovations on 1st floor. horizontal addition & interior renovation on 2nd floor, including new rear deck, vertical addition to include new 3rd floor & decks. ab-112Details
interior renovations on 1st floor. horizontal addition & interior renovation on 2nd floor, including new rear deck, vertical addition to include new 3rd floor & decks. ab-112 | $200,000 | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 610 Fillmore St | strenghten/replace (e) foundations and voluntary seismic retrofit of the ground floor using plywood shear walls.Details
strenghten/replace (e) foundations and voluntary seismic retrofit of the ground floor using plywood shear walls. | $30,000 | |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 149 Casitas Av | new state adu in the garage areaDetails
new state adu in the garage area | $75,000 | |
| Aug 21, 2026 | In progress issued Sep 2026 | 226 06th St | Ambrocio Construction Inc | revision to pa# 200806164548: removal of 4/f addition. removal of south penthouse. elevator to rise to 3/f only. minor interior changes throughout.Details
revision to pa# 200806164548: removal of 4/f addition. removal of south penthouse. elevator to rise to 3/f only. minor interior changes throughout. | |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 1295 Holloway Av | reconfigure layout of kitchen, bathrooms & skylights. update (e) wetbar & plumbing. approved under previous pa#9009636, revise windows & doors size. retain as-built condition of basement stair. revision to pa#201911016253Details
reconfigure layout of kitchen, bathrooms & skylights. update (e) wetbar & plumbing. approved under previous pa#9009636, revise windows & doors size. retain as-built condition of basement stair. revision to pa#201911016253 | $70,000 | |
| Aug 7, 2026 | In progress issued Sep 2026 | 28 Allen St | rev to pa# 2024-0313-7746: adjust configuration of lighthouse at 3rd fl. to align with light well below. discard all replacement of windows in light well. convert study to home office at 1st and 3rd fl.Details
rev to pa# 2024-0313-7746: adjust configuration of lighthouse at 3rd fl. to align with light well below. discard all replacement of windows in light well. convert study to home office at 1st and 3rd fl. | ||
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 28 Allen St | new roof deck. reference pa # 201607293726Details
new roof deck. reference pa # 201607293726 | $18,000 | |
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 230 Noriega St | relocation of stairs from first and second floor; (n) powder room; relocate stairs from second to first floor. (n) laundry remodel (e) bathroom. 3rd fl - relocation of (e) stairs from 2nd fl to 3rd fl; exterior - replace the sides and rear wood sidingDetails
relocation of stairs from first and second floor; (n) powder room; relocate stairs from second to first floor. (n) laundry remodel (e) bathroom. 3rd fl - relocation of (e) stairs from 2nd fl to 3rd fl; exterior - replace the sides and rear wood siding | $65,000 | |
| Jul 22, 2026 | In progress issued Jul 2026 | 1519 Ofarrell St | Northbay Home Construction Solutions Inc | revision 202512222412- reconfigure kitchen layoutDetails
revision 202512222412- reconfigure kitchen layout | |
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 300 Gough St | remodel e bathroomsDetails
remodel e bathrooms | $1,750 | |
| Jun 29, 2026 | In progress issued Jul 2026 | 2868 Bush St | Creedence Corporation | revision to pa# 202507019935: to increase rear spiral stair diameter from 5 ft to 6 ft.Details
revision to pa# 202507019935: to increase rear spiral stair diameter from 5 ft to 6 ft. | |
| Jun 22, 2026 | In progress filed Jun 2026, not yet issued | 2347 Leavenworth St | (n) 496 sq ft roof deck for unit# 2347, extend(e) stair to (n) roof deck.Details
(n) 496 sq ft roof deck for unit# 2347, extend(e) stair to (n) roof deck. | $7,500 | |
| Jun 4, 2026 | In progress issued Sep 2026 | 1945 Lyon St | Sonoma Build Group Inc | infill rear yard 12" h, new 50 sq ft deck for unit 1953. new exclusive 628 sq ft roof decks for units 1949 and 1951. 2/f: reconfigure kithcen and bathroom, (n) 50 sq ft slide deck. 3/f: reconfigure rear floor plans, exterior stairs to roof deck and 2/f windows.Details
infill rear yard 12" h, new 50 sq ft deck for unit 1953. new exclusive 628 sq ft roof decks for units 1949 and 1951. 2/f: reconfigure kithcen and bathroom, (n) 50 sq ft slide deck. 3/f: reconfigure rear floor plans, exterior stairs to roof deck and 2/f windows. | $12,000 |
| May 26, 2026 | In progress filed May 2026, not yet issued | 639 Banks St | remove existing garage parking and convert garage into an state accessory dwelling unit (adu) with 1 bedroom and 1 bathroom.Details
remove existing garage parking and convert garage into an state accessory dwelling unit (adu) with 1 bedroom and 1 bathroom. | $50,000 | |
