Jing Hua Construction Corp
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2017 to Feb 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2024 | In progress filed Feb 2024, not yet issued | 3608 Balboa St | pre housing department request #1284 install two new sink to replace (e) sink. first sink next to dishwasher, replace sind sink to double sink. second sink in the back replace with sink with counter. install 100 gallon water heater and grease trap floor drain.Details
pre housing department request #1284 install two new sink to replace (e) sink. first sink next to dishwasher, replace sind sink to double sink. second sink in the back replace with sink with counter. install 100 gallon water heater and grease trap floor drain. | $5,000 |
| Nov 15, 2023 | Completed final sign-off Jul 2024 | 3886 Noriega St | ti of (e) commercial space. interior partitions, casework, finishes and modification to (e) building system. limited use restaurant.Details
ti of (e) commercial space. interior partitions, casework, finishes and modification to (e) building system. limited use restaurant. | $69,000 |
| Apr 18, 2022 | Completed final sign-off Apr 2022 | 21 Carr St | to comply with nov#202289387: need to reinforce front (e) metal gate. replace main service panel. replace (e) gas stove.Details
to comply with nov#202289387: need to reinforce front (e) metal gate. replace main service panel. replace (e) gas stove. | $4,500 |
| Mar 4, 2022 | Completed final sign-off Feb 2023 | 1577 29th Av | construct 2 bedroom, 1 full bath,& family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath, office & replace (e) sheetroc w/ new at 2/f. repair back siding. relocate (e) bathroom & replace (e) sheetrock w/ new at 3/f. install (2) 2'x4' skylight.Details
construct 2 bedroom, 1 full bath,& family room at g/f. remodel (e) kitchen, bathroom, add 1 full bath, office & replace (e) sheetroc w/ new at 2/f. repair back siding. relocate (e) bathroom & replace (e) sheetrock w/ new at 3/f. install (2) 2'x4' skylight. | $168,000 |
| Sep 10, 2021 | Completed final sign-off Oct 2021 | 2383 30th Av | leaking water from front windows and stucco due to water damage. first level garage door top stucco pop up from the wall. need to fix the crack area and leaking problem.Details
leaking water from front windows and stucco due to water damage. first level garage door top stucco pop up from the wall. need to fix the crack area and leaking problem. | $5,000 |
| Nov 4, 2020 | Completed final sign-off Jan 2021 | 2387 30th Av | leaking water from front windows and stucco craks. due to the wter damange, the bottom level bricks pop=up from wall. need to fix the stucco and windows leak problem.Details
leaking water from front windows and stucco craks. due to the wter damange, the bottom level bricks pop=up from wall. need to fix the stucco and windows leak problem. | $9,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2021 | 2462 25th Av | kitchen & bathroom remodel. enclose lightwell per za bulletin #4.Details
kitchen & bathroom remodel. enclose lightwell per za bulletin #4. | $40,000 |
| Aug 15, 2020 | Completed final sign-off May 2023 | 1522 Howard St | application for adu in existing ground floor space. new work to include new kitchen, remodel of existing bathroom, and new doors and window out to rear yard. mep, and any required title 24 calcs, permitted separately. per ord 162-16.Details
application for adu in existing ground floor space. new work to include new kitchen, remodel of existing bathroom, and new doors and window out to rear yard. mep, and any required title 24 calcs, permitted separately. per ord 162-16. | $50,000 |
| Aug 7, 2020 | Completed final sign-off Oct 2020 | 301 Westgate Dr | dry rot issue do to the weather on the right lower side garage wall. therefore i need to remove outside stucco and change the dry rot wood frame and patch stucco on the exterior.Details
dry rot issue do to the weather on the right lower side garage wall. therefore i need to remove outside stucco and change the dry rot wood frame and patch stucco on the exterior. | $15,000 |
| Oct 1, 2019 | Completed final sign-off Feb 2020 | 1534 36th Av | replace wood windows at front with new, fully matching wood windows in same openings. to have same arch profile, muntin pattern, and ogee lugs. new windows to be full wood marvin ultimate (no aluminum clad).Details
