Brandon Quan
- Listed as
- architect, authorized agent-others, designer
- Firm
- Studio B Architecture
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Jan 2026
16 permits since 2000 (architect on 14 permits, authorized agent-others on 1 permit, designer on 1 permit): 9 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 16, 2026 | Completed final sign-off Jan 2026 | 3471 California St | Swinerton Builders | amendment to existing permit 202505166619 to clarify fire alarm is not required per code due to no existing fire alarm present.Details
amendment to existing permit 202505166619 to clarify fire alarm is not required per code due to no existing fire alarm present. | |
| May 16, 2025 | Completed final sign-off Jan 2026 | 3471 California St | Swinerton Builders | construct new non structural partitions. install new lights. reuse e hvac system, millworks, doors, and finishes. defereed permits, elec/mechDetails
construct new non structural partitions. install new lights. reuse e hvac system, millworks, doors, and finishes. defereed permits, elec/mech | $250,000 |
| Feb 16, 2022 | Never finaled issued Apr 2022, no final | 437 Gold Mine Dr | Skyland Construction Inc. | facade alteration of extg sfd; remove extg wood shingle siding at top 2 floors and replace with combo horizontal siding and stucco finish.Details
facade alteration of extg sfd; remove extg wood shingle siding at top 2 floors and replace with combo horizontal siding and stucco finish. | $38,000 |
| Jun 11, 2021 | Expired or cancelled withdrawn Sep 2021 | 437 Gold Mine Dr | facade alteration of (e) sfd, remove (e) wood shingle siding at top 2 floor; and replace with comination horizontal siding and stucco finish; in kind replacement of (e) window under sep bpa# 202101142722Details
facade alteration of (e) sfd, remove (e) wood shingle siding at top 2 floor; and replace with comination horizontal siding and stucco finish; in kind replacement of (e) window under sep bpa# 202101142722 | $38,000 | |
| Jun 8, 2021 | Completed final sign-off Nov 2023 | 3027 Franklin St | Cpb Construction Corporation | interior remodel of(e)second floor apartment unit(3027 franklin). reconfigure(e)kitchen, combine(e)bathroom & separate water closet into (1)full bath, relocate(e)powder rm, add(n)linen closet, coat closet & laundry rm; ground floor: remove (e)utility sink, laundry, parking blocks, & built-in storageDetails
interior remodel of(e)second floor apartment unit(3027 franklin). reconfigure(e)kitchen, combine(e)bathroom & separate water closet into (1)full bath, relocate(e)powder rm, add(n)linen closet, coat closet & laundry rm; ground floor: remove (e)utility sink, laundry, parking blocks, & built-in storage | $146,000 |
| Jan 14, 2021 | Completed final sign-off Apr 2021 | 1565 Oak St | Hong Wei Construction Inc | interior remodel of unit #11 , relocate extg kitchen and bedroom, and add new closet.Details
interior remodel of unit #11 , relocate extg kitchen and bedroom, and add new closet. | $25,000 |
| Jan 14, 2021 | Never finaled issued Apr 2022, no final | 437 Gold Mine Dr | Skyland Construction Inc. | remodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind.Details
remodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind. | $115,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2020 | 1565 Oak St | Hong Wei Construction Inc | unit 2. interior remodel. relocate kitchen and bedroom, add (n ) closetDetails
unit 2. interior remodel. relocate kitchen and bedroom, add (n ) closet | $20,000 |
| Feb 12, 2019 | Completed final sign-off Oct 2019 | 683 Commercial St | C T Construction & Plumb | submit deferred mechanical for 2018-07-11-4314. new hvac system elec & plumbing under separate submittal. revision to pa 2018-0711-4314. no lighting changes as previously proposed. all current lighting and ceiling (e) to remainDetails
submit deferred mechanical for 2018-07-11-4314. new hvac system elec & plumbing under separate submittal. revision to pa 2018-0711-4314. no lighting changes as previously proposed. all current lighting and ceiling (e) to remain | $10,000 |
| Jul 11, 2018 | Completed final sign-off Oct 2019 | 683 Commercial St | C T Construction & Plumb | interior remodel of (e) grnd flr commercial space w/change of use from office to limited restaurant; (e) entrance and restroom upgrades, new back-of-house area & plmb fixtures, flooring, service counter and lighting; ele & plum under sep permitDetails
interior remodel of (e) grnd flr commercial space w/change of use from office to limited restaurant; (e) entrance and restroom upgrades, new back-of-house area & plmb fixtures, flooring, service counter and lighting; ele & plum under sep permit | $42,300 |
| Apr 12, 2018 | Expired or cancelled withdrawn Jun 2018 | 770 23rd Av | Modern Construction Inc | interior renovation of single family dwelling. lower unit: relocate (e) kitchen & bath, install (n) den, expand into (e) garage for additional 202sf, new cabinets, appliances, finishes. upper unit: relocate (e) kitchen, reconfigure (e) master bed & bath, install (n) bath, (n) cabinets,Details
interior renovation of single family dwelling. lower unit: relocate (e) kitchen & bath, install (n) den, expand into (e) garage for additional 202sf, new cabinets, appliances, finishes. upper unit: relocate (e) kitchen, reconfigure (e) master bed & bath, install (n) bath, (n) cabinets, | $210,000 |
| Jan 26, 2018 | Never finaled issued Jul 2018, no final | 1741 Larkin St | Fale Construction, Citychamp Construction | interior remodel of (e) thirdDetails
interior remodel of (e) third | $60,000 |
| Dec 8, 2017 | Completed final sign-off Mar 2018 | 1565 Oak St | Hong Wei Construction Inc | unit 7 - relocation of (e) kitchen and add (n) closet; mep design/build and permitted under separate applicationDetails
unit 7 - relocation of (e) kitchen and add (n) closet; mep design/build and permitted under separate application | $15,000 |
| Sep 19, 2017 | Expired or cancelled cancelled Jan 2026 | 340 Ritch St | unit #4: install (n) lot line window per sfdbi administrative bulletin ab-009. maher naDetails
unit #4: install (n) lot line window per sfdbi administrative bulletin ab-009. maher na | $1,600 | |
| Aug 25, 2017 | Never finaled issued Feb 2018, no final | 3535 Fillmore St | Flores General Building | units #103 & #202; remodel, install new bedroomn and bathroom for total of 2 bdroom & 2 bath in each unit: relocate non structural walls. relocate extg kitchen, renovate extg bath, new cabinets, appliances, finishes; new plumbing and electrical. n/a maher ordinanceDetails
units #103 & #202; remodel, install new bedroomn and bathroom for total of 2 bdroom & 2 bath in each unit: relocate non structural walls. relocate extg kitchen, renovate extg bath, new cabinets, appliances, finishes; new plumbing and electrical. n/a maher ordinance | $40,000 |
| Aug 4, 2017 | Completed final sign-off Feb 2018 | 979 Teresita Bl | Strong Builders Construction Inc. | legalize (e) gr fl bathrm, remodel (e) kitchen & install (n) master bathrm; interior demo walls, (n) partitions, (n) & replacement lighting & plumbing fixtures. (n) finishes, patch & paint & repair of (e) foundation at west wall; exterior - remove (e) window & replace with (n) in same location on sDetails
legalize (e) gr fl bathrm, remodel (e) kitchen & install (n) master bathrm; interior demo walls, (n) partitions, (n) & replacement lighting & plumbing fixtures. (n) finishes, patch & paint & repair of (e) foundation at west wall; exterior - remove (e) window & replace with (n) in same location on s | $20,000 |