| May 21, 2026 | Completed final sign-off Jul 2026 | 1490 Jefferson St | Maven Maintenance Inc | replacement of e) guardrails at e) common stairsDetails
replacement of e) guardrails at e) common stairs | $5,000 |
| May 15, 2026 | In progress issued May 2026 | 1918 Clement St | 4-Mac Construction | revision 202308023528-revise entry stairsDetails
revision 202308023528-revise entry stairs | |
| May 13, 2026 | Completed final sign-off Jun 2026 | 3049 24th St | Northbay Home Construction Solutions Inc | revision 202512162808- change of kilnDetails
revision 202512162808- change of kiln | |
| May 8, 2026 | In progress issued Jul 2026 | 1335 16th Av | Bartkus Remodel | interior remodel at unit 1 to combine adjacent storage area, x 2 in kind window relacement. new finishes, lighting, electrical throughout storage area.Details
interior remodel at unit 1 to combine adjacent storage area, x 2 in kind window relacement. new finishes, lighting, electrical throughout storage area. | $21,560 |
| Apr 30, 2026 | Completed final sign-off Aug 2026 | 605 Post St | D & K Construction &Painting Company Inc | revision to bpa#202602276712. relocate ada bathroom reconfiguration, relocate toter storage.Details
revision to bpa#202602276712. relocate ada bathroom reconfiguration, relocate toter storage. | |
| Apr 24, 2026 | Expired or cancelled cancelled Jul 2026 | 1519 Ofarrell St | Northbay Home Construction Solutions Inc | revision to 202603197961- structuralDetails
revision to 202603197961- structural | |
| Apr 15, 2026 | Expired or cancelled cancelled Apr 2026 | 157 Bertita St | legalize unpermitted horizontal expansion of building envelope. renewal of pa 201908229585.Details
legalize unpermitted horizontal expansion of building envelope. renewal of pa 201908229585. | ||
| Apr 9, 2026 | In progress issued Aug 2026 | 1736 Fell St | Golden State Plumbing | revision to pa# 2021-0211-4436: 4th fl plan. addition of 4 new dormers instead of 5. relocate water heater and furnace of #1738 to 4th fl. add steps and shear wall at rear side of building at main level patio.Details
revision to pa# 2021-0211-4436: 4th fl plan. addition of 4 new dormers instead of 5. relocate water heater and furnace of #1738 to 4th fl. add steps and shear wall at rear side of building at main level patio. | |
| Apr 8, 2026 | In progress issued Jul 2026 | 1945 Lyon St | Sonoma Build Group Inc | comply with nov#202422836: rebuild front facade, side walls and roof at 4th floor destroyed by fire. rebuild front entry damaged by fire and repalce all fire damaged side. minor floor revisions in all units. replace all windows with (n) alum clad windows.Details
comply with nov#202422836: rebuild front facade, side walls and roof at 4th floor destroyed by fire. rebuild front entry damaged by fire and repalce all fire damaged side. minor floor revisions in all units. replace all windows with (n) alum clad windows. | $80,000 |
| Mar 31, 2026 | Completed final sign-off Sep 2026 | 51 Beaumont Av | K & K Builder Inc | revision to existing permit 202312273127. 1) update as-built layout to refect accurate existing condition. 2) replace gas appliance with electrical appliance. 3) change front door location to adu 4) create new closet.Details
revision to existing permit 202312273127. 1) update as-built layout to refect accurate existing condition. 2) replace gas appliance with electrical appliance. 3) change front door location to adu 4) create new closet. | |
| Mar 24, 2026 | In progress issued Apr 2026 | 150 Wilde Av | Fg Force Construction Inc | remodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building.Details
remodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building. | $75,000 |
| Mar 23, 2026 | In progress issued Sep 2026 | 424 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | rebulid side deck. side deck will be clad in stucco to match (e). (n) railing will be metal with vertical picket. demolish lower solid sections only of (e) arched entryway. remain (e) arches. replace rear deck with spiral spiral stairs and smaller deck.Details
rebulid side deck. side deck will be clad in stucco to match (e). (n) railing will be metal with vertical picket. demolish lower solid sections only of (e) arched entryway. remain (e) arches. replace rear deck with spiral spiral stairs and smaller deck. | $32,000 |
| Mar 19, 2026 | In progress issued Apr 2026 | 2918 Lyon St | Prime Construction & Renovation Inc. | minor remodel 2nd and 3rd floor partial foundation updateDetails
minor remodel 2nd and 3rd floor partial foundation update | $10,000 |
| Mar 17, 2026 | In progress issued Sep 2026 | 2124 Green St | Sonoma Build Group Inc | vertical & horizontal addition to (e) two unit building. excavation & expansion of basement.Details
