Spectrum Development Co.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Dec 2025
- Last 24 months
- 7 permits filed
108 permits since 2000: 92 completed, 6 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 108.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 56 Encanto Av | remodel the existing building footprint including partial capture of the lower level and interior courtyard for the conditional space, revised floor plans, update to fixtures and finishes, updated lightening & power, structural improvements including new shear walls. exterior work includes revisedDetails
remodel the existing building footprint including partial capture of the lower level and interior courtyard for the conditional space, revised floor plans, update to fixtures and finishes, updated lightening & power, structural improvements including new shear walls. exterior work includes revised | $500,000 |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 8 Keyes Al | kitchen remodel, replacement in kind, no structrual workDetails
kitchen remodel, replacement in kind, no structrual work | $15,000 |
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 81 Rosewood Dr | exterior modifications include new skylight,roof in kind, 2 new windows at rear, 3 new windows in kind at the front, remove garage door, replace with 3 windows to match existing at front, deck expansion on west side. remodel bath storage space 1st fl, kitchen, new stair 1st to 2nd fl, bath/bdrm 3rdDetails
exterior modifications include new skylight,roof in kind, 2 new windows at rear, 3 new windows in kind at the front, remove garage door, replace with 3 windows to match existing at front, deck expansion on west side. remodel bath storage space 1st fl, kitchen, new stair 1st to 2nd fl, bath/bdrm 3rd | $550,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 1921 Lake St | recommencement and completion of work approved approved under pa #202002184716.Details
recommencement and completion of work approved approved under pa #202002184716. | $50,000 |
| Aug 28, 2025 | Completed final sign-off Oct 2025 | 2001 Union St | suite 480 on 4/f: interior tenant improvement work for office suite in previously occupied office.Details
suite 480 on 4/f: interior tenant improvement work for office suite in previously occupied office. | $8,750 |
| Jul 23, 2025 | In progress issued Mar 2026 | 135 Melrose Av | b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bathDetails
b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitchen, remove walls at kitchen area, add 1/2 bath, relocate e) furn, renew w.h. 3/f: remodel e) bath & bed, add 1 bath | $250,000 |
| Nov 4, 2024 | Completed final sign-off Dec 2024 | 15 Schwerin St | demo and replacement in kind of exterior staircase visible from the street.Details
demo and replacement in kind of exterior staircase visible from the street. | $15,000 |
| Sep 27, 2024 | Completed final sign-off Mar 2025 | 123 Melrose Av | basement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yardDetails
basement level - build a deck with stair to the rear yard; ground fl - build a deck of the rear yard | $30,000 |
| May 23, 2024 | Completed final sign-off Mar 2025 | 123 Melrose Av | basement: add a half bath & family room. ground fl: add (n) bedroom, full bath, laundry area & nook room. relocate and replace water heater & furnace. replace street facing window with (n) door. 2nd fl: kitchen & bathroom remodel. remove (e) fireplaceDetails
basement: add a half bath & family room. ground fl: add (n) bedroom, full bath, laundry area & nook room. relocate and replace water heater & furnace. replace street facing window with (n) door. 2nd fl: kitchen & bathroom remodel. remove (e) fireplace | $180,000 |
| Mar 21, 2024 | Completed final sign-off Mar 2025 | 123 Melrose Av | kitchen and bathroom remodel replacement in kind no structural workDetails
kitchen and bathroom remodel replacement in kind no structural work | $25,000 |
| Jan 25, 2024 | Completed final sign-off Apr 2024 | 377 Elsie St | hall bathrooms remodel replacement in kindDetails
hall bathrooms remodel replacement in kind | $11,000 |
| Sep 14, 2023 | Completed final sign-off Jul 2026 | 331 Elsie St | partial foundation replacment to create habitable space/legal bedroom @ heated front of house,gr lvl. minor exterior work to depress entry patio, replace (e)window in-kind to meet egress requirementsDetails
partial foundation replacment to create habitable space/legal bedroom @ heated front of house,gr lvl. minor exterior work to depress entry patio, replace (e)window in-kind to meet egress requirements | $75,000 |
