Anne Forell
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Anne Forell Architecture
- Based in
- Tiburon
- On San Francisco permits
- Jun 2003 to Dec 2025
46 permits since 2000 (architect on 40 permits, authorized agent-others on 3 permits, engineer on 3 permits): 41 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 338 28th St | Keegan Contruction Inc. | unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area.Details
unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area. | $38,000 |
| Oct 31, 2025 | In progress issued Mar 2026 | 647 19th Av | Rake Construction Inc | horizontal addition w/new rooms down to convert e) 3 bedroom, 1 bath house to a 4 bedroom & 3 bath house plus media rm. extending e) residence in 1=story addition into rear yard, infill north lightwell on upper level, partial infill lightwell on south side, both within neighbor approval.Details
horizontal addition w/new rooms down to convert e) 3 bedroom, 1 bath house to a 4 bedroom & 3 bath house plus media rm. extending e) residence in 1=story addition into rear yard, infill north lightwell on upper level, partial infill lightwell on south side, both within neighbor approval. | $398,000 |
| Apr 21, 2025 | Completed final sign-off Dec 2025 | 255 Westgate Dr | Hubert Penny | conversion of garage storage space to conditioned area to provide new exercise room, bedroom and half bathroom. remodel of existing bathroom on ground floor. no changes to bulk or mass. no changes to exterior. new conditioned area of 476 sqft.Details
conversion of garage storage space to conditioned area to provide new exercise room, bedroom and half bathroom. remodel of existing bathroom on ground floor. no changes to bulk or mass. no changes to exterior. new conditioned area of 476 sqft. | $65,000 |
| Mar 20, 2025 | Completed final sign-off Feb 2026 | 130 Belgrave Av | Jl Construction | remodel of bathroom on 3rd floor removal of 1 window exterior door and installation of 2 (n) windows in bathroom and adajacent bedroom. no changes to bulker massDetails
remodel of bathroom on 3rd floor removal of 1 window exterior door and installation of 2 (n) windows in bathroom and adajacent bedroom. no changes to bulker mass | $23,000 |
| Mar 20, 2025 | Completed final sign-off Feb 2026 | 1011 Church St | Christopher Gate Construction Inc | kitchen remodel including removal of exterior door and window and installation of (n) sliding door in same location. related structrual, electrical and plumbingDetails
kitchen remodel including removal of exterior door and window and installation of (n) sliding door in same location. related structrual, electrical and plumbing | $25,000 |
| Dec 3, 2024 | Completed final sign-off Aug 2025 | 1749 Sanchez St | Keegan Contruction Inc. | remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405Details
remodel including bathroom and closet addition on 3/f, kitchen remodel, alterations to interior partitions, utility remodel in garage. scope includes removal of 1 light shaft/lightwell on north side.l no exterior changes proposed. note: 2 bathrooms being remodeled under pa# 202411205405 | $330,000 |
| Feb 7, 2024 | In progress issued Feb 2024 | 156 Onondaga Av | removal of existing garage door and installation of new garage door to flush with building face (no increase of habitable space) provide 5/8" drywall on garage ceiling provide 100 square inches of ventilation at garage door verify 20 minute rated door with closer and smoke seal to living areaDetails
removal of existing garage door and installation of new garage door to flush with building face (no increase of habitable space) provide 5/8" drywall on garage ceiling provide 100 square inches of ventilation at garage door verify 20 minute rated door with closer and smoke seal to living area | $4,100 | |
| Mar 17, 2023 | Completed final sign-off Apr 2024 | 3841 25th St | Keegan Contruction Inc. | new rooms down. remodel of (e) storage area and bedroom to add 2 new bedrooms & 2 baths on (e) ground floor including bedrooms & window replacement, skylight and utlity upgrade.Details
new rooms down. remodel of (e) storage area and bedroom to add 2 new bedrooms & 2 baths on (e) ground floor including bedrooms & window replacement, skylight and utlity upgrade. | $350,000 |
| Dec 19, 2022 | Completed final sign-off Nov 2023 | 1370 Portola Dr | Hubert Penny | int remodel & rooms down into (e) storage. includes remodel of kitchen living area & conversion of storage space below living area to provide new family rm, bedrm & (2) bathrooms. includes relocation of some int partitions & modification to (e) stairs. changes to several rear window @ lower additionDetails
