Chris Dorman
- Listed as
- architect, authorized agent-others
- Firm
- Dorman Assoc
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2011 to Sep 2026
51 permits since 2000 (architect on 49 permits, authorized agent-others on 3 permits): 31 completed, 14 in progress, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 264 Dalewood Wy | revision to 202607285677. change location of washer/dryer, create closet in approved kitchenette. remove partial non-bearing interior walls.Details
revision to 202607285677. change location of washer/dryer, create closet in approved kitchenette. remove partial non-bearing interior walls. | ||
| Aug 19, 2026 | In progress issued Sep 2026 | 301 King St | revision to pa 202311271435, revision to layout of units 216, 219, 316 & 319. revisions due to conflict w/tendons in slabDetails
revision to pa 202311271435, revision to layout of units 216, 219, 316 & 319. revisions due to conflict w/tendons in slab | ||
| Jul 28, 2026 | In progress issued Aug 2026 | 264 Dalewood Wy | scope includes replacement of e window with new sliding glass door, removel e bathroom, addition of kitchette with cook top (2 burner) on gr flDetails
scope includes replacement of e window with new sliding glass door, removel e bathroom, addition of kitchette with cook top (2 burner) on gr fl | $100,000 | |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 434 Ellis St | interior remodel of (e) childcare space: modification of (e) non bearing walls, (n) ff&e, (n) lighting on higlighted area on 1st and 2nd floor. accesibility upgrades serving area of work. (n) play area equipment and fininshes upgrades on roof. no changes to bldg use or occupancy. legalizing garage..Details
interior remodel of (e) childcare space: modification of (e) non bearing walls, (n) ff&e, (n) lighting on higlighted area on 1st and 2nd floor. accesibility upgrades serving area of work. (n) play area equipment and fininshes upgrades on roof. no changes to bldg use or occupancy. legalizing garage.. | $350,000 | |
| Jun 2, 2026 | In progress issued Jul 2026 | 1294 Potrero Av | exterior scope: replace e play yard w new play equipment, play sufacing, gavel play area landscaping and outdoor classroom area work includes overlay over e podium deck as well as on grade improvements. replacement o e drinking fountain with accessible model. int scope: upgrade e restrooms onDetails
exterior scope: replace e play yard w new play equipment, play sufacing, gavel play area landscaping and outdoor classroom area work includes overlay over e podium deck as well as on grade improvements. replacement o e drinking fountain with accessible model. int scope: upgrade e restrooms on | $195,000 | |
| Apr 15, 2026 | In progress filed Apr 2026, not yet issued | 1221 Oakdale Av | convert (e) church into (n) childcare center service 0-5yr.new classrooms and support spaces with int alts & cou.new mep systems throughout and vol seismic upgrade,extension of (e) deck at west eval and new outdoor play areas.Details
convert (e) church into (n) childcare center service 0-5yr.new classrooms and support spaces with int alts & cou.new mep systems throughout and vol seismic upgrade,extension of (e) deck at west eval and new outdoor play areas. | $1,500,000 | |
| Oct 3, 2025 | In progress filed Oct 2025, not yet issued | 1 Dr Carlton B Goodlett Pl | prop h:tenant improvement of(e)childcare area within city hall @ ground flDetails
prop h:tenant improvement of(e)childcare area within city hall @ ground fl | $1,100,000 | |
| Aug 27, 2025 | In progress issued Feb 2026 | 283 Farallones St | Acme Builders | rear 825 sf horiz addition at lvs 1 & 2 and interior alterations to (e) group e childcare facility. change of use & occupancy from group e daycare to group i-4 & e daycare. inclds: seismic upgrde, (n) mep, (n) lvl 2 deck with 2 (n) exterior exit stairs, (n) platform lift, and (n) outdoor play areas.Details
