Carl Crizer
- Listed as
- architect, engineer
- Firm
- Salas O'brien
- Based in
- San Jose
- On San Francisco permits
- Dec 2009 to Sep 2026
33 permits since 2000 (engineer on 31 permits, architect on 2 permits): 24 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 559 Pacific Av | 2nd fl - construction of small commercial kitchen, includes millwork, mep and equipmentDetails
2nd fl - construction of small commercial kitchen, includes millwork, mep and equipment | $400,000 | |
| Jun 11, 2024 | In progress issued Mar 2025 | 650 California St | Richlen Construction | retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system toDetails
retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system to | $1,786,903 |
| May 2, 2024 | In progress issued Nov 2025 | 430 Bush St | Roebbelen Contracting Inc | install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ...Details
install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mech, elec, & ... | $400,000 |
| Feb 14, 2023 | Completed final sign-off Nov 2025 | 611 Folsom St | Roebbelen Contracting Inc | install mechanical and electrical infrastructure to support telephone equipmentDetails
install mechanical and electrical infrastructure to support telephone equipment | $500,000 |
| Nov 10, 2022 | In progress issued Nov 2025 | 555 Pine St | Roebbelen Contracting Inc | install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the projectDetails
install 540 gal urea tank on the 1st floor of 555 pine. provide & install fuel piping & associated fuel pumps at 555 pine which transfer between the two buildings. provide & install piping for the equipment mentioned above. all misc. arch, mech, elec, & controls work required to complete the project | $100,000 |
| Feb 18, 2022 | Completed final sign-off Dec 2024 | 1 Mccoppin St | Roebbelen Contracting Inc | replace two (e) air coole chillers on the roof of the building. mech & elec work to support the replacement.Details
replace two (e) air coole chillers on the roof of the building. mech & elec work to support the replacement. | $250,000 |
| May 13, 2019 | Completed final sign-off May 2020 | 430 Bush St | Paradigm General Contractors | 3rd fl l- ti of interior office. select demo and limited construction, partition walls and upgrades to interior finishes; no change to structure. no structure or building envelope changes.Details
3rd fl l- ti of interior office. select demo and limited construction, partition walls and upgrades to interior finishes; no change to structure. no structure or building envelope changes. | $50,000 |
| May 6, 2019 | Completed final sign-off Jun 2020 | 430 Bush St | Paradigm General Contractors | 4th flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a.Details
4th flr - ti - select demo and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a. | $1,500,000 |
| Dec 17, 2018 | Completed final sign-off Jan 2020 | 611 Folsom St | Bangar Construction Corp. | install 2 new computer room air handlers on the 3rd fl.Details
install 2 new computer room air handlers on the 3rd fl. | $200,000 |
| Apr 27, 2018 | Completed final sign-off May 2019 | 611 Folsom St | Bangar Construction Corp. | 9th floor: install a pair of crac units and replace a chiller in the basement. n/a for maherDetails
9th floor: install a pair of crac units and replace a chiller in the basement. n/a for maher | $500,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 555 Pine St | American Incorporated | remove and replace shaft wall, disconnect extg door, frame, and hardware, reinstall under new work. prime and paint new walls to match extg. ref app#201706098944. n/a for maher.Details
remove and replace shaft wall, disconnect extg door, frame, and hardware, reinstall under new work. prime and paint new walls to match extg. ref app#201706098944. n/a for maher. | $20,000 |
| Feb 8, 2018 | Completed final sign-off Nov 2018 | 611 Folsom St | American Incorporated | 8th/9th flr -provide and install a new crah unit to cool telco equip. hot tap new chilled water connection to serve new crah unit. new ele and controls for new crah unitDetails
8th/9th flr -provide and install a new crah unit to cool telco equip. hot tap new chilled water connection to serve new crah unit. new ele and controls for new crah unit | $100,000 |
| Oct 18, 2017 | Completed final sign-off Nov 2018 | 611 Folsom St | American Incorporated | upinterrupted power supply (ups) replacementDetails
upinterrupted power supply (ups) replacement | $100,000 |
| Jun 9, 2017 | Completed final sign-off Nov 2018 | 555 Pine St | American Incorporated | 1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, new batteries . n/a for maher ordinance.Details
1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, new batteries . n/a for maher ordinance. | $4,700,000 |
| Apr 18, 2017 | Completed final sign-off Jul 2018 | 555 Pine St | Building Services/System Maintenance Inc | architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada workDetails
architectural & electrical, plumbing & mechanical work to start preparing for a new it equipment room, including ada work | $139,000 |
| Apr 18, 2017 | Completed final sign-off May 2018 | 611 Folsom St | American Incorporated | freight elevator modernizationDetails
freight elevator modernization | $100,000 |
| Nov 18, 2016 | Completed final sign-off Dec 2017 | 555 Pine St | American Incorporated | replace an air handler on the 6th floor. maher naDetails
replace an air handler on the 6th floor. maher na | $450,000 |
| Sep 2, 2016 | Completed final sign-off Jan 2017 | 611 Folsom St | American Incorporated | 5th floor: provide new distribution duct work. provide and install 2 new fire smoke dampers. installation of smoke detector under separate application.Details
