Bill Brown
- Listed as
- contractor, engineer, subcontractor
- Firm
- Bill Brown Construction
- Based in
- San Jose
- On San Francisco permits
- Mar 2007 to Oct 2025
17 permits since 2000 (contractor on 13 permits, subcontractor on 3 permits, engineer on 1 permit): 10 completed, 3 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2025 | In progress issued Oct 2025 | 2799 Broadway | Van Acker Const Assoc Inc | revision to pa # 2024-1105-4446. horizontal expansion of entry hall 102. no change to footprintDetails
revision to pa # 2024-1105-4446. horizontal expansion of entry hall 102. no change to footprint | $48,000 |
| Sep 7, 2023 | In progress issued Dec 2023 | 3515 Pacific Av | Plath & Company Inc | addendum revision to 201907267098-s1. se & sw corners of rear yard, se corner: relocation one of solid pier/reconfig of retaining wall, reconfig of low landscaping wall. sw corner: reconfig of top landscaping & steps dow to landingDetails
addendum revision to 201907267098-s1. se & sw corners of rear yard, se corner: relocation one of solid pier/reconfig of retaining wall, reconfig of low landscaping wall. sw corner: reconfig of top landscaping & steps dow to landing | $8,000 |
| May 4, 2023 | Completed final sign-off Apr 2025 | 2728 Union St | Bill Brown Construction, Caruso Construction Inc. | temporary shoring related to bpa#202008252555Details
temporary shoring related to bpa#202008252555 | $10,000 |
| Jan 10, 2023 | In progress issued Oct 2023 | 1454 Cortland Av | Appetite For Construction Inc | new adu at 1st lvl, no work will take place on 2nd lvl main unit. 1st lvl: expand 74sf & a lightwell added for egress. a usable open space will be added above the (e) garage. house will be lifted to achieve the required ceiling ht for the adu. foundation amended w/a slab overlay & drilled piers.Details
new adu at 1st lvl, no work will take place on 2nd lvl main unit. 1st lvl: expand 74sf & a lightwell added for egress. a usable open space will be added above the (e) garage. house will be lifted to achieve the required ceiling ht for the adu. foundation amended w/a slab overlay & drilled piers. | $80,000 |
| Nov 29, 2022 | Never finaled issued Apr 2023, no final | 715 Buena Vista Ave West Av | Bill Brown Construction, Aaron Gordon Construction Inc | revision to bpa#202012261736 w/revised layout, new theater build out & associated structural workDetails
revision to bpa#202012261736 w/revised layout, new theater build out & associated structural work | $125,000 |
| Aug 25, 2020 | Completed final sign-off Apr 2025 | 2728 Union St | Bill Brown Construction, Caruso Construction Inc. | renovation an expansion of unit #2 to basement level with rear yard access. partial renovation of unit #1 to include (n) roof dormer, various (n) windows/doors throughout, updated stair, alteration of master bedroom roof line.Details
renovation an expansion of unit #2 to basement level with rear yard access. partial renovation of unit #1 to include (n) roof dormer, various (n) windows/doors throughout, updated stair, alteration of master bedroom roof line. | $470,000 |
| Aug 22, 2019 | Completed final sign-off Nov 2020 | 944 Chestnut St | Noa Construction Llc, Bill Brown Construction | temp shoring support of residential structure for retrofit of the foundation.once the fouadation & frraming are sufficiently complete for removel, the shoring will be removed. ref pa201807124449. maher n/a.Details
temp shoring support of residential structure for retrofit of the foundation.once the fouadation & frraming are sufficiently complete for removel, the shoring will be removed. ref pa201807124449. maher n/a. | $90,000 |
| Jul 26, 2019 | Never finaled issued Sep 2022, no final | 3515 Pacific Av | Plath & Company Inc | to erect a 3-story, type 5, single family bldg w/ 2 basements. comply to maher ord# 155-13, route to dph.Details
to erect a 3-story, type 5, single family bldg w/ 2 basements. comply to maher ord# 155-13, route to dph. | $1,800,000 |