rear 825 sf horiz addition at lvs 1 & 2 and interior alterations to (e) group e childcare facility. change of use & occupancy from group e daycare to group i-4 & e daycare. inclds: seismic upgrde, (n) mep, (n) lvl 2 deck with 2 (n) exterior exit stairs, (n) platform lift, and (n) outdoor play areas. | $2,200,000 |
| Jul 22, 2025 | In progress issued Feb 2026 | 1101 Masonic Av | Guild Construction Inc | minor interior remodel of childcare center at 1101 masonic. the building is childcare since 1985 0-5years only.add childrens restrooms within classrooms and in place of e childrens restrooms, new ada adult restrooms will be added. minor refresh of finishes and lights in other areas. no exteriorDetails
minor interior remodel of childcare center at 1101 masonic. the building is childcare since 1985 0-5years only.add childrens restrooms within classrooms and in place of e childrens restrooms, new ada adult restrooms will be added. minor refresh of finishes and lights in other areas. no exterior | $490,000 |
| Jul 16, 2025 | Completed final sign-off Jun 2026 | 2498 Folsom St | Dore Const. Of Calif. Inc. | minor interior remodel of (e) preschool. no change to occupancy. replacement of old heat pump with new unit, replacement of old flourescent light fixtures w/ new led fixtures, remove (e) plumbing fixtures & replace w/ child size fixtures and adding cabinetry and storage for teachers.Details
minor interior remodel of (e) preschool. no change to occupancy. replacement of old heat pump with new unit, replacement of old flourescent light fixtures w/ new led fixtures, remove (e) plumbing fixtures & replace w/ child size fixtures and adding cabinetry and storage for teachers. | $193,000 |
| Apr 16, 2025 | In progress issued Jul 2026 | 245 East Clementina St | Swinerton Builders | project is commercial t.i.for non-profit childcare facility ages 0-5 w/in (e) residential building. inclds. 4 classrooms, for infant-toddlers and pre-school + administrative areas and 2 outdoor play areas. existing core and shell warm shell conditions to remain.Details
project is commercial t.i.for non-profit childcare facility ages 0-5 w/in (e) residential building. inclds. 4 classrooms, for infant-toddlers and pre-school + administrative areas and 2 outdoor play areas. existing core and shell warm shell conditions to remain. | $1,821,294 |
| Apr 9, 2025 | In progress issued Mar 2026 | 4080 Mission St | Ck Water Systems And Landscape Developme | prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5.Details
prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5. | $785,000 |
| Apr 9, 2025 | In progress issued Feb 2026 | 1011 Garfield St | Art Garden Design Inc Dba Art Garden Des | prop h: project involves a renovation of the children's play area and access/egress to the playground from the exterior sidewalk.this includes the removal of the(e)ramp,including handrails & landings,& a portion of the(e)fence adjacent to the ramp.new accessible walkway from the sidewalk entranceDetails
prop h: project involves a renovation of the children's play area and access/egress to the playground from the exterior sidewalk.this includes the removal of the(e)ramp,including handrails & landings,& a portion of the(e)fence adjacent to the ramp.new accessible walkway from the sidewalk entrance | $290,000 |
| Apr 9, 2025 | Completed final sign-off May 2026 | 729 Kirkwood Av | Ck Water Systems And Landscape Developme | prop h:renovation of outdoor play area including:protection of all(e)canopy trees;demolition & removal of existing exterior paving surfaces & the corresponding surface base course.demolition & removal of (e)playground climbing structures;demolition & removal of(e)onsite chain link fencing.Details
prop h:renovation of outdoor play area including:protection of all(e)canopy trees;demolition & removal of existing exterior paving surfaces & the corresponding surface base course.demolition & removal of (e)playground climbing structures;demolition & removal of(e)onsite chain link fencing. | $785,000 |
| Sep 4, 2024 | Completed final sign-off Jan 2025 | 353 King St | revision to 202311291555(adu unit). revision to the bathroom layout and addition of closet.kitchen and bathroom to be adaptableDetails
