Oscar E Maldonado
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Jul 2026
- Last 24 months
- 5 permits filed
29 permits since 2000: 18 completed, 7 in progress, 4 never finaled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 22 Valley St | to obtain final inspection for work approved under pa: 202409050175. all work is complete.Details
to obtain final inspection for work approved under pa: 202409050175. all work is complete. | |
| Oct 22, 2025 | In progress filed Oct 2025, not yet issued | 2731 38th Av | revision to pa#2025-0328-3317 amendment to add (2) new windows at the area work.Details
revision to pa#2025-0328-3317 amendment to add (2) new windows at the area work. | $6,700 |
| Jul 11, 2025 | In progress issued Jul 2025 | 249 Topaz Wy | renovation of (e) 3 story single family residence including new wood flooring. renovate kitchen and bathrooms, new skylight and sliding glass doors to access the exterior. reconfiguration of 1/f rooms, new mini split mechanical system and heat pump water heater. new perimeter fence, roof, andDetails
renovation of (e) 3 story single family residence including new wood flooring. renovate kitchen and bathrooms, new skylight and sliding glass doors to access the exterior. reconfiguration of 1/f rooms, new mini split mechanical system and heat pump water heater. new perimeter fence, roof, and | $250,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2026 | 2731 38th Av | interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitableDetails
interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitable | $251,027 |
| Mar 10, 2025 | In progress filed Mar 2025, not yet issued | 22 Valley St | revision 202403198162- add (2) new skylights and 1 attic window - not visible from street.Details
revision 202403198162- add (2) new skylights and 1 attic window - not visible from street. | $3,500 |
| Sep 5, 2024 | In progress issued Dec 2024 | 22 Valley St | revise pa 2024-0319-8162 to document/include additional scope comprised of roof deck and interior stairs as well as minor changes due to field conditions.Details
revise pa 2024-0319-8162 to document/include additional scope comprised of roof deck and interior stairs as well as minor changes due to field conditions. | $49,455 |
| May 22, 2024 | Completed final sign-off Oct 2024 | 85 Cerritos Av | remodel existing hall bathroom, new tub, new toilet, new vanity & sink. install tile on floor and partial wall.Details
remodel existing hall bathroom, new tub, new toilet, new vanity & sink. install tile on floor and partial wall. | $22,700 |
| Apr 7, 2024 | In progress issued Aug 2024 | 22 Valley St | interior remodel of upper lvl renovation of kitchen, relocate bathroom, 2 new bathrooms, rlocated laundry, select new or alter windows & doors. replace rear roof. associated electrical & plumbing. new duct heat pump & heat pump hot water heaterDetails
interior remodel of upper lvl renovation of kitchen, relocate bathroom, 2 new bathrooms, rlocated laundry, select new or alter windows & doors. replace rear roof. associated electrical & plumbing. new duct heat pump & heat pump hot water heater | $430,405 |
| Dec 7, 2023 | In progress issued Oct 2024 | 231 Topaz Wy | increased roof height and addition of roof deck with roof access stair. existing exterior cladding and windows require full replacement. new perimeter fence, and landscape improvements.Details
increased roof height and addition of roof deck with roof access stair. existing exterior cladding and windows require full replacement. new perimeter fence, and landscape improvements. | $450,000 |
| Oct 13, 2023 | Completed final sign-off May 2025 | 111 Day St | alteration to existing dwelling comprised of baseement conversion (addition of cfa) into new bedroom, new bathroom, and relocated laundry, including new underpinning foundations, new floor slab, and voluntary retrofit; subdivision of existing upper level bedroom into two (five bedrooms total);Details
alteration to existing dwelling comprised of baseement conversion (addition of cfa) into new bedroom, new bathroom, and relocated laundry, including new underpinning foundations, new floor slab, and voluntary retrofit; subdivision of existing upper level bedroom into two (five bedrooms total); | $300,434 |
| Apr 25, 2023 | Completed final sign-off Dec 2023 | 85 Cerritos Av | alterations to extg remodeled kitchen and laundry, select new windows, associated structural, electrical and plumbing alterations.Details
alterations to extg remodeled kitchen and laundry, select new windows, associated structural, electrical and plumbing alterations. | $166,795 |
| Aug 25, 2022 | Never finaled issued Sep 2022, no final | 145 Kensington Wy | widen driveway by approximately 20"Details
widen driveway by approximately 20" | $5,000 |
| Apr 7, 2021 | Completed final sign-off Apr 2022 | 111 Day St | selective demo and remodel of 2nd flr to create new kitchen and new bathroom including selective window and door replacement. associated structural and mep work.Details
selective demo and remodel of 2nd flr to create new kitchen and new bathroom including selective window and door replacement. associated structural and mep work. | $76,029 |
