David Hecht
- Listed as
- architect, designer, engineer
- Firm
- Tanner Hecht Architecture
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
45 permits since 2000 (architect on 43 permits, designer on 1 permit, engineer on 1 permit): 37 completed, 3 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 1265 Battery St | Rod Heisler Construction | ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting.Details
ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting. | $450,000 |
| May 27, 2026 | In progress issued Jun 2026 | 101 Henry Adams St | E M A Builders Inc. | ste: 300 - tenant improvement to existing unoccupied showroom space. no structural work. improvement include new partitons, entry doors, lighting, heat pump, sinks, casework.Details
ste: 300 - tenant improvement to existing unoccupied showroom space. no structural work. improvement include new partitons, entry doors, lighting, heat pump, sinks, casework. | $680,000 |
| Dec 16, 2025 | Completed final sign-off Feb 2026 | 101 Henry Adams St | E M A Builders Inc. | suite 300-soft demo onlyDetails
suite 300-soft demo only | $7,000 |
| Nov 26, 2025 | Completed final sign-off Aug 2026 | 405 Davis Ct | C B 2 Builders Incorporated | maintenance and repair-replace existing trash chute with new discharge door and chute from basement through roof. remove and replace non-structural partitions with new rated partitions. no structural improvements, no increase in building area or conditioned spaceDetails
maintenance and repair-replace existing trash chute with new discharge door and chute from basement through roof. remove and replace non-structural partitions with new rated partitions. no structural improvements, no increase in building area or conditioned space | $200,000 |
| Jul 9, 2025 | In progress issued Sep 2025 | 750 Florida St | Dome Construction Corp | new pg&e electrical service upgrade to the (e) senior dog rescue with new underground transformer fault in the public sidewalk and onsine design build electrical service equipmentDetails
new pg&e electrical service upgrade to the (e) senior dog rescue with new underground transformer fault in the public sidewalk and onsine design build electrical service equipment | $500,000 |
| Apr 8, 2024 | Completed final sign-off Apr 2025 | 835 Larkin St | 4-Mac Construction | prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications.Details
prop h: non-structural alterations to (e) retail space for new immersive theater space. open kitchen w/ventless hood, powder rm, mech system, lighting and primary entry modifications. | $55,000 |
| Mar 29, 2024 | Completed final sign-off Jan 2025 | 750 Florida St | Dome Construction Corp | rev to pa# 2022-0607-5743 add exterior ships ladder for access to elevator machine room penthouse as required by california state elevator unit. submitted as local equivalency for roof access stair per ab-005. work includes architectural,structural & lighting modifications.Details
rev to pa# 2022-0607-5743 add exterior ships ladder for access to elevator machine room penthouse as required by california state elevator unit. submitted as local equivalency for roof access stair per ab-005. work includes architectural,structural & lighting modifications. | $50,000 |
| Mar 28, 2024 | Completed final sign-off Jan 2025 | 750 Florida St | Dome Construction Corp | rev to pa# 2022-0607-5743 to (1) omit emergency back up power to elevator (2) modify electrical systems for solar design by new venoder prime electrice, (3) chang fire rating of battery backup room b106 incidental use to be 2hr. work includes architectural and electrical modifications solar deferredDetails
rev to pa# 2022-0607-5743 to (1) omit emergency back up power to elevator (2) modify electrical systems for solar design by new venoder prime electrice, (3) chang fire rating of battery backup room b106 incidental use to be 2hr. work includes architectural and electrical modifications solar deferred | |
| Dec 4, 2023 | Completed final sign-off May 2024 | 3316 24th St | Paradigm General Contractors | revision to pa# 202212289285 & 202111011541 non-structural revisions, revise elevator from sec.5.2 to article 15 elevator per oshsb variance. provide hoistway platform for state elevator d.o.s.h approval of dec, 15, 2023Details
revision to pa# 202212289285 & 202111011541 non-structural revisions, revise elevator from sec.5.2 to article 15 elevator per oshsb variance. provide hoistway platform for state elevator d.o.s.h approval of dec, 15, 2023 | |
| Nov 3, 2023 | Completed final sign-off Dec 2023 | 1831 Powell St | accessbile business entry #201810162294 request for technical infeasibility for (e) primary entry w/ one stepDetails
accessbile business entry #201810162294 request for technical infeasibility for (e) primary entry w/ one step | ||