int remodel & rooms down into (e) storage. includes remodel of kitchen living area & conversion of storage space below living area to provide new family rm, bedrm & (2) bathrooms. includes relocation of some int partitions & modification to (e) stairs. changes to several rear window @ lower addition | $250,000 |
| Nov 4, 2021 | Completed final sign-off Aug 2022 | 34 Castle St | Keegan Contruction Inc. | garage repairs and improvement. replacement of 2 hot water heater, furnace in new location. replacement of concrete slab floor. installation of surface drainage channel for water seepage. new sheetrock, installation and painting thru. elec, ltg improvements.Details
garage repairs and improvement. replacement of 2 hot water heater, furnace in new location. replacement of concrete slab floor. installation of surface drainage channel for water seepage. new sheetrock, installation and painting thru. elec, ltg improvements. | $30,000 |
| Apr 14, 2021 | Completed final sign-off Oct 2025 | 235 28th St | Keegan Contruction Inc. | 3rd floor addition to existing single residence in order to provide 3 bedrooms and 2 bathrooms on top floor. remodel of existing first floor bedrooms to create family room, exercise area, and home office.Details
3rd floor addition to existing single residence in order to provide 3 bedrooms and 2 bathrooms on top floor. remodel of existing first floor bedrooms to create family room, exercise area, and home office. | $500,000 |
| Mar 5, 2021 | Completed final sign-off Oct 2021 | 350 Claremont Bl | Custom Construction Enterprises | remodel of 2 6'x8' doors at rear of house at kitchen. new window in (e) opening and new multislide door in enlarged opening. new overhang. no change to bulk or mass.Details
remodel of 2 6'x8' doors at rear of house at kitchen. new window in (e) opening and new multislide door in enlarged opening. new overhang. no change to bulk or mass. | $20,000 |
| Jun 25, 2020 | Completed final sign-off Aug 2020 | 147 29th St | Keegan Contruction Inc. | final as-built revision to pa#2017-0315-1524. revisions include reduction of conditioned floor area on 2nd floor at rear of building to create a covered porch, within existing building envelope. minor interior alterations to bathrooms. add bedroom on 1st floor facing rear yard.Details
final as-built revision to pa#2017-0315-1524. revisions include reduction of conditioned floor area on 2nd floor at rear of building to create a covered porch, within existing building envelope. minor interior alterations to bathrooms. add bedroom on 1st floor facing rear yard. | |
| Feb 21, 2020 | Completed final sign-off Jan 2021 | 2504 Pacific Av | Custom Construction Enterprises | interior remodel - renovation of ground fl rooms including expansion of garage & remodel of (e) bathroom, laundry & family room. replacement windows in (e) openings & 2 (n) windows in rear yardDetails
interior remodel - renovation of ground fl rooms including expansion of garage & remodel of (e) bathroom, laundry & family room. replacement windows in (e) openings & 2 (n) windows in rear yard | $300,000 |
| Feb 19, 2020 | Completed final sign-off Jul 2021 | 80 28th St | Keegan Contruction Inc. | revision to pa 2019-1125-8152 rooms down addition to unit 80 (2nd fl) in rear of (e) garage. comprisinsg of addition of 510 sf under (e) volume. replacement of 2 exterior windows into rear yard in (n) openings. new wood sashes in (e) windows, related electrical & mechanicalDetails
revision to pa 2019-1125-8152 rooms down addition to unit 80 (2nd fl) in rear of (e) garage. comprisinsg of addition of 510 sf under (e) volume. replacement of 2 exterior windows into rear yard in (n) openings. new wood sashes in (e) windows, related electrical & mechanical | $220,000 |
| Feb 4, 2019 | Completed final sign-off Apr 2026 | 410 29th St | Keegan Contruction Inc. | remodel of (e) house to convert ground level garage and storage to occupied space - 3 bedroom and 2 bath. no change to bulk or mass. replacement of (e) windows and new windows.Details
remodel of (e) house to convert ground level garage and storage to occupied space - 3 bedroom and 2 bath. no change to bulk or mass. replacement of (e) windows and new windows. | $280,000 |
