- Feb 2006 to Jul 2026
205 permits since 2000 (architect on 202 permits, engineer on 2 permits, authorized agent-others on 1 permit, designer on 1 permit): 156 completed, 15 in progress, 29 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 205.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 2095 Jerrold Av | Plant Construction Co, Lp | maintain the existing paving(via grind & repaving with crete seal), restripe, and install new ornamental fencing with rolling gate and two egress doors.Details
maintain the existing paving(via grind & repaving with crete seal), restripe, and install new ornamental fencing with rolling gate and two egress doors. | $120,000 |
| Mar 18, 2026 | In progress filed Mar 2026, not yet issued | 1901 Jerrold Av | Plant Construction Co, Lp | demo (e) type vb 1 story marketDetails
demo (e) type vb 1 story market | $150,000 |
| Oct 7, 2025 | In progress issued Apr 2026 | 1645 17th St | **ab-004** site permit with shared plans for 202506128526 to include new foundation for (n) community facility on the east side of caroline st and 138 ft from north mariposa st.Details
**ab-004** site permit with shared plans for 202506128526 to include new foundation for (n) community facility on the east side of caroline st and 138 ft from north mariposa st. | $425,000 | |
| Oct 6, 2025 | In progress issued Apr 2026 | 1645 17th St | **ab-004** renovate and relocate the historic clubhouse from the southeast corner of the site to mid block on the western portion of the site fronting carolina st. the building's exterior will be refurbished per historic standards and interior spaces will be remodeled, including anDetails
**ab-004** renovate and relocate the historic clubhouse from the southeast corner of the site to mid block on the western portion of the site fronting carolina st. the building's exterior will be refurbished per historic standards and interior spaces will be remodeled, including an | $9,325,000 | |
| Jun 23, 2025 | Completed final sign-off Jul 2025 | 2000 Mckinnon Av | Opi Commercial Builders | bldg 427: revision to pa# 202411215509: removal of utility rm, exterior stair, & associated work from scope of work. update various detail & dimensions. no new fixtures.Details
bldg 427: revision to pa# 202411215509: removal of utility rm, exterior stair, & associated work from scope of work. update various detail & dimensions. no new fixtures. | |
| May 21, 2025 | In progress issued Jun 2025 | 901 16th St | Gci, Inc | revision to include pre application meeting notes dated 12-20-2024 into permit application 20210112460 s6Details
revision to include pre application meeting notes dated 12-20-2024 into permit application 20210112460 s6 | |
| Mar 26, 2025 | In progress filed Mar 2025, not yet issued | 2000 Mckinnon Av | constructing a small spec office with accompanying break room and 2 accessible restroom. break room will have capped plumbing for future work to be permformed by a future tenant when obtained.Details
constructing a small spec office with accompanying break room and 2 accessible restroom. break room will have capped plumbing for future work to be permformed by a future tenant when obtained. | $180,000 | |
| Nov 21, 2024 | In progress issued Jan 2025 | 2000 Mckinnon Av | Opi Commercial Builders | construct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room.Details
construct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room. | $180,000 |
| Oct 16, 2024 | In progress filed Oct 2024, not yet issued | 901 16th St | tenant improvement for flower mart managment office fit-out. life safty under seperate permit.Details
tenant improvement for flower mart managment office fit-out. life safty under seperate permit. | $50,000 | |
| Oct 16, 2024 | In progress issued Sep 2025 | 2270 Mckinnon Av | G E C M S Inc | to demolish existing type v, 1-story, industrail accessory structure.Details
to demolish existing type v, 1-story, industrail accessory structure. | $10,000 |
| Aug 6, 2024 | In progress issued Aug 2024 | 2270 Mckinnon Av | installation of (6) indicator piles for exploratory purposes of an existing asphalt parking lot. asphault paving and existing structures to remain.Details
installation of (6) indicator piles for exploratory purposes of an existing asphalt parking lot. asphault paving and existing structures to remain. | $60,000 | |
| Mar 6, 2024 | In progress issued May 2024 | 901 16th St | Gci, Inc | revision to pa# 202101112460 s6: design changes to tenant improvements layout and associate systems revisions and shifting of the air handling unit (ah-1) testing and acceptance from addendum 4 core and shell to addendum 6.Details
revision to pa# 202101112460 s6: design changes to tenant improvements layout and associate systems revisions and shifting of the air handling unit (ah-1) testing and acceptance from addendum 4 core and shell to addendum 6. | |