| Dec 28, 2022 | Completed final sign-off Mar 2023 | 3316 24th St | Paradigm General Contractors | revision to previously approved pa# 202207138326. non structural revisions. relocate transfer fan outside of control room, revise 60-min hollow metal door and frame to 60-min wood door and frame. work located at ground floor.Details
revision to previously approved pa# 202207138326. non structural revisions. relocate transfer fan outside of control room, revise 60-min hollow metal door and frame to 60-min wood door and frame. work located at ground floor. | |
| Aug 30, 2022 | Completed final sign-off May 2023 | 55 02nd St | Novo Construction Inc | 24/f: revision to pa# 202206166472 for non structural revisions to men's and all gender restrooms. scope of work: (n) partitions, relocate plumbing fixtures, lights and hvac venting in restroom area only.Details
24/f: revision to pa# 202206166472 for non structural revisions to men's and all gender restrooms. scope of work: (n) partitions, relocate plumbing fixtures, lights and hvac venting in restroom area only. | $8,000 |
| Jul 13, 2022 | Completed final sign-off Mar 2023 | 3316 24th St | Paradigm General Contractors | revision to 202111011541. non structural revision to gr fl elevator control room and add hoistway vent.Details
revision to 202111011541. non structural revision to gr fl elevator control room and add hoistway vent. | $8,500 |
| Jun 30, 2022 | Completed final sign-off Jan 2025 | 750 Florida St | Dome Construction Corp | alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes **Details
alteration to (e) structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes ** | $4,800,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2023 | 55 02nd St | Novo Construction Inc | 24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.Details
24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg. | $650,000 |
| Apr 6, 2022 | Completed final sign-off Jan 2025 | 750 Florida St | Dome Construction Corp | interior only sow:core and shell seismic/strl improvements. accessibility upgrades deferred per ab-017. tenant improvements and change of use under separate application bpa#2022-0607-5743. deferred:m/e/p, fire protection, life safety & frp reinforcement. building fully fire sprinklered per nfpa-13.Details
interior only sow:core and shell seismic/strl improvements. accessibility upgrades deferred per ab-017. tenant improvements and change of use under separate application bpa#2022-0607-5743. deferred:m/e/p, fire protection, life safety & frp reinforcement. building fully fire sprinklered per nfpa-13. | $600,000 |
| Mar 28, 2022 | Completed final sign-off Mar 2023 | 750 Florida St | Dome Construction Corp | exploratory investigation and selective demo of (e) finishes, lighting, plumbing and heating prior to interior renovation. no structural or egress modifications in the scope. no ceiling workDetails
exploratory investigation and selective demo of (e) finishes, lighting, plumbing and heating prior to interior renovation. no structural or egress modifications in the scope. no ceiling work | $50,000 |
| Mar 21, 2022 | Completed final sign-off Apr 2022 | 649 Front St | C B 2 Builders Incorporated | revision to previously approved permit 202111222919. combine 2 phone rooms to 1 by removing on structural partition. revise hvac duct to reflect change of the areaDetails
revision to previously approved permit 202111222919. combine 2 phone rooms to 1 by removing on structural partition. revise hvac duct to reflect change of the area | $1,000 |
| Mar 21, 2022 | Completed final sign-off Jun 2022 | 200 Larkin St | C B 2 Builders Incorporated | removal of temp exhibition improvements including partition walls, floor finishses, light fixtures and air conditioning.Details
removal of temp exhibition improvements including partition walls, floor finishses, light fixtures and air conditioning. | $180,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2023 | 3316 24th St | Paradigm General Contractors | revision to pa 2021-1101-1541 non structural revisions to include restroom partitions reconfiguration due to (e) structural conditions and raised floor to accommodate existing plumbing. revised door location 2 reception due to existing structural condition. no changes to fixture countDetails
revision to pa 2021-1101-1541 non structural revisions to include restroom partitions reconfiguration due to (e) structural conditions and raised floor to accommodate existing plumbing. revised door location 2 reception due to existing structural condition. no changes to fixture count | $15,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 649 Front St | non-structural tenant improvement. sow: new partitions. fully sprinklered. interior only. no work in prow. mep, sprinklers, life safety deferred.Details
non-structural tenant improvement. sow: new partitions. fully sprinklered. interior only. no work in prow. mep, sprinklers, life safety deferred. | $400,000 | |
| Jan 24, 2020 | Completed final sign-off Jul 2021 | 200 Larkin St | C B 2 Builders Incorporated | construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systemsDetails