| Jan 13, 2023 | Completed final sign-off Jan 2024 | 226 Coleridge St | interior alterations at first floor, partial foundation retrofit, lower slab, bathroom addition at first floor.Details
interior alterations at first floor, partial foundation retrofit, lower slab, bathroom addition at first floor. | $75,000 |
| Aug 19, 2022 | Completed final sign-off May 2023 | 531 Guerrero St | perform wood repairs, replacement in-kind to rear (6) enclosed sunrooms/porches. repair broken windows. less than 50 %. (n) windows with max u-factor 0.58.Details
perform wood repairs, replacement in-kind to rear (6) enclosed sunrooms/porches. repair broken windows. less than 50 %. (n) windows with max u-factor 0.58. | $35,000 |
| Aug 18, 2022 | Completed final sign-off Jun 2023 | 531 Guerrero St | apt 6 -secure permit to abate complaint #202294516: kitchen/bath remodel, rewiring, new fixtures. no structural work. no walls moved. replacement in kind.Details
apt 6 -secure permit to abate complaint #202294516: kitchen/bath remodel, rewiring, new fixtures. no structural work. no walls moved. replacement in kind. | $40,000 |
| May 10, 2022 | Completed final sign-off Aug 2023 | 1029 Page St | kitchen remodel and bathroom addition. kitchen remodel includes new finishes, fixtures, cabinets in existing layout. replacement of 3 kitchen windows in kind. addition of new bathroom in 3/f closet and sink area.Details
kitchen remodel and bathroom addition. kitchen remodel includes new finishes, fixtures, cabinets in existing layout. replacement of 3 kitchen windows in kind. addition of new bathroom in 3/f closet and sink area. | $50,000 |
| Apr 27, 2022 | Completed final sign-off Feb 2024 | 113 Newman St | convert (e) covered patio at front of property into (n) bathroom and enlarge (e) bedroom. add (n) deck to remodeled bedroomDetails
convert (e) covered patio at front of property into (n) bathroom and enlarge (e) bedroom. add (n) deck to remodeled bedroom | $31,000 |
| Apr 21, 2022 | Completed final sign-off Sep 2022 | 278 Joost Av | conversion of garage/storage to bedroom, bathroom, laundry.Details
conversion of garage/storage to bedroom, bathroom, laundry. | $60,000 |
| Feb 7, 2022 | Completed final sign-off Apr 2022 | 1559 Mckinnon Av | pull abatement permit for complaint # 20056221. remove unpermitted work in garage and rear 20x20 structure.Details
pull abatement permit for complaint # 20056221. remove unpermitted work in garage and rear 20x20 structure. | $5,000 |
| Jan 27, 2022 | Never finaled filed Jan 2022, never issued | 57 Manchester St | to comply with complaint# 202178234. legalize (e) finished storage in basement. no structural work.Details
to comply with complaint# 202178234. legalize (e) finished storage in basement. no structural work. | $2,000 |
| Dec 3, 2021 | Completed final sign-off Jan 2022 | 1442 40th Av | bathroom remodel. replace fixtures in kind. no walls moved new shower pan.Details
bathroom remodel. replace fixtures in kind. no walls moved new shower pan. | $10,000 |
| Aug 10, 2021 | Completed final sign-off Jan 2022 | 165 Germania St | kitchen and 1 bathroom replacement in-kind. no structural workDetails
kitchen and 1 bathroom replacement in-kind. no structural work | $30,000 |
| May 14, 2021 | Completed final sign-off Sep 2021 | 165 Germania St | one kitchen and one bathroom remodel. replacement of cabinets and fixtures in kind. no structural work. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5Details
one kitchen and one bathroom remodel. replacement of cabinets and fixtures in kind. no structural work. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 & (k)5 | $30,000 |
| Apr 16, 2021 | Completed final sign-off Dec 2021 | 366 Hermann St | replacement in kind of kitchen and bathroom cabinets, finishes, appliances, fixtures. no strutural work. no wall alteration.Details
replacement in kind of kitchen and bathroom cabinets, finishes, appliances, fixtures. no strutural work. no wall alteration. | $20,000 |
| Apr 16, 2021 | Completed final sign-off Jun 2021 | 368 Hermann St | unit a: replacement in kind of countertop kitchenDetails
unit a: replacement in kind of countertop kitchen | $2,000 |
| Mar 11, 2021 | Completed final sign-off Oct 2021 | 678 Moscow St | addition of new full bathroom within existing ground floor envelope.Details
addition of new full bathroom within existing ground floor envelope. | $5,000 |