| Feb 26, 2024 | In progress issued May 2024 | 901 16th St | Gci, Inc | revision to pa# 202101112460, it covers the removel of covered processes from building envelope inspections and the removal of air handling equipment (ah-1) from title 24 acceptance within this addendum's scope. the equipment testing and acceptance will be moved to a later addendums scope addenda 6.Details
revision to pa# 202101112460, it covers the removel of covered processes from building envelope inspections and the removal of air handling equipment (ah-1) from title 24 acceptance within this addendum's scope. the equipment testing and acceptance will be moved to a later addendums scope addenda 6. | |
| Dec 1, 2023 | In progress issued Jan 2024 | 2000 Mckinnon Av | Opi Commercial Builders | revision to pa# 202208291437, changes include: construction 2 accessible entry elements consisting of an accessible ramp, stair, associated parking & striping and wood canopy, 3 new exit stairs, show existing walls, no longer being removed per pa# 202311271423.Details
revision to pa# 202208291437, changes include: construction 2 accessible entry elements consisting of an accessible ramp, stair, associated parking & striping and wood canopy, 3 new exit stairs, show existing walls, no longer being removed per pa# 202311271423. | |
| Nov 27, 2023 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | Opi Commercial Builders | bldg 428: revision 202207158556 and 202304196060. changes include existing stairs and ramp to remain. sheet notes revised. extent of asphalt being removed updated. ab-017Details
bldg 428: revision 202207158556 and 202304196060. changes include existing stairs and ramp to remain. sheet notes revised. extent of asphalt being removed updated. ab-017 | |
| Oct 18, 2023 | Completed final sign-off Dec 2023 | 901 16th St | Truebeck Construction | revision to permit 202306139941. indicate as built elevator hoisteway hatch locations and product information for access of hoistway smoke detector per sffdDetails
revision to permit 202306139941. indicate as built elevator hoisteway hatch locations and product information for access of hoistway smoke detector per sffd | |
| Sep 14, 2023 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | Opi Commercial Builders | revision to 202207158554. reduction in scope of work-to keep dimising wall.Details
revision to 202207158554. reduction in scope of work-to keep dimising wall. | |
| Jun 13, 2023 | Completed final sign-off Dec 2023 | 901 16th St | Truebeck Construction | revision to bpa#20210111240s4 (arch/mep), revision work is to indicate elevator hoistway hatch, location & product informationDetails
revision to bpa#20210111240s4 (arch/mep), revision work is to indicate elevator hoistway hatch, location & product information | |
| Apr 19, 2023 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | Opi Commercial Builders | revision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy.Details
revision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy. | |
| Apr 19, 2023 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | Opi Commercial Builders | revision to 202207158556. reduce demo scope. keep demising walls, offices, restrooms.Details
revision to 202207158556. reduce demo scope. keep demising walls, offices, restrooms. | |
| Dec 20, 2022 | In progress issued Mar 2026 | 1901 Jerrold Av | Plant Construction Co, Lp | to erect a 1-story, type vb, s2 warehouse building.Details
to erect a 1-story, type vb, s2 warehouse building. | $26,000,000 |
| Nov 14, 2022 | Completed final sign-off Jan 2024 | 901 16th St | Truebeck Construction | pid review only per project sfpuc final stormwater control plan submittal comment. ref architecutre & mep submittal pa# 202101112460 s4.Details
pid review only per project sfpuc final stormwater control plan submittal comment. ref architecutre & mep submittal pa# 202101112460 s4. | |
| Nov 7, 2022 | In progress issued Sep 2024 | 2270 Mckinnon Av | Plant Construction Co, Lp | to erect a 5-story, type iiib & ia building. occupancy class b, s-1, f-1, s-2.Details
to erect a 5-story, type iiib & ia building. occupancy class b, s-1, f-1, s-2. | $20,000,000 |
| Sep 13, 2022 | Never finaled issued Oct 2022, no final | 1313 Armstrong Av | Opi Commercial Builders | site: provide new striping and ada parking stalls, change wehicular gate swing. building b: repair exterior, update resrooms, provide new ada ramp.Details
site: provide new striping and ada parking stalls, change wehicular gate swing. building b: repair exterior, update resrooms, provide new ada ramp. | $450,000 |
| Aug 29, 2022 | Completed final sign-off Mar 2025 | 2000 Mckinnon Av | Opi Commercial Builders | bldg 428: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. four (4) new exit stairs will be constructed. structural upgrades.Details
bldg 428: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. four (4) new exit stairs will be constructed. structural upgrades. | $450,000 |
| Aug 29, 2022 | Never finaled issued Jun 2023, no final | 2000 Mckinnon Av | Opi Commercial Builders | bldg 427: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades.Details