revision to 202311291555(adu unit). revision to the bathroom layout and addition of closet.kitchen and bathroom to be adaptable | ||
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 380 21st Av | Tolo Enterprises Inc. | conversion of teacher support area into laundry & elevator door sustituion. revision to pa# 202210063902. correct the occupancy classification from b,e to i-4-b (non-separated)Details
conversion of teacher support area into laundry & elevator door sustituion. revision to pa# 202210063902. correct the occupancy classification from b,e to i-4-b (non-separated) | |
| Apr 17, 2024 | Completed final sign-off Jul 2026 | 530 Moraga St | Majestic Landscape | horizontal expansion of (e) 3/f, with relocation and expansion of (e) bathroom.Details
horizontal expansion of (e) 3/f, with relocation and expansion of (e) bathroom. | $175,000 |
| Apr 17, 2024 | In progress issued May 2024 | 2350 San Jose Av | revision to 202212057678. sheet a1.6 labels are renamed to show the correct age group of the children within the classrooms. ref 202212057678Details
revision to 202212057678. sheet a1.6 labels are renamed to show the correct age group of the children within the classrooms. ref 202212057678 | ||
| Nov 29, 2023 | Completed final sign-off Jan 2025 | 353 King St | Cobalt Facities Inc Sba Cobalt Construct | conversion of (e) social lounge into (n) 1 bedroom adu unit on the 3rd floor accessory dwelling units (adus) with (n) kitchen, bedroom, living room and bathroom @ 353/383 king st.Details
conversion of (e) social lounge into (n) 1 bedroom adu unit on the 3rd floor accessory dwelling units (adus) with (n) kitchen, bedroom, living room and bathroom @ 353/383 king st. | $50,000 |
| Nov 27, 2023 | In progress issued Jul 2026 | 301 King St | conversion of un-used parking spots on the 2nd & 3rd floor into 10 new accessory dwelling units (adus) with (n) kitchen, bedroom, living room and new bathroomDetails
conversion of un-used parking spots on the 2nd & 3rd floor into 10 new accessory dwelling units (adus) with (n) kitchen, bedroom, living room and new bathroom | $300,000 | |
| Sep 18, 2023 | Completed final sign-off Sep 2024 | 1170 Columbus Av | L C Builders Inc. | repurpose existing e3 multi-purpose room into a i4 classroom, consisting of nap area, diaper changeing area for infants ages 0 to 2. add an ada all gender adult restroom.Details
repurpose existing e3 multi-purpose room into a i4 classroom, consisting of nap area, diaper changeing area for infants ages 0 to 2. add an ada all gender adult restroom. | $149,600 |
| Jun 6, 2023 | Completed final sign-off Oct 2023 | 49 South Van Ness Av | vertical railing extension at (e) guard rail at 3rd fl terrace outside (e) day care center.Details
vertical railing extension at (e) guard rail at 3rd fl terrace outside (e) day care center. | $275,000 | |
| May 25, 2023 | Completed final sign-off Feb 2024 | 1530 Buchanan St | A W T Construction Group Inc | revision to pa#: 202212208808 replace all windows, doors, fixtures, and finishes damaged in fire to match exotiusDetails
revision to pa#: 202212208808 replace all windows, doors, fixtures, and finishes damaged in fire to match exotius | $200,000 |
| May 11, 2023 | Completed final sign-off Feb 2024 | 100 Masonic Av | International Waterproofing | within preschool classroom- removing extg step in the slab to even out the floor for ada accessibility pour of 3" of concrete on the extg slab to level with adjacent corridor for ada pour new partial concrete slab where old step is removed. revision ot 202205315241Details
within preschool classroom- removing extg step in the slab to even out the floor for ada accessibility pour of 3" of concrete on the extg slab to level with adjacent corridor for ada pour new partial concrete slab where old step is removed. revision ot 202205315241 | $80,000 |
| Dec 29, 2022 | Never finaled filed Dec 2022, never issued | 8 Locksley Av | conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave.Details
conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave. | $40,000 | |
| Dec 28, 2022 | Never finaled filed Dec 2022, never issued | 6 Locksley Av | conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance.Details
conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance. | $200,000 | |
| Dec 20, 2022 | Completed final sign-off Feb 2024 | 1530 Buchanan St | A W T Construction Group Inc | t.i. of extg co-working space at main & upper floors, nw interior partition walls & doors to create nw office spaces, includes replaement of fixtures & accessories at restroom due to ada upgrades.Details
t.i. of extg co-working space at main & upper floors, nw interior partition walls & doors to create nw office spaces, includes replaement of fixtures & accessories at restroom due to ada upgrades. | $225,000 |
| Dec 20, 2022 | Completed final sign-off Jan 2024 | 10 Bertie Minor Ln | A W T Construction Group Inc | upgrade to extg accessible path of travel exterio hand rails van parkingDetails
upgrade to extg accessible path of travel exterio hand rails van parking | $15,000 |
| Dec 15, 2022 | Expired or cancelled withdrawn Feb 2025 | 120 Octavia St | prop h: a non-profit child development center facility (ages 0-5yrs) for wu yee of s.f. on g/f of res. bldg. commercial t.i. with three classrooms to include infants, toddlers, preschool age children, and admin areas. project is a t.i of warm shell based on mohcd guidelines. ref pa#201911147293.Details
prop h: a non-profit child development center facility (ages 0-5yrs) for wu yee of s.f. on g/f of res. bldg. commercial t.i. with three classrooms to include infants, toddlers, preschool age children, and admin areas. project is a t.i of warm shell based on mohcd guidelines. ref pa#201911147293. | $1,000,000 | |
| Dec 12, 2022 | Completed final sign-off May 2025 | 100 Masonic Av | Guzman Construction Group Inc. | prop h: interior remodel &play area improvements for non-profit child development center. remodeling classrooms for infants & toddlers age-group, renovate (e) bathrooms, add additional unisex restrooms, remodel (e) offices & add additional lounge. (n) accessible path. remodel (e) play area at back.Details
prop h: interior remodel &play area improvements for non-profit child development center. remodeling classrooms for infants & toddlers age-group, renovate (e) bathrooms, add additional unisex restrooms, remodel (e) offices & add additional lounge. (n) accessible path. remodel (e) play area at back. | $1,600,000 |
| Dec 5, 2022 | Completed final sign-off Nov 2023 | 2350 San Jose Av | Charles Pankow Builders Ltd | prop h: new non-profit child development center / child care facility t.i.. new play areas, 3 classrooms, additional administrative spaces. warm space is a warm shell per mohcd guidelines. parking, exterior doors & windows, electrical panels, etc, are provided as part of the core & shell building.Details
prop h: new non-profit child development center / child care facility t.i.. new play areas, 3 classrooms, additional administrative spaces. warm space is a warm shell per mohcd guidelines. parking, exterior doors & windows, electrical panels, etc, are provided as part of the core & shell building. | $2,540,000 |
| Oct 6, 2022 | Completed final sign-off Nov 2024 | 380 21st Av | Tolo Enterprises Inc. | prop h: t.i.of (e) space @380 21st ave.converting two stories and one basement into(n)child care center with(n) infant,toddler & preschool classrooms,indoor play areas,food prep/staff lounge,child & adult restrooms & (n)elevator.age group of children in 0-5 years old.Details
prop h: t.i.of (e) space @380 21st ave.converting two stories and one basement into(n)child care center with(n) infant,toddler & preschool classrooms,indoor play areas,food prep/staff lounge,child & adult restrooms & (n)elevator.age group of children in 0-5 years old. | $850,000 |
