Bill Brown Construction
- Based in
- San Jose
- On San Francisco permits
- Mar 2007 to May 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2023 | Completed final sign-off Apr 2025 | 2728 Union St | temporary shoring related to bpa#202008252555Details
temporary shoring related to bpa#202008252555 | $10,000 |
| Nov 29, 2022 | Never finaled issued Apr 2023, no final | 715 Buena Vista Ave West Av | revision to bpa#202012261736 w/revised layout, new theater build out & associated structural workDetails
revision to bpa#202012261736 w/revised layout, new theater build out & associated structural work | $125,000 |
| Aug 25, 2020 | Completed final sign-off Apr 2025 | 2728 Union St | renovation an expansion of unit #2 to basement level with rear yard access. partial renovation of unit #1 to include (n) roof dormer, various (n) windows/doors throughout, updated stair, alteration of master bedroom roof line.Details
renovation an expansion of unit #2 to basement level with rear yard access. partial renovation of unit #1 to include (n) roof dormer, various (n) windows/doors throughout, updated stair, alteration of master bedroom roof line. | $470,000 |
| Aug 22, 2019 | Completed final sign-off Nov 2020 | 944 Chestnut St | temp shoring support of residential structure for retrofit of the foundation.once the fouadation & frraming are sufficiently complete for removel, the shoring will be removed. ref pa201807124449. maher n/a.Details
temp shoring support of residential structure for retrofit of the foundation.once the fouadation & frraming are sufficiently complete for removel, the shoring will be removed. ref pa201807124449. maher n/a. | $90,000 |
| Dec 10, 2018 | Completed final sign-off Jul 2026 | 3760 Washington St | renovation & structural upgrade of (e) house. dormer addition at top flr below top of ridge. below grade expansion of (e) 1st & 2nd flr. tile roof of one-story structure at rear to be reduced & replaced with a roof garden.Details
renovation & structural upgrade of (e) house. dormer addition at top flr below top of ridge. below grade expansion of (e) 1st & 2nd flr. tile roof of one-story structure at rear to be reduced & replaced with a roof garden. | $2,600,000 |
| Dec 28, 2015 | Completed final sign-off Mar 2022 | 737 Buena Vista West Av | construct a 3 story horizontal addition including master bedrooms, 2 bedrooms, kitchen, family room, great room & garage to (e) 4 story house & interior remodel.Details
construct a 3 story horizontal addition including master bedrooms, 2 bedrooms, kitchen, family room, great room & garage to (e) 4 story house & interior remodel. | $2,270,000 |
| Nov 24, 2015 | Completed final sign-off Sep 2018 | 3660 21st St | provide temporary shoring to facilitate the excavation and construction of new residence per 201303293348 s/r4Details
provide temporary shoring to facilitate the excavation and construction of new residence per 201303293348 s/r4 | $200,000 |
| Nov 2, 2015 | Completed final sign-off Jul 2022 | 632 El Camino Del Mar | shoring associated with rear yard improvements. maher naDetails
shoring associated with rear yard improvements. maher na | $75,000 |
| Feb 5, 2015 | Completed final sign-off Jan 2018 | 2950 Broadway | landscaping only. work includes new retaining walls, garden shed, retaining walls outdoor staircases, enlarge terrace, remodel pool shed. work is for rear yard. separate permit for landscaping ref 201206041778. <50 c. yards excavated.Details
landscaping only. work includes new retaining walls, garden shed, retaining walls outdoor staircases, enlarge terrace, remodel pool shed. work is for rear yard. separate permit for landscaping ref 201206041778. <50 c. yards excavated. | $99,000 |
| Dec 22, 2014 | Completed final sign-off Jan 2018 | 2950 Broadway | house shoring only for expansion of 1st and 2nd stories at rear. reerence to pa# 2012-0604-1778. shoring for upper structure, and shoring for hand-dug piers.Details
house shoring only for expansion of 1st and 2nd stories at rear. reerence to pa# 2012-0604-1778. shoring for upper structure, and shoring for hand-dug piers. | $200,000 |
| Mar 3, 2008 | Expired or cancelled expired Jan 2009 | 1141 Filbert St | car parkway to be altered as part of the garage wall at 1147-1155 filbert underpinning work. (access for work at 1147 - 1155 will be made through 1141-1143 filbert).Details
car parkway to be altered as part of the garage wall at 1147-1155 filbert underpinning work. (access for work at 1147 - 1155 will be made through 1141-1143 filbert). | $1,500 |
| Mar 3, 2008 | Expired or cancelled expired Mar 2010 | 1155 Filbert St | replace the concrete wall and foundation of the garage. underpin foundation and wall on adjacent property.Details
replace the concrete wall and foundation of the garage. underpin foundation and wall on adjacent property. | $135,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2010 | 1141 Filbert St | basement level addition w/ new foundation. raise building 2'-0" to provide basement parking. second exit stair. seismic upgrade for building. horizontal addition to front of building.Details
basement level addition w/ new foundation. raise building 2'-0" to provide basement parking. second exit stair. seismic upgrade for building. horizontal addition to front of building. | $640,000 |