bldg 427: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades. | $450,000 |
| Jul 15, 2022 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | Opi Commercial Builders | building 428: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components.Details
building 428: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components. | $10,000 |
| Jul 15, 2022 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | Opi Commercial Builders | building 427: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components.Details
building 427: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components. | $10,000 |
| Mar 30, 2022 | Completed final sign-off Jan 2024 | 901 16th St | Truebeck Construction | revision to pa#202010055938. it includes work associated with the construction of a transformer vault and adjacent electrical room. transformer room equipment and electrical room equipment to be non-energized until permits associated with permit no. 202101112460 have been approved.Details
revision to pa#202010055938. it includes work associated with the construction of a transformer vault and adjacent electrical room. transformer room equipment and electrical room equipment to be non-energized until permits associated with permit no. 202101112460 have been approved. | $30,000 |
| Jan 11, 2021 | Never finaled issued Feb 2022, no final | 901 16th St | Truebeck Construction | combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use)Details
combine two 1 story industrial warehouse buildings & the brick office structure to create one bldg on a single lot.the project has applied for a lot merger withthe city of sf.reuse of(e) structures to construct a core & shell base bldg to accomodate wholesale produce market(pdr use) | $40,000,000 |
| Oct 14, 2020 | Completed final sign-off Jan 2024 | 901 16th St | Silverado Contractors Inc | to demolish a type-v, 1-story office building - no basements.Details
to demolish a type-v, 1-story office building - no basements. | $15,000 |
| Oct 5, 2020 | Completed final sign-off Jan 2024 | 901 16th St | Truebeck Construction | the project will use ab-017 as the building is currently temporarily unoccupied in preparation for this work. the sow is seismic bracing of the metal building, and is limited to that scope and associated work. the work includes new foundations, new lateral bracing, and a new plywood roof diaphram.Details
the project will use ab-017 as the building is currently temporarily unoccupied in preparation for this work. the sow is seismic bracing of the metal building, and is limited to that scope and associated work. the work includes new foundations, new lateral bracing, and a new plywood roof diaphram. | $180,000 |
| Sep 10, 2020 | Completed final sign-off Apr 2021 | 749 Toland St | Opi Commercial Builders | bldg 417: soft demo per ab-017, work limited to non-structural demolition. non-structural partitions, doors, door frames, & plumbing componentsDetails
bldg 417: soft demo per ab-017, work limited to non-structural demolition. non-structural partitions, doors, door frames, & plumbing components | $50,000 |
| Aug 27, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | Opi Commercial Builders | building 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and stripDetails
building 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and strip | $450,000 |
| Aug 27, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | Opi Commercial Builders | building 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgradesDetails
building 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades | $450,000 |
| Nov 12, 2019 | Completed final sign-off Oct 2020 | 2230 Jerrold Av | ti - construction of new interior tenant iprovement for an f1 production kitchen and s1 refrigerated storage rooms.Details
ti - construction of new interior tenant iprovement for an f1 production kitchen and s1 refrigerated storage rooms. | $750,000 | |
| Feb 22, 2019 | Completed final sign-off May 2020 | 2230 Jerrold Av | Plant Construction Co, Lp | (small bldg) to demolish a type v-b, 1-story taxi cab operation building.Details
(small bldg) to demolish a type v-b, 1-story taxi cab operation building. | $25,000 |
| Feb 21, 2019 | Completed final sign-off Apr 2020 | 2230 Jerrold Av | Plant Construction Co, Lp | (main bldg ) to demolish a type v-b, 1-story taxi cab operation building.Details
(main bldg ) to demolish a type v-b, 1-story taxi cab operation building. | $80,000 |
| Jan 15, 2019 | Completed final sign-off Aug 2019 | 2020 Jerrold Av | O'dwyer Construction Inc | repair 5 steel columns and encasement of all column bases 20 total in building l as well as repair of 1 spalled concrete pocket at line 18Details
repair 5 steel columns and encasement of all column bases 20 total in building l as well as repair of 1 spalled concrete pocket at line 18 | $10,000 |
| Dec 20, 2018 | Completed final sign-off Dec 2020 | 2230 Jerrold Av | Plant Construction Co, Lp | erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a.Details
