Maven Maintenance Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Aug 2026
- Last 24 months
- 15 permits filed
235 permits since 2000: 173 completed, 4 in progress, 27 never finaled, 31 expired or cancelled.
Of the 27 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 235.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 1243 34th Av | to comply with #202652414 -to remove unpermitted unit per his. install insulation and drywall in open livingroom walls, install drywall in bathroom ceiling, remove doblue door between bedroom and garage, frame opening install drywall and insulation, remove door to garage from hallway...Details
to comply with #202652414 -to remove unpermitted unit per his. install insulation and drywall in open livingroom walls, install drywall in bathroom ceiling, remove doblue door between bedroom and garage, frame opening install drywall and insulation, remove door to garage from hallway... | $7,500 |
| Jul 2, 2026 | In progress issued Jul 2026 | 1138 Taylor St | complete repairs per physical inspection dated 11-12-24 wrap structural member in garage with drywall, close holes in drywall ceiling in garage, remove washer/dryer from garage, install smoke/co alarms in 1138 taylor and 1142 taylor.Details
complete repairs per physical inspection dated 11-12-24 wrap structural member in garage with drywall, close holes in drywall ceiling in garage, remove washer/dryer from garage, install smoke/co alarms in 1138 taylor and 1142 taylor. | $5,000 |
| May 27, 2026 | Completed final sign-off Aug 2026 | 3618 22nd St | dryrot repairs in one front bay, approx 4x6 in size, stucco and paint as needed. street facing repairs.Details
dryrot repairs in one front bay, approx 4x6 in size, stucco and paint as needed. street facing repairs. | $5,000 |
| May 21, 2026 | Completed final sign-off Jul 2026 | 1490 Jefferson St | replacement of e) guardrails at e) common stairsDetails
replacement of e) guardrails at e) common stairs | $5,000 |
| Dec 31, 2025 | Completed final sign-off Aug 2026 | 736 14th St | tenant improvement for a new massage parlour. change of use from jiu jitsu studio to massage parlour.Details
tenant improvement for a new massage parlour. change of use from jiu jitsu studio to massage parlour. | $10,000 |
| Dec 18, 2025 | Completed final sign-off Jun 2026 | 2120 Chestnut St | front facade e tile to be replaced in kindDetails
front facade e tile to be replaced in kind | $17,000 |
| Dec 12, 2025 | In progress issued Jul 2026 | 3355 21st St | rebuild (e) non conforming rear stairs.the enlargement of the (e) non conforming rear stairs is " only to the degree necessary to conform to current building code" per p.c. sec. 188(a) (1)Details
rebuild (e) non conforming rear stairs.the enlargement of the (e) non conforming rear stairs is " only to the degree necessary to conform to current building code" per p.c. sec. 188(a) (1) | $17,300 |
| Dec 4, 2025 | Completed final sign-off May 2026 | 708 Long Bridge St | unit 516- remodel (e) bathroom remove tub and replace with shower stall (n) tile, shower fixtures, extend height of shower head, relocate outlet, replace vanity , accessories and install (n) cabinets.Details
unit 516- remodel (e) bathroom remove tub and replace with shower stall (n) tile, shower fixtures, extend height of shower head, relocate outlet, replace vanity , accessories and install (n) cabinets. | $20,000 |
| Nov 18, 2025 | Completed final sign-off Jul 2026 | 1138 Taylor St | to obtain final inspection for work approved under 9809249. all work is completeDetails
to obtain final inspection for work approved under 9809249. all work is complete | |
| Oct 23, 2025 | Completed final sign-off Dec 2025 | 830 28th Av | install (n) plywood siding on south side of property and paint 900 sq ft.Details
install (n) plywood siding on south side of property and paint 900 sq ft. | $6,000 |
| May 14, 2025 | Completed final sign-off Jun 2025 | 1601 Hyde St | repair existing rear stairwell in kind less than 50%Details
repair existing rear stairwell in kind less than 50% | $5,000 |
| Apr 7, 2025 | Completed final sign-off May 2025 | 3170 25th St | replace rear stairwell less than 50%Details
replace rear stairwell less than 50% | $5,000 |
| Mar 18, 2025 | Completed final sign-off Jul 2025 | 1027 Oak St | unit 1027(b) - replace kitchen cabinets, sink and counter replace bathroom vanity, sink and faucet, install fan in bathroom, install (n) subpanel, light fixtures, gfci outlets, and replace (e) water heater in kind.Details