| Sep 20, 2018 | Completed final sign-off May 2020 | 139 Brompton Av | interior remodel of 2 bathrooms. relocation of laundry facilities. other cosmetic interior changes. replacement of exterior windows in front and rear of residence.Details
interior remodel of 2 bathrooms. relocation of laundry facilities. other cosmetic interior changes. replacement of exterior windows in front and rear of residence. | $110,000 | |
| Sep 20, 2018 | Completed final sign-off Aug 2019 | 337 Teresita Bl | Custom Construction Enterprises | remodel to extg residential. addition of new bedroom in crawl space under house addition of powder room on main floor, addition of bathroom on 3rd floor. new deck in rear yard, new bay projection in rear yard. remodel of other spaces and window modification per scope.Details
remodel to extg residential. addition of new bedroom in crawl space under house addition of powder room on main floor, addition of bathroom on 3rd floor. new deck in rear yard, new bay projection in rear yard. remodel of other spaces and window modification per scope. | $625,000 |
| Jun 12, 2017 | Completed final sign-off Jul 2018 | 4225 23rd St | Keegan Contruction Inc. | add window @ ground levelDetails
add window @ ground level | $10,000 |
| Mar 15, 2017 | Completed final sign-off Sep 2020 | 147 29th St | Keegan Contruction Inc. | vertical & horizontal addition, remodel new 3rd floor, new interior layout, finishes and fixtures, new windows and skylights, add 3 bathrooms and three bedrooms on 3rd floorDetails
vertical & horizontal addition, remodel new 3rd floor, new interior layout, finishes and fixtures, new windows and skylights, add 3 bathrooms and three bedrooms on 3rd floor | $650,000 |
| Feb 27, 2017 | Completed final sign-off Aug 2019 | 3922 22nd St | Keegan Contruction Inc. | replace existing sliding glass door and add two (2) new windows at rear of building, not visable from street. n/a ordinance #155-13Details
replace existing sliding glass door and add two (2) new windows at rear of building, not visable from street. n/a ordinance #155-13 | $15,000 |
| Oct 13, 2016 | Completed final sign-off Aug 2019 | 3922 22nd St | Keegan Contruction Inc. | removal and replacement of exterior stairs in front yard, improvements to building facade including new siding, windows and construction of a single car garage in front yard set back, attached to buildingDetails
removal and replacement of exterior stairs in front yard, improvements to building facade including new siding, windows and construction of a single car garage in front yard set back, attached to building | $110,000 |
| Sep 28, 2016 | Completed final sign-off Oct 2017 | 1045 Church St | Keegan Contruction Inc. | two new cantilevered decks off of rear of building at 1st and 2nd floors.Details
two new cantilevered decks off of rear of building at 1st and 2nd floors. | $35,000 |
| Apr 28, 2016 | Completed final sign-off Oct 2017 | 1045 Church St | Keegan Contruction Inc. | (n) garage and interior remodel and window replacement on front and rear elevations. new rear deck. see permit for details. infill and remodel. new driveway by street improvement permit. new cantilevered deck.Details
(n) garage and interior remodel and window replacement on front and rear elevations. new rear deck. see permit for details. infill and remodel. new driveway by street improvement permit. new cantilevered deck. | $350,000 |
| Mar 3, 2016 | Completed final sign-off Jul 2018 | 4225 23rd St | Keegan Contruction Inc. | vertical & horizontal addition. excavation of storage area to add 2 new bedrooms & 2 baths @ ground level including 12' single story popout. conversion of attic space to occupied floor with 3 bedrooms. window replacement, skylight, landscaping.Details
vertical & horizontal addition. excavation of storage area to add 2 new bedrooms & 2 baths @ ground level including 12' single story popout. conversion of attic space to occupied floor with 3 bedrooms. window replacement, skylight, landscaping. | $600,000 |
| Aug 28, 2015 | Completed final sign-off Sep 2015 | 1725 Wawona St | revision to app#201503272130. new skylights and gas fire place.Details
revision to app#201503272130. new skylights and gas fire place. | $2,500 | |
| Apr 7, 2015 | Completed final sign-off Jan 2016 | 2701 Larkin St | units #1130,#1128 & 1124: interior remodel only: kitchen bath & new electrical & plumbing, some alterations to interior walls & partitions, no exterior changes-no changes to occupied floor area; maher n/aDetails
