Alexander Sivyer
- Listed as
- architect, authorized agent-others, designer, engineer, lessee
- Firm
- Holmes Structures
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Mar 2026
23 permits since 2000 (engineer on 18 permits, architect on 2 permits, authorized agent-others on 1 permit, designer on 1 permit, lessee on 1 permit): 18 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2026 | In progress issued Mar 2026 | 685 07th St | Rainbow Waterproofing & Restor | structural concrete repair of an existing loading dock. steel rebar and concrete replacement in an isolated area of damage as directed by holmes engineeringDetails
structural concrete repair of an existing loading dock. steel rebar and concrete replacement in an isolated area of damage as directed by holmes engineering | $20,700 |
| Sep 19, 2018 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | core & shell renovation. work includes improvements to vertical circulation. hvac & plumbing systems. accessibility upgrades, localized window replacement / repair & localized facade repair. ** maher: n/a **Details
core & shell renovation. work includes improvements to vertical circulation. hvac & plumbing systems. accessibility upgrades, localized window replacement / repair & localized facade repair. ** maher: n/a ** | $5,000,000 |
| Sep 19, 2018 | Completed final sign-off May 2021 | 1800 Mission St | Plant Construction Co, Lp | voluntary seismic retrofit of administration wing. work include new concrete shear walls, associated foundation & localized strengthening. ** maher: n/a **Details
voluntary seismic retrofit of administration wing. work include new concrete shear walls, associated foundation & localized strengthening. ** maher: n/a ** | $9,000,000 |
| Aug 7, 2018 | Completed final sign-off May 2019 | 1146 Florida St | 5 Elements Design | build 10' fence in rear yard; footing excavations not to exceed 5'; pre plans.Details
build 10' fence in rear yard; footing excavations not to exceed 5'; pre plans. | $5,000 |
| Sep 5, 2017 | Completed final sign-off Jun 2018 | 2007 Franklin St | Oliver & Company Inc. | addition of fire escape at rear of property. maher n/a.Details
addition of fire escape at rear of property. maher n/a. | $17,000 |
| Jul 20, 2017 | Completed final sign-off Jul 2018 | 2007 Franklin St | Oliver & Company Inc. | revision to pa#2010-1221-7130, related to elevation 2/a3.2 - to provide additional details for stair at rear of property. n/a ordinance #155-13Details
revision to pa#2010-1221-7130, related to elevation 2/a3.2 - to provide additional details for stair at rear of property. n/a ordinance #155-13 | |
| Sep 11, 2015 | Completed final sign-off Dec 2016 | 3000 16th St | C C I Commercial Construction & Improv | revision to pa 2015 0806 3475; 2015-0402-2593 and 201504022593 - structural workDetails
revision to pa 2015 0806 3475; 2015-0402-2593 and 201504022593 - structural work | $20,000 |
| May 20, 2014 | Expired or cancelled cancelled Jan 2026 | 155 05th St | 6th floor ceiling - (e) steel beam to be temporarily supported by (n) steel beam prior to demo of slab for (n) stair opening. new stair under this permi. new opening under separate permit. n/a maher ordinance 155-13Details
6th floor ceiling - (e) steel beam to be temporarily supported by (n) steel beam prior to demo of slab for (n) stair opening. new stair under this permi. new opening under separate permit. n/a maher ordinance 155-13 | $10,000 | |
| Nov 20, 2013 | Completed final sign-off Nov 2017 | 923 Folsom St | Cahill Contractors Inc | to erect 9 stories, 1 basement, 115 residential units, commercial & parking.Details
to erect 9 stories, 1 basement, 115 residential units, commercial & parking. | $35,000,000 |
| Oct 24, 2013 | Completed final sign-off Jul 2015 | 474 Castro St | Gci, Inc | renovation of existing build to demo interior finishes & non-structural partition. demolition of existing stairway & store front. full seismic upgrade. new partition, staircase, restoring store front. mep & fire protection on separate permit.Details
renovation of existing build to demo interior finishes & non-structural partition. demolition of existing stairway & store front. full seismic upgrade. new partition, staircase, restoring store front. mep & fire protection on separate permit. | $3,950,032 |
| Aug 1, 2013 | Completed final sign-off Feb 2014 | 235 Montgomery St | Bcci Construction Company | 12th floor-t.i office remodel-open office space-new conference room, staff kitchenette & plotter layout room. t.i include construction of new walls, ceilings, doors, finshes, plumbing, venting, lighting, custom millwork, caseworkDetails
12th floor-t.i office remodel-open office space-new conference room, staff kitchenette & plotter layout room. t.i include construction of new walls, ceilings, doors, finshes, plumbing, venting, lighting, custom millwork, casework | $350,000 |