unit 1027(b) - replace kitchen cabinets, sink and counter replace bathroom vanity, sink and faucet, install fan in bathroom, install (n) subpanel, light fixtures, gfci outlets, and replace (e) water heater in kind. | $40,000 |
| Feb 12, 2025 | Completed final sign-off Jul 2025 | 1623 Taraval St | at 2nd lvl residential unit- remodel kitchen and bathroom in kind. replace cabinets, counter and sink upgrade electrical panel and install (n) outlets in kitchen and bath. install (n) lights, install bathroom fan, replace bathroom vanity & fixtures. no change to floor layout. no change to wall layouDetails
at 2nd lvl residential unit- remodel kitchen and bathroom in kind. replace cabinets, counter and sink upgrade electrical panel and install (n) outlets in kitchen and bath. install (n) lights, install bathroom fan, replace bathroom vanity & fixtures. no change to floor layout. no change to wall layou | $30,000 |
| Oct 21, 2024 | In progress issued Oct 2024 | 274 Andover St | repair front steps less than 50% in kindDetails
repair front steps less than 50% in kind | $1,700 |
| Aug 13, 2024 | Completed final sign-off Nov 2024 | 1428 Steiner St | unit 2-remodel bathroom and kitchen in kind. replace kitchen cabinets, rewire kitchen and bathroom. install (n) light fixtures, bathroom and install(n) plumbing fixtures. all fixtrues to remain in same location. bathroom approx. 35 sq ft. kitchen approx. 35 sq ft.Details
unit 2-remodel bathroom and kitchen in kind. replace kitchen cabinets, rewire kitchen and bathroom. install (n) light fixtures, bathroom and install(n) plumbing fixtures. all fixtrues to remain in same location. bathroom approx. 35 sq ft. kitchen approx. 35 sq ft. | $20,000 |
| Jun 27, 2024 | Completed final sign-off Jan 2025 | 1615 Taraval St | remodel in kind 2 bedroom apartment kitchen and bathroom. replace kitchen cabinets and counter tops. retile bathroom. repair/replace existing floors.Details
remodel in kind 2 bedroom apartment kitchen and bathroom. replace kitchen cabinets and counter tops. retile bathroom. repair/replace existing floors. | $22,000 |
| Jun 7, 2024 | Completed final sign-off Oct 2024 | 375 Santa Clara Av | replace damaged concrete corner with in kind concrete column, work to be done at lower floor garage opening. work does not affect public right-of-wayDetails
replace damaged concrete corner with in kind concrete column, work to be done at lower floor garage opening. work does not affect public right-of-way | $20,000 |
| Oct 24, 2023 | Expired or cancelled expired Apr 2026 | 787 Broadway | change of use from bar to art exhibit / retail. new ada restroom. new chair liftDetails
change of use from bar to art exhibit / retail. new ada restroom. new chair lift | |
| Oct 24, 2023 | Expired or cancelled expired Apr 2026 | 799 Broadway | change of use from retail to art exhibit/ retail. update e bathroom to be ada compliant, n interior ada door & push button, n interior wallDetails
change of use from retail to art exhibit/ retail. update e bathroom to be ada compliant, n interior ada door & push button, n interior wall | |
| Jul 13, 2023 | Completed final sign-off Apr 2024 | 1998 Broadway | unit 1601: remodel kitchen in-kind, replace cabinets, counters, plumbing & light fixtures; remodel (2) bathrooms in-kind: replace vanities, tile, plumbing & light fixtures, install new hardwood flooring throughout. no structural changes.Details
unit 1601: remodel kitchen in-kind, replace cabinets, counters, plumbing & light fixtures; remodel (2) bathrooms in-kind: replace vanities, tile, plumbing & light fixtures, install new hardwood flooring throughout. no structural changes. | $125,000 |
| May 22, 2023 | Completed final sign-off Jan 2024 | 850 Geary St | unit 22-2/f: remodel in kind (1) bathroom and (1) kitchen. replace kitchen cabinets, relocate gas line, rewire kitchen and bathroom. install new light fixtures. retile bathroom and install new plumbing fixtures. no removal of walls. lighting comply w/cec 150.0(k)Details
unit 22-2/f: remodel in kind (1) bathroom and (1) kitchen. replace kitchen cabinets, relocate gas line, rewire kitchen and bathroom. install new light fixtures. retile bathroom and install new plumbing fixtures. no removal of walls. lighting comply w/cec 150.0(k) | $16,000 |
| Feb 23, 2023 | Never finaled issued Feb 2023, no final | 850 Geary St | unit 25 on 2nd fl: remodel kitchen and bathroom. replace kitchen cabinets. rewire kitchen and bath. install new light fixtures. retile bathroom and install new plumbing fixtures. no removal of wallsDetails