| May 31, 2022 | Completed final sign-off Feb 2024 | 100 Masonic Av | International Waterproofing | prop h: minor interior remodel only, and includes replacing existing finishes with new standard finishes. no structural change or modification is proposed.Details
prop h: minor interior remodel only, and includes replacing existing finishes with new standard finishes. no structural change or modification is proposed. | $170,000 |
| Apr 20, 2022 | Completed final sign-off Nov 2023 | 1820 Alemany Bl | James E Roberts-Obayashi Corporation | prop h: tenant improvement. non-profit child care facility.Details
prop h: tenant improvement. non-profit child care facility. | $1,200,000 |
| Feb 24, 2022 | Completed final sign-off Aug 2026 | 1801 25th St | Charles Pankow Builders Ltd | tenant improvements, and new play areas.t.i. improvement commericial prjt including 4 classrooms & additional admin spaces.age-approp play areas for childring are provided in the outdoor space.childcare t.i. space is warm sheel per mohcd guildleines. t.i. scope only includes interior improvements.Details
tenant improvements, and new play areas.t.i. improvement commericial prjt including 4 classrooms & additional admin spaces.age-approp play areas for childring are provided in the outdoor space.childcare t.i. space is warm sheel per mohcd guildleines. t.i. scope only includes interior improvements. | $2,700,000 |
| Jun 25, 2021 | Completed final sign-off Nov 2023 | 175 Scotia Av | Ncr Construction Inc | prop h. remodel extg interior space of 175 scotia ave. to a new t.i. childcare center, which includes infant, toddlers, and preschool classrooms, as well as administration areas. new doors and windows on the exteriors, many are to be replaced inDetails
prop h. remodel extg interior space of 175 scotia ave. to a new t.i. childcare center, which includes infant, toddlers, and preschool classrooms, as well as administration areas. new doors and windows on the exteriors, many are to be replaced in | $1,000,000 |
| Feb 8, 2021 | Expired or cancelled cancelled Jan 2026 | 55 09th St | reduce height of (e) metal sidewalk planters along 9th street. add (n) in-grade planting areas at specified areas adjacent to bldg. add (n) veritical extension to (e) fense & street gate at north property lineDetails
reduce height of (e) metal sidewalk planters along 9th street. add (n) in-grade planting areas at specified areas adjacent to bldg. add (n) veritical extension to (e) fense & street gate at north property line | $75,000 | |
| Dec 2, 2020 | Expired or cancelled suspend Aug 2025 | 55 09th St | replace existing entry lobby door with new power-assist door. entry lobby door is for residential lobby onlyDetails
replace existing entry lobby door with new power-assist door. entry lobby door is for residential lobby only | $7,000 | |
| Oct 21, 2020 | Completed final sign-off Jun 2021 | 301 De Montfort Av | Hillhouse Construction Company Inc | remove temporary stairs installed under pa 2015 1006 8907Details
remove temporary stairs installed under pa 2015 1006 8907 | $4,500 |
| Feb 21, 2020 | Completed final sign-off Sep 2021 | 670 Brunswick St | A W T Construction Group Inc | revision to 201809059151, additon of new child toilet in bath area, increase size childrens sink to include 3 faucets, move e janitorial sink to adjacent gardening storage area and replace old sink with new mop sink, chang appliance type in brk rm, door leaves changed to flush panel for 2 doors.Details
revision to 201809059151, additon of new child toilet in bath area, increase size childrens sink to include 3 faucets, move e janitorial sink to adjacent gardening storage area and replace old sink with new mop sink, chang appliance type in brk rm, door leaves changed to flush panel for 2 doors. | $20,000 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 1601 Lane St | Nibbi Bros Assoc Inc. | remodel extg office to be a child watch 'e' occupancy in this room. add child's bathroom.Details
remodel extg office to be a child watch 'e' occupancy in this room. add child's bathroom. | $80,000 |
