Brooks Mcdonald
- Listed as
- architect
- Firm
- Brooks Mcdonald Architecture
- Based in
- Sausalito
- On San Francisco permits
- Jul 2019 to Oct 2026
57 permits since 2000 (architect on 57 permits): 28 completed, 18 in progress, 4 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 432 Lawton St | Centoni Restoration & Development | new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry.Details
new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry. | $50,000 |
| Sep 22, 2026 | In progress issued Oct 2026 | 2512 Union St | Cairn Construction | interior remodel within existing building, expansion of existing deck at 1st floor and replacement of select window and doors where noted. not subject to ab-112.Details
interior remodel within existing building, expansion of existing deck at 1st floor and replacement of select window and doors where noted. not subject to ab-112. | $336,071 |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 279 Diamond St | Centoni Restoration & Development | horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard.Details
horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard. | $100,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 279 Diamond St | Centoni Restoration & Development | interior remodel, remove rear deck and stairs, convert 661 sf of storage at garage to habitable space. no expansion of (e) building envelope.Details
interior remodel, remove rear deck and stairs, convert 661 sf of storage at garage to habitable space. no expansion of (e) building envelope. | $180,000 |
| Jul 14, 2026 | In progress issued Aug 2026 | 2651 Pierce St | Larkspur Builders Inc. | converting 1st floor as habitable space (1097 sf). electrical , hvac, and plumbing work. no structural work.Details
converting 1st floor as habitable space (1097 sf). electrical , hvac, and plumbing work. no structural work. | $50,000 |
| Jun 22, 2026 | In progress issued Jul 2026 | 67 Potomac St | Urban Builder General Contracting Inc | replace 6 windows in kind at front facade.Details
replace 6 windows in kind at front facade. | $12,000 |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 2033 Broderick St | interior remodel, lower garage floor, convert 731 sf existing storage at garage to habitable space, remove fire place and chimney. no expansion of envelope.Details
interior remodel, lower garage floor, convert 731 sf existing storage at garage to habitable space, remove fire place and chimney. no expansion of envelope. | $350,000 | |
| May 15, 2026 | In progress issued May 2026 | 3956 Washington St | Centoni Restoration & Development | replace select windows (24) and (4) exterior door where noted. fill in select windows (4) as shown on plans. reduce gaarage depth.Details
replace select windows (24) and (4) exterior door where noted. fill in select windows (4) as shown on plans. reduce gaarage depth. | $30,000 |
| Apr 9, 2026 | In progress filed Apr 2026, not yet issued | 35 Commonwealth Av | excavate & lower ground floor for new habitable space. interior remodel at all floors, new garage door and driveway, new interior stairs, removal of (2) fireplaces. new skylight, no expansion of existingDetails
excavate & lower ground floor for new habitable space. interior remodel at all floors, new garage door and driveway, new interior stairs, removal of (2) fireplaces. new skylight, no expansion of existing | $500,000 | |
| Jan 30, 2026 | In progress issued Mar 2026 | 3956 Washington St | Centoni Restoration & Development | interior remodel at all 4 floors, existing storage at 1st floor to be converted to new habitable space (796 sq ft). no structural work. all work within existing building envelope.Details
interior remodel at all 4 floors, existing storage at 1st floor to be converted to new habitable space (796 sq ft). no structural work. all work within existing building envelope. | $967,936 |
| Oct 20, 2025 | In progress issued Nov 2025 | 3315 Jackson St | Northington Innovations Inc | interior remodel. new bathroom, new walk-in closet. no work on exterior.Details
interior remodel. new bathroom, new walk-in closet. no work on exterior. | $100,000 |
| Jul 25, 2025 | Completed final sign-off Feb 2026 | 1 Northgate Dr | Javier Magana Construction Services | revision to pa# 202411275851, exterior entry stairs to remain, (e) beam & posts in garage to remain, update to door schedule, repair dryrot, (n) dishwasher.Details
revision to pa# 202411275851, exterior entry stairs to remain, (e) beam & posts in garage to remain, update to door schedule, repair dryrot, (n) dishwasher. | |
| Jun 13, 2025 | In progress issued Aug 2025 | 1070 Green St | Magnitude Builders Inc | interior remodel, replace windows in kind and in place. electrical and plumbing work. no structural workDetails
interior remodel, replace windows in kind and in place. electrical and plumbing work. no structural work | $531,883 |