unit 25 on 2nd fl: remodel kitchen and bathroom. replace kitchen cabinets. rewire kitchen and bath. install new light fixtures. retile bathroom and install new plumbing fixtures. no removal of walls | $20,000 |
| Jan 12, 2023 | Completed final sign-off Feb 2024 | 944 Irving St | establish new massage use (dba enchanted massage) per cua 2022-007603cua, remove and replace entry door with glass door.Details
establish new massage use (dba enchanted massage) per cua 2022-007603cua, remove and replace entry door with glass door. | $6,000 |
| Jan 11, 2023 | Completed final sign-off Dec 2024 | 4661 18th St | remodel of unit 4661, 3rd fl - includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwel, same location. living room converted to new bedroom.Details
remodel of unit 4661, 3rd fl - includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwel, same location. living room converted to new bedroom. | $47,236 |
| Dec 20, 2022 | Completed final sign-off Aug 2023 | 121 Clayton St | remodel in-kind kitchen & bathroom, replace kitchen cabinets, relocate gas line, relocate water heater, install 4 recessed lights in kitchen, rewire kitchen & bathroom, install new 60 amp subpanelDetails
remodel in-kind kitchen & bathroom, replace kitchen cabinets, relocate gas line, relocate water heater, install 4 recessed lights in kitchen, rewire kitchen & bathroom, install new 60 amp subpanel | $33,256 |
| Oct 7, 2022 | Completed final sign-off May 2023 | 1438 Page St | unit 5: remodel apartment in-kind. repalce kitchen cabinets, one kitchen and one bathroom, replace and install new tile in bathroom on floor and walls.Details
unit 5: remodel apartment in-kind. repalce kitchen cabinets, one kitchen and one bathroom, replace and install new tile in bathroom on floor and walls. | $47,330 |
| Aug 30, 2022 | Completed final sign-off Feb 2023 | 3637 Fillmore St | repairs to back stairwell. replace damaged wood, less than 50%. repair in kind.Details
repairs to back stairwell. replace damaged wood, less than 50%. repair in kind. | $17,500 |
| Jun 7, 2022 | Completed final sign-off Mar 2024 | 759 14th St | remodel of units on 1st, 2nd, and 3rd floor. window changes to front facade rear facade and lightwell.Details
remodel of units on 1st, 2nd, and 3rd floor. window changes to front facade rear facade and lightwell. | $87,634 |
| May 20, 2022 | Never finaled issued May 2022, no final | 153 Arkansas St | recommencement of work started under previously approved permit application #201902011923.Details
recommencement of work started under previously approved permit application #201902011923. | |
| May 12, 2022 | Expired or cancelled cancelled May 2022 | 153 Arkansas St | commencement of work not started under previously approved permit. application pa # 201308285446Details
commencement of work not started under previously approved permit. application pa # 201308285446 | |
| May 9, 2022 | Completed final sign-off Nov 2023 | 4663 18th St | remodel unit #4663 on 3rd fl. includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwell.Details
remodel unit #4663 on 3rd fl. includes kitchen & bathroom remodel as well as (n) bathroom. window change in lightwell. | $40,000 |
| Mar 2, 2022 | Completed final sign-off Nov 2022 | 3355 21st St | repair and replace front stairs. repair and replace common stairs in front of bldg.Details
repair and replace front stairs. repair and replace common stairs in front of bldg. | $7,500 |
| Feb 28, 2022 | Completed final sign-off Mar 2022 | 1428 Steiner St | renew for final. renewal of the following permits for final: 201712217171- unit 4, 201712217191 units# 1, 9, 10, 201712217192 units #3,6, 7.Details
renew for final. renewal of the following permits for final: 201712217171- unit 4, 201712217191 units# 1, 9, 10, 201712217192 units #3,6, 7. | |
| Feb 22, 2022 | Completed final sign-off Sep 2023 | 759 14th St | 759-761 14th street: remove and replace wall finishes and remove flooring. exploratory work only.Details
759-761 14th street: remove and replace wall finishes and remove flooring. exploratory work only. | $2,000 |
| Feb 18, 2022 | Completed final sign-off Jul 2022 | 1140 Taylor St | to obtain final inspection for work approved under pa# 201904198492. all work is complete.Details
to obtain final inspection for work approved under pa# 201904198492. all work is complete. | |
| Jan 10, 2022 | Completed final sign-off Dec 2022 | 2085 Hayes St | unit 11. residential: replace kitchen cabinets, sink, and appliances. install new electric panel. run new electric to kitchen and bathroom. replace light fixtures in kitchen. relocate gas line for stove. replace bathroom vanity and toilet. in kind - no layout change.Details