vertical & horizontal addition to (e) two unit building. excavation & expansion of basement. | $125,000 |
| Mar 9, 2026 | Completed final sign-off Jul 2026 | 376 Union St | Sonoma Build Group Inc | new aluminum clad front window front builing. unit 378 3rd flr. remove wall between living room and bedroom. unit 380 fourth floor: remove wall between living room and office, expand powder room to full bath.Details
new aluminum clad front window front builing. unit 378 3rd flr. remove wall between living room and bedroom. unit 380 fourth floor: remove wall between living room and office, expand powder room to full bath. | $65,300 |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 605 Post St | D & K Construction &Painting Company Inc | convert 2 (e) bathrooms into 1 accessible bathroom. (n) closet for toters , (n) power door operationDetails
convert 2 (e) bathrooms into 1 accessible bathroom. (n) closet for toters , (n) power door operation | $35,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 570 44th Av | 1/f: infill at rear, 2 new bedrooms, new bathroom, new family room. 2/f: new master closet and master bathroom. relocation of (e) bedroom, (e) kitchen and (e) dining. new stairs from first to second floor.Details
1/f: infill at rear, 2 new bedrooms, new bathroom, new family room. 2/f: new master closet and master bathroom. relocation of (e) bedroom, (e) kitchen and (e) dining. new stairs from first to second floor. | $105,000 | |
| Feb 23, 2026 | In progress filed Feb 2026, not yet issued | 562 Filbert St | Sonoma Build Group Inc | comply with nov 202546030 to legalize change from approved 201803073109. reloation of (n) stairsto deck addition of 2 (n) skylights, relocation of (e) kitchen on 3rd floorDetails
comply with nov 202546030 to legalize change from approved 201803073109. reloation of (n) stairsto deck addition of 2 (n) skylights, relocation of (e) kitchen on 3rd floor | |
| Feb 3, 2026 | In progress filed Feb 2026, not yet issued | 823 Niagara Av | to comply with nov# 202545448 & 202545747, legalize unpermitted kitchen to establish new adu at ground floor per state adu program. planning code no.207.2. adu unit includes 1-kitchen, 1-bath, and 2-bedrooms.Details
to comply with nov# 202545448 & 202545747, legalize unpermitted kitchen to establish new adu at ground floor per state adu program. planning code no.207.2. adu unit includes 1-kitchen, 1-bath, and 2-bedrooms. | $75,000 | |
| Feb 3, 2026 | In progress issued Jul 2026 | 1700 Lombard St | Josh Tyler Young | (n) mercantile store- ti (n) sinks, counters, equipments. comply nov 202544149,Details
(n) mercantile store- ti (n) sinks, counters, equipments. comply nov 202544149, | $3,000 |
| Jan 16, 2026 | In progress issued Sep 2026 | 2762 23rd St | Josh Tyler Young | rev 201902203381: no vertical additions will be made to the side aera. expanding will only be horizontal and vertical in the rear area.Details
rev 201902203381: no vertical additions will be made to the side aera. expanding will only be horizontal and vertical in the rear area. | |
| Jan 7, 2026 | Expired or cancelled suspend Jul 2026 | 4901 03rd St | Josh Tyler Young | t.i. (n) general grocery. (n) counters, (n) equipment.Details
t.i. (n) general grocery. (n) counters, (n) equipment. | $21,500 |
| Dec 31, 2025 | Completed final sign-off Aug 2026 | 736 14th St | Maven Maintenance Inc | tenant improvement for a new massage parlour. change of use from jiu jitsu studio to massage parlour.Details
tenant improvement for a new massage parlour. change of use from jiu jitsu studio to massage parlour. | $10,000 |
| Dec 31, 2025 | In progress filed Dec 2025, not yet issued | 363 Monterey Bl | rear yard remodel for new decks at rear of 1/f and 2/f. new sliding glass doors. new window at 1/f. new spiral stairs for decks. firewall and stairs from storage level deck to lower level deck, (n) storage door, and outdoor lighting.Details
rear yard remodel for new decks at rear of 1/f and 2/f. new sliding glass doors. new window at 1/f. new spiral stairs for decks. firewall and stairs from storage level deck to lower level deck, (n) storage door, and outdoor lighting. | $15,000 | |
| Dec 31, 2025 | In progress issued May 2026 | 146 Russ St | Sonoma Build Group Inc | commencement of work not started under previously approved permit application pa#: 201903296629Details
commencement of work not started under previously approved permit application pa#: 201903296629 | |
| Dec 26, 2025 | In progress issued Feb 2026 | 3049 24th St | Northbay Home Construction Solutions Inc | tenant improvement for a (n) clay studio.Details
tenant improvement for a (n) clay studio. | $5,000 |
| Dec 22, 2025 | In progress issued Dec 2025 | 1519 Ofarrell St | Northbay Home Construction Solutions Inc | switch location of (e) dining room and (e) bedroom. remodel (e) kitchen.Details