5th floor: provide new distribution duct work. provide and install 2 new fire smoke dampers. installation of smoke detector under separate application. | $50,000 |
| Dec 10, 2015 | Never finaled issued Apr 2016, no final | 555 Pine St | American Incorporated | 8th floor modify air distribution, new control damper, (1) new fire smoke damper. n/a meher ordinanceDetails
8th floor modify air distribution, new control damper, (1) new fire smoke damper. n/a meher ordinance | $20,000 |
| Jul 21, 2015 | Completed final sign-off Jun 2016 | 430 Bush St | Paradigm General Contractors | demo(e)non-load bearing partitions,ceilings,ductwork,elec conduit& plumbing fixtures.install new ceiling,interior partitions,lighting,doors, finishes&plumbing fixtures.alter both mech&elec sys.refinish interior side(e)exterior window frames.n/a maher ord.Details
demo(e)non-load bearing partitions,ceilings,ductwork,elec conduit& plumbing fixtures.install new ceiling,interior partitions,lighting,doors, finishes&plumbing fixtures.alter both mech&elec sys.refinish interior side(e)exterior window frames.n/a maher ord. | $3,500,000 |
| Mar 27, 2015 | Completed final sign-off Jan 2016 | 30 Onondaga Av | American Incorporated | remove and replace 2 chillers on roof. replace 1 chilled water pump. chillers are in same location and weigh less. n/a for the maher.Details
remove and replace 2 chillers on roof. replace 1 chilled water pump. chillers are in same location and weigh less. n/a for the maher. | $450,000 |
| Nov 12, 2014 | Completed final sign-off May 2015 | 611 Folsom St | American Incorporated | 7th floor: disconnect and remove one fire damper. install one new fire smoke damper. install 2 new cable holes. relocate one exhaust air duct. all electrical work required to support the above work. n/a for the maherDetails
7th floor: disconnect and remove one fire damper. install one new fire smoke damper. install 2 new cable holes. relocate one exhaust air duct. all electrical work required to support the above work. n/a for the maher | $25,000 |
| May 15, 2014 | Never finaled filed May 2014, never issued | 430 Bush St | demolition of (e) non load bearing partition, ceiling & finishes. install new non-load bearing partition, ceiling & finishes. modification of (e) mechanical, electrical & plumbing distribution system. replace (e) windows glazing. 1 hr on building sides & non rated on bush street side. replaceDetails
demolition of (e) non load bearing partition, ceiling & finishes. install new non-load bearing partition, ceiling & finishes. modification of (e) mechanical, electrical & plumbing distribution system. replace (e) windows glazing. 1 hr on building sides & non rated on bush street side. replace | $3,000,000 | |
| Apr 25, 2014 | Expired or cancelled withdrawn Sep 2016 | 611 Folsom St | provide new distribution ductwork on 5/f, provide and install 2 new fire smoke dampers. n/a ordinance #155-13.Details
provide new distribution ductwork on 5/f, provide and install 2 new fire smoke dampers. n/a ordinance #155-13. | $50,000 | |
| Apr 25, 2014 | Expired or cancelled cancelled Jan 2026 | 3333 25th St | install new air handlers in 2/f, install new distribution duct work, provide power to new mechanical equipment. n/a ordinance #155-13.Details
install new air handlers in 2/f, install new distribution duct work, provide power to new mechanical equipment. n/a ordinance #155-13. | $200,000 | |
| Aug 15, 2013 | Completed final sign-off Oct 2013 | 611 Folsom St | Roebbelen Contracting Inc | install new pdsc panels & minor duct work modifications. all work on 7/fDetails
install new pdsc panels & minor duct work modifications. all work on 7/f | $50,000 |
| Aug 15, 2013 | Completed final sign-off Feb 2014 | 465 Irwin St | Roebbelen Contracting Inc | cardboard baler 82"w x40.5"d x139.5"tallDetails
cardboard baler 82"w x40.5"d x139.5"tall | $10,000 |
| Jan 25, 2013 | Completed final sign-off Oct 2013 | 611 Folsom St | Roebbelen Contracting Inc | install new roof top air handler and duct work.Details
install new roof top air handler and duct work. | $750,000 |
| Aug 1, 2012 | Completed final sign-off Dec 2012 | 1515 19th Av | Roebbelen Contracting Inc | relocate a wall to shorten the pioneer storage room includes mechanical- fire/smoke dampers included- fire alarm separate permit.Details
relocate a wall to shorten the pioneer storage room includes mechanical- fire/smoke dampers included- fire alarm separate permit. | $100,000 |
| Jun 19, 2012 | Completed final sign-off Oct 2012 | 611 Folsom St | Roebbelen Contracting Inc | 6th floor - install 2 new computer room air handler units. fire alarm and smoke detection separate permit.Details
6th floor - install 2 new computer room air handler units. fire alarm and smoke detection separate permit. | $100,000 |
| May 25, 2012 | Completed final sign-off Aug 2012 | 611 Folsom St | Roebbelen Contracting Inc | 2nd floor - install ductwork for new telephone equipmentDetails
2nd floor - install ductwork for new telephone equipment | $10,000 |
| May 18, 2012 | Completed final sign-off Sep 2012 | 389 09th Av | Roebbelen Contracting Inc | 2nd floor-install a new 1 hour rated room for wi-fi equipmentDetails
2nd floor-install a new 1 hour rated room for wi-fi equipment | $20,000 |
| Dec 3, 2009 | Completed final sign-off Sep 2010 | 555 Pine St | Roebbelen Contracting Inc | chiller installation in basement. fa is required under separate permit.Details
chiller installation in basement. fa is required under separate permit. | $775,392 |