Daniel Pho
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Pho Architects
- Based in
- San Francisco
- On San Francisco permits
- Apr 2017 to Sep 2026
34 permits since 2000 (architect on 29 permits, engineer on 4 permits, authorized agent-others on 1 permit): 15 completed, 10 in progress, 2 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 2574 San Bruno Av | remove and replace (e) wood siding with (n) aluminum sidingDetails
remove and replace (e) wood siding with (n) aluminum siding | $45,000 | |
| Jul 21, 2026 | In progress issued Jul 2026 | 162 Clara St | tenant to remove & reconstruct (e) stair, renovate (e) restroom/adjoining wall. provide new window, drinkling fountain, mop sink & kitchenette. change of use to office.Details
tenant to remove & reconstruct (e) stair, renovate (e) restroom/adjoining wall. provide new window, drinkling fountain, mop sink & kitchenette. change of use to office. | $45,000 | |
| Jul 7, 2026 | In progress issued Jul 2026 | 373 Broadway | Mytrn Enterprises Llc | interior t.i. for (e) restaurant space. remove interior partition new reception counter, countertop seating, accessible restroom, kitchen equipment at cookline only. no mech scope of work. plumbing and electrical and hood/duct fire suppression system are deferred submittals by contractor.Details
interior t.i. for (e) restaurant space. remove interior partition new reception counter, countertop seating, accessible restroom, kitchen equipment at cookline only. no mech scope of work. plumbing and electrical and hood/duct fire suppression system are deferred submittals by contractor. | $55,000 |
| Jun 24, 2026 | In progress issued Aug 2026 | 1390 Noriega St | Amone Corp | 1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding doorDetails
1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding door | $800,000 |
| Jun 8, 2026 | In progress filed Jun 2026, not yet issued | 2574 San Bruno Av | remove and replace existing mechanical rooftop unit.Details
remove and replace existing mechanical rooftop unit. | $10,000 | |
| May 14, 2026 | Completed final sign-off Jun 2026 | 1590 Pacific Av | Js Sullivan Construction Inc | permit is being filed to revise pa# 202403208206 to indicate minor work performed & all scope of work not performed & being removed from project. work performed: 1. reinforced steel & concrete ramp to be removed, 2. abandoned non-structural light gauge metal partition to be removed.Details
permit is being filed to revise pa# 202403208206 to indicate minor work performed & all scope of work not performed & being removed from project. work performed: 1. reinforced steel & concrete ramp to be removed, 2. abandoned non-structural light gauge metal partition to be removed. | $3,000 |
| Mar 18, 2026 | In progress issued Jun 2026 | 728 Pacific Av | Singular Builders | 4/fl- ti to convert (e) clicnic space into (n) accpunture clinic and restroom remodelDetails
4/fl- ti to convert (e) clicnic space into (n) accpunture clinic and restroom remodel | $600,000 |
| Nov 20, 2025 | In progress issued Nov 2025 | 4281 25th St | Vsa Construction | deferred submittal for new interior steel stairs to span 3 floors. ref 202212309573Details
deferred submittal for new interior steel stairs to span 3 floors. ref 202212309573 | $20,000 |
| Nov 17, 2025 | Completed final sign-off Jun 2026 | 1590 Pacific Av | minor remodel for 1590 pacific to separate 2,502 sf commercial space into 2 smaller commercial spaces. core and shell only. new accessible restroomDetails
minor remodel for 1590 pacific to separate 2,502 sf commercial space into 2 smaller commercial spaces. core and shell only. new accessible restroom | $8,000 | |
| Sep 9, 2025 | In progress issued Oct 2025 | 1627 Newcomb Av | rear bldg/storage shed: rebuild fire damaged west wall involving demo, new structural supports, patching, waterproofing, painting, repair/patch roof to comply w/nov 202542053Details
rear bldg/storage shed: rebuild fire damaged west wall involving demo, new structural supports, patching, waterproofing, painting, repair/patch roof to comply w/nov 202542053 | $7,000 | |
| Sep 18, 2024 | In progress filed Sep 2024, not yet issued | 279 Andover St | reno (e) 2-unit res dwelling unit incl a new roof deck, a rear & partial 3rd flr addition. work includes but shall not be limited to: retro of 1st fl facade. rear & 3rd flr addition, roof deck, repair & retro (e) finishes to remain, sectional garage dr, vol seismic upgrade, new interior partitions &Details
reno (e) 2-unit res dwelling unit incl a new roof deck, a rear & partial 3rd flr addition. work includes but shall not be limited to: retro of 1st fl facade. rear & 3rd flr addition, roof deck, repair & retro (e) finishes to remain, sectional garage dr, vol seismic upgrade, new interior partitions & | $650,000 | |