erect 2-story, type 5b, no basement, no dwelling unit, production kitchen & support building. maher n/a. | $10,471,820 |
| Jan 24, 2018 | Completed final sign-off May 2018 | 1901 Jerrold Av | O'dwyer Construction Inc | building m: voluntary repair of 1 steel column at open dock area of san francisco wholesale produce market (building m). repair will be in-kind.Details
building m: voluntary repair of 1 steel column at open dock area of san francisco wholesale produce market (building m). repair will be in-kind. | $1,200 |
| Jan 24, 2018 | Completed final sign-off May 2018 | 2035 Jerrold Av | O'dwyer Construction Inc | building k: voluntary repair of 1 steel column at open dock area of san francisco wholesale produce market (building k). repair will be in-kind.Details
building k: voluntary repair of 1 steel column at open dock area of san francisco wholesale produce market (building k). repair will be in-kind. | $1,200 |
| Dec 12, 2017 | Completed final sign-off Feb 2018 | 2095 Jerrold Av | O'dwyer Construction Inc | to comply bid nov#201719931, replacement in kind of a carport column (next to the warehouse) base & associated beam that were struck by a vehicle. not visable from street. n/a ordinance #155-13Details
to comply bid nov#201719931, replacement in kind of a carport column (next to the warehouse) base & associated beam that were struck by a vehicle. not visable from street. n/a ordinance #155-13 | $4,500 |
| Sep 5, 2017 | Completed final sign-off Feb 2018 | 1900 Jerrold Av | Cold Storage Manufacturing Inc | tenant improvement at above address to construct a regrigerated, walk-in cooler. scope also included the addition of an accessible mandoor in a existing coiling door & providing a rear exit to the tenant space. maher n/aDetails
tenant improvement at above address to construct a regrigerated, walk-in cooler. scope also included the addition of an accessible mandoor in a existing coiling door & providing a rear exit to the tenant space. maher n/a | $22,000 |
| May 10, 2017 | Completed final sign-off Feb 2018 | 1700 Sutter St | Ncr Construction Inc | renovation of a cummunity kitchen & upgrade nearby restrooms for accessibility per 20% rule. casework & finishes to be repalced in scope of work. mech, elec, plbg & fire sprinkler work to be deferred submittals under separate permit.Details
renovation of a cummunity kitchen & upgrade nearby restrooms for accessibility per 20% rule. casework & finishes to be repalced in scope of work. mech, elec, plbg & fire sprinkler work to be deferred submittals under separate permit. | $180,800 |
| Dec 29, 2016 | Completed final sign-off Oct 2017 | 2149 Taraval St | Chang Chao Ming Constr | change of occupancy - convert 1/f b occupancy to preschool(e)occupancy). level 2(s-2 occupancy)to remain.renovate new childrens rstrm,ada upgrades to(e)restrm&entry,new prep&wash areas in activity spaces,new storage rm & new finishes thruout.proj req demo of attached garage for outdoor play area.Details
change of occupancy - convert 1/f b occupancy to preschool(e)occupancy). level 2(s-2 occupancy)to remain.renovate new childrens rstrm,ada upgrades to(e)restrm&entry,new prep&wash areas in activity spaces,new storage rm & new finishes thruout.proj req demo of attached garage for outdoor play area. | $134,750 |
| Aug 26, 2016 | Completed final sign-off Nov 2016 | 2020 Jerrold Av | Turn Key Systems Incorporated | deferred submittal of refigeration panels and equipment for 201607152486Details
deferred submittal of refigeration panels and equipment for 201607152486 | |
| Jul 22, 2016 | Completed final sign-off Apr 2018 | 3660 Jackson St | Van Acker Const Assoc Inc | revision to pa 2014-1103-0548, work includes revised window configuration @ 2nd floor addtition, removal of decorative railing @ (e) deck, removal of decorative balconette, relocation of condensing unitsDetails
revision to pa 2014-1103-0548, work includes revised window configuration @ 2nd floor addtition, removal of decorative railing @ (e) deck, removal of decorative balconette, relocation of condensing units | |
| May 4, 2016 | Completed final sign-off Aug 2017 | 317 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, two family dwelling building.Details
erect 3-story, 1 basement, type 5-b, two family dwelling building. | $794,220 |
| May 4, 2016 | Never finaled issued Jul 2016, no final | 12 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Aug 2017 | 313 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 2-story, 1 basement, type 5-b, single family dwelling building.Details
erect 2-story, 1 basement, type 5-b, single family dwelling building. | $380,800 |
| May 4, 2016 | Completed final sign-off Aug 2017 | 2 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, no basement, type 5-b, two family dwellings building.Details
erect 3-story, no basement, type 5-b, two family dwellings building. | $864,280 |