switch location of (e) dining room and (e) bedroom. remodel (e) kitchen. | $67,500 |
| Dec 17, 2025 | Expired or cancelled cancelled Jan 2026 | 646 Duncan St | interior renovations on 1st floor. horizontal addition & interior renovations on 2nd floor including new rear deck. vertical addition to include new 3rd floor & decks.Details
interior renovations on 1st floor. horizontal addition & interior renovations on 2nd floor including new rear deck. vertical addition to include new 3rd floor & decks. | $850,000 | |
| Dec 12, 2025 | In progress issued Jul 2026 | 3355 21st St | Maven Maintenance Inc | rebuild (e) non conforming rear stairs.the enlargement of the (e) non conforming rear stairs is " only to the degree necessary to conform to current building code" per p.c. sec. 188(a) (1)Details
rebuild (e) non conforming rear stairs.the enlargement of the (e) non conforming rear stairs is " only to the degree necessary to conform to current building code" per p.c. sec. 188(a) (1) | $17,300 |
| Dec 9, 2025 | In progress issued Oct 2026 | 2827 Broderick St | common area - new planter wall & driveway wall to be relocated 3 feet from (e) location. the reconfigure planter wall & reverse driveway slope will extend 3.75 feet into the property right of way resulting in a minor encroachment of approximately 25% of the row widthDetails
common area - new planter wall & driveway wall to be relocated 3 feet from (e) location. the reconfigure planter wall & reverse driveway slope will extend 3.75 feet into the property right of way resulting in a minor encroachment of approximately 25% of the row width | $22,900 | |
| Nov 25, 2025 | Completed final sign-off Apr 2026 | 2470 43rd Av | first floor: infill underneath of (e) popout. 2 (n)bedroom, (n) bathroom (n) family room. second flr: repurpose (e) study to (n) closet and (n)bathroom, (e)bedroom and (e) living room relocated kitchen remodel. (n) 190 sqft deck and stairs to rear yardDetails
first floor: infill underneath of (e) popout. 2 (n)bedroom, (n) bathroom (n) family room. second flr: repurpose (e) study to (n) closet and (n)bathroom, (e)bedroom and (e) living room relocated kitchen remodel. (n) 190 sqft deck and stairs to rear yard | $80,000 | |
| Nov 24, 2025 | In progress filed Nov 2025, not yet issued | 346 01st St | replace wood decking supported on existing roof with bison support system or equivalentDetails
replace wood decking supported on existing roof with bison support system or equivalent | $11,500 | |
| Nov 18, 2025 | In progress filed Nov 2025, not yet issued | 506 Diamond St | new retaining wall at front yard. rebuild walk way porch.Details
new retaining wall at front yard. rebuild walk way porch. | $39,000 | |
| Nov 17, 2025 | In progress issued Dec 2025 | 2990 California St | revision to pa#: 202408098319. new kitchen layout on 2nd floor. new layout in bathroom one. add a new bathroom on 3rd flr. interior reconfiguration. new bathroom & 2 burner kitchenette at 4/fDetails
revision to pa#: 202408098319. new kitchen layout on 2nd floor. new layout in bathroom one. add a new bathroom on 3rd flr. interior reconfiguration. new bathroom & 2 burner kitchenette at 4/f | $5,000 | |
| Nov 10, 2025 | In progress issued Jan 2026 | 83 Fair Oaks St | R C Construction | unit 91; revision to bpa#: 202506058062. unit 91. convert existing conditioned storage to a media room/office.Details
unit 91; revision to bpa#: 202506058062. unit 91. convert existing conditioned storage to a media room/office. | $500 |
| Nov 3, 2025 | In progress issued Nov 2025 | 908 Post St | Sewer Master | 2/fl- managers unit bathroom to be split in (2) to create a (n) bathroom for unit 7. 3/fl- (n) bathroom for room 17 and grab bars voluntary added to common bathroomDetails
2/fl- managers unit bathroom to be split in (2) to create a (n) bathroom for unit 7. 3/fl- (n) bathroom for room 17 and grab bars voluntary added to common bathroom | $40,000 |
| Sep 12, 2025 | In progress filed Sep 2025, not yet issued | 2237 Mason St | addition of 2 common bathrooms and 37 bathrooms including 4 ada compliant bathrooms. removal of existing common bathrooms and reconfiguration of guest rooms on 2nd & 3rd floor. no change to room count. new elevator shaft.Details
addition of 2 common bathrooms and 37 bathrooms including 4 ada compliant bathrooms. removal of existing common bathrooms and reconfiguration of guest rooms on 2nd & 3rd floor. no change to room count. new elevator shaft. | $1,300,000 | |
| Aug 12, 2025 | In progress issued Aug 2025 | 2929 Clay St | Sonoma Build Group Inc | 1/fl- infill (e) deck to (n) family room, remodel (e) bath, (n) kitchenette. replace in kind (e) pergola, rear decks, stairs handrails and guardrails throughout first -third floorDetails
1/fl- infill (e) deck to (n) family room, remodel (e) bath, (n) kitchenette. replace in kind (e) pergola, rear decks, stairs handrails and guardrails throughout first -third floor | $72,525 |
