David Penney
- Listed as
- engineer, pmt consultant/expediter
- Firm
- Dpc Consulting Engineers Inc.
- Based in
- Alameda
- On San Francisco permits
- Jan 2006 to Mar 2023
17 permits since 2000 (engineer on 10 permits, pmt consultant/expediter on 7 permits): 12 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2023 | Completed final sign-off Jan 2024 | 3370 Geary Bl | Abm Building Solutions Llc | replace (e) rooftop hvac unit. reconnect electrical & condensate. existing mcquary model# rpo018c -8161 lbs. new daikin model# rps020d -8456 lbs. new unit to sit on existing curb & sleeper.Details
replace (e) rooftop hvac unit. reconnect electrical & condensate. existing mcquary model# rpo018c -8161 lbs. new daikin model# rps020d -8456 lbs. new unit to sit on existing curb & sleeper. | $222,000 |
| Dec 15, 2021 | Completed final sign-off May 2022 | 730 Polk St | Abm Building Solutions Llc | install new ductless hvac system w/(1) 2 ton condenser & (2) 1 ton fan coils, condensate to tie intao existing drain. electrical excluded.Details
install new ductless hvac system w/(1) 2 ton condenser & (2) 1 ton fan coils, condensate to tie intao existing drain. electrical excluded. | $37,261 |
| Dec 15, 2021 | Completed final sign-off Apr 2022 | 1049 Howard St | Abm Building Solutions Llc | replace (3) existing rooftop duct heaters. reconnect to existing electrical, gas, and duct.Details
replace (3) existing rooftop duct heaters. reconnect to existing electrical, gas, and duct. | $97,200 |
| Feb 26, 2018 | Completed final sign-off Jan 2019 | 3838 California St | Cameron Builders Inc. | demo of interior partitions, selected furring channels, flooring, ceiling and unused mep. construct new interior ti for b occupancy office/medical suite (not a clinic) for orthopedic exam and mri x-ray imaging. construct structural support for mri and magnetic shielding. mep included.Details
demo of interior partitions, selected furring channels, flooring, ceiling and unused mep. construct new interior ti for b occupancy office/medical suite (not a clinic) for orthopedic exam and mri x-ray imaging. construct structural support for mri and magnetic shielding. mep included. | $200,000 |
| Oct 4, 2017 | Completed final sign-off Jun 2018 | 1805 Geary Bl | Abm Building Solutions Llc | install storage room exhaust fan. replace above door window w/makeup air louver. door/window storefront is side entrance, not original to building.Details
install storage room exhaust fan. replace above door window w/makeup air louver. door/window storefront is side entrance, not original to building. | $10,200 |
| Nov 23, 2016 | Never finaled issued Nov 2016, no final | 1450 Franklin St | Johnstone Moyer Inc | revision to addendum 4 (arch/mep) pa 200809252660. smoke control panel detailDetails
revision to addendum 4 (arch/mep) pa 200809252660. smoke control panel detail | |
| Sep 24, 2014 | Never finaled issued Jul 2015, no final | 680 Filbert St | Nibbi Bros Assoc Inc. | revision to pa# 2013/04/15/4538. mep design for 1st, 2nd & mezzanine remodel along with 3rd floor mep design. architectural modifications to accommodate the mep design. aka 1836 powell street block 0089 lot 048-049.Details
revision to pa# 2013/04/15/4538. mep design for 1st, 2nd & mezzanine remodel along with 3rd floor mep design. architectural modifications to accommodate the mep design. aka 1836 powell street block 0089 lot 048-049. | |
| Jan 9, 2014 | Completed final sign-off Jul 2014 | 1844 Market St | James E Roberts-Obayashi Corporation | add exhaust fans to new dog wash room & restroom. adjust cfm to existing supply air for new fitness room on b2 level. ref pa #2013.0909.6281.Details
add exhaust fans to new dog wash room & restroom. adjust cfm to existing supply air for new fitness room on b2 level. ref pa #2013.0909.6281. | $8,000 |
| Aug 31, 2012 | Completed final sign-off Dec 2013 | 25 Essex St | Bay City Mechanical Inc | revision to appl #2010.0315.8191 - delete fire dampers in outside air duct, entering each apartment ending in o2 on floors 2 and 8.Details
revision to appl #2010.0315.8191 - delete fire dampers in outside air duct, entering each apartment ending in o2 on floors 2 and 8. | |
| Jun 22, 2009 | Completed final sign-off Mar 2010 | 335 Powell St | Marchetti Construction Inc. | mechanical work only. clock bar - existing hvac alterations project. install new 5 ton-heat pump hvac unit. new ducted outside air. new ducted return air, add new fire damper at tenant space demising wall. use (e) hotel condenser water piping.Details
mechanical work only. clock bar - existing hvac alterations project. install new 5 ton-heat pump hvac unit. new ducted outside air. new ducted return air, add new fire damper at tenant space demising wall. use (e) hotel condenser water piping. | $60,000 |
| Feb 26, 2007 | Expired or cancelled expired Jul 2009 | 333 Pine St | Pacific Coast Trane Service Co. | mechanical: (n) roof mounted food cooler & pump to existing system. da compliance exempt for hvac work. sec.1134b2.1Details
mechanical: (n) roof mounted food cooler & pump to existing system. da compliance exempt for hvac work. sec.1134b2.1 | $130,000 |
| Nov 28, 2006 | Expired or cancelled expired Apr 2008 | 160 Spear St | Novo Construction Inc | sprinkler drawings. ref. appl#200610235792, relocate 10 heads.Details
sprinkler drawings. ref. appl#200610235792, relocate 10 heads. | $3,500 |
| Oct 5, 2006 | Completed final sign-off May 2007 | 201 Mission St | Wcp Svcs, Dba: Venture Builders | oti-3 22nd floor elDetails
oti-3 22nd floor el | $218,000 |
| Sep 13, 2006 | Completed final sign-off Jun 2007 | 345 California St | oti-1 21st floor elDetails
oti-1 21st floor el | $40,000 | |
| Jul 28, 2006 | Completed final sign-off May 2007 | 1650 Mission St | oti-1, 2nd floor, el, ls, sp.Details
oti-1, 2nd floor, el, ls, sp. | $111,524 | |
| Jul 28, 2006 | Completed final sign-off May 2007 | 1650 Mission St | oti-1, 3rd floor, el, ls, sp.Details
oti-1, 3rd floor, el, ls, sp. | $53,384 | |
| Jan 24, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | oti-1 15th floor, me, el, lsDetails
oti-1 15th floor, me, el, ls | $45,000 |