| Dec 2, 2020 | Completed final sign-off Aug 2021 | 378 23rd Av | bathroom remodel. fixtures will be replacement in-kind. no structural work.Details
bathroom remodel. fixtures will be replacement in-kind. no structural work. | $10,000 |
| Oct 2, 2020 | Completed final sign-off Apr 2021 | 679 Athens St | new openings at rear facade and south facade. removeal ofopening at front facade, interior remodel including rebuilding of internal stair, kitchen remodel, relocation of bathroom and addition of full bathroom.Details
new openings at rear facade and south facade. removeal ofopening at front facade, interior remodel including rebuilding of internal stair, kitchen remodel, relocation of bathroom and addition of full bathroom. | $89,500 |
| Sep 8, 2020 | In progress issued Dec 2023 | 3323 26th St | addition of 2 adu to (e) 2 unit building per oridinance 162-16. total of 4 units. 2 (n) adu located within (e) building envelope at the basement level.Details
addition of 2 adu to (e) 2 unit building per oridinance 162-16. total of 4 units. 2 (n) adu located within (e) building envelope at the basement level. | $115,000 |
| May 28, 2020 | Completed final sign-off Mar 2021 | 679 Athens St | dryrot repair at front stair framing. replacement in kind.Details
dryrot repair at front stair framing. replacement in kind. | $10,000 |
| Feb 24, 2020 | In progress issued Sep 2024 | 1921 Lake St | addition of one (1) accessory dwelling unit per ordinance 162-16 to an existing four (4) unit bldg for total of five(5) units. the one(1) proposed dwelling unit is located within the existing bldg envelope at the 1st fl. ref# 2020-0218-4716 for ab-094 seismic retrofit.Details
addition of one (1) accessory dwelling unit per ordinance 162-16 to an existing four (4) unit bldg for total of five(5) units. the one(1) proposed dwelling unit is located within the existing bldg envelope at the 1st fl. ref# 2020-0218-4716 for ab-094 seismic retrofit. | $77,200 |
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 2071 28th Av | remodel bathroom: fixtures replce in-kind. new tub,shower pan, lavaotry, toilet. no structural work.Details
remodel bathroom: fixtures replce in-kind. new tub,shower pan, lavaotry, toilet. no structural work. | $12,000 |
| Jan 23, 2020 | Completed final sign-off Apr 2020 | 260 Coleridge St | kitchen (120 sq ft) and bathroom (36 dq ft) remodel in kind. no structural workDetails
kitchen (120 sq ft) and bathroom (36 dq ft) remodel in kind. no structural work | $20,000 |
| Dec 17, 2019 | Completed final sign-off Apr 2022 | 36 Kronquist Ct | alterations to existing split level house. conversion of open air main entrance to conditioned interior space. new master suite, remodel of kitchen & bathroom. new conditioned 751 sq ft. no changes to be made to front facadeDetails
alterations to existing split level house. conversion of open air main entrance to conditioned interior space. new master suite, remodel of kitchen & bathroom. new conditioned 751 sq ft. no changes to be made to front facade | $65,000 |
| Oct 8, 2019 | Completed final sign-off May 2020 | 3323 26th St | same layout on 2nd fl - remove and replace kitchen and bath in kind to includes appliances, fixtures, cabinets and counters, tile. no structural workDetails
same layout on 2nd fl - remove and replace kitchen and bath in kind to includes appliances, fixtures, cabinets and counters, tile. no structural work | $30,000 |
| Jul 16, 2019 | Completed final sign-off Sep 2019 | 371 Elsie St | replace (e) balcony with new roof, replace sliding door with new window (max u-factor 0.32), adjust closet doors in bedroom.Details
replace (e) balcony with new roof, replace sliding door with new window (max u-factor 0.32), adjust closet doors in bedroom. | $5,000 |
| Jul 1, 2019 | Completed final sign-off Oct 2019 | 654 Athens St | remove and replace in kind kitchen cabinets and bathroom fixtures no structural work to be done.Details
remove and replace in kind kitchen cabinets and bathroom fixtures no structural work to be done. | $30,000 |
| Jun 19, 2019 | Completed final sign-off Feb 2020 | 91 Winfield St | new family room, laundry and bathroom at 1st floor.Details
new family room, laundry and bathroom at 1st floor. | $75,000 |
| May 28, 2019 | Completed final sign-off Sep 2019 | 271 Waller St | to obtain final inspection for work approved under pa 201605107070. all work is complete.Details
to obtain final inspection for work approved under pa 201605107070. all work is complete. | |