| Dec 10, 2018 | Completed final sign-off Jul 2026 | 3760 Washington St | Van Acker Const Assoc Inc, Bill Brown Construction | renovation & structural upgrade of (e) house. dormer addition at top flr below top of ridge. below grade expansion of (e) 1st & 2nd flr. tile roof of one-story structure at rear to be reduced & replaced with a roof garden.Details
renovation & structural upgrade of (e) house. dormer addition at top flr below top of ridge. below grade expansion of (e) 1st & 2nd flr. tile roof of one-story structure at rear to be reduced & replaced with a roof garden. | $2,600,000 |
| Dec 28, 2015 | Completed final sign-off Mar 2022 | 737 Buena Vista West Av | Redhorse Constructors Inc., Northgate Scaffold Inc, Bill Brown Construction | construct a 3 story horizontal addition including master bedrooms, 2 bedrooms, kitchen, family room, great room & garage to (e) 4 story house & interior remodel.Details
construct a 3 story horizontal addition including master bedrooms, 2 bedrooms, kitchen, family room, great room & garage to (e) 4 story house & interior remodel. | $2,270,000 |
| Nov 24, 2015 | Completed final sign-off Sep 2018 | 3660 21st St | Bill Brown Construction, Forsythe General Contractors | provide temporary shoring to facilitate the excavation and construction of new residence per 201303293348 s/r4Details
provide temporary shoring to facilitate the excavation and construction of new residence per 201303293348 s/r4 | $200,000 |
| Nov 2, 2015 | Completed final sign-off Jul 2022 | 632 El Camino Del Mar | Fma Builders, Bill Brown Construction | shoring associated with rear yard improvements. maher naDetails
shoring associated with rear yard improvements. maher na | $75,000 |
| Feb 5, 2015 | Completed final sign-off Jan 2018 | 2950 Broadway | Pete Moffat Construction Inc, Bill Brown Construction | landscaping only. work includes new retaining walls, garden shed, retaining walls outdoor staircases, enlarge terrace, remodel pool shed. work is for rear yard. separate permit for landscaping ref 201206041778. <50 c. yards excavated.Details
landscaping only. work includes new retaining walls, garden shed, retaining walls outdoor staircases, enlarge terrace, remodel pool shed. work is for rear yard. separate permit for landscaping ref 201206041778. <50 c. yards excavated. | $99,000 |
| Dec 22, 2014 | Completed final sign-off Jan 2018 | 2950 Broadway | Bill Brown Construction | house shoring only for expansion of 1st and 2nd stories at rear. reerence to pa# 2012-0604-1778. shoring for upper structure, and shoring for hand-dug piers.Details
house shoring only for expansion of 1st and 2nd stories at rear. reerence to pa# 2012-0604-1778. shoring for upper structure, and shoring for hand-dug piers. | $200,000 |
| Mar 3, 2008 | Expired or cancelled expired Jan 2009 | 1141 Filbert St | Bill Brown Construction | car parkway to be altered as part of the garage wall at 1147-1155 filbert underpinning work. (access for work at 1147 - 1155 will be made through 1141-1143 filbert).Details
car parkway to be altered as part of the garage wall at 1147-1155 filbert underpinning work. (access for work at 1147 - 1155 will be made through 1141-1143 filbert). | $1,500 |
| Mar 3, 2008 | Expired or cancelled expired Mar 2010 | 1155 Filbert St | Bill Brown Construction | replace the concrete wall and foundation of the garage. underpin foundation and wall on adjacent property.Details
replace the concrete wall and foundation of the garage. underpin foundation and wall on adjacent property. | $135,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2010 | 1141 Filbert St | Fma Builders, Bill Brown Construction | basement level addition w/ new foundation. raise building 2'-0" to provide basement parking. second exit stair. seismic upgrade for building. horizontal addition to front of building.Details
basement level addition w/ new foundation. raise building 2'-0" to provide basement parking. second exit stair. seismic upgrade for building. horizontal addition to front of building. | $640,000 |