Brad Tardy
- Listed as
- architect
- Firm
- Bradford Tardy Arch.
- Based in
- Sausalito
- On San Francisco permits
- Aug 2005 to Dec 2017
3 permits since 2000 (architect on 3 permits): 3 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2017 | Completed final sign-off Aug 2018 | 360 Post St | Marchetti Group | 5th flr: ti - build out entire 5th flr, including demo min work in elevator lobby, corridor & toilet rooms.Details
5th flr: ti - build out entire 5th flr, including demo min work in elevator lobby, corridor & toilet rooms. | $777,000 |
| May 28, 2008 | Completed final sign-off Oct 2008 | 1480 Haight St | Metro Construction Inc. | add disabled access door, relocate hand wash sink and dip caseDetails
add disabled access door, relocate hand wash sink and dip case | $13,000 |
| Aug 16, 2005 | Completed final sign-off Jan 2006 | 1760 Cesar Chavez St | Meylan Construction | install electrical material storage racks. minor interior modifications for ada compliance-bathroomDetails
install electrical material storage racks. minor interior modifications for ada compliance-bathroom | $65,000 |