| Feb 20, 2019 | Completed final sign-off Apr 2019 | 231 Coleridge St | to comply w/physical inspection report #cc-8328Details
to comply w/physical inspection report #cc-8328 | $6,000 |
| Dec 17, 2018 | Completed final sign-off Feb 2021 | 1200 Rhode Island St | unit 3: bathroom remodel. replacement of fixtures in kind. no structural work (no change of existing floor plan).Details
unit 3: bathroom remodel. replacement of fixtures in kind. no structural work (no change of existing floor plan). | $12,000 |
| Dec 12, 2018 | Completed final sign-off Mar 2019 | 139 Skyview Wy | revision to bldg permit #201802161532. removal of ducting and forced air system. radiant heat system installed under pw20180726437Details
revision to bldg permit #201802161532. removal of ducting and forced air system. radiant heat system installed under pw20180726437 | $10,000 |
| Jun 21, 2018 | Expired or cancelled cancelled Jan 2026 | 234 Connecticut St | build deck on rear of houseDetails
build deck on rear of house | $3,000 |
| Jun 19, 2018 | Completed final sign-off Dec 2018 | 371 Elsie St | top floor - remodel guest bath, add master bath, add skylightDetails
top floor - remodel guest bath, add master bath, add skylight | $60,000 |
| Jun 12, 2018 | Completed final sign-off Jul 2023 | 3245 Clay St | repurpose (e) rear storage area @ ground flr for (3) new adu dwelling units; provide (n) bike parking; fire sprinklers @ ground flr under separate permit. adu per ordinance 162-16.Details
repurpose (e) rear storage area @ ground flr for (3) new adu dwelling units; provide (n) bike parking; fire sprinklers @ ground flr under separate permit. adu per ordinance 162-16. | $120,000 |
| May 30, 2018 | Completed final sign-off Jan 2020 | 266 Coleridge St | add one adu (825 sqft) to an (e) (4) unit building in bernal heights per ordinance #162-16 & fs-05.Details
add one adu (825 sqft) to an (e) (4) unit building in bernal heights per ordinance #162-16 & fs-05. | $50,000 |
| Apr 24, 2018 | Expired or cancelled cancelled Jan 2026 | 371 Elsie St | reconfigure of 3rd flr bathroom & master bedroom closet. addition of new master bath with 2 skylights 5' off of property line, addition of collor ties at master bedroom rafters. new tile and bathrrom fixturesDetails
reconfigure of 3rd flr bathroom & master bedroom closet. addition of new master bath with 2 skylights 5' off of property line, addition of collor ties at master bedroom rafters. new tile and bathrrom fixtures | $65,000 |
| Mar 26, 2018 | Completed final sign-off Jun 2018 | 260 Coleridge St | unit #264: rewire apartment. bathroom remodel. new fixtures and new appliances in kitchen. replacement in kind. no structural workDetails
unit #264: rewire apartment. bathroom remodel. new fixtures and new appliances in kitchen. replacement in kind. no structural work | $15,000 |
| Feb 16, 2018 | Completed final sign-off Mar 2019 | 139 Skyview Wy | renovation of single family dwelling. upper level remodel kitchen and bath. small improvements to family room and bedrooms. new stairs to renovated lower level with new master suite, bath, bedroom, family room. window at front will be wood or aluminum exterior cladding.Details
renovation of single family dwelling. upper level remodel kitchen and bath. small improvements to family room and bedrooms. new stairs to renovated lower level with new master suite, bath, bedroom, family room. window at front will be wood or aluminum exterior cladding. | $150,000 |
| Feb 9, 2018 | Completed final sign-off Jun 2018 | 369 Bocana St | kitchen remodel. replace cabinets and counter top. bring kitchen electrical up to code. appliances to remain in existing locations. no structural work.Details
kitchen remodel. replace cabinets and counter top. bring kitchen electrical up to code. appliances to remain in existing locations. no structural work. | $16,000 |
| Sep 7, 2017 | Completed final sign-off Sep 2017 | 271 Waller St | per nov #201569421, itms #2 and #5, install new 4x6 presuure-treated post with concrete base, fire-rated post.Details
per nov #201569421, itms #2 and #5, install new 4x6 presuure-treated post with concrete base, fire-rated post. | |
| Jul 25, 2017 | Completed final sign-off Sep 2017 | 359 Church St | to comply with physical inspection report #cc-8168.Details
to comply with physical inspection report #cc-8168. | $8,000 |
| Feb 3, 2017 | Completed final sign-off May 2017 | 6 Keyes Al | kitchen remodel -relocate sink & stove. new appliances, cabinets, and countertops. no structural work. rewire apartment to code.Details
