Jl Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2016 to Jul 2026
- Last 24 months
- 4 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | Completed final sign-off Aug 2026 | 184 Trumbull St | partial comply w/nov 202539400: removed dry rot on the deck & railing, removed some dry rot off the ballister and install new one (<50%). repaint deck & stairs including railing. the scope of work is only for the stairs. the retaining wall at the north side of the property by others.Details
partial comply w/nov 202539400: removed dry rot on the deck & railing, removed some dry rot off the ballister and install new one (<50%). repaint deck & stairs including railing. the scope of work is only for the stairs. the retaining wall at the north side of the property by others. | $3,882 |
| May 7, 2026 | In progress filed May 2026, not yet issued | 1473 Palou Av | new adu to be added per planing code 207.2.Details
new adu to be added per planing code 207.2. | $30,000 |
| Jun 18, 2025 | Completed final sign-off Aug 2025 | 1908 Fillmore St | comply w/ nov 202538459: legalize one partition wall install w/o permit at g/f. change of use from retail to nail salonDetails
comply w/ nov 202538459: legalize one partition wall install w/o permit at g/f. change of use from retail to nail salon | $20,000 |
| Mar 20, 2025 | Completed final sign-off Feb 2026 | 130 Belgrave Av | remodel of bathroom on 3rd floor removal of 1 window exterior door and installation of 2 (n) windows in bathroom and adajacent bedroom. no changes to bulker massDetails
remodel of bathroom on 3rd floor removal of 1 window exterior door and installation of 2 (n) windows in bathroom and adajacent bedroom. no changes to bulker mass | $23,000 |
| Jul 26, 2024 | Completed final sign-off Sep 2024 | 110 07th Av | replace (1) kitchen cabinets and counter tops, install gfci receptalces, layout to remain the same, like for like replacement. inkindDetails
replace (1) kitchen cabinets and counter tops, install gfci receptalces, layout to remain the same, like for like replacement. inkind | $15,000 |
| Nov 27, 2023 | Completed final sign-off May 2026 | 2850 Vicente St | legalize family room, 2 berdoom, 1 full bath & wetbar. all work on g/f.Details
legalize family room, 2 berdoom, 1 full bath & wetbar. all work on g/f. | $138,000 |
| Jan 19, 2016 | Completed final sign-off May 2016 | 307 Banks St | kitchen remodel - cabinets and countertops, elec. and plumbing. no alteration of wall and door and windows.Details
kitchen remodel - cabinets and countertops, elec. and plumbing. no alteration of wall and door and windows. | $24,400 |