Nest Building
- Based in
- Pacifica
- On San Francisco permits
- Jul 2012 to May 2020
- Last 24 months
- 0 permits filed
30 permits since 2000: 30 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2020 | Completed final sign-off Aug 2020 | 965 Burnett Av | additional dry rot work has become necessary at the front of the building upon removal of vinyl siding and stucco. also the owner would like to change the windows at the front of the house. ref bpa#202003066354. per applicant email to planning on 6/3/20, new windows will be aluminum.Details
additional dry rot work has become necessary at the front of the building upon removal of vinyl siding and stucco. also the owner would like to change the windows at the front of the house. ref bpa#202003066354. per applicant email to planning on 6/3/20, new windows will be aluminum. | $10,000 |
| Mar 6, 2020 | Completed final sign-off Aug 2020 | 965 Burnett Av | remove vinyl siding from front of building and replace with stucco and hardiplank siding.Details
remove vinyl siding from front of building and replace with stucco and hardiplank siding. | $25,000 |
| Aug 5, 2019 | Completed final sign-off Oct 2019 | 16 Montezuma St | bathroom remodel, change fixtures.Details
bathroom remodel, change fixtures. | $15,000 |
| Jul 5, 2019 | Completed final sign-off Nov 2019 | 234 Joost Av | remodel bathroom. new concrete floor - changing new fixtures.Details
remodel bathroom. new concrete floor - changing new fixtures. | $15,000 |
| May 15, 2019 | Completed final sign-off Sep 2019 | 166 Riverton Dr | one kitchen remodel including cabinetry and fixtures replacement. also replacing (2) windows in kind. not facing streetDetails
one kitchen remodel including cabinetry and fixtures replacement. also replacing (2) windows in kind. not facing street | $15,000 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 965 Burnett Av | reference pa#201804237120. remove additional stucco & replace/remove additional plywood, 2 windows at rear of bldg. all replacements in-kind.Details
reference pa#201804237120. remove additional stucco & replace/remove additional plywood, 2 windows at rear of bldg. all replacements in-kind. | $13,000 |
| Sep 6, 2018 | Completed final sign-off Feb 2019 | 175 07th Av | rev to pa201807305932: additional dry rot repair in-kinds. replace (4) doors & (7) windows in-kind, not visible to street. max u-factor 0.32 or better.Details
rev to pa201807305932: additional dry rot repair in-kinds. replace (4) doors & (7) windows in-kind, not visible to street. max u-factor 0.32 or better. | $20,000 |
| Aug 1, 2018 | Completed final sign-off Feb 2019 | 1186 Valencia St | ti- interior partitions, sinks, janitor closet. no exterior workDetails
ti- interior partitions, sinks, janitor closet. no exterior work | $40,000 |
| Jul 30, 2018 | Completed final sign-off Feb 2019 | 175 07th Av | dryrot repair to siding and trim in kind at rear of bldg. approx 10'x10' area.Details
dryrot repair to siding and trim in kind at rear of bldg. approx 10'x10' area. | $2,500 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 234 Joost Av | install new velux sun tunnel in existing bathroomDetails
install new velux sun tunnel in existing bathroom | $500 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 3233 Noriega St | bathroom remodel including new fixturesDetails
bathroom remodel including new fixtures | $15,000 |
| Apr 23, 2018 | Completed final sign-off Aug 2019 | 965 Burnett Av | replace e balcony in kindDetails
replace e balcony in kind | $10,000 |
| Apr 17, 2018 | Completed final sign-off Jul 2018 | 234 Joost Av | top floor -bathroom remodel with new fixtures and add showerDetails
top floor -bathroom remodel with new fixtures and add shower | $18,000 |
| Dec 8, 2017 | Completed final sign-off Jan 2018 | 2164 15th St | revision to permit #2017-08-17-5199. work expanded to siding at front facade to replace existing siding with wood siding and decorative elements.Details
revision to permit #2017-08-17-5199. work expanded to siding at front facade to replace existing siding with wood siding and decorative elements. | $10,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2017 | 35 Valdez Av | kitchen remodel - new cabinets, counter tops and opening/widening a doorway.Details
kitchen remodel - new cabinets, counter tops and opening/widening a doorway. | $15,000 |
| Jul 27, 2017 | Completed final sign-off Jul 2017 | 58 Shrader St | revision to pa#201704285248 to change address from 56 shrader st. to 58 shrader st. n/a ordinance #155-13Details
revision to pa#201704285248 to change address from 56 shrader st. to 58 shrader st. n/a ordinance #155-13 | |
