Babak Vaziri
- Listed as
- architect, engineer
- Firm
- Vaziri Structural Engineering
- Based in
- San Rafael Ca
- On San Francisco permits
- Feb 2005 to Apr 2024
24 permits since 2000 (engineer on 23 permits, architect on 1 permit): 17 completed, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 12, 2024 | Completed final sign-off Dec 2024 | 2238 36th Av | Good Neighbor Construction | revision to permit 202401184202. add bearing wall in lieu of beam.Details
revision to permit 202401184202. add bearing wall in lieu of beam. | |
| Jan 18, 2024 | Completed final sign-off Dec 2024 | 2238 36th Av | Good Neighbor Construction | add rooms downstairs. 1 bath, 1 powder, 1 bedroom. 1 living /study, 1 wetbar, new footing opt b and concrete slab. modify rear elevation for news doors.Details
add rooms downstairs. 1 bath, 1 powder, 1 bedroom. 1 living /study, 1 wetbar, new footing opt b and concrete slab. modify rear elevation for news doors. | $16,000 |
| Sep 11, 2023 | Never finaled issued Sep 2023, no final | 551 Spruce St | Tamayo General Construction | add (2) new skylights in kitchenDetails
add (2) new skylights in kitchen | $8,000 |
| Apr 7, 2023 | Expired or cancelled withdrawn Aug 2023 | 4027 Clement St | grnd/f: new deck, repair dryrot (e)stairs, (1)new door, new french doors, (1)new window in (e)openings, (1)new fixed window in enlarged opening; main/f: new prefab metal, nonbearling juliette balcony, new french doors w/sidelight new opening, (3)new windows, in (e)openings, replace siding materialDetails
grnd/f: new deck, repair dryrot (e)stairs, (1)new door, new french doors, (1)new window in (e)openings, (1)new fixed window in enlarged opening; main/f: new prefab metal, nonbearling juliette balcony, new french doors w/sidelight new opening, (3)new windows, in (e)openings, replace siding material | $50,000 | |
| May 6, 2022 | Never finaled issued Jun 2022, no final | 3251 20th Av | W G Fritz Construction Inc. | space op-186-190: as built revisions to 202111303280. additional demo facade, relocate 1 duct.Details
space op-186-190: as built revisions to 202111303280. additional demo facade, relocate 1 duct. | $5,000 |
| Nov 30, 2021 | Completed final sign-off Jun 2022 | 3251 20th Av | W G Fritz Construction Inc. | #op186-190: add non-bearing demising wall, demo as required. provide utilty stubs, new hvac support. t.i. by others and under a seperate permit.Details
#op186-190: add non-bearing demising wall, demo as required. provide utilty stubs, new hvac support. t.i. by others and under a seperate permit. | $25,000 |
| Mar 5, 2021 | Completed final sign-off Jun 2021 | 665 03rd St | Team Commercial Construction Inc. | decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.Details
decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project. | $80,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2021 | 2462 25th Av | Jing Hua Construction Corp | kitchen & bathroom remodel. enclose lightwell per za bulletin #4.Details
kitchen & bathroom remodel. enclose lightwell per za bulletin #4. | $40,000 |
| Aug 15, 2020 | Completed final sign-off Jun 2022 | 1853 24th Av | O'shea Co. Home Grown Construction | kitchen remodel, removal of interior light well.Details
kitchen remodel, removal of interior light well. | $62,000 |
| Sep 6, 2019 | Completed final sign-off Mar 2021 | 168 28th Av | Pro Com Home Services California Inc | revision to pa 201904026860. underpinning (e) foundation. ref s3.1 detail 3Details
revision to pa 201904026860. underpinning (e) foundation. ref s3.1 detail 3 | $15,000 |
| Jul 13, 2018 | Never finaled issued Jul 2018, no final | 415 Mission St | Principal Builders Inc. | .59th fl - revision to pa 2018-0222-1805 to add conference room to previously approved scope of work including addition of a new operable partition and mechanical/electrical changedDetails
.59th fl - revision to pa 2018-0222-1805 to add conference room to previously approved scope of work including addition of a new operable partition and mechanical/electrical changed | |
| May 1, 2018 | Completed final sign-off Jun 2019 | 45 Fremont St | Principal Builders Inc. | revision to pa #201801239305, to include structural details for sliding glass door on 15th fl.Details
revision to pa #201801239305, to include structural details for sliding glass door on 15th fl. | |
| Dec 8, 2016 | Completed final sign-off May 2018 | 164 23rd Av | add unit per ordinance no. 162-16. new accessory dwelling unit in (e) garage space of approx 545 sf.(423 habitable space) including rear yard fencing, landscaping & paving. bldg completed soft story upgrade under p/a#2015-0403-2727. life safety, mep deferred.Details
add unit per ordinance no. 162-16. new accessory dwelling unit in (e) garage space of approx 545 sf.(423 habitable space) including rear yard fencing, landscaping & paving. bldg completed soft story upgrade under p/a#2015-0403-2727. life safety, mep deferred. | $51,500 | |
| Jun 9, 2016 | Never finaled issued Nov 2016, no final | 89 Alpine Tr | Drake Construction | revision to pa#2015-0807-3661, scope of work includes replacement of windows at rear, bay and side of bldg on 2/f, 3/f. removal of wing walls adjacent to rear windows. reconfiguration of kitchens at 2nd and 3rd floors.Details
