American Incorporated
- Based in
- Visalia
- On San Francisco permits
- Nov 2000 to Feb 2018
- Last 24 months
- 0 permits filed
36 permits since 2000: 26 completed, 3 never finaled, 7 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 555 Pine St | remove and replace shaft wall, disconnect extg door, frame, and hardware, reinstall under new work. prime and paint new walls to match extg. ref app#201706098944. n/a for maher.Details
remove and replace shaft wall, disconnect extg door, frame, and hardware, reinstall under new work. prime and paint new walls to match extg. ref app#201706098944. n/a for maher. | $20,000 |
| Feb 8, 2018 | Completed final sign-off Nov 2018 | 611 Folsom St | 8th/9th flr -provide and install a new crah unit to cool telco equip. hot tap new chilled water connection to serve new crah unit. new ele and controls for new crah unitDetails
8th/9th flr -provide and install a new crah unit to cool telco equip. hot tap new chilled water connection to serve new crah unit. new ele and controls for new crah unit | $100,000 |
| Oct 18, 2017 | Completed final sign-off Nov 2018 | 611 Folsom St | upinterrupted power supply (ups) replacementDetails
upinterrupted power supply (ups) replacement | $100,000 |
| Jun 9, 2017 | Completed final sign-off Nov 2018 | 555 Pine St | 1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, new batteries . n/a for maher ordinance.Details
1st floor - new 45 ton air handler, new rear door heat exchangers, new pumps and heat exchangers, new water-side economizer, new electrical feeds to hvac equipment, new electrical to it equipment, new batteries . n/a for maher ordinance. | $4,700,000 |
| Apr 18, 2017 | Completed final sign-off May 2018 | 611 Folsom St | freight elevator modernizationDetails
freight elevator modernization | $100,000 |
| Nov 18, 2016 | Completed final sign-off Dec 2017 | 555 Pine St | replace an air handler on the 6th floor. maher naDetails
replace an air handler on the 6th floor. maher na | $450,000 |
| Sep 16, 2016 | Never finaled issued Oct 2016, no final | 555 Pine St | add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher naDetails
add fall arrest archorages and tiebacks to penthouse roof and 16thfloor roof maher na | $50,000 |
| Sep 2, 2016 | Completed final sign-off Jan 2017 | 611 Folsom St | 5th floor: provide new distribution duct work. provide and install 2 new fire smoke dampers. installation of smoke detector under separate application.Details
5th floor: provide new distribution duct work. provide and install 2 new fire smoke dampers. installation of smoke detector under separate application. | $50,000 |
| Jan 25, 2016 | Completed final sign-off Nov 2016 | 611 Folsom St | 2nd flr: at&t- install 2 in-row cooling units one is redundant; maher n/a separate permit deferred for 4" sprinkler pipe relocationDetails
2nd flr: at&t- install 2 in-row cooling units one is redundant; maher n/a separate permit deferred for 4" sprinkler pipe relocation | $200,000 |
| Dec 10, 2015 | Never finaled issued Apr 2016, no final | 555 Pine St | 8th floor modify air distribution, new control damper, (1) new fire smoke damper. n/a meher ordinanceDetails
8th floor modify air distribution, new control damper, (1) new fire smoke damper. n/a meher ordinance | $20,000 |
| Mar 27, 2015 | Completed final sign-off Jan 2016 | 30 Onondaga Av | remove and replace 2 chillers on roof. replace 1 chilled water pump. chillers are in same location and weigh less. n/a for the maher.Details
remove and replace 2 chillers on roof. replace 1 chilled water pump. chillers are in same location and weigh less. n/a for the maher. | $450,000 |
| Nov 12, 2014 | Completed final sign-off May 2015 | 611 Folsom St | 7th floor: disconnect and remove one fire damper. install one new fire smoke damper. install 2 new cable holes. relocate one exhaust air duct. all electrical work required to support the above work. n/a for the maherDetails
7th floor: disconnect and remove one fire damper. install one new fire smoke damper. install 2 new cable holes. relocate one exhaust air duct. all electrical work required to support the above work. n/a for the maher | $25,000 |
| Jan 27, 2012 | Completed final sign-off Apr 2012 | 611 Folsom St | 8th floor - duct work modifications, removal of a condenser from the roof.Details
8th floor - duct work modifications, removal of a condenser from the roof. | $50,000 |
| Dec 21, 2011 | Completed final sign-off Mar 2012 | 611 Folsom St | add supply ductwork, balancing dampers, air outlets to cool 2 new routers. add 3 new zone dampers and modify 6 supply grille assemblies.Details
add supply ductwork, balancing dampers, air outlets to cool 2 new routers. add 3 new zone dampers and modify 6 supply grille assemblies. | $75,000 |
| Mar 14, 2011 | Completed final sign-off May 2011 | 611 Folsom St | 8th floor-install new ductwork, add 1 new fire smoke damper, 5 new air boots & 1 control damperDetails
8th floor-install new ductwork, add 1 new fire smoke damper, 5 new air boots & 1 control damper | $80,000 |
| Dec 19, 2008 | Completed final sign-off Jul 2009 | 6150 03rd St | provide & install new built-up air handler with new supply fans (2), new return fans, and new economizer actuators. fire alarm under separate permit - if reqd. demo of (e) fan and temp connection of duct.Details