| Jul 28, 2025 | Completed final sign-off Oct 2025 | 2655 Clay St | Sonoma Build Group Inc | revision 202401264781- no change to kitchen, stairs, rear sliding door on 2nd floor. revision to special inspections- omitting items not required any longer. consolidate siso of pa#202401264781 into pa#202507281768. modify roof deck.Details
revision 202401264781- no change to kitchen, stairs, rear sliding door on 2nd floor. revision to special inspections- omitting items not required any longer. consolidate siso of pa#202401264781 into pa#202507281768. modify roof deck. | |
| Jul 16, 2025 | Completed final sign-off Oct 2025 | 534 Page St | Sonoma Build Group Inc | revision 202405283104- minor remodel unit 536b, added egress stair in basement rear patio, add (n) window on basement and second floor. not facing street.Details
revision 202405283104- minor remodel unit 536b, added egress stair in basement rear patio, add (n) window on basement and second floor. not facing street. | |
| Jul 16, 2025 | Completed final sign-off Jan 2026 | 2955 Sacramento St | Sonoma Build Group Inc | revision to pa# 202501098051: revise front and side facade to be horizontal wood siding and garage door size.Details
revision to pa# 202501098051: revise front and side facade to be horizontal wood siding and garage door size. | |
| Jul 3, 2025 | Completed final sign-off Oct 2025 | 950 Harrison St | San Francisco Design Build | unit 102- conversion (e) office to (n) bedroom , (n) wet bar with dishwasher and washer/dryer. (n) electric 2 burner stove.Details
unit 102- conversion (e) office to (n) bedroom , (n) wet bar with dishwasher and washer/dryer. (n) electric 2 burner stove. | $7,000 |
| Jul 1, 2025 | In progress issued Jun 2026 | 2868 Bush St | Creedence Corporation | new exterior spiral staircase at rear 2/f. increase 3rd floor rear deck glass guard to ~6'-0". permit to coo with pa 201807124412.Details
new exterior spiral staircase at rear 2/f. increase 3rd floor rear deck glass guard to ~6'-0". permit to coo with pa 201807124412. | $19,050 |
| Jul 1, 2025 | In progress issued Jul 2025 | 2868 Bush St | Paniagua Construction Inc, Creedence Corporation | repair water damage and rebuild (e) rear and front decks on 2/f and 3/f in-kind.Details
repair water damage and rebuild (e) rear and front decks on 2/f and 3/f in-kind. | $25,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 11 Mars St | revision to pa 202307031400 to reduce structural scope of work: reduce exterior wall (voluntary strengthening)Details
revision to pa 202307031400 to reduce structural scope of work: reduce exterior wall (voluntary strengthening) | ||
| Jun 23, 2025 | In progress issued Aug 2025 | 4015 Ortega St | Wnc Construction Inc | revise pa # 2024-1115-5084 to eliminate from the approved scope of work the construction of the fence shown on sheet a105 of the approved drawings and to document that the closet shown in the ground floor bedroom does not exist as shown on sheet a101 of the approved drawings.Details
revise pa # 2024-1115-5084 to eliminate from the approved scope of work the construction of the fence shown on sheet a105 of the approved drawings and to document that the closet shown in the ground floor bedroom does not exist as shown on sheet a101 of the approved drawings. | $21,500 |
| Jun 5, 2025 | Completed final sign-off Oct 2025 | 1845 Pacific Av | K&H Construction Development Inc | revision to permit 202408088272. remove trashroom from scope of work. remodel (e) undconditioned laundry room. relocate dryers within room, new dryer vent with booster fan. lighting. exterior lighting in conveience stair.Details
revision to permit 202408088272. remove trashroom from scope of work. remodel (e) undconditioned laundry room. relocate dryers within room, new dryer vent with booster fan. lighting. exterior lighting in conveience stair. | |
| Jun 5, 2025 | In progress issued Jul 2025 | 83 Fair Oaks St | R C Construction | remodel (6) bathrooms: (2) in unit 91, (2) in unit 83, (2) in unit 87. no structural work. new toilets, vanities and showers. all new fixtures and finishes. remodel (1) kitchen in unit 91 in-kind. no change to walls or openings.Details
remodel (6) bathrooms: (2) in unit 91, (2) in unit 83, (2) in unit 87. no structural work. new toilets, vanities and showers. all new fixtures and finishes. remodel (1) kitchen in unit 91 in-kind. no change to walls or openings. | $120,000 |
| May 12, 2025 | In progress issued Feb 2026 | 785 Vermont St | revision to permit 202107285305-s1. changes to closets. change to vestible. new windows at rear. change to steps/stair - interior.Details
revision to permit 202107285305-s1. changes to closets. change to vestible. new windows at rear. change to steps/stair - interior. | ||