| Jun 5, 2025 | Completed final sign-off Sep 2026 | 20 Alton Av | Andrew Gallagher Construction | horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deckDetails
horizontal addition for new stairs at 3rd fl. interior remodel. lower floor at media room at ground level to create more ceiling height. 9 (n) windows and 1 (n) sliding door. removal of (e) rear deck | $300,000 |
| May 21, 2025 | In progress issued Sep 2025 | 67 Potomac St | revision to pa# 202205103946. new elevator at all 4 floors & changes to interior layout to accomodate new elevator, building footprint is the same as previously permitted drawings. revised structural design & calculations.Details
revision to pa# 202205103946. new elevator at all 4 floors & changes to interior layout to accomodate new elevator, building footprint is the same as previously permitted drawings. revised structural design & calculations. | ||
| Apr 24, 2025 | Completed final sign-off Mar 2026 | 2715 Steiner St | Arrow Builders Inc | interior remodel at 3 bathrooms, 1 new bathroom. replace 5 windows in kind and in place. all public facing windows to be woodDetails
interior remodel at 3 bathrooms, 1 new bathroom. replace 5 windows in kind and in place. all public facing windows to be wood | $44,357 |
| Mar 3, 2025 | In progress issued Mar 2025 | 1943 Lyon St | Northington Innovations Inc | interior remodel, infill of lightwell at 2nd level(with neighbor's permission) and new structuraal framing at attic & roof framingDetails
interior remodel, infill of lightwell at 2nd level(with neighbor's permission) and new structuraal framing at attic & roof framing | $50,000 |
| Feb 13, 2025 | Completed final sign-off Dec 2025 | 6140 California St | Northington Innovations Inc | infill lightwell at 3rd fl against blank wall of adjacent property. remove living room fireplace & chimney, interior remodel at top fl, replace wall and door at ground fl. replace 5 windows, street facing to be alum clad wood.Details
infill lightwell at 3rd fl against blank wall of adjacent property. remove living room fireplace & chimney, interior remodel at top fl, replace wall and door at ground fl. replace 5 windows, street facing to be alum clad wood. | $300,000 |
| Feb 7, 2025 | Completed final sign-off Oct 2025 | 1401 Hyde St | Kilrea Construction Inc. | new opening at wall between kitchen and den at all 4 floors, and all 4 units.Details
new opening at wall between kitchen and den at all 4 floors, and all 4 units. | $20,000 |
| Jan 21, 2025 | Completed final sign-off Feb 2026 | 2715 Steiner St | Arrow Builders Inc | new lighting at dining room. replace 6 windows in-kind and in-place.Details
new lighting at dining room. replace 6 windows in-kind and in-place. | $8,000 |
| Jan 1, 2025 | Completed final sign-off Feb 2026 | 1 Northgate Dr | Javier Magana Construction Services | interior remodel: expand habitable space @ first floor, new plumbing and electrical. replace front exterior stairs, replace interior stairs, new steps @ rear yardDetails
interior remodel: expand habitable space @ first floor, new plumbing and electrical. replace front exterior stairs, replace interior stairs, new steps @ rear yard | $400,000 |
| Nov 25, 2024 | Completed final sign-off Jun 2026 | 572 Hill St | Achill Beg Construction Inc | revision to pa# 202208160669: minor reconfiguration of flr plans & associated structural work. alteration to front door design, increase size of lightwell, new windows added at lightwell, new skylight in lightwell, fire rated glass partition added to dining room.Details
revision to pa# 202208160669: minor reconfiguration of flr plans & associated structural work. alteration to front door design, increase size of lightwell, new windows added at lightwell, new skylight in lightwell, fire rated glass partition added to dining room. | |
| Oct 25, 2024 | Completed final sign-off Sep 2025 | 2721 Pierce St | Cairn Construction | revision to pa # 202409191163: remove brick chimney not visible from public right of way.Details
revision to pa # 202409191163: remove brick chimney not visible from public right of way. | |
| Sep 30, 2024 | Expired or cancelled cancelled Jun 2026 | 572 Hill St | Achill Beg Construction Inc | scope of wok includeds shoring design for pa#: 202208160669Details
scope of wok includeds shoring design for pa#: 202208160669 | $150,000 |
| Sep 19, 2024 | Completed final sign-off Sep 2025 | 2721 Pierce St | Cairn Construction | kitchen remodel, new powder room, remodel 1 bath, and new primary bath. no exterior workDetails
kitchen remodel, new powder room, remodel 1 bath, and new primary bath. no exterior work | $268,000 |
| Aug 20, 2024 | Completed final sign-off Nov 2025 | 21 Presidio Tr | Cairn Construction | remodel bathroom, kitchen, laundry room, new heat pump space heating at top floor, replace select windows in kind, non visible to the street.Details