provide & install new built-up air handler with new supply fans (2), new return fans, and new economizer actuators. fire alarm under separate permit - if reqd. demo of (e) fan and temp connection of duct. | $300,000 |
| Apr 2, 2008 | Completed final sign-off Jul 2008 | 430 Bush St | renew 200708028602 for final inspection.Details
renew 200708028602 for final inspection. | |
| Dec 10, 2007 | Completed final sign-off Jul 2008 | 1515 19th Av | remove and replace approx. 95 ton air cooled chiller with new 120 ton unit. upgrade electrical in kind to bring up to code and correct corrosion issues. re-integrate to ex. chilled water system. replace pump in kind if required.Details
remove and replace approx. 95 ton air cooled chiller with new 120 ton unit. upgrade electrical in kind to bring up to code and correct corrosion issues. re-integrate to ex. chilled water system. replace pump in kind if required. | $260,000 |
| Nov 5, 2007 | Completed final sign-off May 2008 | 611 Folsom St | repair/replace existing insulation in vertical air supply plenum on all floors of building/ encapsulate insulation w/ 22gauge sheet metal from basement to 9th floor, install new code compliant access doors for duct work on all floorsDetails
repair/replace existing insulation in vertical air supply plenum on all floors of building/ encapsulate insulation w/ 22gauge sheet metal from basement to 9th floor, install new code compliant access doors for duct work on all floors | $500,000 |
| Aug 2, 2007 | Expired or cancelled expired Jul 2008 | 430 Bush St | selected a different manufacture for the chiller, revision to approved permit 200611087232Details
selected a different manufacture for the chiller, revision to approved permit 200611087232 | |
| Jun 11, 2004 | Completed final sign-off Feb 2005 | 1930 Steiner St | install exhaust fan relief dampers, opening in concrete slab & connect fan to 1-1rg shut down systemDetails
install exhaust fan relief dampers, opening in concrete slab & connect fan to 1-1rg shut down system | $30,000 |
| Feb 19, 2004 | Completed final sign-off Apr 2005 | 555 Pine St | replacement of chiller located in bsmnt/replace 2 chilled water pumpsDetails
replacement of chiller located in bsmnt/replace 2 chilled water pumps | $275,000 |
| Feb 19, 2004 | Completed final sign-off Mar 2005 | 611 Folsom St | replacement of chillers located in basement/rplmnt of 2 chilled water pumpsDetails
replacement of chillers located in basement/rplmnt of 2 chilled water pumps | $275,000 |
| May 12, 2003 | Completed final sign-off Nov 2003 | 370 03rd St | rreplace chiller located on roofDetails
rreplace chiller located on roof | $100,000 |
| Apr 7, 2003 | Expired or cancelled expired Jan 2005 | 370 03rd St | replace cooling tower on roofDetails
replace cooling tower on roof | $200,000 |
| Jul 10, 2002 | Expired or cancelled expired Aug 2004 | 3333 25th St | as built mechanical, revs to pa 200104267764-demo duct per tag 76 on sheet a28-new ductwork to conneDetails
as built mechanical, revs to pa 200104267764-demo duct per tag 76 on sheet a28-new ductwork to conne | $1,000 |
| Jan 22, 2002 | Expired or cancelled expired May 2002 | 951 Howard St | ap#200103023373 - modify #of dwg fr 1 to 0/reduce scope of wrk can struct & arch activity modify plnDetails
ap#200103023373 - modify #of dwg fr 1 to 0/reduce scope of wrk can struct & arch activity modify pln | |
| Jun 26, 2001 | Expired or cancelled expired Aug 2002 | 611 Folsom St | replace exhaust fan motors w/new, install new return & static pressure control dampers on @floorDetails
replace exhaust fan motors w/new, install new return & static pressure control dampers on @floor | $110,000 |
| Apr 6, 2001 | Completed final sign-off May 2001 | 611 Folsom St | to renew permit#2001/02/07/1531 for final inspection.Details
to renew permit#2001/02/07/1531 for final inspection. | |
| Mar 26, 2001 | Completed final sign-off Apr 2002 | 1 Mccoppin St | 3rd & 4th flr ductworkDetails
3rd & 4th flr ductwork | $200,000 |
| Mar 26, 2001 | Completed final sign-off Apr 2002 | 1 Mccoppin St | basement,first & 2nd flr ductworkDetails
basement,first & 2nd flr ductwork | $150,000 |
| Mar 2, 2001 | Expired or cancelled expired Jul 2002 | 951 Howard St | structural modification for independent truss system to support telco cable rackingDetails
structural modification for independent truss system to support telco cable racking | $160,000 |
| Feb 7, 2001 | Completed final sign-off May 2001 | 611 Folsom St | install hvac,chilled water piping & new power feeds (1st flr)Details
install hvac,chilled water piping & new power feeds (1st flr) | $159,000 |
| Feb 7, 2001 | Completed final sign-off Apr 2001 | 611 Folsom St | repl of 2 condessor water pumps & new elec(work in basement)Details
repl of 2 condessor water pumps & new elec(work in basement) | $48,000 |
| Feb 7, 2001 | Expired or cancelled expired Sep 2003 | 140 New Montgomery St | replace (1) 80 ton water chillar and 2 pumpsin kind of existing reconnect extisting electricalDetails
replace (1) 80 ton water chillar and 2 pumpsin kind of existing reconnect extisting electrical | $90,000 |
| Nov 9, 2000 | Completed final sign-off May 2001 | 555 Pine St | one stop (archt. finishes,mechanical duct, electrical lighting voluntary upgrade of existing roomsDetails
one stop (archt. finishes,mechanical duct, electrical lighting voluntary upgrade of existing rooms | $100,000 |