| May 2, 2025 | Completed final sign-off May 2025 | 957 Teresita Bl | revision 202408279573- addition of (2) skylights- not visibile from street.Details
revision 202408279573- addition of (2) skylights- not visibile from street. | ||
| May 2, 2025 | In progress issued Aug 2025 | 126 Staples Av | revision to 202409191181: add skylight, enlarge rear sliding door 2nd fl. structural concrete on 1st flDetails
revision to 202409191181: add skylight, enlarge rear sliding door 2nd fl. structural concrete on 1st fl | ||
| Apr 16, 2025 | Completed final sign-off Mar 2026 | 2868 Bush St | Paniagua Construction Inc | rebuild the exterior staircase in-kind at front. replace all electrical lighting at stair. new security gateDetails
rebuild the exterior staircase in-kind at front. replace all electrical lighting at stair. new security gate | $43,000 |
| Apr 14, 2025 | In progress filed Apr 2025, not yet issued | 841 Ocean Av | Bay C T Construction Inc. | legalize udu to comply with nov# 202200275. legalize (e) unpermited dwelling unit of 1 bedroom & 1 bathroom. this unit is going to expand into a unit of 4 bedrooms & 2 bath. new rear stair in (e) unit at 2nd floor. horizontal addition of 50 sq.ft. at ground level with new interior concrete slab.Details
legalize udu to comply with nov# 202200275. legalize (e) unpermited dwelling unit of 1 bedroom & 1 bathroom. this unit is going to expand into a unit of 4 bedrooms & 2 bath. new rear stair in (e) unit at 2nd floor. horizontal addition of 50 sq.ft. at ground level with new interior concrete slab. | $122,500 |
| Apr 9, 2025 | In progress filed Apr 2025, not yet issued | 993 Mission St | revision to 201904016783 to document as built conditions & ada upgrades to disabled access pathDetails
revision to 201904016783 to document as built conditions & ada upgrades to disabled access path | $15,000 | |
| Mar 26, 2025 | In progress issued Sep 2025 | 2080 Mcallister St | Arthur Mcnulty Construction | revision to bpa# 202307142215: (n) layout of interior partitions only.Details
revision to bpa# 202307142215: (n) layout of interior partitions only. | |
| Mar 25, 2025 | Completed final sign-off Aug 2025 | 832 Divisadero St | Handyman Heroes Inc. | bathroom remodelDetails
bathroom remodel | $20,000 |
| Mar 14, 2025 | Completed final sign-off Jul 2025 | 1515 Union St | Sonoma Build Group Inc | revision 202412116641 to document the following removal of personal trainer room, adjustment to non accusible unisex restoom size. change of wall depth at studio. 1 west reformer wall removal of wall base of stairs. new glass doors to studio 1 and 2 and new glass curtain wall to studio 1. notDetails
revision 202412116641 to document the following removal of personal trainer room, adjustment to non accusible unisex restoom size. change of wall depth at studio. 1 west reformer wall removal of wall base of stairs. new glass doors to studio 1 and 2 and new glass curtain wall to studio 1. not | |
| Mar 7, 2025 | In progress issued Sep 2025 | 443 Stevenson St | Olive Remodeling | revise p/a 2018-0202-0261 to show a different interior/ti configuration from the configuration previously permitted. addtionally a new mezzanine will be installed between the 2nd and 3rd stories and the existing mezzanine between the 1st and 2nd stories is being expanded and strengthened.Details
revise p/a 2018-0202-0261 to show a different interior/ti configuration from the configuration previously permitted. addtionally a new mezzanine will be installed between the 2nd and 3rd stories and the existing mezzanine between the 1st and 2nd stories is being expanded and strengthened. | |
| Mar 4, 2025 | Completed final sign-off Nov 2025 | 1848 Castro St | Kevin Webb Construction Inc | new rear decks and stairs.Details
new rear decks and stairs. | $29,500 |
| Feb 27, 2025 | In progress filed Feb 2025, not yet issued | 2272 Union St | new conversion adu- existing 427 sqft.ground flr of existing rear yard structure to be legalized into adu under the state program. replace window @ front of adu. lower landing @ adu entry to provide min. 7' clr height. new 1-hr rated ceiling. no structural work, not work in (e) upper unit, work.....Details
new conversion adu- existing 427 sqft.ground flr of existing rear yard structure to be legalized into adu under the state program. replace window @ front of adu. lower landing @ adu entry to provide min. 7' clr height. new 1-hr rated ceiling. no structural work, not work in (e) upper unit, work..... | $21,500 | |
| Feb 26, 2025 | In progress filed Feb 2025, not yet issued | 2322 Lombard St | altered site permit to 2014/1217/3954: converting parking (17 spaces) to 14 new guest rooms and 3/f converting storage to 1 new guest room. increasing total guestrooms count from 60 to 75. addition of a fire wall for area increase. new flr opening to above lightwells, reconfigure lobby add laundry.Details