kitchen remodel -relocate sink & stove. new appliances, cabinets, and countertops. no structural work. rewire apartment to code. | $15,000 |
| Jan 23, 2017 | Completed final sign-off Sep 2019 | 271 Waller St | revision for permit #201605107070 which was not previously review by sffd. no work under this permit per cbc 1021.1. qualifies for a single exit travel destance is less than 125' first floor sprinklered per nfpa13r (garage to nfpa 13, oh), added area of safe dispersal at >50' for emergency egress.Details
revision for permit #201605107070 which was not previously review by sffd. no work under this permit per cbc 1021.1. qualifies for a single exit travel destance is less than 125' first floor sprinklered per nfpa13r (garage to nfpa 13, oh), added area of safe dispersal at >50' for emergency egress. | |
| Jan 17, 2017 | Completed final sign-off Aug 2018 | 109 Quintara St | interior renovation to include an addition of 19 conditioned sf at foyer and 10 sf balcony within bkd footprint, cosemtic remodel to front facade and entry portico. additional of (n) skylight over master bath.Details
interior renovation to include an addition of 19 conditioned sf at foyer and 10 sf balcony within bkd footprint, cosemtic remodel to front facade and entry portico. additional of (n) skylight over master bath. | $100,000 |
| Jan 10, 2017 | Completed final sign-off Apr 2019 | 229 Coleridge St | 80 square feet fillin under extg non conforming projection. excavate approx 40 cubic feet for new 8'-0" ceiling height. rebuild extg front stair in front yard as permitted obstruction. add additional dwelling unit.Details
80 square feet fillin under extg non conforming projection. excavate approx 40 cubic feet for new 8'-0" ceiling height. rebuild extg front stair in front yard as permitted obstruction. add additional dwelling unit. | $65,000 |
| Jan 4, 2017 | Completed final sign-off Apr 2017 | 57 Manchester St | unit #c: demo kitchen and bath and replace in kind. no structural work.Details
unit #c: demo kitchen and bath and replace in kind. no structural work. | $40,000 |
| Oct 6, 2016 | Completed final sign-off Aug 2018 | 109 Quintara St | new 400 sq ft roof deck & exterior wood stair on the south elevation.Details
new 400 sq ft roof deck & exterior wood stair on the south elevation. | $25,000 |
| Sep 14, 2016 | Completed final sign-off Dec 2017 | 404 Crescent Av | interior renovation of garage, 1st floor, and second floor within extg footprint of bldg. reconfigure 1st floor kitchen, family room and bathroom. 2nd fl: renovation add a bathrooms & reconfigure of master suite. replacing windows and adding rear windows and skylights to exterior.Details
interior renovation of garage, 1st floor, and second floor within extg footprint of bldg. reconfigure 1st floor kitchen, family room and bathroom. 2nd fl: renovation add a bathrooms & reconfigure of master suite. replacing windows and adding rear windows and skylights to exterior. | $180,000 |
| Jun 17, 2016 | Completed final sign-off Jan 2017 | 3617 19th St | remodel kitchen, bathrooms, laundry room, and bedrooms. add additional skylights (flat roof).Details
remodel kitchen, bathrooms, laundry room, and bedrooms. add additional skylights (flat roof). | $50,000 |
| May 10, 2016 | Completed final sign-off Sep 2019 | 271 Waller St | addition of (n) dwelling unit at rear of (e) ground floor garage. scope does not include any structural work or window modificationsDetails
addition of (n) dwelling unit at rear of (e) ground floor garage. scope does not include any structural work or window modifications | $60,000 |
| Apr 7, 2016 | Completed final sign-off Jan 2019 | 271 Waller St | revision to app#201412163804. changes are all structural.Details
revision to app#201412163804. changes are all structural. | $10,000 |
| Jan 25, 2016 | Completed final sign-off Apr 2016 | 3704 Folsom St | to obtain a final inspection for work approved under pa#201308225046 for value of remaining work.Details
to obtain a final inspection for work approved under pa#201308225046 for value of remaining work. | $25,000 |
| Dec 2, 2015 | Completed final sign-off Sep 2016 | 1895 Pacific Av | unit #102 - interior renovation the (e) bathroom, add an additional bathroom, relocate kitchen to (e) dining room, open a non-load bearing wall, & converting (e) kitchen into a bedroom, apartment footprint, fenestration & sq ft will not changes. n/a maher ordinanceDetails