remodel bathroom, kitchen, laundry room, new heat pump space heating at top floor, replace select windows in kind, non visible to the street. | $436,665 |
| May 2, 2024 | In progress filed May 2024, not yet issued | 102 Walnut St | Cairn Construction | interior remodel of bathroom only. new hydronic radiant warmboard floor heatingDetails
interior remodel of bathroom only. new hydronic radiant warmboard floor heating | $25,000 |
| Mar 6, 2024 | Completed final sign-off Oct 2025 | 1401 Hyde St | interior remodel at all floors (remodel at all baths & kitchens) existing windows to be replaced in-kind.Details
interior remodel at all floors (remodel at all baths & kitchens) existing windows to be replaced in-kind. | $250,000 | |
| Feb 27, 2024 | In progress filed Feb 2024, not yet issued | 2200 Lyon St | Terence Mcmahon Construction | revision to pa# 202107295402- revision to clarify the building is existing 4 stories with no habitable space at the ground floor.Details
revision to pa# 202107295402- revision to clarify the building is existing 4 stories with no habitable space at the ground floor. | |
| Nov 7, 2023 | Completed final sign-off Dec 2025 | 2290 Green St | Osmun Construction | revision to 202010277485 to add roof deck kitchen, spa, firepit, dumbwaiter and omit proposed window at rear facade- change skylights.Details
revision to 202010277485 to add roof deck kitchen, spa, firepit, dumbwaiter and omit proposed window at rear facade- change skylights. | $25,000 |
| Aug 23, 2023 | Expired or cancelled cancelled Feb 2025 | 33 Allston Wy | horizontal addition to the rear of 2-story family home.Details
horizontal addition to the rear of 2-story family home. | $40,665 | |
| Aug 22, 2023 | Never finaled filed Aug 2023, never issued | 3125 Steiner St | interior remodel of bedroom and enlarge existing bathroom at 3rd fl, 2 new windowsDetails
interior remodel of bedroom and enlarge existing bathroom at 3rd fl, 2 new windows | $25,000 | |
| Aug 3, 2023 | Never finaled filed Aug 2023, never issued | 3364 Washington St | Cairn Construction | structural upgrade to reinforce (e) roof deckDetails
structural upgrade to reinforce (e) roof deck | $30,000 |
| Jul 11, 2023 | Expired or cancelled cancelled Jan 2026 | 2222 Lyon St | admin permit to clarify that the building is existing non-sprinklered revision to pa 2021-0729-5402. (n) habitable space on ground floor to be sprinklered nfpa-13d under separate permit.Details
admin permit to clarify that the building is existing non-sprinklered revision to pa 2021-0729-5402. (n) habitable space on ground floor to be sprinklered nfpa-13d under separate permit. | ||
| Mar 30, 2023 | Completed final sign-off Aug 2025 | 210 11th Av | Kilrea Construction Inc. | horizontal addition at first level of single family home.remodel on second and third level. excavation for new foundation, approx 46 cu. yds. max depth 1'-10"Details
horizontal addition at first level of single family home.remodel on second and third level. excavation for new foundation, approx 46 cu. yds. max depth 1'-10" | $184,567 |
| Feb 28, 2023 | Expired or cancelled expired Mar 2026 | 525 Buena Vista West Av | Egoodat Inc | replace (e) fence w/ new 10' fence on back yard. on the property line all setbacj remains same as isDetails
replace (e) fence w/ new 10' fence on back yard. on the property line all setbacj remains same as is | $6,000 |
| Jan 23, 2023 | Completed final sign-off Oct 2023 | 2026 Laguna St | repair/replace failing retaining wall at rear yard less than 10' no new gradeDetails
repair/replace failing retaining wall at rear yard less than 10' no new grade | $10,000 | |
| Dec 5, 2022 | Never finaled filed Dec 2022, never issued | 2358 North Point St | remodel at all floors, 4th floor vertival addition over 3-story 3-unit building, horizontal addition to rear, and new roof decks.Details
remodel at all floors, 4th floor vertival addition over 3-story 3-unit building, horizontal addition to rear, and new roof decks. | $776,110 | |
| Nov 23, 2022 | Completed final sign-off Oct 2023 | 2020 Laguna St | repair and replace failing retaining wall at rear side property line. retaining wall at 10 feet or less to maintain existing grade.Details
repair and replace failing retaining wall at rear side property line. retaining wall at 10 feet or less to maintain existing grade. | $10,000 | |
| Oct 12, 2022 | Completed final sign-off May 2024 | 54 06th Av | Caruso Construction Inc. | interior remodel with structural work, replace plumbing fixtures, lighting and windows. provide sprinkler on the 4th floor under a separate permitDetails
interior remodel with structural work, replace plumbing fixtures, lighting and windows. provide sprinkler on the 4th floor under a separate permit | $151,170 |
| Aug 16, 2022 | Completed final sign-off Jun 2026 | 572 Hill St | Achill Beg Construction Inc | horizontal addition, addition of a garage and interior remodel.Details