altered site permit to 2014/1217/3954: converting parking (17 spaces) to 14 new guest rooms and 3/f converting storage to 1 new guest room. increasing total guestrooms count from 60 to 75. addition of a fire wall for area increase. new flr opening to above lightwells, reconfigure lobby add laundry. | $200,000 | |
| Feb 18, 2025 | In progress issued Mar 2025 | 11 Mars St | 1) replace rear deck guardrail. 2) repair rear deck in-kind less than 50%. 3) replace side/rear facade window/doors - repair dry rot.Details
1) replace rear deck guardrail. 2) repair rear deck in-kind less than 50%. 3) replace side/rear facade window/doors - repair dry rot. | $18,900 | |
| Jan 30, 2025 | In progress filed Jan 2025, not yet issued | 704 North Point St | new construction of a 4 story, 1 dwelling mix building.busness residential type vDetails
new construction of a 4 story, 1 dwelling mix building.busness residential type v | $588,600 | |
| Jan 17, 2025 | Completed final sign-off Feb 2025 | 1601 Dolores St | Skytech Construction Inc | new gate & power door operatorDetails
new gate & power door operator | $4,300 |
| Jan 9, 2025 | Completed final sign-off Jan 2026 | 2955 Sacramento St | Sonoma Build Group Inc | revision to pa# 202209212825: to document removal of elevator on levels 1-3. new stairs from level 2 to level 1 garage. new floor layout in place of removed elevator. (ref pa# 202411064492) modify rear yard layout. various changes to window sizesDetails
revision to pa# 202209212825: to document removal of elevator on levels 1-3. new stairs from level 2 to level 1 garage. new floor layout in place of removed elevator. (ref pa# 202411064492) modify rear yard layout. various changes to window sizes | |
| Dec 20, 2024 | In progress issued Jul 2025 | 182 Alpine Tr | Tinka Construction | voluntary upgrade of new foundation with addition of shear wall and moment frame. interior remodel at first & second fl (remodel to include new office, new laundry, new pantry & new bath)Details
voluntary upgrade of new foundation with addition of shear wall and moment frame. interior remodel at first & second fl (remodel to include new office, new laundry, new pantry & new bath) | $65,000 |
| Dec 20, 2024 | In progress issued Jul 2025 | 610 Fillmore St | Sonoma Build Group Inc | barrier removal to install (n) ada elevator to provide accessibility. upgrade 1 (e) common use bathing facility at level 2, provide accessible entrance to the building. elevator will be deffered submittal.Details
barrier removal to install (n) ada elevator to provide accessibility. upgrade 1 (e) common use bathing facility at level 2, provide accessible entrance to the building. elevator will be deffered submittal. | $60,000 |
| Dec 18, 2024 | Completed final sign-off Dec 2025 | 2822 Van Ness Av | 1st fl - convert office to storage; convert bar to laundry; convert 1/2 bath to full; 2nd fl - relocate 4th fl kitchen to 2nd fl; convert break rm to dining; office to living rm; 3rd fl - convert 3 offices to bedrooms; add full bath and laundry; 4th fl - convert 2 office to bedrmDetails
1st fl - convert office to storage; convert bar to laundry; convert 1/2 bath to full; 2nd fl - relocate 4th fl kitchen to 2nd fl; convert break rm to dining; office to living rm; 3rd fl - convert 3 offices to bedrooms; add full bath and laundry; 4th fl - convert 2 office to bedrm | $38,000 | |
| Dec 9, 2024 | In progress issued Jan 2025 | 151 Madison St | Fg Force Construction Inc | revision to 202405011140 to indicate that slab will be 9" below e) slab. ref 202411155081, rev 1Details
revision to 202405011140 to indicate that slab will be 9" below e) slab. ref 202411155081, rev 1 | |
| Dec 5, 2024 | Completed final sign-off Mar 2025 | 26 Parnassus Av | 4-Mac Construction | ref 202310209137 relocate garage door 12" replace planters with metal railingsDetails
ref 202310209137 relocate garage door 12" replace planters with metal railings | |
| Nov 18, 2024 | Completed final sign-off Jul 2025 | 3498 Jackson St | Global Building Solutions Management Inc | 2nd floor interior conversion of bedroom in to laundry roomDetails
2nd floor interior conversion of bedroom in to laundry room | $3,500 |
| Nov 15, 2024 | In progress issued Jan 2025 | 4015 Ortega St | Wnc Construction Inc | address bldg inspector complaint 202430064. repair existing 6-0 fence. (n) type x 5/8 gysum and garage. enlarge window & door at rear. (n) lighting & electrical at garage & rear yard. replace garage door. demo exist trash enclosure. relocate washer & dryer, relocate water heater. demo rear overhangDetails
address bldg inspector complaint 202430064. repair existing 6-0 fence. (n) type x 5/8 gysum and garage. enlarge window & door at rear. (n) lighting & electrical at garage & rear yard. replace garage door. demo exist trash enclosure. relocate washer & dryer, relocate water heater. demo rear overhang | $21,500 |
