Northbay Home Construction Solutions Inc
- Based in
- Novato
- On San Francisco permits
- Jul 2019 to Aug 2026
- Last 24 months
- 15 permits filed
48 permits since 2000: 25 completed, 9 in progress, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 7 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | Completed final sign-off Sep 2026 | 711 04th Av | drywall replacement 300 sq ft (l/r, d/r & back bedroom) and replacement of (8) outlets due to hvac replacement.Details
drywall replacement 300 sq ft (l/r, d/r & back bedroom) and replacement of (8) outlets due to hvac replacement. | $4,500 |
| Jul 22, 2026 | In progress issued Jul 2026 | 1519 Ofarrell St | revision 202512222412- reconfigure kitchen layoutDetails
revision 202512222412- reconfigure kitchen layout | |
| Jul 10, 2026 | In progress issued Jul 2026 | 128 Morris St | unit 6: bathroom remodel, with new bathrub, new shower, tub valves, new toilet, vanity. remodel is like for like no conversions.Details
unit 6: bathroom remodel, with new bathrub, new shower, tub valves, new toilet, vanity. remodel is like for like no conversions. | $30,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 711 04th Av | replace 2 existing interior facing windows, in kind. replace existing water damaged structural framing at east facade. refer to window replacement building permit #202512111598Details
replace 2 existing interior facing windows, in kind. replace existing water damaged structural framing at east facade. refer to window replacement building permit #202512111598 | $27,000 |
| May 13, 2026 | Completed final sign-off Jun 2026 | 3049 24th St | revision 202512162808- change of kilnDetails
revision 202512162808- change of kiln | |
| Apr 24, 2026 | Expired or cancelled cancelled Jul 2026 | 1519 Ofarrell St | revision to 202603197961- structuralDetails
revision to 202603197961- structural | |
| Mar 19, 2026 | Expired or cancelled cancelled Jul 2026 | 1519 Ofarrell St | reference to bpa 202512222412; floor framing alteration as a result of load-bearing wall removal. add new posts and footing to support re-distributed loads. this is not considered substantial structural alteration per engineer's evaluation. see s2.3Details
reference to bpa 202512222412; floor framing alteration as a result of load-bearing wall removal. add new posts and footing to support re-distributed loads. this is not considered substantial structural alteration per engineer's evaluation. see s2.3 | $6,500 |
| Feb 23, 2026 | In progress issued Feb 2026 | 12 Rico Wy | reroofing- no hot works ref 202602236352Details
reroofing- no hot works ref 202602236352 | $6,000 |
| Feb 23, 2026 | In progress issued Feb 2026 | 12 Rico Wy | replace subroof and remove furnace. hvac not needed because radiant heating added per pp20070925866Details
replace subroof and remove furnace. hvac not needed because radiant heating added per pp20070925866 | $6,000 |
| Jan 26, 2026 | In progress issued Sep 2026 | 3701 Divisadero St | unit 102: remove center bearing post. install new structural garage door header. replace 2 garage doors with one wider door.Details
unit 102: remove center bearing post. install new structural garage door header. replace 2 garage doors with one wider door. | $12,000 |
| Dec 26, 2025 | In progress issued Feb 2026 | 3049 24th St | tenant improvement for a (n) clay studio.Details
tenant improvement for a (n) clay studio. | $5,000 |
| Dec 22, 2025 | In progress issued Dec 2025 | 1519 Ofarrell St | switch location of (e) dining room and (e) bedroom. remodel (e) kitchen.Details
switch location of (e) dining room and (e) bedroom. remodel (e) kitchen. | $67,500 |
| Dec 11, 2025 | Completed final sign-off Sep 2026 | 711 04th Av | replace 3(e) casement windows at the 2nd floor facing street. (n) exterior trim, (n) stucco siding, install of a (n) 1 hr rated wall and 20 min fire rated door in the garage.Details
