Daniel Connell
- Listed as
- architect, designer, engineer
- Firm
- Infinigy & Design.
- Based in
- Lake Forest
- On San Francisco permits
- Oct 2010 to Apr 2026
19 permits since 2000 (engineer on 12 permits, architect on 5 permits, designer on 2 permits): 8 completed, 3 in progress, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2026 | In progress filed Apr 2026, not yet issued | 890 Taraval St | replace existing antenna mounts with new antenna mounts. relocate existing antennas + radios onto new mount. install 2 new cabinets, replace existing roottop equip., platform with new. reinforce existing roof framing at new equip, platform. install 1 led outdoor service light, 1 new h-frame &Details
replace existing antenna mounts with new antenna mounts. relocate existing antennas + radios onto new mount. install 2 new cabinets, replace existing roottop equip., platform with new. reinforce existing roof framing at new equip, platform. install 1 led outdoor service light, 1 new h-frame & | $25,000 | |
| Jul 28, 2025 | In progress issued Jan 2026 | 599 Monterey Bl | Mastec Network Solutions Inc | t-mobile: install 6 new antennas 2 per sector. install 6 radios (3 x 3). add 2 cabinets. remove 1 cabinet.Details
t-mobile: install 6 new antennas 2 per sector. install 6 radios (3 x 3). add 2 cabinets. remove 1 cabinet. | $25,000 |
| Jul 25, 2025 | In progress issued Feb 2026 | 5235 Diamond Heights Bl | Metropolitan Electrical Construction | t-mobile: install 6 new antennas, 6 radios, add 2 cabinets, remove 1 existing cabinet, remove 1 antenna.Details
t-mobile: install 6 new antennas, 6 radios, add 2 cabinets, remove 1 existing cabinet, remove 1 antenna. | $25,000 |
| Jan 31, 2019 | Completed final sign-off Jul 2019 | 1740 Sloat Bl | Metropolitan Electrical Construction | replace (3) sprint antennas inside existing church steepleDetails
replace (3) sprint antennas inside existing church steeple | $20,000 |
| Dec 27, 2018 | Completed final sign-off Dec 2019 | 897 Hyde St | Electric Tech Construction Inc | att modification r&r 9 (e) antennas w/ 9 (n) antenans; install other small equip, no change to batteries. remove 2(e) rrus, add 4 (n) rrus per sectorDetails
att modification r&r 9 (e) antennas w/ 9 (n) antenans; install other small equip, no change to batteries. remove 2(e) rrus, add 4 (n) rrus per sector | $56,000 |
| Nov 6, 2018 | Completed final sign-off Jul 2019 | 602 The Embarcadero | Electric Tech Construction Inc | at&t modification: remove &replace 9 (e) antennas with 9 (n) antennas; remove and replace 3 (e) rrus with 3 (n) rrus; install 6(n) rrus; remove and replace batteriesDetails
at&t modification: remove &replace 9 (e) antennas with 9 (n) antennas; remove and replace 3 (e) rrus with 3 (n) rrus; install 6(n) rrus; remove and replace batteries | $27,000 |
| Oct 4, 2017 | Completed final sign-off Oct 2021 | 2191 Market St | Cba Site Services Inc., C I K Power Distributors, Llc | verizon wireless: rooftop: remove & replace (6) antennas. add (3) (n) antennas, add 20 rru's & supporting equipment on rooftop. install (n) 48 dc power plan in (e) equipment room. frp will be surrounding (n) rru's. maher n/aDetails
verizon wireless: rooftop: remove & replace (6) antennas. add (3) (n) antennas, add 20 rru's & supporting equipment on rooftop. install (n) 48 dc power plan in (e) equipment room. frp will be surrounding (n) rru's. maher n/a | $25,000 |
| Jul 8, 2016 | Never finaled issued Jul 2016, no final | 324 Yerba Buena Rd | North Valley Engineers Incorporated | revision to ref pa 2015 1204 4162 & 2015 0508 5816: move equipment area - see drawingDetails
revision to ref pa 2015 1204 4162 & 2015 0508 5816: move equipment area - see drawing | |
| May 19, 2016 | Never finaled issued Sep 2016, no final | 1001 Potrero Av | Mc Millan Electric | verizon wireless proposing to add 3 new rrus on extg cabinet. also adding idas rack mounted equipment in extg cabinet. no antenna installation or work. onle rrus and racks. no changes to rf report. n/a for maher.Details
verizon wireless proposing to add 3 new rrus on extg cabinet. also adding idas rack mounted equipment in extg cabinet. no antenna installation or work. onle rrus and racks. no changes to rf report. n/a for maher. | $10,000 |
| Feb 18, 2016 | Expired or cancelled cancelled Sep 2022 | 849 Avenue D | add generator to (e) verizon wireless facility @ pa# 2015/08/13/4144. ** maher: n/a **Details
add generator to (e) verizon wireless facility @ pa# 2015/08/13/4144. ** maher: n/a ** | $15,000 | |
| Feb 18, 2016 | Expired or cancelled cancelled Aug 2022 | 324 Yerba Buena Rd | add generator to (e) verizon wireless facility @ pa# 2015/05/08/5816. ** maher: n/a **Details