| Jul 27, 2017 | Completed final sign-off Sep 2017 | 54 Shrader St | work as necessary to comply with inspection report #cc8170. n/a ordinance #155-13Details
work as necessary to comply with inspection report #cc8170. n/a ordinance #155-13 | $5,000 |
| Apr 28, 2017 | Completed final sign-off Jul 2017 | 56 Shrader St | per physical inspection cc-8170, item 9 (to legalize windodw replacement); replace three center aluminum windows on front facade of lower unit with wood tdl in a style to match the corresponding windows in the above unit w/ same muntin pattern; center dh to have ogee lugs; no other workDetails
per physical inspection cc-8170, item 9 (to legalize windodw replacement); replace three center aluminum windows on front facade of lower unit with wood tdl in a style to match the corresponding windows in the above unit w/ same muntin pattern; center dh to have ogee lugs; no other work | $2,000 |
| Jan 3, 2017 | Completed final sign-off Jan 2017 | 861 Rhode Island St | front building - revision to pa 2016-1117-2993 to correct physical inspection report number from cc-8119 to cc-8144 "to comply with physical inspection report cc-8144"Details
front building - revision to pa 2016-1117-2993 to correct physical inspection report number from cc-8119 to cc-8144 "to comply with physical inspection report cc-8144" | |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 861 Rhode Island St | to comply with inspection report # cc-8119 (rear bldg.)Details
to comply with inspection report # cc-8119 (rear bldg.) | $1,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 861 Rhode Island St | to comply with inspection report # cc-8119 (front bldg.)Details
to comply with inspection report # cc-8119 (front bldg.) | $3,000 |
| Sep 30, 2016 | Completed final sign-off Feb 2017 | 233 14th St | replacing dryrotted sections of back stairs in-kind; (1) landing will be replaced with a roofing membrane over plywood; less than 50% replaced.Details
replacing dryrotted sections of back stairs in-kind; (1) landing will be replaced with a roofing membrane over plywood; less than 50% replaced. | $6,000 |
| Sep 6, 2016 | Completed final sign-off Dec 2016 | 3233 Noriega St | add bathroom in garage of residence move furnacne and h/w heaterDetails
add bathroom in garage of residence move furnacne and h/w heater | $20,000 |
| May 17, 2016 | Completed final sign-off Aug 2016 | 235 14th St | renovation of 2nd floor unit kitchen: scope includes replacement cabinets, countertop & applicances; plumbing fixtures @ existing locations; new double door to adjacent living room; new lighting, new finises. electrical under separate permit.Details
renovation of 2nd floor unit kitchen: scope includes replacement cabinets, countertop & applicances; plumbing fixtures @ existing locations; new double door to adjacent living room; new lighting, new finises. electrical under separate permit. | $61,818 |
| Mar 1, 2016 | Completed final sign-off Jul 2016 | 174 Taraval St | remove damaged terrazzo landing, replace rotten wood beneath, and replace landing with decorative concrete. front of propertyDetails
remove damaged terrazzo landing, replace rotten wood beneath, and replace landing with decorative concrete. front of property | $8,000 |
| Apr 24, 2015 | Completed final sign-off May 2015 | 34 Wawona St | move/relocate door to closet & enlargeDetails
move/relocate door to closet & enlarge | $2,500 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 3233 Noriega St | changing kitchen cabinets and countertops. lighting to comply with cec 150(k)Details
changing kitchen cabinets and countertops. lighting to comply with cec 150(k) | $25,000 |
| Jul 5, 2013 | Completed final sign-off Sep 2013 | 313 Parnassus Av | replacing window sashes at front and rear of bldg. 3 at front and 2 at rear. u-factor shall not exceed 0.4.Details
replacing window sashes at front and rear of bldg. 3 at front and 2 at rear. u-factor shall not exceed 0.4. | $6,000 |
| Jun 17, 2013 | Completed final sign-off Nov 2013 | 1033 Lake St | repair and replace in kind dry rot at front stairs side wall, repair & replace w/kind dryrotted door & 5 windows at rear/side of house . windows not vivible from the street,Details
repair and replace in kind dry rot at front stairs side wall, repair & replace w/kind dryrotted door & 5 windows at rear/side of house . windows not vivible from the street, | $9,500 |
| Jul 24, 2012 | Completed final sign-off Oct 2012 | 2689 Sacramento St | replace dry rotted windows and door & associated repair to exterior cladding & trim, total 5 windows & 1 door, not visable from street, u-factor 0.40Details
replace dry rotted windows and door & associated repair to exterior cladding & trim, total 5 windows & 1 door, not visable from street, u-factor 0.40 | $18,000 |