horizontal addition, addition of a garage and interior remodel. | $571,845 |
| Aug 3, 2022 | Completed final sign-off Jul 2024 | 2020 Laguna St | minor interior remodel & atrium infill: 2 kitchens & 4 baths remodels, convert atrium into habitable space for both floors, 2 new skylightsDetails
minor interior remodel & atrium infill: 2 kitchens & 4 baths remodels, convert atrium into habitable space for both floors, 2 new skylights | $50,000 | |
| Jul 1, 2022 | Completed final sign-off Oct 2023 | 2020 Laguna St | new rear deck additionDetails
new rear deck addition | $10,000 | |
| Jun 9, 2022 | Completed final sign-off Jul 2022 | 3230 Broderick St | Amn Construction | revision to pa #202102265461. deleted non structural wall and moving closet and door.Details
revision to pa #202102265461. deleted non structural wall and moving closet and door. | |
| May 31, 2022 | Completed final sign-off Apr 2023 | 146 07th Av | Cmac Construction | kitchen remodel. install cabinetry in living room. refinish floors and paint.Details
kitchen remodel. install cabinetry in living room. refinish floors and paint. | $150,000 |
| May 31, 2022 | In progress issued Sep 2026 | 849 44th Av | The Toboni Group | interior remodel & horizontal addition at rear of building.new deck above the 1st floor.Details
interior remodel & horizontal addition at rear of building.new deck above the 1st floor. | $200,000 |
| May 10, 2022 | In progress issued Dec 2024 | 67 Potomac St | horizontal additions at 4 floors, legalize attic as new 4th floor with new stair, interior remodel, facade to be preserved as-is, replace windows in-kind.Details
horizontal additions at 4 floors, legalize attic as new 4th floor with new stair, interior remodel, facade to be preserved as-is, replace windows in-kind. | $500,501 | |
| Apr 27, 2022 | Never finaled filed Apr 2022, never issued | 2385 Broadway | horizontal addition at rear of 3-story single family home: 2 new windows & 1 new door with new wood landing to existing rear.Details
horizontal addition at rear of 3-story single family home: 2 new windows & 1 new door with new wood landing to existing rear. | $25,000 | |
| Apr 21, 2022 | Completed final sign-off Dec 2022 | 3201 Clay St | Plath & Company Inc | reframe south side wall at 2nd story master bath & closet. replace & match wood siding in-kind. no other change to exterior element.Details
reframe south side wall at 2nd story master bath & closet. replace & match wood siding in-kind. no other change to exterior element. | $4,000 |
| Apr 7, 2022 | Completed final sign-off Sep 2022 | 510 Douglass St | Merlyn Construction | new deck and stair at rear yard.Details
new deck and stair at rear yard. | $5,000 |
| Mar 11, 2022 | Expired or cancelled cancelled Jan 2026 | 731 48th Av | interior remodel and new deck and stairs at rear yard.Details
interior remodel and new deck and stairs at rear yard. | $81,000 | |
| Feb 26, 2021 | Completed final sign-off Dec 2021 | 1 Market St | Dpr Construction | 34th floor (#3400): interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maherDetails
34th floor (#3400): interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maher | $180,000 |
| Feb 26, 2021 | Completed final sign-off Dec 2021 | 1 Market St | Dpr Construction | 33rd floor: interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maherDetails
33rd floor: interior ti includes demo of select partitions, millwork, ceilings & lighting, new partitions, millwork, ceilings & lighting deferred mep n/a maher | $195,000 |
| Oct 27, 2020 | Expired or cancelled cancelled Jan 2026 | 2722 Green St | rear deck horizontal expansion at 1st habitable story of 3-story single family home. deck less than 10'0". above grade (e) doors to deck to be replaced in-kindDetails
rear deck horizontal expansion at 1st habitable story of 3-story single family home. deck less than 10'0". above grade (e) doors to deck to be replaced in-kind | $3,000 | |
| Aug 17, 2020 | Expired or cancelled withdrawn Jan 2022 | 1522 07th Av | horizontal addition at first floor below existing deck and kitchen remodel.Details
horizontal addition at first floor below existing deck and kitchen remodel. | $20,000 | |
| Aug 6, 2019 | Completed final sign-off Oct 2021 | 2640 Broderick St | The Toboni Group | replace in-kind front facade windows, front door and garage door. (n) stucco. interior remodel within (e) bldg. (n) bath at ground flr, 2 (n) skylights. replace deck finishes and add (n) glass guardrail to meet code.Details
replace in-kind front facade windows, front door and garage door. (n) stucco. interior remodel within (e) bldg. (n) bath at ground flr, 2 (n) skylights. replace deck finishes and add (n) glass guardrail to meet code. | $300,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2021 | 2640 Broderick St | The Toboni Group | (n) elevator on (e) lightwellDetails
(n) elevator on (e) lightwell | $20,000 |