units #1130,#1128 & 1124: interior remodel only: kitchen bath & new electrical & plumbing, some alterations to interior walls & partitions, no exterior changes-no changes to occupied floor area; maher n/a | $60,000 | |
| Mar 27, 2015 | Completed final sign-off Sep 2015 | 1725 Wawona St | Cullinane Plastering | revision to pa# 2014 0307 0218: revise stair, garage wall and exterior doors at basementDetails
revision to pa# 2014 0307 0218: revise stair, garage wall and exterior doors at basement | |
| Feb 12, 2015 | Completed final sign-off Oct 2015 | 1544 Lake St | Custom Construction Enterprises | rear yard improvements including new fence, deck, exterior statirs, and replacement windows in existing openings.Details
rear yard improvements including new fence, deck, exterior statirs, and replacement windows in existing openings. | $30,000 |
| Feb 12, 2015 | Completed final sign-off Dec 2015 | 69 28th St | Keegan Contruction Inc. | facade remodel including new windows siding, door and stairs. no interior work. non historic per ceqa 2014002185envDetails
facade remodel including new windows siding, door and stairs. no interior work. non historic per ceqa 2014002185env | $30,000 |
| Feb 9, 2015 | Completed final sign-off Mar 2016 | 14 28th St | horizontal addition. interior remodel & dormer addition, interior remodel to 2 bathrooms, kitchen, hallway, master bedroom, create 441 new sq.ft. in existing attic & dormer addition, related structural, electrical & plumbing work.Details
horizontal addition. interior remodel & dormer addition, interior remodel to 2 bathrooms, kitchen, hallway, master bedroom, create 441 new sq.ft. in existing attic & dormer addition, related structural, electrical & plumbing work. | $220,000 | |
| Jan 27, 2015 | Completed final sign-off Jun 2016 | 1029 Page St | Spectrum Development Co. | to legalize & improve (e)apartment on ground floor of (e)residence, improved apartment to provide 2 br,2bath,&laundry.modifications incl: fnd replacement & 1' of excavation,elec & plmbg upgrades,hvac,& strctl strengthening.alter include (n)windows & doors in grnd level apt.removal of brick fireplaceDetails
to legalize & improve (e)apartment on ground floor of (e)residence, improved apartment to provide 2 br,2bath,&laundry.modifications incl: fnd replacement & 1' of excavation,elec & plmbg upgrades,hvac,& strctl strengthening.alter include (n)windows & doors in grnd level apt.removal of brick fireplace | $140,000 |
| Jan 13, 2015 | Completed final sign-off Sep 2016 | 249 Prospect Av | Keegan Contruction Inc., Ace Drilling & Excavation | (e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwellDetails
(e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwell | $70,000 |
| Dec 16, 2014 | Completed final sign-off Jan 2019 | 271 Waller St | Spectrum Development Co. | convert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage.Details
convert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage. | $50,000 |
| Jan 4, 2012 | Completed final sign-off Apr 2014 | 2150 Lyon St | Keegan Contruction Inc. | change of use r2 to r3. combine mid & top flr units (2150, 2152 lyon st.) into 1 unit. remove kitch in 2150, & remove int stairway encl walls & replace w/ open guard rails. dr case filed 2011.1419d w/ planning on 12/20/11. w/ 311 materials. struct ref to pa 200409245136.Details
change of use r2 to r3. combine mid & top flr units (2150, 2152 lyon st.) into 1 unit. remove kitch in 2150, & remove int stairway encl walls & replace w/ open guard rails. dr case filed 2011.1419d w/ planning on 12/20/11. w/ 311 materials. struct ref to pa 200409245136. | $10,000 |
| Jul 21, 2010 | Completed final sign-off Jun 2014 | 2701 Larkin St | Keegan Contruction Inc. | interior remodel to units #100, 101, 200 & 202-2nd & 3rd floors-remodel includes ktichen & bathroom remodeling, new interior closets, minor partition modifications for doors, etc. add 1 powder room (unit #201 & 202 only). new electrical, no changes to bldg exterior, windows or envelopeDetails
interior remodel to units #100, 101, 200 & 202-2nd & 3rd floors-remodel includes ktichen & bathroom remodeling, new interior closets, minor partition modifications for doors, etc. add 1 powder room (unit #201 & 202 only). new electrical, no changes to bldg exterior, windows or envelope | $250,000 |
| Jun 28, 2010 | Never finaled issued Jan 2011, no final | 180 Collins St | Keegan Contruction Inc. | enclosure of 93 sf of rear deck on 2nd floor of existing residence in rear of house to provide additional square footage to kitchen. new enclosed area is not in required rear yard setback & is lower than exsiting roof structure.Details