unit #102 - interior renovation the (e) bathroom, add an additional bathroom, relocate kitchen to (e) dining room, open a non-load bearing wall, & converting (e) kitchen into a bedroom, apartment footprint, fenestration & sq ft will not changes. n/a maher ordinance | $75,000 |
| Apr 9, 2015 | Completed final sign-off Jun 2015 | 403 Main St | kitchen remodel, replacement in kind. no structural work, new cabinets, counters, appliances, fixtures. n/a ordinance #155-13Details
kitchen remodel, replacement in kind. no structural work, new cabinets, counters, appliances, fixtures. n/a ordinance #155-13 | $9,000 |
| Mar 16, 2015 | Completed final sign-off Jul 2015 | 301 Winfield St | master bathroom remodel in kind. new tub, stall shower, vanity, toilet, lighting, exhaust fan. no structural work.Details
master bathroom remodel in kind. new tub, stall shower, vanity, toilet, lighting, exhaust fan. no structural work. | $15,000 |
| Jan 27, 2015 | Completed final sign-off Jun 2016 | 1029 Page St | to legalize & improve (e)apartment on ground floor of (e)residence, improved apartment to provide 2 br,2bath,&laundry.modifications incl: fnd replacement & 1' of excavation,elec & plmbg upgrades,hvac,& strctl strengthening.alter include (n)windows & doors in grnd level apt.removal of brick fireplaceDetails
to legalize & improve (e)apartment on ground floor of (e)residence, improved apartment to provide 2 br,2bath,&laundry.modifications incl: fnd replacement & 1' of excavation,elec & plmbg upgrades,hvac,& strctl strengthening.alter include (n)windows & doors in grnd level apt.removal of brick fireplace | $140,000 |
| Dec 16, 2014 | Completed final sign-off Jan 2019 | 271 Waller St | convert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage.Details
convert (e) basement storage to 2 car garage. scope includes infill of lightwells in basement; rebuilding ext.stairs to code in center of bldg; (n) foundation work & modifications to plumbing & electrical in (n) garage. | $50,000 |
| Oct 14, 2014 | Completed final sign-off Jun 2015 | 354 Hearst Av | interior renovation of house including replacement of windows, roof sheathing, new furnace, remodel kitchen and bathrooms and adding 3 skylightsDetails
interior renovation of house including replacement of windows, roof sheathing, new furnace, remodel kitchen and bathrooms and adding 3 skylights | $195,000 |
| Aug 21, 2014 | Completed final sign-off Oct 2014 | 57 Manchester St | revision to permit applicatioh #201406279705 to clarify work on upstairs unit is 57 manchester apt. # a & b. add kitchen and bathroom remodel in-kind, no structural work and no existing wall relocaton to lower unit a & b. also change the water heaters in apt. a & b for tankness water heatersDetails
revision to permit applicatioh #201406279705 to clarify work on upstairs unit is 57 manchester apt. # a & b. add kitchen and bathroom remodel in-kind, no structural work and no existing wall relocaton to lower unit a & b. also change the water heaters in apt. a & b for tankness water heaters | $20,000 |
| Jul 10, 2014 | Completed final sign-off Oct 2015 | 1745 16th Av | replace extg front window with new 4'x4' double pane window u=0.40Details
replace extg front window with new 4'x4' double pane window u=0.40 | $500 |
| Jul 8, 2014 | Completed final sign-off Jan 2015 | 3380 20th St | # 102: change use from an office to a new accupuncture office. t.i. to reconfigure existing space with non-load bearing partitions. no structural work included. maher n/a.Details
# 102: change use from an office to a new accupuncture office. t.i. to reconfigure existing space with non-load bearing partitions. no structural work included. maher n/a. | $39,500 |
| Jul 8, 2014 | Completed final sign-off Oct 2015 | 1745 16th Av | add a family room, storage & full bath at the side of (e) ground floor (garage area).Details
add a family room, storage & full bath at the side of (e) ground floor (garage area). | $7,000 |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 57 Manchester St | volunteer foundation retrofit in basement. interior alterations on 2nd fl east unit. no change to exterior or living area boundries. kitchen remodelDetails
volunteer foundation retrofit in basement. interior alterations on 2nd fl east unit. no change to exterior or living area boundries. kitchen remodel | $60,000 |
| Jun 13, 2014 | Completed final sign-off Jul 2015 | 1783 San Jose Av | convert rear of garage to living space with a new bathroom, 1 bedroom, laundry room and family room. repair dryrot at existing interior stairs. install new furnace and duct work. install new on-demand water heater. total new habitable space=474 square feet.Details