replace 3(e) casement windows at the 2nd floor facing street. (n) exterior trim, (n) stucco siding, install of a (n) 1 hr rated wall and 20 min fire rated door in the garage. | $27,000 |
| Oct 27, 2025 | Completed final sign-off Aug 2026 | 447 Noe St | in-kind remodel kitchen: new cabinets, countertops, faucet, fixtures and outlets. in-kind remodel of 2 bathrooms: new tile, vanity, toilet, update outlets and install dehumidifier fans, relocate subpanel from bedroom closet to hallway.Details
in-kind remodel kitchen: new cabinets, countertops, faucet, fixtures and outlets. in-kind remodel of 2 bathrooms: new tile, vanity, toilet, update outlets and install dehumidifier fans, relocate subpanel from bedroom closet to hallway. | $57,500 |
| Jun 20, 2025 | In progress issued Jul 2025 | 3665 Clay St | 1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath.Details
1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath. | |
| Jul 25, 2024 | Completed final sign-off Aug 2024 | 1600 Noe St | replace in kind facia and roofingDetails
replace in kind facia and roofing | $15,000 |
| May 31, 2024 | In progress filed May 2024, not yet issued | 3665 Clay St | revision to 202009103826, fill in lightwell 1 at 3rd fl bath, partial lightwell infill at 2nd 3rd fl bath, reduce skylight, remove fireplace, reconfigure powder room plumbing, reconfigure bathroom and closet.Details
revision to 202009103826, fill in lightwell 1 at 3rd fl bath, partial lightwell infill at 2nd 3rd fl bath, reduce skylight, remove fireplace, reconfigure powder room plumbing, reconfigure bathroom and closet. | $30,000 |
| Mar 12, 2024 | Completed final sign-off Oct 2024 | 82 Landers St | comply w/ planning enforcemenr case 2023009759 enf. rebuild of previously e) rear egress stairsDetails
comply w/ planning enforcemenr case 2023009759 enf. rebuild of previously e) rear egress stairs | $12,500 |
| Feb 21, 2024 | Completed final sign-off Jun 2024 | 509 Scott St | remodel in kind (6x7) master bathroomDetails
remodel in kind (6x7) master bathroom | $27,000 |
| Oct 5, 2023 | Completed final sign-off Dec 2025 | 3957 26th St | (n) 132 sq ft deck. first fl: (n) 512 sq ft habitable space with (3) (n) bedrooms. second fl: kitchen remodel and bath.Details
(n) 132 sq ft deck. first fl: (n) 512 sq ft habitable space with (3) (n) bedrooms. second fl: kitchen remodel and bath. | $95,300 |
| Jun 26, 2023 | Completed final sign-off Nov 2023 | 1527 32nd Av | remodel (2) existing baths and kitchen; add powder room; replace 11 windows. all work on 2nd floor. no change to elevations that faces public wayDetails
remodel (2) existing baths and kitchen; add powder room; replace 11 windows. all work on 2nd floor. no change to elevations that faces public way | $75,000 |
| May 24, 2023 | Completed final sign-off Nov 2023 | 743 Vermont St | revision to 201710272504 to comply with notice of enforcement for planning 2019-004496enfDetails
revision to 201710272504 to comply with notice of enforcement for planning 2019-004496enf | |
| Mar 9, 2023 | Completed final sign-off Aug 2023 | 50 Burlwood Dr | comply with nov 202301395. repair damage to front of building. update garage per code. plumbing and elec permits pulled separately to remove illegal toilet and shower stall and fix main lineDetails
comply with nov 202301395. repair damage to front of building. update garage per code. plumbing and elec permits pulled separately to remove illegal toilet and shower stall and fix main line | $21,332 |
| Feb 14, 2023 | Completed final sign-off Mar 2023 | 1527 32nd Av | revision to 202211297268 modify proposed concrete system at gal 1 rear wall. new underpinned ftg instead of replacement ftg. document e concrete foundations and conditionsDetails