add generator to (e) verizon wireless facility @ pa# 2015/05/08/5816. ** maher: n/a ** | $15,000 | |
| Dec 4, 2015 | Never finaled issued Jan 2016, no final | 324 Yerba Buena Rd | North Valley Engineers Incorporated | revision to pa#201505085816 moving the antenna to the equipment area. n/a ordinance #155-13.Details
revision to pa#201505085816 moving the antenna to the equipment area. n/a ordinance #155-13. | |
| Aug 11, 2015 | Completed final sign-off Jan 2016 | 3801 03rd St | Cba Site Services Inc. | modification to a verizon wireless e antenna facility to replace 6 e antennas with 6 new antennas,add 3 new pcs rrus12/a2 units behind antennas, add 3 n a2 units to e aws rrus12 located behind antennas, reuse coax or add 2 7/8" if no spares, add 1 diplexer inside e equipment shelter,Details
modification to a verizon wireless e antenna facility to replace 6 e antennas with 6 new antennas,add 3 new pcs rrus12/a2 units behind antennas, add 3 n a2 units to e aws rrus12 located behind antennas, reuse coax or add 2 7/8" if no spares, add 1 diplexer inside e equipment shelter, | $30,000 |
| Jul 23, 2015 | Completed final sign-off Mar 2016 | 150 Executive Park Bl | Ridge Communications Inc | replace 4 antennas & 2 mounting brackets w/4 new antennas, 2 per sector & 2 mounting brackets on beta sector. add 2 new pcs rrus 12 w/a2 units, replace 2 aws rrusii with 2 rrusiz w/a2 units, relocate (e) gps antenna from top of equipment shetter to cable tray on building roof. all antennas, bracketsDetails
replace 4 antennas & 2 mounting brackets w/4 new antennas, 2 per sector & 2 mounting brackets on beta sector. add 2 new pcs rrus 12 w/a2 units, replace 2 aws rrusii with 2 rrusiz w/a2 units, relocate (e) gps antenna from top of equipment shetter to cable tray on building roof. all antennas, brackets | $30,000 |
| Jun 29, 2015 | Completed final sign-off Jan 2016 | 2191 Market St | Ridge Communications Inc | modification to verizon wireless telecom site to remove (1) eudo cabinet in eqpt area,instal 3 aws rrus w/az units,3pcs rrusw/ az units 6 rfs diplexers & 3 commonscope couplers all inside the (e)eqpt area located in garage on basement level,no change to antennas; maher n/aDetails
modification to verizon wireless telecom site to remove (1) eudo cabinet in eqpt area,instal 3 aws rrus w/az units,3pcs rrusw/ az units 6 rfs diplexers & 3 commonscope couplers all inside the (e)eqpt area located in garage on basement level,no change to antennas; maher n/a | $15,000 |
| May 8, 2015 | Never finaled issued Nov 2015, no final | 324 Yerba Buena Rd | North Valley Engineers Incorporated | verizon wireless proposes to build a new steel platform for ground level. on the platform will be radio cabinets, 30kv generator. adjacent to platform - (2) 20' tall poles for (4) 6' tall antennas. n/a maher ordinanceDetails
verizon wireless proposes to build a new steel platform for ground level. on the platform will be radio cabinets, 30kv generator. adjacent to platform - (2) 20' tall poles for (4) 6' tall antennas. n/a maher ordinance | $86,000 |
| Nov 15, 2013 | Expired or cancelled cancelled Nov 2015 | 576 Sacramento St | verizon wireless proposes to replace 3 (e) lte antennas w/ 3 (n) dual-band split-beam antennas, add 12 (n) rrh units, raycaps, hybrid & ret cables, 1 ac power circuit from equipment room to roof, & 1 dc power cabinet at roof. paint exposes cable & antennas to match (e) bldgDetails
verizon wireless proposes to replace 3 (e) lte antennas w/ 3 (n) dual-band split-beam antennas, add 12 (n) rrh units, raycaps, hybrid & ret cables, 1 ac power circuit from equipment room to roof, & 1 dc power cabinet at roof. paint exposes cable & antennas to match (e) bldg | $18,000 | |
| Jul 12, 2013 | Expired or cancelled withdrawn Oct 2021 | 2301 03rd St | Overland Contracting Inc | perform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units.Details
perform site modification to an (e) wireless communications facility. adding (3) panel antennas on rooftop penthouse. additing (2) equipment cabinets. adding (6) rru units. | $45,000 |
| Oct 27, 2010 | Completed final sign-off May 2011 | 5630 Mission St | Park Place Contractors | verizon proposes to add three antennas inside their screened enclosure next to their existing antennas. also to add three new "back pack" size radio units and enlarge the existing screen wall by 2' on three sides. revision to #200906049807.Details
verizon proposes to add three antennas inside their screened enclosure next to their existing antennas. also to add three new "back pack" size radio units and enlarge the existing screen wall by 2' on three sides. revision to #200906049807. | $18,000 |