| May 30, 2024 | Expired or cancelled expired Nov 2025 | 62 Dolores Tr | Perez Construction Llc. | ground floor foyer and garage extension to be flush with (e) building facade. exterior work includes new front and garage door, renovated front facade interior includes foyer and garage renovation. electrical panel and meter shall be relocated.Details
ground floor foyer and garage extension to be flush with (e) building facade. exterior work includes new front and garage door, renovated front facade interior includes foyer and garage renovation. electrical panel and meter shall be relocated. | $45,000 |
| Apr 5, 2024 | Expired or cancelled cancelled Aug 2024 | 279 Andover St | reno (e) 2-unit res dwelling unit incl a new roof deck, a rear & partial 3rd flr addition. work includes but shall not be limited to: retro of 1st fl facade. rear & 3rd flr addition, roof deck, repair & retro (e) finishes to remain, sectional garage dr, vol seismic upgrade, new interior partitions &Details
reno (e) 2-unit res dwelling unit incl a new roof deck, a rear & partial 3rd flr addition. work includes but shall not be limited to: retro of 1st fl facade. rear & 3rd flr addition, roof deck, repair & retro (e) finishes to remain, sectional garage dr, vol seismic upgrade, new interior partitions & | $650,000 | |
| Jan 23, 2024 | Expired or cancelled expired Nov 2025 | 62 Dolores Tr | Perez Construction Llc. | revision to (e) permit# 202212309533: (e) building had steel moment frames discovered during construction. scope of work for home renovation is being adjusted since (e) structure exceeds designed structure requirement.Details
revision to (e) permit# 202212309533: (e) building had steel moment frames discovered during construction. scope of work for home renovation is being adjusted since (e) structure exceeds designed structure requirement. | |
| Nov 15, 2023 | Completed final sign-off Jul 2024 | 3886 Noriega St | Jing Hua Construction Corp | ti of (e) commercial space. interior partitions, casework, finishes and modification to (e) building system. limited use restaurant.Details
ti of (e) commercial space. interior partitions, casework, finishes and modification to (e) building system. limited use restaurant. | $69,000 |
| Dec 30, 2022 | Completed final sign-off Nov 2025 | 62 Dolores Tr | Perez Construction Llc. | renovation of (e) single family home. windows. interior renovation of kitchen, living, bedroom and bathrooms.Details
renovation of (e) single family home. windows. interior renovation of kitchen, living, bedroom and bathrooms. | $500,000 |
| Dec 30, 2022 | In progress issued Feb 2025 | 4281 25th St | Vsa Construction | renovation of (e) single family home & basement addition.minor exterior window/door work.new building systems to accomodate new renovation scope of work.Details
renovation of (e) single family home & basement addition.minor exterior window/door work.new building systems to accomodate new renovation scope of work. | $750,000 |
| Dec 16, 2022 | Expired or cancelled cancelled Jan 2026 | 1174 Folsom St | ground floor first tenant improvement of (e) commercial space (tenant a) to accommodate a new restaurant. fire sprinkler & protection is a deffered submission. minor alterations to (e) common corridor interior partitions at tenant c entrance.Details
ground floor first tenant improvement of (e) commercial space (tenant a) to accommodate a new restaurant. fire sprinkler & protection is a deffered submission. minor alterations to (e) common corridor interior partitions at tenant c entrance. | $150,000 | |
| Apr 1, 2022 | Completed final sign-off Mar 2023 | 1174 Folsom St | Transworld Construction | unit b: revision to pa# 202111162490. revised kitchen/ preparation room equipment layout. relocation of proposed sink, ventless hood, & refrigeration equipment.Details
unit b: revision to pa# 202111162490. revised kitchen/ preparation room equipment layout. relocation of proposed sink, ventless hood, & refrigeration equipment. | |
| Nov 16, 2021 | Completed final sign-off Mar 2023 | 1174 Folsom St | Transworld Construction | unit b: tenant improvement for 1st time use tenant on g/f of (e) mixed unse building. subdivide exist commercial space for multi. tenants w a cooridor on the ground flrDetails
unit b: tenant improvement for 1st time use tenant on g/f of (e) mixed unse building. subdivide exist commercial space for multi. tenants w a cooridor on the ground flr | $50,000 |
| Mar 6, 2021 | Never finaled issued Feb 2023, no final | 520 Precita Av | Boom City Builders Llc | two story rear horizontal addition and basement extension to (e) legal three dwelling unit building. remodel to unit #1 & unit #3. no scope of work for unit #2.Details