revision to 202211297268 modify proposed concrete system at gal 1 rear wall. new underpinned ftg instead of replacement ftg. document e concrete foundations and conditions | |
| Jan 26, 2023 | Never finaled issued Jan 2023, no final | 1433 Jefferson St | replace in kind due to water damage interior sheetrock repair (150 sq ft), repair flooring and painting.Details
replace in kind due to water damage interior sheetrock repair (150 sq ft), repair flooring and painting. | $2,000 |
| Dec 23, 2022 | Completed final sign-off Dec 2025 | 1068 De Haro St | renovation and completion of work begun by previous owner, ref bpa#201609077011 (no-plans). new foundation at rear of building. finish electrical to comply with nov 201405531. new bedroom, bath, and interior stair.Details
renovation and completion of work begun by previous owner, ref bpa#201609077011 (no-plans). new foundation at rear of building. finish electrical to comply with nov 201405531. new bedroom, bath, and interior stair. | $205,000 |
| Dec 19, 2022 | Completed final sign-off May 2023 | 2394 Folsom St | tenant improvement of existing space into pottery studio with kiln. new sinks. no exterior work.Details
tenant improvement of existing space into pottery studio with kiln. new sinks. no exterior work. | $47,200 |
| Nov 29, 2022 | Completed final sign-off Mar 2023 | 1527 32nd Av | remodel (e) bath at first fl. reconfigure walls at rear of 1st fl. and add french doors no new fl area or change to elevation visible from public way proposedDetails
remodel (e) bath at first fl. reconfigure walls at rear of 1st fl. and add french doors no new fl area or change to elevation visible from public way proposed | $60,000 |
| Sep 19, 2022 | Expired or cancelled withdrawn Mar 2023 | 11 Mars St | revision to bpa#202204182382. convert (e) half bath to a (n) full bath -add new shower to (e) half bath remodel permit. new electrical receptacles, high efficacey lighting in garage/bathroom, gfi outlets in bathroomDetails
revision to bpa#202204182382. convert (e) half bath to a (n) full bath -add new shower to (e) half bath remodel permit. new electrical receptacles, high efficacey lighting in garage/bathroom, gfi outlets in bathroom | $4,000 |
| Aug 9, 2022 | Never finaled issued Aug 2022, no final | 4726 Anza St | remodel 7'x 6' bathroom in-kind. update plumbing in wahsroom and bath. update elec fixtures. replace bathroom and washroom window in-kindDetails
remodel 7'x 6' bathroom in-kind. update plumbing in wahsroom and bath. update elec fixtures. replace bathroom and washroom window in-kind | $31,028 |
| Jun 7, 2022 | Never finaled issued Jun 2022, no final | 2900 Pierce St | unit #6: convert bathroom to new bedroom and construct new smaller bathroom.Details
unit #6: convert bathroom to new bedroom and construct new smaller bathroom. | $25,000 |
| May 31, 2022 | Never finaled issued May 2022, no final | 579 07th Av | replace rear siding in kind approx 600 sqft, (n) insulation, 4(n) rear windows replacae in kind, 2 (n) doors replace in kind and paint (exterior only). all work not visible from street. u < 0.3Details
replace rear siding in kind approx 600 sqft, (n) insulation, 4(n) rear windows replacae in kind, 2 (n) doors replace in kind and paint (exterior only). all work not visible from street. u < 0.3 | $28,633 |
| May 9, 2022 | Completed final sign-off Mar 2023 | 1737 Post St | suite 383: propose beverage store (drink shop) pink pink tea shop to existing space. to add the equipments needs with associate mechanical, plumbing and electrical work.Details
suite 383: propose beverage store (drink shop) pink pink tea shop to existing space. to add the equipments needs with associate mechanical, plumbing and electrical work. | $90,000 |
| Apr 27, 2022 | Expired or cancelled cancelled Jun 2022 | 579 07th Av | one bathroom remodel in kind, no walls to be removed.Details