revision to pa#2015-0807-3661, scope of work includes replacement of windows at rear, bay and side of bldg on 2/f, 3/f. removal of wing walls adjacent to rear windows. reconfiguration of kitchens at 2nd and 3rd floors. | $8,000 |
| Feb 16, 2016 | Completed final sign-off Dec 2016 | 419 Prentiss St | Drake Construction | install hardy frames at back of house.Details
install hardy frames at back of house. | $3,000 |
| Jan 4, 2016 | Completed final sign-off Dec 2016 | 419 Prentiss St | Drake Construction | replace a total of 9 windows and three doors in-kind with no rough opening changes: of which 5 windows and one door are located at front of the building. wood or wood interior exterior aluminum clad at front. u-factor for all windows replacement and glazing at doors shall not exceed 0.32.Details
replace a total of 9 windows and three doors in-kind with no rough opening changes: of which 5 windows and one door are located at front of the building. wood or wood interior exterior aluminum clad at front. u-factor for all windows replacement and glazing at doors shall not exceed 0.32. | $3,000 |
| Aug 13, 2015 | Completed final sign-off Aug 2016 | 551 Spruce St | Drake Construction | remodel existing single family home. gr fl living room expansion, guest bedroom expansion add mudroom and office. 2nd fl open living room to dining room, turn dining rm into kitchen, turn office into powder rm and coat closet. reframe and open stairs, expand bdrm 1, 2 and master. expand hallwayDetails
remodel existing single family home. gr fl living room expansion, guest bedroom expansion add mudroom and office. 2nd fl open living room to dining room, turn dining rm into kitchen, turn office into powder rm and coat closet. reframe and open stairs, expand bdrm 1, 2 and master. expand hallway | $150,000 |
| Aug 7, 2015 | Completed final sign-off Jan 2018 | 89 Alpine Tr | Drake Construction | demo (e) walls, windows & doors. remove (e) fixtures & finishes. construction of new walls, doors, window & roof deck. exterior work includes new finishes, doors, windows & partial lightwell infill. construction will include fully auto. sprinkler system.Details
demo (e) walls, windows & doors. remove (e) fixtures & finishes. construction of new walls, doors, window & roof deck. exterior work includes new finishes, doors, windows & partial lightwell infill. construction will include fully auto. sprinkler system. | $593,500 |
| Mar 31, 2015 | Completed final sign-off Jun 2015 | 201 Mendell St | Plant Construction Co, Lp | suite #225 - installation of skylights (4) max u-factor =0.58 (typ) ref #2015.0113.5642.. maher - not req'dDetails
suite #225 - installation of skylights (4) max u-factor =0.58 (typ) ref #2015.0113.5642.. maher - not req'd | $3,258 |
| Nov 12, 2014 | Completed final sign-off May 2015 | 1455 Market St | Principal Builders Inc. | revision to 201406259488 to show new demo and opening for non egress stair to the 11th fl. 11th fl cutout and structural plans included, and additional partitions and doors on 10/f. n/a ordinance #155-13Details
revision to 201406259488 to show new demo and opening for non egress stair to the 11th fl. 11th fl cutout and structural plans included, and additional partitions and doors on 10/f. n/a ordinance #155-13 | $250,000 |
| Jul 18, 2014 | Never finaled issued Jul 2014, no final | 140 New Montgomery St | Principal Builders Inc. | 26th flr: revision to permit 201405085258 to show additional structural details for bracing of stud wall and sliding glass partition; maher n/aDetails
26th flr: revision to permit 201405085258 to show additional structural details for bracing of stud wall and sliding glass partition; maher n/a | |
| May 8, 2014 | Completed final sign-off Oct 2014 | 140 New Montgomery St | Principal Builders Inc. | construction of non-structural partitions, doors, frames, hardware, millwork, drywall & acoustic ceiling, grid/tile, finishes. mechanical, electrical and plumbing are design build. fire sprinkler & life safety is design build by general contractor. n/a ordinance #155-13.Details
construction of non-structural partitions, doors, frames, hardware, millwork, drywall & acoustic ceiling, grid/tile, finishes. mechanical, electrical and plumbing are design build. fire sprinkler & life safety is design build by general contractor. n/a ordinance #155-13. | $678,000 |
| Feb 29, 2012 | Completed final sign-off Apr 2013 | 2061 Hayes St | interior and exterior rehabilitation, restoration and remodel of both flats. work shall include new electrical, plumbing and mechanical throughout. replace all front windows in-kind w/ wood frame double hung & casement windows. no deck work on this permit.Details
interior and exterior rehabilitation, restoration and remodel of both flats. work shall include new electrical, plumbing and mechanical throughout. replace all front windows in-kind w/ wood frame double hung & casement windows. no deck work on this permit. | $250,000 | |
| Feb 10, 2005 | Never finaled issued Apr 2005, no final | 250 Post St | interior t.i. new mechanical, lighting systems, new partitions. minor structural floor infil on fl 1Details
interior t.i. new mechanical, lighting systems, new partitions. minor structural floor infil on fl 1 | $750,000 |