two story rear horizontal addition and basement extension to (e) legal three dwelling unit building. remodel to unit #1 & unit #3. no scope of work for unit #2. | $450,000 |
| Dec 9, 2019 | Completed final sign-off Dec 2019 | 419 31st Av | revision to pa 2017-0406-3363 revise existing entertainment space to include bedroom & bathroomDetails
revision to pa 2017-0406-3363 revise existing entertainment space to include bedroom & bathroom | $18,000 | |
| Aug 27, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | Transworld Construction | revision to pa 201904087356 minor front facade remodel - remove brick & replace with wood siding to match (e) entry door, garage door & stepsDetails
revision to pa 201904087356 minor front facade remodel - remove brick & replace with wood siding to match (e) entry door, garage door & steps | $12,000 |
| May 30, 2019 | Expired or cancelled cancelled Jan 2026 | 96 Huntington Dr | add deack at rear, less than 10'-0" above grade. located within req' setbackDetails
add deack at rear, less than 10'-0" above grade. located within req' setback | $10,000 | |
| Feb 15, 2019 | Completed final sign-off Sep 2020 | 2509 Lake St | Transworld Construction | demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs.Details
demo of interior non-struc parti, kitchen, baths, fixtures, rear deck hardscape & landscape in preparation for new construction. all (e) load bearing walls shall remain. limited demo of rated walls & ceilings, maintain ratings until new work is approved. no exterior work @ facade & interior stairs. | $5,000 |
| Jan 29, 2019 | Expired or cancelled cancelled Jan 2026 | 96 Huntington Dr | revision to app#201809251380 to remove and replace one window in frontDetails
revision to app#201809251380 to remove and replace one window in front | ||
| Jun 15, 2018 | Completed final sign-off Nov 2018 | 2575 Judah St | Urban Builder General Contracting Inc | interior demolition. ab-017. construction/t.i. will be sep permit.Details
interior demolition. ab-017. construction/t.i. will be sep permit. | $2,000 |
| May 30, 2018 | Completed final sign-off Nov 2018 | 2575 Judah St | Urban Builder General Contracting Inc | ti- (e) commercial space in a mixed use bld. the (e) retail space already functions as light food facility. the new space will serve coffee & sandwiches. new interior finishes, upgrade bld systems, new accessible restroom. casework maher naDetails
ti- (e) commercial space in a mixed use bld. the (e) retail space already functions as light food facility. the new space will serve coffee & sandwiches. new interior finishes, upgrade bld systems, new accessible restroom. casework maher na | $40,000 |
| Mar 22, 2018 | Never finaled issued Jun 2018, no final | 2230 Pacific Av | Michael E Miranda General Contractor | minor interior restroom remodelDetails
minor interior restroom remodel | $15,000 |
| Feb 5, 2018 | Completed final sign-off Apr 2019 | 10 Roscoe St | interior bldg remodel, new exterior fenestrations, new bldg systems, voluntary structural retrofit and in kind/replacement of deteriorated exterior finishes.Details
interior bldg remodel, new exterior fenestrations, new bldg systems, voluntary structural retrofit and in kind/replacement of deteriorated exterior finishes. | $50,000 | |
| Sep 12, 2017 | Expired or cancelled expired Apr 2019 | 10 Roscoe St | Bay Built Construction Inc | removal & replacement of unreinforced foundation w/new reinforced concrete foundation. adjust doors & windows at side elevation. not visible from st.Details
removal & replacement of unreinforced foundation w/new reinforced concrete foundation. adjust doors & windows at side elevation. not visible from st. | $92,000 |
| Aug 14, 2017 | Completed final sign-off May 2018 | 136 Mateo St | Western Division Build | removal of (e) closets for new 2nd floor bathroomDetails
removal of (e) closets for new 2nd floor bathroom | $8,000 |
| Jun 14, 2017 | Completed final sign-off Sep 2017 | 234 Evelyn Wy | Rutherford Scott Hayes | to comply with nov#201775432- modify (e) deck & fence in rear yard, reduce deck in size by 29 sq.ft., reduce height of fence to 6', replace (e) french door & install new header, replace (e) deck boards.Details
to comply with nov#201775432- modify (e) deck & fence in rear yard, reduce deck in size by 29 sq.ft., reduce height of fence to 6', replace (e) french door & install new header, replace (e) deck boards. | $7,500 |
| Apr 6, 2017 | Completed final sign-off Dec 2019 | 419 31st Av | O'shaughnessy Construction | interior renovation, minor rear addition & lightwell infill, voluntary seismic upgrade & building systems. new rear deck, (1) bathroom & (1) bedroom.Details
interior renovation, minor rear addition & lightwell infill, voluntary seismic upgrade & building systems. new rear deck, (1) bathroom & (1) bedroom. | $350,000 |