unit 11. residential: replace kitchen cabinets, sink, and appliances. install new electric panel. run new electric to kitchen and bathroom. replace light fixtures in kitchen. relocate gas line for stove. replace bathroom vanity and toilet. in kind - no layout change. | $18,000 |
| Oct 19, 2021 | Completed final sign-off Jul 2022 | 3430 19th St | exterior dryrot repairs near entrance unit 3430 front door. not visible from street. comply with 202179982.Details
exterior dryrot repairs near entrance unit 3430 front door. not visible from street. comply with 202179982. | $6,600 |
| Oct 12, 2021 | Completed final sign-off Feb 2022 | 1600 Taraval St | tenant improvement for proposed florist. new copying room, new ada bathroom, new utility sink. change occupant class from b to mDetails
tenant improvement for proposed florist. new copying room, new ada bathroom, new utility sink. change occupant class from b to m | $36,000 |
| Oct 6, 2021 | Completed final sign-off Jun 2023 | 116 Avila St | partial conversion of 1/f garage/stroage space to habitable space. infill below rear 2/f room, complete infill of s/ly lightwell on 1/f.push garage door to be 1ft from facade.2/f: remodel of whole floor. partial infill of s/ly lightwell.Details
partial conversion of 1/f garage/stroage space to habitable space. infill below rear 2/f room, complete infill of s/ly lightwell on 1/f.push garage door to be 1ft from facade.2/f: remodel of whole floor. partial infill of s/ly lightwell. | $42,000 |
| Sep 28, 2021 | Completed final sign-off Dec 2021 | 1644 Clay St | repairs to back stairwell in kind. remove and replace damaged wood. less than 50%.Details
repairs to back stairwell in kind. remove and replace damaged wood. less than 50%. | $4,800 |
| Sep 14, 2021 | Completed final sign-off Sep 2021 | 1428 Steiner St | to obtain a final inspection for work approved under previous permit pa201804126173. all work is complete.Details
to obtain a final inspection for work approved under previous permit pa201804126173. all work is complete. | |
| Aug 5, 2021 | Completed final sign-off Jul 2022 | 4288 24th St | replace exterior egress stair in-kind.Details
replace exterior egress stair in-kind. | $2,000 |
| Jul 7, 2021 | Completed final sign-off Jun 2023 | 116 Avila St | temporary interior removal of sheeting only plywood structural panels not to be removed removal of fixture and cabinets for one kitchen and one bathroom remodel permit to be pulled separately.Details
temporary interior removal of sheeting only plywood structural panels not to be removed removal of fixture and cabinets for one kitchen and one bathroom remodel permit to be pulled separately. | $7,500 |
| Jun 25, 2021 | Completed final sign-off Apr 2022 | 545 Francisco St | new forced air unit, new condenser unit, new exhaust fan, and new duct workDetails
new forced air unit, new condenser unit, new exhaust fan, and new duct work | $4,000 |
| Jun 18, 2021 | Completed final sign-off Jun 2022 | 768 Clayton St | remodel e bath in unit 770 b on 2nd flDetails
remodel e bath in unit 770 b on 2nd fl | $10,000 |
| Jun 2, 2021 | Completed final sign-off Sep 2022 | 1097 Irving St | converting salon to limited restaurant cafe serving coffee,pastries & retail component.Details
converting salon to limited restaurant cafe serving coffee,pastries & retail component. | $18,000 |
| May 19, 2021 | Completed final sign-off Apr 2022 | 545 Francisco St | administrative permit to document interior tenant improvement to be included in pa 201910043575Details
administrative permit to document interior tenant improvement to be included in pa 201910043575 | |
| Apr 5, 2021 | Expired or cancelled withdrawn Jul 2021 | 200 Green St | addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris.Details
addition of steel/wood formed catchment wall as extension into an (e) concrete site retaining wall for protection from falling small rocks and misc debris. | $16,000 |
| Apr 2, 2021 | Completed final sign-off Dec 2021 | 1428 Steiner St | unit 8 - bathroom and kitchen remodel in kind. new cabinets, new sink kitchen & bath. new tile in bathroom kitchen (2x5), bathroom (5x6). replace lumbing fixtures, upgrade electric. comply cec150.0(k)3 cec 150.0(k)5Details
unit 8 - bathroom and kitchen remodel in kind. new cabinets, new sink kitchen & bath. new tile in bathroom kitchen (2x5), bathroom (5x6). replace lumbing fixtures, upgrade electric. comply cec150.0(k)3 cec 150.0(k)5 | $25,000 |
| Mar 26, 2021 | Completed final sign-off Aug 2022 | 186 Nevada St | unit 186a: remove and replace wall finishes as needed for water damage repair.Details