| Sep 5, 2018 | Completed final sign-off Sep 2021 | 670 Brunswick St | A W T Construction Group Inc | interior remodel of existing club house to a preschool, including remodel bathroom and teacher's loungeDetails
interior remodel of existing club house to a preschool, including remodel bathroom and teacher's lounge | $300,000 |
| Jul 25, 2017 | Completed final sign-off Jan 2018 | 50 Fremont St | Swinerton Builders | revision to 201508275469, 201705106189. reconfirgure north gr fl exist door swings to achieve optimal exit separationDetails
revision to 201508275469, 201705106189. reconfirgure north gr fl exist door swings to achieve optimal exit separation | $2,000 |
| May 10, 2017 | Completed final sign-off Sep 2017 | 50 Fremont St | Swinerton Builders | revision to 201608275469 for inclusion of exit discharge separation rail. clarification of ext egress paths, reissuance of ab005 for childcare egressDetails
revision to 201608275469 for inclusion of exit discharge separation rail. clarification of ext egress paths, reissuance of ab005 for childcare egress | $500 |
| Dec 8, 2016 | Completed final sign-off Sep 2017 | 50 Fremont St | Swinerton Builders | revision to 201508275469 to revise name of food prep to pantry area. dishwasher to be low temp undercounter, not commercial. maher naDetails
revision to 201508275469 to revise name of food prep to pantry area. dishwasher to be low temp undercounter, not commercial. maher na | |
| Jan 28, 2016 | Completed final sign-off Aug 2018 | 399 San Fernando Wy | James Labao | replace 3 windows and install new bike lockers, conform plans to new planning conditional use permit.Details
replace 3 windows and install new bike lockers, conform plans to new planning conditional use permit. | $8,000 |
| Aug 27, 2015 | Completed final sign-off Aug 2017 | 50 Fremont St | Swinerton Builders | (mahner ordin. extended 155-13 not required)change of use:restaurant space into (n)child care facility on partial 1&2nd fls.restaurant space on 1st fl.office on 2/fl convert to child care. portions of (e)plaza converted to play area.Details
(mahner ordin. extended 155-13 not required)change of use:restaurant space into (n)child care facility on partial 1&2nd fls.restaurant space on 1st fl.office on 2/fl convert to child care. portions of (e)plaza converted to play area. | $2,500,000 |
| Oct 10, 2013 | Never finaled issued Oct 2013, no final | 1601 Lane St | establish occupant load signs for three rooms on 1 and 2 floors. sffd assembly permit required. construction was done under pa #2012.06.21.3101. no work to be done at this permit.Details
establish occupant load signs for three rooms on 1 and 2 floors. sffd assembly permit required. construction was done under pa #2012.06.21.3101. no work to be done at this permit. | ||
| Jul 31, 2013 | Completed final sign-off Nov 2013 | 1601 Lane St | Hillhouse Construction Company Inc | remodel (e) fitness rooms & change (e) storage room into new shower rooms & 09Details
remodel (e) fitness rooms & change (e) storage room into new shower rooms & 09 | $90,000 |
| Jun 21, 2012 | Completed final sign-off Jun 2013 | 1601 Lane St | Thompson Builders Corp | tenant improvement of existing space to accommodate new kitche, community room, conference room, offices, womens restroomDetails
tenant improvement of existing space to accommodate new kitche, community room, conference room, offices, womens restroom | $181,000 |
| Jul 18, 2011 | Completed final sign-off Sep 2013 | 1601 Lane St | River View Construction Inc | remove (e) offices & refinish (e) restroom for teen center, remove (e) entry, fill in wall & add new windows, add new exit. occupant load calculations added to plans. must field verify 3 exits for occupant load calculated for gym. review 2nd floor for proper occupant load signage, egress.Details
remove (e) offices & refinish (e) restroom for teen center, remove (e) entry, fill in wall & add new windows, add new exit. occupant load calculations added to plans. must field verify 3 exits for occupant load calculated for gym. review 2nd floor for proper occupant load signage, egress. | $120,000 |