| Jan 27, 2020 | Completed final sign-off Oct 2020 | 2126 47th Av | replace instead of patch siding in rear of house and atrium. rev to #201907115695. approx 500sq ft.Details
replace instead of patch siding in rear of house and atrium. rev to #201907115695. approx 500sq ft. | |
| Dec 19, 2019 | Never finaled issued May 2020, no final | 30 Macedonia St | 295 gsf to be added to extg envelope on lvl 1, currently garage & storage. nw rooms will include master bed & bath &laundry room. proposed rear deck and siding replacement at rear, new openings to deck and yard. move column and level 2 interior.minor excavation for nw shear wall footing<50 cu.yardsDetails
295 gsf to be added to extg envelope on lvl 1, currently garage & storage. nw rooms will include master bed & bath &laundry room. proposed rear deck and siding replacement at rear, new openings to deck and yard. move column and level 2 interior.minor excavation for nw shear wall footing<50 cu.yards | $70,000 |
| Jul 22, 2019 | Completed final sign-off Jul 2019 | 86 Midcrest Wy | revision to pa #201806071273. to clarify scope of work to include conversion of garage area to bedroom & bathroom.Details
revision to pa #201806071273. to clarify scope of work to include conversion of garage area to bedroom & bathroom. | |
| Apr 29, 2019 | Completed final sign-off Feb 2020 | 2786 42nd Av | revision to pa #201902203379. adding retaining wall to the patio.Details
revision to pa #201902203379. adding retaining wall to the patio. | $3,000 |
| Feb 20, 2019 | Completed final sign-off Feb 2020 | 2786 42nd Av | revision to 201812037278, adding 1 more bathroom in ground floor, remodeling the deck and two new doors in 1st fl.Details
revision to 201812037278, adding 1 more bathroom in ground floor, remodeling the deck and two new doors in 1st fl. | $20,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2020 | 2786 42nd Av | kitchen remodel, upper bath remodel, conversion of (e) unfinished ground fl space to add (2) bedrooms & (1) new bath, replace (e) windows on the front facade, enlarging two e(e) windows at rear facade & adding (1) new window to rear facadeDetails
kitchen remodel, upper bath remodel, conversion of (e) unfinished ground fl space to add (2) bedrooms & (1) new bath, replace (e) windows on the front facade, enlarging two e(e) windows at rear facade & adding (1) new window to rear facade | $110,000 |
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 681 Portola Dr | some concrete cutting for expoloratory purposes for soft sotry upgrade design.Details
some concrete cutting for expoloratory purposes for soft sotry upgrade design. | $3,500 |
| Nov 17, 2016 | Never finaled issued Nov 2016, no final | 2510 Van Ness Av | repair wood rot on side stairs, less than 50%Details
repair wood rot on side stairs, less than 50% | $2,200 |
| Nov 10, 2016 | Completed final sign-off Nov 2016 | 1990 California St | #5: to obtain final inspection for work approved under pa 201411212223; all work is completeDetails
#5: to obtain final inspection for work approved under pa 201411212223; all work is complete | |
| Oct 19, 2016 | Completed final sign-off Nov 2016 | 1990 California St | #5: to obtain final inspection for work approved under pa#201410017773. all work is complete.Details
#5: to obtain final inspection for work approved under pa#201410017773. all work is complete. | |
| Mar 14, 2016 | Completed final sign-off Mar 2016 | 2510 Van Ness Av | to renew pa# 201502138397 & 201306250464 for a final inspection, all work is completeDetails
to renew pa# 201502138397 & 201306250464 for a final inspection, all work is complete | |
| Feb 12, 2016 | Completed final sign-off Oct 2016 | 1990 California St | remove concrete in backyard & pour new. approx 500 ft. patio. area drain under plumbing permit. n/a for maher.Details
remove concrete in backyard & pour new. approx 500 ft. patio. area drain under plumbing permit. n/a for maher. | $3,000 |
| Feb 13, 2015 | Completed final sign-off Mar 2016 | 2510 Van Ness Av | to comply with nov# 201516591. replace siding & repair stucco. not visible from street. ** maher: compliance with ordinance no# 155-13 not required **Details
to comply with nov# 201516591. replace siding & repair stucco. not visible from street. ** maher: compliance with ordinance no# 155-13 not required ** | $5,000 |
| Jun 25, 2014 | Completed final sign-off Nov 2014 | 735 Battery St | install new glazed partitions and glazed doors at extg alcoves. n/a for maher ordinance #155-13Details
install new glazed partitions and glazed doors at extg alcoves. n/a for maher ordinance #155-13 | $80,000 |
| Jun 25, 2013 | Completed final sign-off Mar 2016 | 2510 Van Ness Av | repair section of damaged stucco approx 10'(2), front of building less than 50%.Details
repair section of damaged stucco approx 10'(2), front of building less than 50%. | $1,500 |
| Mar 29, 2013 | Completed final sign-off Jun 2014 | 727 Guerrero St | repair rear egress stairs. less than 50%. and to comply with violation #201394161. same for same.Details
repair rear egress stairs. less than 50%. and to comply with violation #201394161. same for same. | $10,000 |