unit 186a: remove and replace wall finishes as needed for water damage repair. | $5,000 |
| Feb 23, 2021 | Completed final sign-off Mar 2022 | 119 Clayton St | remodel kitchen & bathroom. no change in wall & opening layouts. replace kitchen cabinets.Details
remodel kitchen & bathroom. no change in wall & opening layouts. replace kitchen cabinets. | $30,000 |
| Feb 4, 2021 | Completed final sign-off Apr 2021 | 125 Clayton St | unit # 9 - upgrade electrical, install new sub panel replace all electrical outlets and switches. replace electrical wall heater. replace kitchen cabinets and kitcehn 5 x 9'Details
unit # 9 - upgrade electrical, install new sub panel replace all electrical outlets and switches. replace electrical wall heater. replace kitchen cabinets and kitcehn 5 x 9' | $18,000 |
| Dec 24, 2020 | Completed final sign-off Aug 2022 | 186 Nevada St | remove & replace wall finishes and remove flooring. exploratory work aprox. 200 sq ft.Details
remove & replace wall finishes and remove flooring. exploratory work aprox. 200 sq ft. | $1,000 |
| Jul 27, 2020 | Completed final sign-off Jan 2021 | 2460 Larkin St | remodel kitchen & bath inkind (kitchen 7'x10'/bath 5'x7'). replace kitchen cabinets & counters. no removal of walls re-tile bathroomDetails
remodel kitchen & bath inkind (kitchen 7'x10'/bath 5'x7'). replace kitchen cabinets & counters. no removal of walls re-tile bathroom | $18,000 |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 1490 Jefferson St | remodel kitchen & bath inkind. install (n) shower mixer & toilet. replace cabinets. install (n) subpanel & upgrade kitchen & bath electrical inkind. replace gas line, install fan in bathDetails
remodel kitchen & bath inkind. install (n) shower mixer & toilet. replace cabinets. install (n) subpanel & upgrade kitchen & bath electrical inkind. replace gas line, install fan in bath | $21,000 |
| Jun 13, 2020 | Completed final sign-off Oct 2020 | 125 Clayton St | unit 1: remodel kitchen (15x8) and bath (5x7).replace cabinets. install new sub-panel and upgrade kitchen and bath electrical. install four ceiling recessed lights in living room. relocate gas line. install fan in bath. install new shower mixer and toilet. in-kind replacment/remodel.Details
unit 1: remodel kitchen (15x8) and bath (5x7).replace cabinets. install new sub-panel and upgrade kitchen and bath electrical. install four ceiling recessed lights in living room. relocate gas line. install fan in bath. install new shower mixer and toilet. in-kind replacment/remodel. | $16,000 |
| Jun 12, 2020 | Completed final sign-off Jun 2020 | 2591 California St | replacement of 7 steps, landing and 3 stringers in kind. stairs located left side of building , less than 50% of staircase. not viewable from street.Details
replacement of 7 steps, landing and 3 stringers in kind. stairs located left side of building , less than 50% of staircase. not viewable from street. | $2,900 |
| Jun 2, 2020 | Completed final sign-off Jan 2021 | 1420 Taylor St | rebuild the south east and north east exterior stair wells in kind, 100% replacementDetails
rebuild the south east and north east exterior stair wells in kind, 100% replacement | $10,000 |
| Feb 14, 2020 | Never finaled issued Feb 2020, no final | 2080 Vallejo St | repairs to side stairwell and back decks. all work in kind not visible from streetDetails
repairs to side stairwell and back decks. all work in kind not visible from street | $1,200 |
| Feb 13, 2020 | Completed final sign-off Aug 2020 | 1344 Jackson St | replace e wood stairs with new in like kind in accordance with sfbc 1011.12.3 cbc 2019403.1Details
replace e wood stairs with new in like kind in accordance with sfbc 1011.12.3 cbc 2019403.1 | $18,000 |
| Jan 31, 2020 | Completed final sign-off Sep 2020 | 1260 Grove St | renovate master bathroom 8'x9'. replace tub, tile, relocate plumbing. renovate second bathroom 4'x8'. replace tile, relocate plumbing. no alteration of walls. have electric switches, plugs & lights.Details
renovate master bathroom 8'x9'. replace tub, tile, relocate plumbing. renovate second bathroom 4'x8'. replace tile, relocate plumbing. no alteration of walls. have electric switches, plugs & lights. | $12,000 |
| Oct 4, 2019 | Completed final sign-off Apr 2022 | 545 Francisco St | exterior remodel. ada upgrade of (e) entry. remove (e) canvas awning & replace (e) windows on francisco street & install new windows on water street. interior t.i. under seperate permit. ** maher: n/a **Details