| Nov 15, 2024 | In progress issued Dec 2024 | 151 Madison St | Fg Force Construction Inc | revision to permit 202405011140. change to bathroom layout on 2nd flr. new concrete slab on 1st flr and garage.Details
revision to permit 202405011140. change to bathroom layout on 2nd flr. new concrete slab on 1st flr and garage. | $21,500 |
| Nov 15, 2024 | Expired or cancelled expired Sep 2026 | 11 Mars St | Umlaut Interiors Llc | remodel kitchen on 3rd fl. new 1/2 bath on 3rd fl. remove wall bwt kitchen & living rm on 3rd fl. no exterior workDetails
remodel kitchen on 3rd fl. new 1/2 bath on 3rd fl. remove wall bwt kitchen & living rm on 3rd fl. no exterior work | $29,050 |
| Nov 14, 2024 | In progress issued Dec 2024 | 126 Staples Av | A S A P Expert Plumbing & Construction | revision to pa 202409191181. 2nd floor relocation of kitchen and bathroom (n) master bedroom and bathroom . removal of walls to be replaced, removal of deck to be replaced with (n) 10ft deck relocation of deck stairs located at the rear.Details
revision to pa 202409191181. 2nd floor relocation of kitchen and bathroom (n) master bedroom and bathroom . removal of walls to be replaced, removal of deck to be replaced with (n) 10ft deck relocation of deck stairs located at the rear. | $95,000 |
| Nov 6, 2024 | Expired or cancelled expired Jan 2026 | 2955 Sacramento St | Sonoma Build Group Inc | rev 202209212825- first floor - horizontal addition of 210sf and relocation of bathroom sink. second floor- (n) 197 sf roof deck at rearDetails
rev 202209212825- first floor - horizontal addition of 210sf and relocation of bathroom sink. second floor- (n) 197 sf roof deck at rear | |
| Oct 28, 2024 | Completed final sign-off Jul 2025 | 3498 Jackson St | Global Building Solutions Management Inc | 4/fl- convert storage room to steam room.Details
4/fl- convert storage room to steam room. | $13,259 |
| Oct 28, 2024 | Completed final sign-off Jul 2025 | 3498 Jackson St | Global Building Solutions Management Inc | 2nd flr interior renvoation power room, bathroom and kitchen/dining area.Details
2nd flr interior renvoation power room, bathroom and kitchen/dining area. | $76,770 |
| Oct 23, 2024 | In progress filed Oct 2024, not yet issued | 170 09th St | relocate door and wall at rear, entrance door located on washburn stDetails
relocate door and wall at rear, entrance door located on washburn st | $3,500 | |
| Oct 11, 2024 | In progress issued Oct 2024 | 2237 Mason St | 4-Mac Construction | replace sheetrock and insulation for guest rooms in kind replace electrical & plumbing for guest rooms in kind. new ada door opener.Details
replace sheetrock and insulation for guest rooms in kind replace electrical & plumbing for guest rooms in kind. new ada door opener. | $62,300 |
| Oct 4, 2024 | In progress issued Dec 2024 | 2990 California St | 1st floor- (n) doors and siding jwhen (e) rough opening front facade. 2nd floor- interior remodel (n) kitchen and (n) bathroom remodel stair and replace windows. 3rd floor- interior remodel (n) baths and demo rear deck and remove chimeny and fire escape , replace windows in kind. no work on 4th flDetails
1st floor- (n) doors and siding jwhen (e) rough opening front facade. 2nd floor- interior remodel (n) kitchen and (n) bathroom remodel stair and replace windows. 3rd floor- interior remodel (n) baths and demo rear deck and remove chimeny and fire escape , replace windows in kind. no work on 4th fl | $92,000 | |
| Sep 30, 2024 | Expired or cancelled cancelled Oct 2024 | 841 Ocean Av | legalize unpermitted aduDetails
legalize unpermitted adu | ||
| Sep 26, 2024 | Completed final sign-off Sep 2025 | 17 30th St | revision to bpa#: 202407085990 and 202408239370. new 1 hr fire rated west interior wall on both floors.Details
revision to bpa#: 202407085990 and 202408239370. new 1 hr fire rated west interior wall on both floors. | ||
| Sep 26, 2024 | Expired or cancelled withdrawn Feb 2025 | 1515 Union St | ti for retail space located at first floor.Details
ti for retail space located at first floor. | $62,000 | |
| Sep 19, 2024 | In progress issued Nov 2024 | 126 Staples Av | A S A P Expert Plumbing & Construction | 1st flr: convert part of garage to habitable space(2 new bedrms, 1 new bath, new laundry & family rm. new garage door, rear horizontal infill. relocate interior stairs to 1st flr.Details
1st flr: convert part of garage to habitable space(2 new bedrms, 1 new bath, new laundry & family rm. new garage door, rear horizontal infill. relocate interior stairs to 1st flr. | $79,300 |
| Sep 12, 2024 | Expired or cancelled withdrawn Aug 2025 | 600 Fillmore St | barrier removal to install (n) ada lift to provide accessibility.Details