Charles Lee
- Listed as
- architect, engineer
- Firm
- Charles Lee Architects
- On San Francisco permits
- May 2016 to Oct 2025
13 permits since 2000 (architect on 12 permits, engineer on 1 permit): 9 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2025 | In progress filed Oct 2025, not yet issued | 2731 38th Av | Oscar E Maldonado | revision to pa#2025-0328-3317 amendment to add (2) new windows at the area work.Details
revision to pa#2025-0328-3317 amendment to add (2) new windows at the area work. | $6,700 |
| Jul 23, 2025 | In progress issued Aug 2025 | 398 Christopher Dr | Rati Construction Inc | 1) 2 new bedrooms, 2 new bathrooms and 1 family room to be constructed at ground floor. 2)reconfigure existing kitchen layout at 2nd floor. 3) reconfigure existing stair from 2nd floor to ground floor.Details
1) 2 new bedrooms, 2 new bathrooms and 1 family room to be constructed at ground floor. 2)reconfigure existing kitchen layout at 2nd floor. 3) reconfigure existing stair from 2nd floor to ground floor. | $150,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2026 | 2731 38th Av | Oscar E Maldonado | interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitableDetails
interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitable | $251,027 |
| Sep 5, 2024 | In progress issued Dec 2024 | 22 Valley St | Oscar E Maldonado | revise pa 2024-0319-8162 to document/include additional scope comprised of roof deck and interior stairs as well as minor changes due to field conditions.Details
revise pa 2024-0319-8162 to document/include additional scope comprised of roof deck and interior stairs as well as minor changes due to field conditions. | $49,455 |
| Apr 7, 2024 | In progress issued Aug 2024 | 22 Valley St | Oscar E Maldonado | interior remodel of upper lvl renovation of kitchen, relocate bathroom, 2 new bathrooms, rlocated laundry, select new or alter windows & doors. replace rear roof. associated electrical & plumbing. new duct heat pump & heat pump hot water heaterDetails
interior remodel of upper lvl renovation of kitchen, relocate bathroom, 2 new bathrooms, rlocated laundry, select new or alter windows & doors. replace rear roof. associated electrical & plumbing. new duct heat pump & heat pump hot water heater | $430,405 |
| Oct 13, 2023 | Completed final sign-off May 2025 | 111 Day St | Oscar E Maldonado | alteration to existing dwelling comprised of baseement conversion (addition of cfa) into new bedroom, new bathroom, and relocated laundry, including new underpinning foundations, new floor slab, and voluntary retrofit; subdivision of existing upper level bedroom into two (five bedrooms total);Details
alteration to existing dwelling comprised of baseement conversion (addition of cfa) into new bedroom, new bathroom, and relocated laundry, including new underpinning foundations, new floor slab, and voluntary retrofit; subdivision of existing upper level bedroom into two (five bedrooms total); | $300,434 |
| Apr 25, 2023 | Completed final sign-off Dec 2023 | 85 Cerritos Av | Oscar E Maldonado | alterations to extg remodeled kitchen and laundry, select new windows, associated structural, electrical and plumbing alterations.Details
alterations to extg remodeled kitchen and laundry, select new windows, associated structural, electrical and plumbing alterations. | $166,795 |
| Apr 7, 2021 | Completed final sign-off Apr 2022 | 111 Day St | Oscar E Maldonado | selective demo and remodel of 2nd flr to create new kitchen and new bathroom including selective window and door replacement. associated structural and mep work.Details
selective demo and remodel of 2nd flr to create new kitchen and new bathroom including selective window and door replacement. associated structural and mep work. | $76,029 |
| Feb 7, 2020 | Completed final sign-off Oct 2020 | 2126 47th Av | rev pa# 201907115695; remove fire sprinkler from scope of work. previously approved ab-005 will not be usedDetails
rev pa# 201907115695; remove fire sprinkler from scope of work. previously approved ab-005 will not be used | ||
| Jul 11, 2019 | Completed final sign-off Oct 2020 | 2126 47th Av | interior remodel of (e) sfd: seperation of 1 car garage, convert lower level to habitable space (rooms down), new study, bath, family room. remodel upper level incl kitchen & bath. new rear yard deck.Details
interior remodel of (e) sfd: seperation of 1 car garage, convert lower level to habitable space (rooms down), new study, bath, family room. remodel upper level incl kitchen & bath. new rear yard deck. | $151,057 | |
| Jun 7, 2018 | Completed final sign-off Jul 2019 | 86 Midcrest Wy | Kanler Inc | alterations including kitchen and bath remodels, streets window and door replacement, mech upgrades, voluntary seismic bolt and braceDetails
alterations including kitchen and bath remodels, streets window and door replacement, mech upgrades, voluntary seismic bolt and brace | $211,099 |
| Jun 16, 2017 | Completed final sign-off Apr 2018 | 1246 34th Av | Brickhouse Construction Inc | both units: kitchen & bath remodel, replacement of: 2 windows, doors. lighting upgrades. at grnd lvl- fire seperatipon of garage, new gas meter & elec utility closets. ele panel upgrades.Details
both units: kitchen & bath remodel, replacement of: 2 windows, doors. lighting upgrades. at grnd lvl- fire seperatipon of garage, new gas meter & elec utility closets. ele panel upgrades. | $166,397 |
| May 17, 2016 | Completed final sign-off Aug 2016 | 235 14th St | Nest Building | renovation of 2nd floor unit kitchen: scope includes replacement cabinets, countertop & applicances; plumbing fixtures @ existing locations; new double door to adjacent living room; new lighting, new finises. electrical under separate permit.Details
renovation of 2nd floor unit kitchen: scope includes replacement cabinets, countertop & applicances; plumbing fixtures @ existing locations; new double door to adjacent living room; new lighting, new finises. electrical under separate permit. | $61,818 |