exterior remodel. ada upgrade of (e) entry. remove (e) canvas awning & replace (e) windows on francisco street & install new windows on water street. interior t.i. under seperate permit. ** maher: n/a ** | $30,000 |
| Oct 2, 2019 | Expired or cancelled cancelled Jan 2026 | 545 Francisco St | interior t.i. and change of use from restaurant to retail professional service office, work includes ada upgrade of (e) entry and restroom, construct new private office break area and storage closet, exterior work under sep permit, mechanical, elec, plumbing to be design build under deffered permitDetails
interior t.i. and change of use from restaurant to retail professional service office, work includes ada upgrade of (e) entry and restroom, construct new private office break area and storage closet, exterior work under sep permit, mechanical, elec, plumbing to be design build under deffered permit | $70,000 |
| Sep 30, 2019 | Completed final sign-off Mar 2020 | 2401 Lake St | units 3 & 6: replace bathroom vanity, tub and toilet. upgrade electrical in bathroom, kitchen. replace kitchen cabinets in kind. install new electric subpanel. install new lights.Details
units 3 & 6: replace bathroom vanity, tub and toilet. upgrade electrical in bathroom, kitchen. replace kitchen cabinets in kind. install new electric subpanel. install new lights. | $15,000 |
| Sep 27, 2019 | Completed final sign-off Oct 2019 | 575 Columbus Av | comply with nov 201972351 item #5 repair back stairwell less than 50 percentDetails
comply with nov 201972351 item #5 repair back stairwell less than 50 percent | $10,000 |
| Sep 19, 2019 | Completed final sign-off Feb 2020 | 1216 38th Av | remodel 1 bathroom & 1 kitchen in-kind. new cabinets, appliances, plumbign fixtures, lights, upgrade electrical, relocate gas line.Details
remodel 1 bathroom & 1 kitchen in-kind. new cabinets, appliances, plumbign fixtures, lights, upgrade electrical, relocate gas line. | $8,000 |
| Jul 19, 2019 | Never finaled issued Jul 2019, no final | 2197 Golden Gate Av | administrative permit only: address correction for work performed under previous permit pa201808167599 under 2195 golden gate ave. correct address is 2197 golden gate avenue unit b.Details
administrative permit only: address correction for work performed under previous permit pa201808167599 under 2195 golden gate ave. correct address is 2197 golden gate avenue unit b. | |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 2401 Lake St | uniti 2: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k)Details
uniti 2: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k) | $10,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 2401 Lake St | uniti 10: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k)Details
uniti 10: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k) | $10,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 2401 Lake St | uniti 12: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k)Details
uniti 12: replace bathroom vanity/tub/toilet, upgrade electrical in bathroom/kitchen, replace kitchen cabinets in-kind, install new electric subpanel/lights. to compmly with cec 150.0(k) 3 & cec 150.0(k) | $10,000 |
| Jul 12, 2019 | Completed final sign-off Jan 2020 | 770 Clayton St | to obtain final inspection for work approved under pa# 201504103339 / 201510301208 / 201612225695. all work is completeDetails
to obtain final inspection for work approved under pa# 201504103339 / 201510301208 / 201612225695. all work is complete | |
| Jul 9, 2019 | Completed final sign-off May 2021 | 2401 Lake St | complete various repairs in apartments (unit 1,8&9), storage area, garage and common areas. to comply with and nov's 200865213, 201283953, 201930081, 201931381, 201935001Details
complete various repairs in apartments (unit 1,8&9), storage area, garage and common areas. to comply with and nov's 200865213, 201283953, 201930081, 201931381, 201935001 | $25,000 |
| Jul 2, 2019 | Completed final sign-off Dec 2019 | 525 Gough St | unit 104: submit plans for 201903125038 per inspector's requestDetails
unit 104: submit plans for 201903125038 per inspector's request | $15,000 |
| May 14, 2019 | Completed final sign-off Apr 2021 | 1428 Steiner St | comply w/ n.o.v 201945751. replacing concrete stem walls in rear yard.Details
comply w/ n.o.v 201945751. replacing concrete stem walls in rear yard. | |
| May 6, 2019 | Expired or cancelled expired Feb 2025 | 800 Post St | accessible business entrance program per ordinance 51-16. comply with mandatory disability improvement program. install auto door closer. install complaint threshold. remove mailslot in front door, install kick plate.Details