construction of a temporary art installation w/in an (e) gallery space. work include temporary partitions, floor & ceiling finishes and modifications to (e) air conditioning and lighting systems | $1,000,000 |
| Nov 30, 2017 | Never finaled issued Dec 2017, no final | 732 Broadway | C C I Commercial Construction & Improv | ground floor bar-restaurant improvements to include entry door barrier removal and replaced w/power assist openerDetails
ground floor bar-restaurant improvements to include entry door barrier removal and replaced w/power assist opener | $4,500 |
| Aug 29, 2016 | Completed final sign-off Jan 2018 | 644 Broadway | change of use record set for tenant assembly space, motion picture to live theater. all construction work approved under separate permit 201510028663. occupancy load pa201606271003.Details
change of use record set for tenant assembly space, motion picture to live theater. all construction work approved under separate permit 201510028663. occupancy load pa201606271003. | ||
| Jun 27, 2016 | Completed final sign-off Sep 2016 | 644 Broadway | fire department assembly permit occupant load approval only. all other work under pa 2015-1002-8663.Details
fire department assembly permit occupant load approval only. all other work under pa 2015-1002-8663. | ||
| Apr 26, 2016 | Completed final sign-off Sep 2016 | 644 Broadway | Hilbers Inc. | revision to pa #201510028663 including revsion to wall type, ada counters & addition of walls in lieu of guardrails.Details
revision to pa #201510028663 including revsion to wall type, ada counters & addition of walls in lieu of guardrails. | |
| Oct 2, 2015 | Completed final sign-off Sep 2016 | 644 Broadway | Hilbers Inc. | basement theater, ti- including new mecahnical platform, stairs, ramp, partitions, ceiling and associated mechanical and plumbing systemDetails
basement theater, ti- including new mecahnical platform, stairs, ramp, partitions, ceiling and associated mechanical and plumbing system | $764,000 |
| Apr 14, 2015 | Completed final sign-off Jan 2016 | 644 Broadway | D.P. Stearns | tenant improvements to existing shell space including new partitions, finishes, lighting and air conditioning. mechanical, electrical and fire sprinkler work under seperate permits.Details
tenant improvements to existing shell space including new partitions, finishes, lighting and air conditioning. mechanical, electrical and fire sprinkler work under seperate permits. | $200,000 |
| Mar 20, 2015 | Completed final sign-off Apr 2016 | 644 Broadway | replace (e) after hours security gate with new sliding panel gate system with exit door equipped w/panic hardwareDetails
replace (e) after hours security gate with new sliding panel gate system with exit door equipped w/panic hardware | $6,500 | |
| Feb 26, 2015 | Completed final sign-off Feb 2016 | 644 Broadway | C C I Commercial Construction & Improv | t.i. to existing vacant office shell space on 4/f. improvements includes new demising wall between tenant spaces, office partitions & kitchenette.Details
t.i. to existing vacant office shell space on 4/f. improvements includes new demising wall between tenant spaces, office partitions & kitchenette. | $163,000 |
| Jul 30, 2014 | Expired or cancelled expired Mar 2018 | 644 Broadway | C C I Commercial Construction & Improv | install 3 new communicating openings in existing fire-rated west property line.Details
install 3 new communicating openings in existing fire-rated west property line. | $95,000 |
| Jul 10, 2014 | Completed final sign-off Jun 2015 | 644 Broadway | C C I Commercial Construction & Improv | 4th floor - install 3 (n) fire rated windows in an (e) fire rated property line wall. not visible from street.Details
4th floor - install 3 (n) fire rated windows in an (e) fire rated property line wall. not visible from street. | $15,000 |
| Jun 24, 2014 | Expired or cancelled expired Mar 2018 | 660 Broadway | C C I Commercial Construction & Improv | core and shell improvements to basement and 1st fl. mep and core and shell only. no work to 2nd fl. no change in useDetails
core and shell improvements to basement and 1st fl. mep and core and shell only. no work to 2nd fl. no change in use | $180,000 |
| Jun 24, 2014 | Expired or cancelled expired Mar 2018 | 644 Broadway | C C I Commercial Construction & Improv | revision to 201312204760. 1st fl entry area, 2nd and 3rd fl elevator lobbies, (no kitcen/food svc equip work)Details
revision to 201312204760. 1st fl entry area, 2nd and 3rd fl elevator lobbies, (no kitcen/food svc equip work) | $12,000 |
| May 30, 2014 | Completed final sign-off Jun 2015 | 644 Broadway | C C I Commercial Construction & Improv | t.i. on 4th floor include new office with kitchenette, new partition walls, new lighting, electrical improvements, mechanical system - air conditioning and fire sprinklers.Details