one bathroom remodel in kind, no walls to be removed. | $5,500 |
| Apr 27, 2022 | Completed final sign-off Nov 2023 | 1901 California St | 2 bathrooms remodel in kind, no walls to be removed.Details
2 bathrooms remodel in kind, no walls to be removed. | $13,725 |
| Apr 18, 2022 | Completed final sign-off Mar 2026 | 11 Mars St | remodel in kind bathroom (7x10) and kitchen (13x16) in kindDetails
remodel in kind bathroom (7x10) and kitchen (13x16) in kind | $42,732 |
| Feb 2, 2022 | Never finaled issued Feb 2022, no final | 2015 San Jose Av | replacement of stair trim boards. paint interior and exterior of entire house.Details
replacement of stair trim boards. paint interior and exterior of entire house. | $2,000 |
| Oct 21, 2021 | Completed final sign-off Apr 2022 | 2030 Green St | update scope of work to cover nov 202182298. non structural change to closets attached drawings. kitchen cabinets now being replaced not refaced.Details
update scope of work to cover nov 202182298. non structural change to closets attached drawings. kitchen cabinets now being replaced not refaced. | $7,500 |
| Oct 20, 2021 | Completed final sign-off Nov 2022 | 830 41st Av | remodel (e) second fl bathroom.Details
remodel (e) second fl bathroom. | $18,000 |
| Sep 3, 2021 | Completed final sign-off Mar 2022 | 2030 Green St | reface kitchen cabinets, retile bathroom, paint sand and refinish floorsDetails
reface kitchen cabinets, retile bathroom, paint sand and refinish floors | $35,000 |
| Jul 28, 2021 | Never finaled issued May 2023, no final | 785 Vermont St | whole house remodel.lower level addition, main level addition. new upper story addition.Details
whole house remodel.lower level addition, main level addition. new upper story addition. | $240,000 |
| Mar 17, 2021 | Expired or cancelled expired Feb 2025 | 223 Monterey Bl | remodel 1 kitchen. remodel 2 bathrooms. hallway remodel.Details
remodel 1 kitchen. remodel 2 bathrooms. hallway remodel. | $40,000 |
| Mar 12, 2021 | Completed final sign-off Dec 2021 | 1450 Green St | #5: bathroom remodel. replacing like for ike, retile, paint.Details
#5: bathroom remodel. replacing like for ike, retile, paint. | $12,000 |
| Feb 16, 2021 | Never finaled issued Feb 2021, no final | 1033 Noe St | bathroom remodel only, no moving walls.Details
bathroom remodel only, no moving walls. | $6,000 |
| Feb 16, 2021 | Completed final sign-off Feb 2021 | 4 Valletta Ct | bathroom remodel, no moving walls.Details
bathroom remodel, no moving walls. | $5,000 |
| Dec 7, 2020 | Completed final sign-off Oct 2022 | 579 07th Av | rear deck replacement.Details
rear deck replacement. | $35,000 |
| Sep 10, 2020 | Never finaled issued Aug 2023, no final | 3665 Clay St | to comply with noe#2021-001684enf. restore bldg to 2 family dwelling. expand unit 1 into 1/f. expand unit 2 into 4/f.expand (e) garage to 10'.partial infill of east lightwell. new 306sf roofdeck on 4/f. new dormers. new skylights.Details
to comply with noe#2021-001684enf. restore bldg to 2 family dwelling. expand unit 1 into 1/f. expand unit 2 into 4/f.expand (e) garage to 10'.partial infill of east lightwell. new 306sf roofdeck on 4/f. new dormers. new skylights. | $650,000 |
| Jul 5, 2019 | Never finaled issued Jul 2019, no final | 830 41st Av | kitchen remodel: (1) replace cabinets, (2) floor and countertop backsplash tiling, associated work: new countertops, electrical work for new countertop outlets, cabinet lighting, and dishwasher/garbage disposal connections: plumbing for dishwasher, move stove gas pipe and hood vent.Details
kitchen remodel: (1) replace cabinets, (2) floor and countertop backsplash tiling, associated work: new countertops, electrical work for new countertop outlets, cabinet lighting, and dishwasher/garbage disposal connections: plumbing for dishwasher, move stove gas pipe and hood vent. | $35,000 |