accessible business entrance program per ordinance 51-16. comply with mandatory disability improvement program. install auto door closer. install complaint threshold. remove mailslot in front door, install kick plate. | $10,000 |
| Apr 19, 2019 | Expired or cancelled expired Jul 2022 | 1140 Taylor St | remodel kitchen in kind, 125 ft. replace cabinets and light fixtures. replace plumbingDetails
remodel kitchen in kind, 125 ft. replace cabinets and light fixtures. replace plumbing | $6,000 |
| Mar 19, 2019 | Completed final sign-off Jul 2019 | 2080 Vallejo St | all work in unit number 3: comply with nov# 201879251 and 201886871. replace kitchen cabinets in kind, upgrade electrical in kitchen install new electrical sub panel. relocate kitchen water line install new lights remove laundry.Details
all work in unit number 3: comply with nov# 201879251 and 201886871. replace kitchen cabinets in kind, upgrade electrical in kitchen install new electrical sub panel. relocate kitchen water line install new lights remove laundry. | $30,000 |
| Mar 12, 2019 | Completed final sign-off Dec 2019 | 525 Gough St | unit #104; remodel in kind. replace kitchen cabinets and counters. new bathroom tiles and fixtures in all three bathrooms. replace tub in master bath with shower stall only. replace light fixtures. replace sliding glass doors to rear deckDetails
unit #104; remodel in kind. replace kitchen cabinets and counters. new bathroom tiles and fixtures in all three bathrooms. replace tub in master bath with shower stall only. replace light fixtures. replace sliding glass doors to rear deck | $7,000 |
| Feb 1, 2019 | Completed final sign-off Aug 2023 | 153 Arkansas St | sawcut and demolish concrete wall of approx 10' high x 5' wide. maher naDetails
sawcut and demolish concrete wall of approx 10' high x 5' wide. maher na | $10,000 |
| Oct 24, 2018 | Completed final sign-off Nov 2018 | 2239 Market St | remove counter top & sink leaking to comply with nov# 201800011.Details
remove counter top & sink leaking to comply with nov# 201800011. | $500 |
| Aug 16, 2018 | Completed final sign-off Jun 2019 | 2195 Golden Gate Av | unit b - remodel in kind, replace kitchen cabinets & counter, new bathroom tile and fixtures. upgrade electrical, install new 60 amp panel. no structural work comply with cec 150.0 (k) 3 cec 150.0 (k) 5Details
unit b - remodel in kind, replace kitchen cabinets & counter, new bathroom tile and fixtures. upgrade electrical, install new 60 amp panel. no structural work comply with cec 150.0 (k) 3 cec 150.0 (k) 5 | $40,000 |
| Aug 14, 2018 | Completed final sign-off Jul 2019 | 2080 Vallejo St | unit 3: to comply with nov #2018779251, item 3-repair deteriorated drainage pipes @ exterior, item 4-provide approved waste/vent & gas piping to washer/dryer, repair dryroy as required in-kindDetails
unit 3: to comply with nov #2018779251, item 3-repair deteriorated drainage pipes @ exterior, item 4-provide approved waste/vent & gas piping to washer/dryer, repair dryroy as required in-kind | $6,000 |
| Jul 30, 2018 | Completed final sign-off May 2019 | 1600 Taraval St | comply with 201832648 remove metal studs, return to e vacant condition no occupancy allowedDetails
comply with 201832648 remove metal studs, return to e vacant condition no occupancy allowed | $3,600 |
| Jul 30, 2018 | Completed final sign-off Jan 2019 | 1420 Taylor St | apt a: remodel studio apt in-kind; install new install new electric panel, tile shower stall, replace bathroom fixtures. replace light fixtures.Details
apt a: remodel studio apt in-kind; install new install new electric panel, tile shower stall, replace bathroom fixtures. replace light fixtures. | $25,000 |
| Jul 13, 2018 | Completed final sign-off Jan 2019 | 606 02nd Av | remodel in kind. replace kitchen cabinets and counter. new bathroom tiles and fixtures. upgrade electrical, install new 60amp panel, unit a: replace light fixtures.Details
remodel in kind. replace kitchen cabinets and counter. new bathroom tiles and fixtures. upgrade electrical, install new 60amp panel, unit a: replace light fixtures. | $50,000 |
| Jun 18, 2018 | Completed final sign-off Jan 2019 | 1420 Taylor St | comply with nov #201832531. remove and replace exterior and interior finishes siding in kind. no exreior work visible from street.Details
comply with nov #201832531. remove and replace exterior and interior finishes siding in kind. no exreior work visible from street. | $100,000 |