t.i. on 4th floor include new office with kitchenette, new partition walls, new lighting, electrical improvements, mechanical system - air conditioning and fire sprinklers. | $30,000 |
| Dec 20, 2013 | Expired or cancelled expired Mar 2018 | 644 Broadway | Cci Com'l Constr & Improv**See 985808*** | core & shell improvements to (e) 4 story bldg, with improvements to 1st thru 4 floors includiing new restrooms on floors 3 & 4 only. new air conditioning & lighting. all floors are (e) shell spaces. no work to the (e) basement theater.Details
core & shell improvements to (e) 4 story bldg, with improvements to 1st thru 4 floors includiing new restrooms on floors 3 & 4 only. new air conditioning & lighting. all floors are (e) shell spaces. no work to the (e) basement theater. | $935,427 |
| Aug 16, 2012 | Completed final sign-off Sep 2012 | 755 Sansome St | Daryl Lassen Construction Inc | tenant improvements to existing office suite. alteration include dmolition of existing partitions and construct new partitions, replace some lightsDetails
tenant improvements to existing office suite. alteration include dmolition of existing partitions and construct new partitions, replace some lights | $40,000 |
| May 4, 2012 | Completed final sign-off Jun 2012 | 153 Kearny St | Northern Sun Associates | mezzanine level tenant improvement - remove & relocate existing doors in new door & window frames. no mechanical, electrical, or plumbing work under this permit.Details
mezzanine level tenant improvement - remove & relocate existing doors in new door & window frames. no mechanical, electrical, or plumbing work under this permit. | $21,254 |
| Nov 7, 2011 | Completed final sign-off Jul 2012 | 330 Pacheco St | Ashbury Gen Constructing & Eng | construct new stair from 1st floor to basement level with enclosed landing at rear yard.Details
construct new stair from 1st floor to basement level with enclosed landing at rear yard. | $65,000 |
| Aug 25, 2011 | Completed final sign-off Jul 2012 | 330 Pacheco St | Ashbury Gen Constructing & Eng | remodel of existing residence including kitchen and dining rooms, new powder room, reconfigured stairs, new master bathroom and bedroom suite, replace existing electrical panel and furnace, remove existing windows and doors and provide new doors and windows.Details
remodel of existing residence including kitchen and dining rooms, new powder room, reconfigured stairs, new master bathroom and bedroom suite, replace existing electrical panel and furnace, remove existing windows and doors and provide new doors and windows. | $220,000 |
| Jul 25, 2011 | Completed final sign-off Dec 2011 | 1853 Market St | Northern Sun Associates | 1st floor-tenant improvement to existing vacant commercial space including new paritions, lighting, plumbing, finishes. mechanical/ hvac under separate permit.Details
1st floor-tenant improvement to existing vacant commercial space including new paritions, lighting, plumbing, finishes. mechanical/ hvac under separate permit. | $120,000 |
| May 20, 2008 | Completed final sign-off Dec 2008 | 301 Battery St | Bcci Construction Company | revision to pa# 2008.0319.7455. changes to area 508. change from office to conference room.Details
revision to pa# 2008.0319.7455. changes to area 508. change from office to conference room. | $50,000 |
| Mar 6, 2008 | Completed final sign-off Dec 2008 | 301 Battery St | Bcci Construction Company | demolition of 5th floor tenant space, no fire-rated construction to be removed. fire sprinkler & life safety systems are to remain operation al. floor to remain unoccupied in accordance with sf ab-017.Details
demolition of 5th floor tenant space, no fire-rated construction to be removed. fire sprinkler & life safety systems are to remain operation al. floor to remain unoccupied in accordance with sf ab-017. | $20,000 |
| Feb 21, 2008 | Completed final sign-off Jul 2008 | 121 Spear St | Northern Sun Associates | revision to permit # 200712079916. revised work includes new locations of water closets due to existing structural conflicts and addition of one exercise studio and storage room.Details
revision to permit # 200712079916. revised work includes new locations of water closets due to existing structural conflicts and addition of one exercise studio and storage room. | $15,000 |
| Dec 7, 2007 | Completed final sign-off Jul 2008 | 121 Spear St | Northern Sun Associates | suite b-10 - construct new fitness studio within existing vacant commercial space. improvements include new partitions, finishes,lighting, air conditioning, plumbing,sprinklers and life safety modifications.mep, sprinklers and life safety separate permits.Details
suite b-10 - construct new fitness studio within existing vacant commercial space. improvements include new partitions, finishes,lighting, air conditioning, plumbing,sprinklers and life safety modifications.mep, sprinklers and life safety separate permits. | $90,000 |