enclosure of 93 sf of rear deck on 2nd floor of existing residence in rear of house to provide additional square footage to kitchen. new enclosed area is not in required rear yard setback & is lower than exsiting roof structure. | $30,000 |
| Dec 11, 2009 | Completed final sign-off Dec 2010 | 373 Eureka St | Keegan Contruction Inc. | conversion of (e) roof to roof deck. infill of 6'x16' area below existing rear yard deck to create larger sun room. new infill and (n) roof deck fall within allowable areaDetails
conversion of (e) roof to roof deck. infill of 6'x16' area below existing rear yard deck to create larger sun room. new infill and (n) roof deck fall within allowable area | $15,000 |
| Oct 30, 2008 | Completed final sign-off Apr 2010 | 1340 Mcallister St | removal & replacement of (e) rear yard egress stairs with new code confirming egress stairs. structural improvements to rear (north) wall of building at new stairs. new stair relocation of exit door & replacement of window at each level in area of new stairsDetails
removal & replacement of (e) rear yard egress stairs with new code confirming egress stairs. structural improvements to rear (north) wall of building at new stairs. new stair relocation of exit door & replacement of window at each level in area of new stairs | $60,000 | |
| Oct 30, 2008 | Completed final sign-off Mar 2010 | 14 28th St | Keegan Contruction Inc. | removal of front entry stairs and replacement with new stairs. new stairs to be in original historical condition. replacement of 3 windows with matching wood windows and lighting improvementsDetails
removal of front entry stairs and replacement with new stairs. new stairs to be in original historical condition. replacement of 3 windows with matching wood windows and lighting improvements | $10,000 |
| Oct 17, 2008 | Expired or cancelled cancelled Jan 2026 | 186 Collins St | leak repair & window replacement. replacement of 8 windows in rear of building with new dual glazed marvinwood windows. 4 windows to be smaller sized, patch and repair siding, flashing as required for leak repairDetails
leak repair & window replacement. replacement of 8 windows in rear of building with new dual glazed marvinwood windows. 4 windows to be smaller sized, patch and repair siding, flashing as required for leak repair | $10,000 | |
| Jul 15, 2008 | Completed final sign-off May 2009 | 1320 Kearny St | dry rot repair to fraiming along 21' of front wall @ 2nd floor. mud sill & around bay window. addition to pa# 2006/12/11/9587.Details
dry rot repair to fraiming along 21' of front wall @ 2nd floor. mud sill & around bay window. addition to pa# 2006/12/11/9587. | $15,000 | |
| Apr 11, 2008 | Completed final sign-off May 2009 | 1320 Kearny St | revision to application 200612119587, removal of 3rd & 4th floor. addition of 2nd bathroom on 2nd floor, addition of bathroom & office into (e) 1st floor garage. new roof deck.Details
revision to application 200612119587, removal of 3rd & 4th floor. addition of 2nd bathroom on 2nd floor, addition of bathroom & office into (e) 1st floor garage. new roof deck. | ||
| Apr 11, 2008 | Completed final sign-off Nov 2008 | 3930 18th St | interior remodel of (e) residence and rear deck addition. interior remodel includes conversion of 2 bathrms on 3rd floor to single bath, removal of partition on 2nd floor dining room, window replacement, new foundation for (e) sunroom. rear deck & stairs. change in occupancy back to single family.Details
interior remodel of (e) residence and rear deck addition. interior remodel includes conversion of 2 bathrms on 3rd floor to single bath, removal of partition on 2nd floor dining room, window replacement, new foundation for (e) sunroom. rear deck & stairs. change in occupancy back to single family. | $70,000 | |
| Jul 1, 2005 | Completed final sign-off Nov 2005 | 3628 Fulton St | kitchen & bathrm remodel k8tchen new appliances, cabinets, lighting & fisxtures, movinb of interiorDetails
kitchen & bathrm remodel k8tchen new appliances, cabinets, lighting & fisxtures, movinb of interior | $29,000 | |
| Jun 16, 2003 | Expired or cancelled expired Apr 2004 | 2206 Pine St | to finish out rooms down started under appl#200212173716, interior finish to (e) storage area,Details
to finish out rooms down started under appl#200212173716, interior finish to (e) storage area, | $20,000 |