| May 4, 2016 | Never finaled issued Jul 2016, no final | 16 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, 1 single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, 1 single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Aug 2017 | 311 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 2-story, 1 basement, type 5-b, single family dwelling building.Details
erect 2-story, 1 basement, type 5-b, single family dwelling building. | $380,800 |
| May 4, 2016 | Completed final sign-off Jul 2017 | 15 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4-story, 1 basement, type 5-b, single family dwelling building.Details
erect 4-story, 1 basement, type 5-b, single family dwelling building. | $439,000 |
| May 4, 2016 | Completed final sign-off Jun 2017 | 18 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, 1 single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, 1 single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Jul 2017 | 10 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Jul 2017 | 8 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Jun 2017 | 20 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| Apr 6, 2016 | Completed final sign-off May 2017 | 17 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4-story, 1 basement, type 5-b, 1 unit residental building.Details
erect 4-story, 1 basement, type 5-b, 1 unit residental building. | $439,000 |
| Apr 6, 2016 | Completed final sign-off May 2017 | 19 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4-story, 1 basement, type 5-b, 1 unit residential building.Details
erect 4-story, 1 basement, type 5-b, 1 unit residential building. | $439,000 |
| Apr 6, 2016 | Completed final sign-off Jun 2017 | 26 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| Apr 6, 2016 | Completed final sign-off Jun 2017 | 28 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| Apr 6, 2016 | Completed final sign-off May 2017 | 32 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| Apr 6, 2016 | Completed final sign-off May 2017 | 21 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4-story, 1 basement, type 5-b, 1 unit residential building.Details
erect 4-story, 1 basement, type 5-b, 1 unit residential building. | $439,000 |
| Apr 6, 2016 | Completed final sign-off Jun 2017 | 22 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| Apr 6, 2016 | Completed final sign-off May 2017 | 30 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, 1 unit residential building.Details
erect 3-story, 1 basement, type 5-b, 1 unit residential building. | $437,900 |
| Apr 6, 2016 | Completed final sign-off Mar 2017 | 56 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, 2 units residential building.Details
erect 3-story, 1 basement, type 5-b, 2 units residential building. | $702,500 |
| Feb 12, 2016 | Completed final sign-off Jul 2016 | 2035 Jerrold Av | Ed Ryan Construction Project Mgmt & Cons | deferred submittal for permit 2016-0114-7050 scope of work is mep work for 2 new coolers. permit for mep work only.Details
deferred submittal for permit 2016-0114-7050 scope of work is mep work for 2 new coolers. permit for mep work only. | |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 191 Summit Wy | Western Sun Ent. Inc.Dba: Three D Elec | install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093209Details
install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093209 | $5,000 |
| Jan 27, 2016 | Completed final sign-off Apr 2016 | 175 Summit Wy | Western Sun Ent. Inc.Dba: Three D Elec | install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201502279501Details
install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201502279501 | $5,000 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 171 Summit Wy | Western Sun Ent. Inc.Dba: Three D Elec | install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg, 201502279500Details
install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg, 201502279500 | $5,000 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 187 Summit Wy | Western Sun Ent. Inc.Dba: Three D Elec | install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093208Details
install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093208 | $5,000 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 183 Summit Wy | Western Sun Ent. Inc.Dba: Three D Elec | install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093207Details
install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093207 | $5,000 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 179 Summit Wy | Western Sun Ent. Inc.Dba: Three D Elec | install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093197Details
install fire sprinkler monitoring system, the permit references bldg. type c master bldg. pa#201209119425 & 201401317504 master sprinkler pa#201401095944, new bldg pa#201504093197 | $5,000 |
| Jan 14, 2016 | Completed final sign-off Jul 2016 | 2035 Jerrold Av | Ed Ryan Construction Project Mgmt & Cons | deferred submittal for 201507070833. tenant improvement to construct (2) two new walk-in coolers. work includes structural work. ref 201507070833 t.i, 201507070834 landlord improvements.Details