| May 2, 2013 | Completed final sign-off Jan 2014 | 140 New Montgomery St | Plant Construction Company Lp | revision to pa# 2011/10/17/6931. strengthening of structural steel floors 26 to penthouse.Details
revision to pa# 2011/10/17/6931. strengthening of structural steel floors 26 to penthouse. | $75,000 |
| Apr 26, 2013 | Completed final sign-off Jan 2016 | 340 Bryant St | Charles Pankow Builders Ltd, Construction Studios, Inc | interior/core rehab of (e) & accessibility element, including: new elevator, two exit stairs, improved lobby & stair, new accessible restrooms. mep, sprinklers under separate permits.Details
interior/core rehab of (e) & accessibility element, including: new elevator, two exit stairs, improved lobby & stair, new accessible restrooms. mep, sprinklers under separate permits. | $500,000 |
| Apr 17, 2013 | Completed final sign-off Apr 2014 | 2055 Union St | Fisher Development Inc | 3 new skylights (cable). new windows @ 4th floor. fire & smoke sutters @ stairs. future t.i mechanical openings coordate with structural system. fire & smoke shutter @ 3rd floor lightwell.Details
3 new skylights (cable). new windows @ 4th floor. fire & smoke sutters @ stairs. future t.i mechanical openings coordate with structural system. fire & smoke shutter @ 3rd floor lightwell. | $50,000 |
| Oct 16, 2012 | Completed final sign-off Aug 2016 | 650 07th St | Swinerton Builders | tenant improvement on 1st fl consisting of new partitions, glazing, doors, telcom, av structural support framing for non load bearing partitions. mep, sprinklers, fire alarm on seperate permit.Details
tenant improvement on 1st fl consisting of new partitions, glazing, doors, telcom, av structural support framing for non load bearing partitions. mep, sprinklers, fire alarm on seperate permit. | $797,531 |
| Aug 1, 2012 | Completed final sign-off Jun 2014 | 2055 Union St | Fisher Development Inc | demolition under seperate permit pa# 201212186484. new seismic core & shell retrofit to include new columns, floor & (e) roof reinforecement. (n) foundation & demising walls at ground floor. ((n) elevator/stair & storefront. ab-017Details
demolition under seperate permit pa# 201212186484. new seismic core & shell retrofit to include new columns, floor & (e) roof reinforecement. (n) foundation & demising walls at ground floor. ((n) elevator/stair & storefront. ab-017 | $2,500,000 |
| Aug 1, 2012 | Completed final sign-off Jun 2015 | 500 Sansome St | Centric Construction Inc | all floors: barrier removal & replacement of elevator. 3rd-8th floors: phase 2 of a 2 phase voluntary seismic strengthening. phase 1 pa# 2011/11/16/9069.Details
all floors: barrier removal & replacement of elevator. 3rd-8th floors: phase 2 of a 2 phase voluntary seismic strengthening. phase 1 pa# 2011/11/16/9069. | $2,000,000 |
| Nov 16, 2011 | Completed final sign-off Aug 2014 | 500 Sansome St | Centric Construction Inc | voluntary seismic strengthening in basement, 1st, mezz, and 2nd floor in accordance with ch 16 & 34 of the 2010 sfbc & elevator e02 upgrade replacement w/ new elevator & controls. also enlarge 2 hr elevator shaft. assessibility compliance exempt per sfbc ab-o17 for vacant bldg. at these floors.Details
voluntary seismic strengthening in basement, 1st, mezz, and 2nd floor in accordance with ch 16 & 34 of the 2010 sfbc & elevator e02 upgrade replacement w/ new elevator & controls. also enlarge 2 hr elevator shaft. assessibility compliance exempt per sfbc ab-o17 for vacant bldg. at these floors. | $500,000 |
| Jul 12, 2011 | Completed final sign-off Feb 2013 | 33 03rd St | Cahill Contractors Inc | repair corroded post tensioning cables and strengthen a portion of concrete slab with carbon fiber reinforced polymers.Details
repair corroded post tensioning cables and strengthen a portion of concrete slab with carbon fiber reinforced polymers. | $10,000 |
| Jan 23, 2009 | Never finaled issued Jan 2009, no final | 800 Market St | reduce 2 column sections (cladding) at east entrance on ground floor retail space. interior work onlyDetails
reduce 2 column sections (cladding) at east entrance on ground floor retail space. interior work only | $5,000 | |
| Sep 28, 2006 | Expired or cancelled expired Jan 2008 | 3150 18th St | revision to pa# 2004/05/21/4487 / s1/r1 - foundation to podium slab as per plans.Details
revision to pa# 2004/05/21/4487 / s1/r1 - foundation to podium slab as per plans. | ||
| Aug 12, 2005 | Completed final sign-off Jan 2006 | 355 Roosevelt Wy | rev.appl#200506134912,relocate proposed bathroom,swap out location from previous proposed storageDetails
rev.appl#200506134912,relocate proposed bathroom,swap out location from previous proposed storage | ||
| Dec 26, 2000 | Expired or cancelled expired Jan 2002 | 2498 Broadway | upgrade existing foundation walls, connections reinforcement footings & retaining walls at grnd leveDetails
upgrade existing foundation walls, connections reinforcement footings & retaining walls at grnd leve | $25,000 |