| Jun 14, 2018 | Completed final sign-off May 2019 | 47 Kittredge Tr | upgrade kitchen, remodel 2 bathrooms, add 1 bathroom, add 1 office in basement.Details
upgrade kitchen, remodel 2 bathrooms, add 1 bathroom, add 1 office in basement. | $125,000 |
| May 22, 2018 | Completed final sign-off Jun 2018 | 151 Arkansas St | side siding & damaged/rotted studs as need in kind. work not visible from the streetDetails
side siding & damaged/rotted studs as need in kind. work not visible from the street | $5,000 |
| May 22, 2018 | Completed final sign-off Apr 2019 | 300 Waller St | unit #300; remodel (1) kitchen & (1) bathroom in kind, new cabinets, counter top, vanity, toliet, tiles & fixture. no structural work under this permit, lighting fixture to comply with cec 150(k)Details
unit #300; remodel (1) kitchen & (1) bathroom in kind, new cabinets, counter top, vanity, toliet, tiles & fixture. no structural work under this permit, lighting fixture to comply with cec 150(k) | $30,000 |
| Apr 16, 2018 | Completed final sign-off Nov 2018 | 711 Capp St | remodel kitchen & bathroom in kind. new cabinets, sinks, counter top, tiles, fixtures as needed. no structural work under this permit. all work in unit #4.Details
remodel kitchen & bathroom in kind. new cabinets, sinks, counter top, tiles, fixtures as needed. no structural work under this permit. all work in unit #4. | $40,000 |
| Apr 16, 2018 | Never finaled issued Apr 2018, no final | 1631 Oakdale Av | street spaceDetails
street space | |
| Apr 12, 2018 | Expired or cancelled expired May 2022 | 1428 Steiner St | soft story per sfebc chapter 4d. design criteris cebc appx a4 install new shearwalls and new moment frames to comply with chapter 4dDetails
soft story per sfebc chapter 4d. design criteris cebc appx a4 install new shearwalls and new moment frames to comply with chapter 4d | $60,000 |
| Mar 28, 2018 | Completed final sign-off Sep 2018 | 1420 Taylor St | to comply with n.o.v. 201832531. repair to address fire. demolish plaster and or drywall in front two parlors. in unit b, 3, 5, 9. demolish flooring in front two parlos of unit b, 3, 5, 9. demolish drywall in hallway of unit c. demolish plaster in ceiling of entry hallway. covers demo only. repairDetails
to comply with n.o.v. 201832531. repair to address fire. demolish plaster and or drywall in front two parlors. in unit b, 3, 5, 9. demolish flooring in front two parlos of unit b, 3, 5, 9. demolish drywall in hallway of unit c. demolish plaster in ceiling of entry hallway. covers demo only. repair | $10,000 |
| Mar 20, 2018 | Completed final sign-off Aug 2018 | 535 Geary St | remodel kitcehn in-kind. new cabinets, kitchen floor tiles, quartz countertop and new appliances. all work in unit 202. no structural work under this permit. everything is same location.Details
remodel kitcehn in-kind. new cabinets, kitchen floor tiles, quartz countertop and new appliances. all work in unit 202. no structural work under this permit. everything is same location. | $35,000 |
| Mar 14, 2018 | Completed final sign-off May 2022 | 1428 Steiner St | addition of 1 new dwelling unit on 1st fl. per ordinance 162-16. 1 living room, 2 beds, 1 bath and 1 kitchenDetails
addition of 1 new dwelling unit on 1st fl. per ordinance 162-16. 1 living room, 2 beds, 1 bath and 1 kitchen | $60,000 |
| Mar 14, 2018 | Completed final sign-off Jun 2018 | 2395 26th Av | unit #3: to obtain final inspection for work approved under pa#2015-03-24-2153, 2015-03-27-2151 & 2015-03-27-2152. all work is completeDetails
unit #3: to obtain final inspection for work approved under pa#2015-03-24-2153, 2015-03-27-2151 & 2015-03-27-2152. all work is complete | |
| Mar 14, 2018 | Completed final sign-off Jun 2018 | 2395 26th Av | unit #3: to obtain final inspection for work approved under pa#2015-03-27-2149, 2015-03-27-2031 & 2016-01-14-7146. all work is completeDetails
unit #3: to obtain final inspection for work approved under pa#2015-03-27-2149, 2015-03-27-2031 & 2016-01-14-7146. all work is complete | |
| Feb 20, 2018 | Completed final sign-off Oct 2019 | 505 26th Av | amendment to pa# 2018 0205 0376 -to correct complaint numbers 201621861, 201535441, 201692581, 201692641, 201574855.Details
amendment to pa# 2018 0205 0376 -to correct complaint numbers 201621861, 201535441, 201692581, 201692641, 201574855. | |
| Feb 8, 2018 | Completed final sign-off Aug 2018 | 850 Geary St | #24: to obtain final inspection for work approved uner pa #201307242621. all work is complete. maher naDetails
#24: to obtain final inspection for work approved uner pa #201307242621. all work is complete. maher na |