deferred submittal for 201507070833. tenant improvement to construct (2) two new walk-in coolers. work includes structural work. ref 201507070833 t.i, 201507070834 landlord improvements. | $119,000 |
| Nov 3, 2015 | Completed final sign-off May 2017 | 23 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4-story, type 5-b, single family dwelling building.Details
erect 4-story, type 5-b, single family dwelling building. | $397,100 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 60 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off Apr 2017 | 76 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 66 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 70 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 80 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Jul 7, 2015 | Completed final sign-off Jul 2016 | 2035 Jerrold Av | t.i. to include demolition of extg partitions and cooler construction of new partitions, rr and kitchenette.Details
t.i. to include demolition of extg partitions and cooler construction of new partitions, rr and kitchenette. | $94,244 | |
| Jul 7, 2015 | Completed final sign-off Jul 2016 | 2035 Jerrold Av | accessibilty upgrades to include 2 access doors, interior striping and stairs. replace (e) rear wall. n/a for the maherDetails
accessibilty upgrades to include 2 access doors, interior striping and stairs. replace (e) rear wall. n/a for the maher | $72,215 | |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 269 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family dwelling.Details
to erect 2 stories, 1 basement, single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 266 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a 2-story, 1 basement, single family dwelling.Details
erect a 2-story, 1 basement, single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 270 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 272 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Jan 2017 | 259 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 3 stories, no basement. single family dwelling.Details
to erect 3 stories, no basement. single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 271 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family dwelling.Details
to erect 2 stories, 1 basement, single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 268 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 265 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 267 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family dwelling.Details
to erect 2 stories, 1 basement, single family dwelling. | $380,800 |
| May 29, 2015 | Completed final sign-off Nov 2015 | 901 Rankin St | J K Baker Construction | health department review.ref pa 2015 0123 6530 - construction at the warehouse for mollie stones markets produce distribution ctr. maher naDetails
health department review.ref pa 2015 0123 6530 - construction at the warehouse for mollie stones markets produce distribution ctr. maher na | |
| May 27, 2015 | Completed final sign-off Dec 2015 | 901 Rankin St | Key Mechanical Co /Key Refrigeration Co | construction of 5 temperature controlled rooms on 1st floor within warehouse area. this is a deffered submittal for pa #2015.0123.6530. n/a maher ordinanceDetails
construction of 5 temperature controlled rooms on 1st floor within warehouse area. this is a deffered submittal for pa #2015.0123.6530. n/a maher ordinance | $175,000 |
| Apr 9, 2015 | Never finaled issued Jul 2015, no final | 187 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | (type c bldg) erect 4-story, 2-units, with 1 basement residential building.Details
(type c bldg) erect 4-story, 2-units, with 1 basement residential building. | $800,320 |
| Apr 9, 2015 | Completed final sign-off Jul 2016 | 216 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | (type a bldg) erect 3-story, 2-units, with 1 basement residential building.Details
(type a bldg) erect 3-story, 2-units, with 1 basement residential building. | $702,500 |
| Apr 9, 2015 | Expired or cancelled cancelled Sep 2018 | 206 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a 3-story, 2-units, with 1 basement residential building.Details
erect a 3-story, 2-units, with 1 basement residential building. | $702,500 |
| Apr 9, 2015 | Completed final sign-off Jun 2016 | 206 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | (type c bldg) erect 3-story, 2-units, with 1 basement residential building.(type a bldg)Details
(type c bldg) erect 3-story, 2-units, with 1 basement residential building.(type a bldg) | $702,500 |
| Apr 9, 2015 | Completed final sign-off Sep 2016 | 191 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | (type c bldg) erect 4-story, 2-units, with 1 basement residential building.Details
(type c bldg) erect 4-story, 2-units, with 1 basement residential building. | $800,320 |