convert rear of garage to living space with a new bathroom, 1 bedroom, laundry room and family room. repair dryrot at existing interior stairs. install new furnace and duct work. install new on-demand water heater. total new habitable space=474 square feet. | $65,000 |
| Feb 20, 2014 | Never finaled issued Feb 2014, no final | 168 Andover St | revision to appl #2014.02.06.7967Details
revision to appl #2014.02.06.7967 | $20,000 |
| Oct 24, 2013 | Completed final sign-off Feb 2014 | 1330 Kirkham St | remodel kitchen and bath in upstairs unit and lower unit. both kitchen and bathrooms will be replacement in kind. no structural work.Details
remodel kitchen and bath in upstairs unit and lower unit. both kitchen and bathrooms will be replacement in kind. no structural work. | $30,000 |
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 234 Connecticut St | address pest report #53467, #5a-remove sheet metal pan & stucco as needed. repair framing at entry columns & archway. re-stucco, lath to match (e). re-install architectural detailsDetails
address pest report #53467, #5a-remove sheet metal pan & stucco as needed. repair framing at entry columns & archway. re-stucco, lath to match (e). re-install architectural details | $6,000 |
| Aug 22, 2013 | Expired or cancelled expired Apr 2016 | 3704 Folsom St | deck replacement, interior remodel to bring building up to compliance. reference permit # 2013-0731-3257 for abatement of first floor per nov # 201389241Details
deck replacement, interior remodel to bring building up to compliance. reference permit # 2013-0731-3257 for abatement of first floor per nov # 201389241 | $5,000 |
| Jul 11, 2013 | Completed final sign-off Jul 2014 | 79 Inverness Dr | add 1 bedroom, 1 family room & 1 bathroom at ground floorDetails
add 1 bedroom, 1 family room & 1 bathroom at ground floor | $20,000 |
| Jun 26, 2013 | Completed final sign-off Oct 2013 | 148 Prospect Av | upgrades to existing rear deck, less than 50% repair in kind. siding on south side lightwell.Details
upgrades to existing rear deck, less than 50% repair in kind. siding on south side lightwell. | $25,000 |
| Feb 15, 2013 | Completed final sign-off Apr 2013 | 134 Hearst Av | add new bathroom at existing pantry located on second floor. add toilet, shower, lavy sink, new lighting circuit, exhaust fan, new tempered window to replace existing window. window with u-factor not to exceed 0.40.Details
add new bathroom at existing pantry located on second floor. add toilet, shower, lavy sink, new lighting circuit, exhaust fan, new tempered window to replace existing window. window with u-factor not to exceed 0.40. | $8,000 |
| Apr 6, 2012 | Completed final sign-off Jun 2012 | 1834 Fell St | remodel kitchen, new cabinets, appliances, counters. insulate and sheet rock adjacent to kitchen. install tankless water heater. perform electrical, mechancial, plumbing work as required. demo hall bathroom with stall shower. install new shower pan and walls(hall). (e) kitchen hood to remain, (e)Details
remodel kitchen, new cabinets, appliances, counters. insulate and sheet rock adjacent to kitchen. install tankless water heater. perform electrical, mechancial, plumbing work as required. demo hall bathroom with stall shower. install new shower pan and walls(hall). (e) kitchen hood to remain, (e) | $40,000 |
| Jan 19, 2012 | Completed final sign-off May 2012 | 331 Elsie St | revision to pa# 2011-1025-7560-excavation of (e) backyard & addition of concrete retaining walls at property line (north side).Details
revision to pa# 2011-1025-7560-excavation of (e) backyard & addition of concrete retaining walls at property line (north side). | $3,000 |
| Oct 25, 2011 | Completed final sign-off May 2012 | 331 Elsie St | full remodel to remain within (e) building envelope. electrical, plumbing, window upgrades. kitchen relocation & remodel. excavation at bottom floor to provide clearence for a new bedroom suite.Details
full remodel to remain within (e) building envelope. electrical, plumbing, window upgrades. kitchen relocation & remodel. excavation at bottom floor to provide clearence for a new bedroom suite. | $150,000 |
| Jul 6, 2011 | Completed final sign-off Sep 2011 | 1832 Fell St | unit #1836-remodel kitchen, install new cabinets, appliances. insulate & sheetrock (e) laundry area adjacent to kitchen. move stove to new location, replace water heater with tankless unit. add additional electrical as needed. no structural work. water heater in laundry roomDetails