replace wood windows at front with new, fully matching wood windows in same openings. to have same arch profile, muntin pattern, and ogee lugs. new windows to be full wood marvin ultimate (no aluminum clad). | $25,000 |
| Aug 7, 2019 | Completed final sign-off Oct 2022 | 3342 Laguna St | 4th fl, top unit - remodel kitchen, open up 2 walls, remodel 2 baths, add w/d, reconfigure closet; 3rd fl - remodel kitchen, open up 1 wall, remodel 2 baths, add w/d, reconfigure closet; 2nd fl - remodel kitchen, open 1 wall, remodel 2 baths, add w/d, reconfigure closet. add fireplaces, add plywoodDetails
4th fl, top unit - remodel kitchen, open up 2 walls, remodel 2 baths, add w/d, reconfigure closet; 3rd fl - remodel kitchen, open up 1 wall, remodel 2 baths, add w/d, reconfigure closet; 2nd fl - remodel kitchen, open 1 wall, remodel 2 baths, add w/d, reconfigure closet. add fireplaces, add plywood | $320,000 |
| Jul 19, 2019 | Completed final sign-off Aug 2019 | 475 07th Av | to comply with complaint #201961241 item #3 at the above address based on the exterior roof deck dry rot problem. repair the dry rot deck board less than 50%. repair in kind.Details
to comply with complaint #201961241 item #3 at the above address based on the exterior roof deck dry rot problem. repair the dry rot deck board less than 50%. repair in kind. | $4,500 |
| Dec 27, 2018 | Completed final sign-off Sep 2019 | 451 Naples St | 1/f-add 2 (n) bedrms, 1 (n) full bath, (n) home theater w/ bar sink, (n) mud rm. 2/f-remodel (e) bathrm, add (n) half-bath, remodel (e) kitchen. 3/f-convert (e) bedrm to (n) full bath. no new fire walls.Details
1/f-add 2 (n) bedrms, 1 (n) full bath, (n) home theater w/ bar sink, (n) mud rm. 2/f-remodel (e) bathrm, add (n) half-bath, remodel (e) kitchen. 3/f-convert (e) bedrm to (n) full bath. no new fire walls. | $120,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 106 Foerster St | reference 201889312 - revision under #201807023569. remove & replace partial (e) slab w/new 4" concrete slabDetails
reference 201889312 - revision under #201807023569. remove & replace partial (e) slab w/new 4" concrete slab | $10,000 |
| Aug 6, 2018 | Completed final sign-off Sep 2020 | 734 07th Av | aler-site revision to approved bpa #201705186925. revise floor plans, change to rear windows openings and no change to building envelope.Details
aler-site revision to approved bpa #201705186925. revise floor plans, change to rear windows openings and no change to building envelope. | $10,000 |
| Jul 2, 2018 | Completed final sign-off Apr 2019 | 106 Foerster St | construct 3 bedrooms, 2 full baths at gr fl, remodel e kitchen, bathroom, add new full bath, rebuild interior stair, 1 skylight 2nd fl, new deck with staircase at rear of bldg siz 18'6x8Details
construct 3 bedrooms, 2 full baths at gr fl, remodel e kitchen, bathroom, add new full bath, rebuild interior stair, 1 skylight 2nd fl, new deck with staircase at rear of bldg siz 18'6x8 | $120,000 |
| Jul 7, 2017 | Completed final sign-off Jan 2018 | 1879 40th Av | kitchen remodel change al lthe cabinets, new floor tile, instal ttl 6 recessed lights in the kitchen ceilings (n) countertop, sink location stay the same add (n) electrical wire for the counter, stove, hood,refrigirator, diswasher.Details
kitchen remodel change al lthe cabinets, new floor tile, instal ttl 6 recessed lights in the kitchen ceilings (n) countertop, sink location stay the same add (n) electrical wire for the counter, stove, hood,refrigirator, diswasher. | $9,000 |
| Jul 7, 2017 | Completed final sign-off Jan 2018 | 2030 17th Av | kitchen remodel, cabinets, floor tile, recessed lights, countertop, sink, new elctrical for counter, appoiances, stove hood.Details
kitchen remodel, cabinets, floor tile, recessed lights, countertop, sink, new elctrical for counter, appoiances, stove hood. | $9,500 |
| Mar 6, 2017 | Completed final sign-off Feb 2018 | 107 Guttenberg St | remodel kitchen & bath, add full bath, relocate stairs, remove walls on 2nd flr. add 3 bedrooms, family, 2 bath on 1st flr. replace w/alum windows @ front & vinyl windows @ rear. relocate water heaters, furnace. upgrade elec, plbg system.Details
remodel kitchen & bath, add full bath, relocate stairs, remove walls on 2nd flr. add 3 bedrooms, family, 2 bath on 1st flr. replace w/alum windows @ front & vinyl windows @ rear. relocate water heaters, furnace. upgrade elec, plbg system. | $98,000 |