unit #1836-remodel kitchen, install new cabinets, appliances. insulate & sheetrock (e) laundry area adjacent to kitchen. move stove to new location, replace water heater with tankless unit. add additional electrical as needed. no structural work. water heater in laundry room | $27,500 |
| Jul 1, 2011 | Completed final sign-off Apr 2012 | 124 Chilton Av | revision to delta #7 to approved plans2008-0701-5706 relocate fire place to the master bedroom add fire place the media room add 2/2/ operable skylight to master bedroom & bedroom #3 add beams 3fb-8 and 3-fb9 to the 3rd floor framing substitue steel w8x40 beam 3fb-6 with engineered wood beam.Details
revision to delta #7 to approved plans2008-0701-5706 relocate fire place to the master bedroom add fire place the media room add 2/2/ operable skylight to master bedroom & bedroom #3 add beams 3fb-8 and 3-fb9 to the 3rd floor framing substitue steel w8x40 beam 3fb-6 with engineered wood beam. | |
| Jun 14, 2011 | Completed final sign-off Nov 2011 | 234 Connecticut St | kitchen remodel. remove interior walls. relocate stairs to ground floor. add bath on ground floor. retile extg bath.Details
kitchen remodel. remove interior walls. relocate stairs to ground floor. add bath on ground floor. retile extg bath. | $78,000 |
| May 19, 2011 | Completed final sign-off Aug 2011 | 3102 25th St | to comply with physical inspection #cc5990 report.Details
to comply with physical inspection #cc5990 report. | $4,000 |
| May 19, 2011 | Completed final sign-off Oct 2012 | 2790 19th Av | kitchen & bath remodel; appliances & fixtures in-kind, no gas appliances.Details
kitchen & bath remodel; appliances & fixtures in-kind, no gas appliances. | $30,000 |
| Feb 28, 2011 | Completed final sign-off May 2011 | 159 Delmar St | front entrance stair repair/in-kind replacement per paln.Details
front entrance stair repair/in-kind replacement per paln. | $7,500 |
| Nov 18, 2010 | Completed final sign-off Jan 2011 | 1832 Fell St | remodel 2 bathrooms, convert (e) powder room to full bath. work on 1832 fell st.Details
remodel 2 bathrooms, convert (e) powder room to full bath. work on 1832 fell st. | $12,000 |
| Oct 12, 2010 | Completed final sign-off Dec 2010 | 30 Malta Dr | bathroom remodel, all fixtures replaced in place in kind.Details
bathroom remodel, all fixtures replaced in place in kind. | $10,000 |
| Jul 7, 2010 | Completed final sign-off Jul 2010 | 6 Keyes Al | comply with nov remove roof deck at rear of propertyDetails
comply with nov remove roof deck at rear of property | $3,000 |
| Apr 22, 2010 | Completed final sign-off Mar 2011 | 237 05th Av | revision to application 200909086341. on 1st floor unit 1 delete powder room, rearange bathroom fixtures, provide furring to ducts and flue in 2nd floor unit 3.Details
revision to application 200909086341. on 1st floor unit 1 delete powder room, rearange bathroom fixtures, provide furring to ducts and flue in 2nd floor unit 3. | |
| Mar 10, 2010 | Completed final sign-off May 2010 | 300 Ortega St | full interior renovation of (e) kitchen, work to include new fuxtures, finishes, plumbing and electrical, new skylight to replace (e) damaged skylightDetails
full interior renovation of (e) kitchen, work to include new fuxtures, finishes, plumbing and electrical, new skylight to replace (e) damaged skylight | $60,000 |
| Feb 1, 2010 | Completed final sign-off Dec 2010 | 333 Elsie St | to obtain final inspection for work approved under pa #200801303542, all work is completed.Details
to obtain final inspection for work approved under pa #200801303542, all work is completed. | |
| Oct 9, 2009 | Completed final sign-off Apr 2010 | 2411 Webster St | revision to pa# 2009.06.30.1727. kitch/bath remodel of apt#9. bathrm remodel apt#10, kitch. remodel apt#15. 5/8" sheet rock at exposed framing in front stairwell in apts# 1,5,9,10. elec. work in #1,5,9,10. plb/mech in #5,9,10.Details
revision to pa# 2009.06.30.1727. kitch/bath remodel of apt#9. bathrm remodel apt#10, kitch. remodel apt#15. 5/8" sheet rock at exposed framing in front stairwell in apts# 1,5,9,10. elec. work in #1,5,9,10. plb/mech in #5,9,10. | $60,000 |
| Sep 15, 2009 | Completed final sign-off Apr 2010 | 3106 25th St | windows alterations in south and west walls on third floor of buildingDetails
windows alterations in south and west walls on third floor of building | $5,000 |
| Aug 31, 2009 | Completed final sign-off Nov 2009 | 2411 Webster St | reroofingDetails
reroofing | $10,000 |